問題一覧
1
with a delay if the bleed air was in use
2
APU master switch pb and APU fire pb switch
3
41, 000 ft
4
runs when tank pumps pressure is not sufficient
5
100%
6
ON illuminates blue. APU system is supplied. APU starts as soon as start pb is depressed and intake flap completely open
7
by ECB
8
N ≥102%
9
EGT ≥ 1090°C and 675°C (start and running)
10
electric power + bleed air
11
is not permitted
12
Yes
13
left fuel feed line
14
keeps running for a cooling period of 60 sec.
15
APU N reaches above 99.5% or 2 sec after N reaches 95%
16
Yes
17
electronic control box
18
both (pushing the APU fire push button) and (pressing APU shut off pb on external Interphone Panel under the nose fuselage) are correct
19
Yes
20
ECB is electrically supplied
21
100%
B777 - Part 8
B777 - Part 8
Angelo Ortiz · 50問 · 3年前B777 - Part 8
B777 - Part 8
50問 • 3年前B777 - Part 3
B777 - Part 3
Angelo Ortiz · 50問 · 3年前B777 - Part 3
B777 - Part 3
50問 • 3年前B777 - Part 6
B777 - Part 6
Angelo Ortiz · 50問 · 3年前B777 - Part 6
B777 - Part 6
50問 • 3年前B777 - Part 4
B777 - Part 4
Angelo Ortiz · 50問 · 3年前B777 - Part 4
B777 - Part 4
50問 • 3年前B777 - Part 1
B777 - Part 1
Angelo Ortiz · 50問 · 3年前B777 - Part 1
B777 - Part 1
50問 • 3年前B777 - Part 7
B777 - Part 7
Angelo Ortiz · 50問 · 3年前B777 - Part 7
B777 - Part 7
50問 • 3年前B777 - Part 9
B777 - Part 9
Angelo Ortiz · 28問 · 3年前B777 - Part 9
B777 - Part 9
28問 • 3年前B777 - Part 2
B777 - Part 2
Angelo Ortiz · 50問 · 3年前B777 - Part 2
B777 - Part 2
50問 • 3年前B777 - Part 5
B777 - Part 5
Angelo Ortiz · 50問 · 3年前B777 - Part 5
B777 - Part 5
50問 • 3年前AIA - VUL
AIA - VUL
Angelo Ortiz · 100問 · 2年前AIA - VUL
AIA - VUL
100問 • 2年前Underwriting
Underwriting
Angelo Ortiz · 66問 · 2年前Underwriting
Underwriting
66問 • 2年前Airplanes and Aerodynamics
Airplanes and Aerodynamics
Angelo Ortiz · 49問 · 2年前Airplanes and Aerodynamics
Airplanes and Aerodynamics
49問 • 2年前Airplane Instruments, Engines and Systems
Airplane Instruments, Engines and Systems
Angelo Ortiz · 77問 · 2年前Airplane Instruments, Engines and Systems
Airplane Instruments, Engines and Systems
77問 • 2年前Airport, ATC and Airspace
Airport, ATC and Airspace
Angelo Ortiz · 88問 · 2年前Airport, ATC and Airspace
Airport, ATC and Airspace
88問 • 2年前Federal Aviation Regulations - Part 1
Federal Aviation Regulations - Part 1
Angelo Ortiz · 100問 · 2年前Federal Aviation Regulations - Part 1
Federal Aviation Regulations - Part 1
100問 • 2年前Federal Aviation Regulations - Part 2
Federal Aviation Regulations - Part 2
Angelo Ortiz · 89問 · 2年前Federal Aviation Regulations - Part 2
Federal Aviation Regulations - Part 2
89問 • 2年前Airplane Weight and Balance
Airplane Weight and Balance
Angelo Ortiz · 10問 · 2年前Airplane Weight and Balance
Airplane Weight and Balance
10問 • 2年前Medical Factors and Decision Making
Medical Factors and Decision Making
Angelo Ortiz · 25問 · 2年前Medical Factors and Decision Making
Medical Factors and Decision Making
25問 • 2年前Weather and Services
Weather and Services
Angelo Ortiz · 87問 · 2年前Weather and Services
Weather and Services
87問 • 2年前Navigation
Navigation
Angelo Ortiz · 30問 · 2年前Navigation
Navigation
30問 • 2年前問題一覧
1
with a delay if the bleed air was in use
2
APU master switch pb and APU fire pb switch
3
41, 000 ft
4
runs when tank pumps pressure is not sufficient
5
100%
6
ON illuminates blue. APU system is supplied. APU starts as soon as start pb is depressed and intake flap completely open
7
by ECB
8
N ≥102%
9
EGT ≥ 1090°C and 675°C (start and running)
10
electric power + bleed air
11
is not permitted
12
Yes
13
left fuel feed line
14
keeps running for a cooling period of 60 sec.
15
APU N reaches above 99.5% or 2 sec after N reaches 95%
16
Yes
17
electronic control box
18
both (pushing the APU fire push button) and (pressing APU shut off pb on external Interphone Panel under the nose fuselage) are correct
19
Yes
20
ECB is electrically supplied
21
100%