問題一覧
1
Delivery of physical therapy, License required, Exemptions, Required displays, PT compliant officer, Employee record, Record Retention, Compliance plan, Sanitary conditions, Change in physical therapy facility ownership, Change in location, Good moral character, Insurance requirement
2
Delivery of physical therapy
3
License required
4
True
5
False
6
Healthcare delivery is the primary purpose, activity or business of the site(s) where the services are provided
7
True
8
Required displays
9
Physical therapy facility’s license, License of each health care provider, Most recent inspection report
10
True
11
False
12
Employee record
13
Record retention
14
7 years
15
True
16
Only second statement is true
17
Compliance plan
18
Sanitary conditions
19
False
20
True
21
False
22
False
23
True
24
False
25
Master facility planning
26
Master facility planning
27
Master facility planning
28
Project design planning
29
External
30
External
31
Internal
32
Internal
33
Internal
34
Parking
35
Gait training
36
Gait lane
37
Gait training
38
Gait training
39
Mat platform area
40
Mat platforms
41
Private treatment room
42
Private treatment room
43
Hydrotherapy
44
Hydrotherapy
45
Hydrotherapy
46
4,5
47
7500 x 4500 mm
48
Rectangular
49
False
50
800mm shallow end
51
1500mm deep end
52
False
53
Hoist
54
True
55
False
56
True
57
30-35, 34-35
58
Reception area
59
Patient lounge
60
Patient lounge
61
Service area
62
Service area
63
Cubicle
64
Cubicle
65
Clean utility room
66
Soiled utility room
67
Soiled utility room
68
Team collaboration room
69
Gymnasium
70
8x10 ft
71
96” wide, 60” aisle
72
96” wide, 96” aisle
73
Outpatient: 10% accessible to disabled, Units specializing in treatment of persons with mobility impairment: 20% accessible
74
Parking space: 132 inches, Access aisle between parking spaces: 60 inches
75
30 inches wide
76
32 inches wide
77
36 inches
78
<24 inches
79
36 inches for 90 degree turn, 60 inches for 180 degree turn
80
Pathway space: 42” wide, Clearance around the top of obstacle: 48” wide
81
Max. ht. of reach: 48” from floor, Min. ht. of reach: 15” from floor
82
Max. side reach ht.: 54” from floor, Min. side reach ht.: 9” from floor
83
General hospital: atleast 10% accessible, Long term care facilities: 50%, Door width: 36” of clear foot space
84
Forward transfer: 18 inch access on both sides of toilet approximately 20 sq ft of foot clearance, Sideward: 42 inches on one side, 18 inches on one side, Diagonal: 18-30 inches on one side
85
17-19 inches from the floor
86
33-36 inches from floor, 42 inches from wall
87
True
88
Handrails
89
True
90
12 inches length, 1 inch elevation
91
Electrical system, Plumbing, Lighting natural vs artificial, Heating and cooling, Communication system
92
Parking, Wheelchair maneuverability, Reaching objects from wheelchairs, Bedroom facility, Toilet facilities, Handrails
93
Medical staff, Nursing staff, Physiotherapists, Neuropsychologist, Social worker, Occupational therapist
ROM
ROM
Kyla Rafols · 71問 · 2年前ROM
ROM
71問 • 2年前Endocrinology
Endocrinology
Kyla Rafols · 54問 · 2年前Endocrinology
Endocrinology
54問 • 2年前IPC, Tilt table, Traction
IPC, Tilt table, Traction
Kyla Rafols · 5問 · 2年前IPC, Tilt table, Traction
IPC, Tilt table, Traction
5問 • 2年前OrgAd
OrgAd
Kyla Rafols · 88問 · 1年前OrgAd
OrgAd
88問 • 1年前org2
org2
Kyla Rafols · 10問 · 1年前org2
org2
10問 • 1年前History and Physical Exam
History and Physical Exam
Kyla Rafols · 7問 · 1年前History and Physical Exam
History and Physical Exam
7問 • 1年前2 OrgAd
2 OrgAd
Kyla Rafols · 100問 · 1年前2 OrgAd
2 OrgAd
100問 • 1年前2 OrgAd 2
2 OrgAd 2
Kyla Rafols · 6問 · 1年前2 OrgAd 2
2 OrgAd 2
6問 • 1年前Thorax
Thorax
Kyla Rafols · 100問 · 1年前Thorax
Thorax
100問 • 1年前Thorax 2
Thorax 2
Kyla Rafols · 72問 · 1年前Thorax 2
Thorax 2
72問 • 1年前Pecs
Pecs
Kyla Rafols · 56問 · 1年前Pecs
Pecs
56問 • 1年前Arm
Arm
Kyla Rafols · 100問 · 1年前Arm
Arm
100問 • 1年前Arm 2
Arm 2
Kyla Rafols · 20問 · 1年前Arm 2
Arm 2
20問 • 1年前FOREARM
FOREARM
Kyla Rafols · 83問 · 1年前FOREARM
FOREARM
83問 • 1年前WRIST AND HAND
WRIST AND HAND
Kyla Rafols · 98問 · 1年前WRIST AND HAND
WRIST AND HAND
98問 • 1年前WH joints
WH joints
Kyla Rafols · 13問 · 1年前WH joints
WH joints
13問 • 1年前ENTREP
ENTREP
Kyla Rafols · 49問 · 1年前ENTREP
ENTREP
49問 • 1年前kapoya org ad
kapoya org ad
Kyla Rafols · 43問 · 1年前kapoya org ad
kapoya org ad
43問 • 1年前Fiscal management
Fiscal management
Kyla Rafols · 41問 · 1年前Fiscal management
Fiscal management
41問 • 1年前問題一覧
1
Delivery of physical therapy, License required, Exemptions, Required displays, PT compliant officer, Employee record, Record Retention, Compliance plan, Sanitary conditions, Change in physical therapy facility ownership, Change in location, Good moral character, Insurance requirement
2
Delivery of physical therapy
3
License required
4
True
5
False
6
Healthcare delivery is the primary purpose, activity or business of the site(s) where the services are provided
7
True
8
Required displays
9
Physical therapy facility’s license, License of each health care provider, Most recent inspection report
10
True
11
False
12
Employee record
13
Record retention
14
7 years
15
True
16
Only second statement is true
17
Compliance plan
18
Sanitary conditions
19
False
20
True
21
False
22
False
23
True
24
False
25
Master facility planning
26
Master facility planning
27
Master facility planning
28
Project design planning
29
External
30
External
31
Internal
32
Internal
33
Internal
34
Parking
35
Gait training
36
Gait lane
37
Gait training
38
Gait training
39
Mat platform area
40
Mat platforms
41
Private treatment room
42
Private treatment room
43
Hydrotherapy
44
Hydrotherapy
45
Hydrotherapy
46
4,5
47
7500 x 4500 mm
48
Rectangular
49
False
50
800mm shallow end
51
1500mm deep end
52
False
53
Hoist
54
True
55
False
56
True
57
30-35, 34-35
58
Reception area
59
Patient lounge
60
Patient lounge
61
Service area
62
Service area
63
Cubicle
64
Cubicle
65
Clean utility room
66
Soiled utility room
67
Soiled utility room
68
Team collaboration room
69
Gymnasium
70
8x10 ft
71
96” wide, 60” aisle
72
96” wide, 96” aisle
73
Outpatient: 10% accessible to disabled, Units specializing in treatment of persons with mobility impairment: 20% accessible
74
Parking space: 132 inches, Access aisle between parking spaces: 60 inches
75
30 inches wide
76
32 inches wide
77
36 inches
78
<24 inches
79
36 inches for 90 degree turn, 60 inches for 180 degree turn
80
Pathway space: 42” wide, Clearance around the top of obstacle: 48” wide
81
Max. ht. of reach: 48” from floor, Min. ht. of reach: 15” from floor
82
Max. side reach ht.: 54” from floor, Min. side reach ht.: 9” from floor
83
General hospital: atleast 10% accessible, Long term care facilities: 50%, Door width: 36” of clear foot space
84
Forward transfer: 18 inch access on both sides of toilet approximately 20 sq ft of foot clearance, Sideward: 42 inches on one side, 18 inches on one side, Diagonal: 18-30 inches on one side
85
17-19 inches from the floor
86
33-36 inches from floor, 42 inches from wall
87
True
88
Handrails
89
True
90
12 inches length, 1 inch elevation
91
Electrical system, Plumbing, Lighting natural vs artificial, Heating and cooling, Communication system
92
Parking, Wheelchair maneuverability, Reaching objects from wheelchairs, Bedroom facility, Toilet facilities, Handrails
93
Medical staff, Nursing staff, Physiotherapists, Neuropsychologist, Social worker, Occupational therapist