1
1-50
問題一覧
1
0.75 to 1.20 Mach
2
Jet Stream
3
so that no part of the aircraft extends beyond the hold line.
4
another control seat is occupied by a safety pilot who appropriately rated.
5
changes as required by Airworthiness Directives
6
D. B and C are correct
7
31.00
8
Outflow valve.
9
operator or owner of the aircraft
10
C. Command
11
1,500 feet AGL.
12
arrival at the DH on the glide slope.
13
its use is not permitted
14
additional action by the operator to set the course.
15
Sea level.
16
yellow in color and the dashed lines are nearest the runway.
17
D. B and C are both correct.
18
True altitude is lower than 31,000 feet.
19
SPECI
20
D. B and C are correct
21
Semi-Monocoque Type
22
12 hours during any 24 consecutive hours
23
Impulsivity
24
the beginning of rain at the earth's surface indicates the mature stage of the thunderstorm
25
3 miles visibility; 1000 feet above and 500 feet below
26
D. All of the above
27
not execute the procedure turn unless specifically cleared to do so by ATC.
28
Controlled flight maneuver
29
Reserve Fuel
30
varies for different headings of the same aircraft
31
the circulation of lubricating oil
32
C. 31st at 0500
33
B. From the 01st 1PM to 2nd at 8AM
34
70 percent
35
select another type of approach using another type of navigation aid.
36
25010kt 4SM -SHRA OVC040
37
2SM -SHRA OV030
38
25010KT 4SM -SHRA OVC040
39
Yes, because the ceiling is above minimum
40
Manila
41
C. 31st at 0700Z
42
B. VRB20G30K
43
2,100 feet / 1,900 feet
44
force acting perpendicular to the relative wind
45
10 minutes, 348 dge, 18 NM, 1.4 gallons
46
decrease the rate of turn resulting in no change in load factor
47
As velocity increases, pressure decreases
48
dividing total moments by total weight.
49
Airplane B, the pilot should expect to be passed on the right
50
cool air must sink to force the warm air upward
CPL HUMAN PERFORMANCE AND LIMITATIONS (1)
CPL HUMAN PERFORMANCE AND LIMITATIONS (1)
Via · 78問 · 1年前CPL HUMAN PERFORMANCE AND LIMITATIONS (1)
CPL HUMAN PERFORMANCE AND LIMITATIONS (1)
78問 • 1年前CPL HUMAN PERFORMANCE AND LIMITATIONS (2)
CPL HUMAN PERFORMANCE AND LIMITATIONS (2)
Via · 81問 · 1年前CPL HUMAN PERFORMANCE AND LIMITATIONS (2)
CPL HUMAN PERFORMANCE AND LIMITATIONS (2)
81問 • 1年前CPL Radio Telephony (1)
CPL Radio Telephony (1)
Via · 100問 · 1年前CPL Radio Telephony (1)
CPL Radio Telephony (1)
100問 • 1年前CPL Radio Telephony (2)
CPL Radio Telephony (2)
Via · 100問 · 1年前CPL Radio Telephony (2)
CPL Radio Telephony (2)
100問 • 1年前CPL Radio Telephony (3)
CPL Radio Telephony (3)
Via · 20問 · 1年前CPL Radio Telephony (3)
CPL Radio Telephony (3)
20問 • 1年前Met 1
Met 1
Via · 78問 · 1年前Met 1
Met 1
78問 • 1年前Met 2
Met 2
Via · 43問 · 1年前Met 2
Met 2
43問 • 1年前Met 3
Met 3
Via · 49問 · 1年前Met 3
Met 3
49問 • 1年前Met 4
Met 4
Via · 14問 · 1年前Met 4
Met 4
14問 • 1年前Met 5
Met 5
Via · 83問 · 1年前Met 5
Met 5
83問 • 1年前Met 6
Met 6
Via · 35問 · 1年前Met 6
Met 6
35問 • 1年前Met 7
Met 7
Via · 54問 · 1年前Met 7
Met 7
54問 • 1年前Met 8
Met 8
Via · 7問 · 1年前Met 8
Met 8
7問 • 1年前Human Performance 3
Human Performance 3
Via · 57問 · 1年前Human Performance 3
Human Performance 3
57問 • 1年前Met 9
Met 9
Via · 35問 · 1年前Met 9
Met 9
35問 • 1年前Met 10
Met 10
Via · 43問 · 1年前Met 10
Met 10
43問 • 1年前AGK 1
AGK 1
Via · 63問 · 1年前AGK 1
AGK 1
63問 • 1年前AGK 2
AGK 2
Via · 47問 · 1年前AGK 2
AGK 2
47問 • 1年前AGK 3
AGK 3
Via · 97問 · 1年前AGK 3
AGK 3
97問 • 1年前POF 1
POF 1
Via · 56問 · 1年前POF 1
POF 1
56問 • 1年前POF 2
POF 2
Via · 84問 · 1年前POF 2
POF 2
84問 • 1年前POF 3
POF 3
Via · 40問 · 1年前POF 3
POF 3
40問 • 1年前FPP 1
FPP 1
Via · 6問 · 1年前FPP 1
FPP 1
6問 • 1年前NAV 1
NAV 1
Via · 63問 · 1年前NAV 1
NAV 1
63問 • 1年前NAV 2
NAV 2
Via · 50問 · 1年前NAV 2
NAV 2
50問 • 1年前OP 1
OP 1
Via · 72問 · 1年前OP 1
OP 1
72問 • 1年前OP 2
OP 2
Via · 36問 · 1年前OP 2
OP 2
36問 • 1年前OP 3
OP 3
Via · 8問 · 1年前OP 3
OP 3
8問 • 1年前OP 4
OP 4
Via · 57問 · 1年前OP 4
OP 4
57問 • 1年前OP 5
OP 5
Via · 20問 · 1年前OP 5
OP 5
20問 • 1年前OP 6
OP 6
Via · 19問 · 1年前OP 6
OP 6
19問 • 1年前OP 7
OP 7
Via · 39問 · 1年前OP 7
OP 7
39問 • 1年前OP 8
OP 8
Via · 85問 · 1年前OP 8
OP 8
85問 • 1年前OP 9
OP 9
Via · 61問 · 1年前OP 9
OP 9
61問 • 1年前OP 10
OP 10
Via · 50問 · 1年前OP 10
OP 10
50問 • 1年前OP 11
OP 11
Via · 30問 · 1年前OP 11
OP 11
30問 • 1年前OP 12
OP 12
Via · 48問 · 1年前OP 12
OP 12
48問 • 1年前OP 13
OP 13
Via · 32問 · 1年前OP 13
OP 13
32問 • 1年前OP 14
OP 14
Via · 33問 · 1年前OP 14
OP 14
33問 • 1年前IR Gleims 1
IR Gleims 1
Via · 60問 · 1年前IR Gleims 1
IR Gleims 1
60問 • 1年前IR Gleims 2
IR Gleims 2
Via · 60問 · 1年前IR Gleims 2
IR Gleims 2
60問 • 1年前IR Gleims 3
IR Gleims 3
Via · 60問 · 1年前IR Gleims 3
IR Gleims 3
60問 • 1年前IR Gleims 4
IR Gleims 4
Via · 60問 · 1年前IR Gleims 4
IR Gleims 4
60問 • 1年前IR Gleims 5
IR Gleims 5
Via · 64問 · 1年前IR Gleims 5
IR Gleims 5
64問 • 1年前Meteorology
Meteorology
Via · 30問 · 1年前Meteorology
Meteorology
30問 • 1年前AGK
AGK
Via · 43問 · 1年前AGK
AGK
43問 • 1年前Met 2
Met 2
Via · 42問 · 1年前Met 2
Met 2
42問 • 1年前AGK 2
AGK 2
Via · 27問 · 1年前AGK 2
AGK 2
27問 • 1年前AGK 3
AGK 3
Via · 34問 · 1年前AGK 3
AGK 3
34問 • 1年前AGK 4
AGK 4
Via · 17問 · 1年前AGK 4
AGK 4
17問 • 1年前1
1
Via · 61問 · 1年前1
1
61問 • 1年前2
2
Via · 32問 · 1年前2
2
32問 • 1年前2
2
Via · 50問 · 1年前2
2
50問 • 1年前1
1
Via · 50問 · 1年前1
1
50問 • 1年前2
2
Via · 50問 · 1年前2
2
50問 • 1年前1
1
Via · 50問 · 1年前1
1
50問 • 1年前2
2
Via · 50問 · 1年前2
2
50問 • 1年前3
3
Via · 50問 · 1年前3
3
50問 • 1年前4
4
Via · 26問 · 1年前4
4
26問 • 1年前Avee 1
Avee 1
Via · 40問 · 5ヶ月前Avee 1
Avee 1
40問 • 5ヶ月前Bob 1
Bob 1
Via · 40問 · 5ヶ月前Bob 1
Bob 1
40問 • 5ヶ月前Miko 1
Miko 1
Via · 40問 · 5ヶ月前Miko 1
Miko 1
40問 • 5ヶ月前Dan
Dan
Via · 40問 · 5ヶ月前Dan
Dan
40問 • 5ヶ月前Ivan
Ivan
Via · 40問 · 5ヶ月前Ivan
Ivan
40問 • 5ヶ月前Avee 2
Avee 2
Via · 40問 · 5ヶ月前Avee 2
Avee 2
40問 • 5ヶ月前Bob 2
Bob 2
Via · 40問 · 5ヶ月前Bob 2
Bob 2
40問 • 5ヶ月前Miko 2
Miko 2
Via · 40問 · 5ヶ月前Miko 2
Miko 2
40問 • 5ヶ月前Dan 2
Dan 2
Via · 40問 · 5ヶ月前Dan 2
Dan 2
40問 • 5ヶ月前Ivan 2
Ivan 2
Via · 40問 · 5ヶ月前Ivan 2
Ivan 2
40問 • 5ヶ月前Final
Final
Via · 100問 · 5ヶ月前Final
Final
100問 • 5ヶ月前2
2
Via · 33問 · 5ヶ月前2
2
33問 • 5ヶ月前1 Airconditioning - Pressurization
1 Airconditioning - Pressurization
Via · 59問 · 5ヶ月前1 Airconditioning - Pressurization
1 Airconditioning - Pressurization
59問 • 5ヶ月前2 Auxiliary Power Unit
2 Auxiliary Power Unit
Via · 21問 · 5ヶ月前2 Auxiliary Power Unit
2 Auxiliary Power Unit
21問 • 5ヶ月前3 Communications
3 Communications
Via · 32問 · 5ヶ月前3 Communications
3 Communications
32問 • 5ヶ月前4 Electrical System
4 Electrical System
Via · 39問 · 5ヶ月前4 Electrical System
4 Electrical System
39問 • 5ヶ月前5 Indicating / Recording Systems
5 Indicating / Recording Systems
Via · 21問 · 5ヶ月前5 Indicating / Recording Systems
5 Indicating / Recording Systems
21問 • 5ヶ月前6 Fire Protections
6 Fire Protections
Via · 17問 · 5ヶ月前6 Fire Protections
6 Fire Protections
17問 • 5ヶ月前7 Flight Controls
7 Flight Controls
Via · 44問 · 5ヶ月前7 Flight Controls
7 Flight Controls
44問 • 5ヶ月前8 FMGS Navigation
8 FMGS Navigation
Via · 80問 · 5ヶ月前8 FMGS Navigation
8 FMGS Navigation
80問 • 5ヶ月前9 Fuel System
9 Fuel System
Via · 49問 · 5ヶ月前9 Fuel System
9 Fuel System
49問 • 5ヶ月前10 Hydraulic System
10 Hydraulic System
Via · 62問 · 5ヶ月前10 Hydraulic System
10 Hydraulic System
62問 • 5ヶ月前11 Ice and Rain
11 Ice and Rain
Via · 30問 · 5ヶ月前11 Ice and Rain
11 Ice and Rain
30問 • 5ヶ月前12 Landing Gear
12 Landing Gear
Via · 52問 · 5ヶ月前12 Landing Gear
12 Landing Gear
52問 • 5ヶ月前13 Oxygen – Emergency Equipment
13 Oxygen – Emergency Equipment
Via · 9問 · 5ヶ月前13 Oxygen – Emergency Equipment
13 Oxygen – Emergency Equipment
9問 • 5ヶ月前14 Pneumatic System
14 Pneumatic System
Via · 13問 · 5ヶ月前14 Pneumatic System
14 Pneumatic System
13問 • 5ヶ月前15 Powerplant
15 Powerplant
Via · 50問 · 5ヶ月前15 Powerplant
15 Powerplant
50問 • 5ヶ月前16 Safety
16 Safety
Via · 12問 · 5ヶ月前16 Safety
16 Safety
12問 • 5ヶ月前17 Smoke (Fire Protection)
17 Smoke (Fire Protection)
Via · 12問 · 5ヶ月前17 Smoke (Fire Protection)
17 Smoke (Fire Protection)
12問 • 5ヶ月前1 Airconditioning - Pressurization
1 Airconditioning - Pressurization
Via · 59問 · 5ヶ月前1 Airconditioning - Pressurization
1 Airconditioning - Pressurization
59問 • 5ヶ月前問題一覧
1
0.75 to 1.20 Mach
2
Jet Stream
3
so that no part of the aircraft extends beyond the hold line.
4
another control seat is occupied by a safety pilot who appropriately rated.
5
changes as required by Airworthiness Directives
6
D. B and C are correct
7
31.00
8
Outflow valve.
9
operator or owner of the aircraft
10
C. Command
11
1,500 feet AGL.
12
arrival at the DH on the glide slope.
13
its use is not permitted
14
additional action by the operator to set the course.
15
Sea level.
16
yellow in color and the dashed lines are nearest the runway.
17
D. B and C are both correct.
18
True altitude is lower than 31,000 feet.
19
SPECI
20
D. B and C are correct
21
Semi-Monocoque Type
22
12 hours during any 24 consecutive hours
23
Impulsivity
24
the beginning of rain at the earth's surface indicates the mature stage of the thunderstorm
25
3 miles visibility; 1000 feet above and 500 feet below
26
D. All of the above
27
not execute the procedure turn unless specifically cleared to do so by ATC.
28
Controlled flight maneuver
29
Reserve Fuel
30
varies for different headings of the same aircraft
31
the circulation of lubricating oil
32
C. 31st at 0500
33
B. From the 01st 1PM to 2nd at 8AM
34
70 percent
35
select another type of approach using another type of navigation aid.
36
25010kt 4SM -SHRA OVC040
37
2SM -SHRA OV030
38
25010KT 4SM -SHRA OVC040
39
Yes, because the ceiling is above minimum
40
Manila
41
C. 31st at 0700Z
42
B. VRB20G30K
43
2,100 feet / 1,900 feet
44
force acting perpendicular to the relative wind
45
10 minutes, 348 dge, 18 NM, 1.4 gallons
46
decrease the rate of turn resulting in no change in load factor
47
As velocity increases, pressure decreases
48
dividing total moments by total weight.
49
Airplane B, the pilot should expect to be passed on the right
50
cool air must sink to force the warm air upward