  • 1

    Is defined as the means of collecting, transporting and disposing of surface water originating in or near the right of way, or flowing in stream crossing or bordering the right of way.

    Drainage

  • 2

    It is the artificial removal of water, both surface and subsurface.

    Drainage

  • 3

    Is often a major element in construction projects and is necessary to avoid flooding and other damage.

    Drainage

  • 4

    Is that branch of physical geography that deals with water of the earth.

    Hydrology

  • 5

    Deals with estimating the highest rate of run-off to be handled.

    Hydraulic Design

  • 6

    Deals with the selection of the kinds and sizes of the drainage facilities that is most economical to accommodate the estimated water flow.

    Hydraulic Design

  • 7

    is to ascertain the design will not create the erosion or other unacceptable environmental conditions.

    Erosion Control

  • 8

    Item 501

    Underdrains

  • 9

    Item 501.3.2

    Underdrain Outlets

  • 10

    Item 501.3.3

    Blind Drain

  • 11

    Is categorized under item 502 of DPWH Standard Specifications

    Underdrain

  • 12

    “This item shall consist of constructing underdrain, using pipes and granular filter material underdrain pipe outlets and blind drains using granular material in accordance with the specification and in reasonably close comfomity with the lines and gradess hown on the plans or as established by the engineer.”

    Underdrain

  • 13

    shall be permeable meeting the requirements of AASHTO M-6 specification except that soundness tests will not be required and minor variations in grading and content of deleterious substances may be approved by the engineer. All materials are subject to inspection before acceptance.

    Granular Backfill Filter Materials

  • 14

    Trench are excavated to the depth and width as planned.

    Underdrain Outlet

  • 15

    Pipes are laid in the trench with all ends firmly joined and backfilled after inspection and approval of the pipe installation.

    Underdrain Outlet

  • 16

    Flood water usually carries objectionable objects like brushes, banana trunks, tree branches etc. This floating debris clog culverts entrances and raises the headwater elevation over-flowing the road and damaging adjoining properties.

    Debris Control

  • 17

    Trenches for this shall be excavated to the width and depth shown on the plans, the trench shall be filled with granular backfill material to the depth required by the plans.

    Blind Drain

  • 18

    Any remaining upper portion of trench shall be filled with either granular or impervious material in accordance with item 103-Structure Escalation.

    Blind Drain

  • 19

    Problems usually encountered in the design and constructions of roadways are:

    Stability of Fill and Slope, Drainage, Permafrost, Elasticity and Rutting

  • 20

    Run-off Predicted Based on the following Method:

    By the Rational Methods, By the Empirical Formula, By the Unit Hydrograph, By Statistical Approach, By Simulation

  • 21

    are under item __ of the DPWH standard specification which includes construction or adjustment of manholes, inlets, and catch basin.

    Manhole, Inlets, Catch Basin, 502

  • 22

    Also known as an inspection chamber.

    Manhole

  • 23

    Provides access to underground utilities, most commonly sewer system.

    Manhole

  • 24

    Usually consist of a chamber or ring.

    Manhole

  • 25

    a vertical circular pipe of carrying sizes and depths, which is used to access inspection points.

    Manhole

  • 26

    -Test Load 10 km

    CLASS A

  • 27

    -Test Load 80 kN

    CLASS B

  • 28

    -Test Load 150 kN

    CLASS C

  • 29

    -Test Load 210 kN

    CLASS D

  • 30

    - Test Load 400 kN, 600 KN and 900 kN

    CLASS E,F,G

  • 31

    Its purpose is to determine the cross-section of the canal that will accommodate water flow smoothly and cheapest to construct and maintain.

    Designing a Channel

  • 32

    Water flowing down a mild slope in an open canal.

    Sub-Critical Flow

  • 33

    Water flow on steep slope.

    Super Critical Flow

  • 34

    exist when the depth of water in the channel is greater than the critical depth.

    Sub-Critical Flow

  • 35

    exists when the depth is less than the critical level.

    Super Critical Flow

  • 36

    occurs when the velocity head is one half the average depths.

    Critical Depth

  • 37

    is the cross-sectional area of the flow divided by its width at the liquid surface.

    Average Depth or Mean Depth

  • 38

    Is the tendency of water to seek its own level as if in an open channels flows trough the pores and fine channel of the soil.

    Capillarity

  • 39

    With the exception of storm drain, it includes all closed conduits with standard design repeated used.

    Culverts

  • 40

    ITEM 519

    Concrete Slope Protection

  • 41

    ITEM 511

    Gabions and Matresses

  • 42

    An existing earth slope that have been stable can experience significant movement called.

    Slope Failure or Landslide

  • 43

    Slope Failure or Landslide due to the following changes:

    Changes in Natural Conditions, Changes Induced by Man

  • 44

    Changes in natural conditions may be the result from:

    Occurrence of Earthquake, Subsidence of Underground Cavern, Erosion, Slope weakening due to the development of cracks or shrinkage cracks that are followed by water intrusions, Variations in the elevations of ground water or changes in the slope subsurface flow that create new seepage forces, Weakening of buried soils or rock seems due to ground water flow or chemical leaching

  • 45

    Changes induced by Man.

    Slide

  • 46

    refers to the occurrence where the moving mass is defined and separated from the underlying and adjacent earth by plane, comprising a number of adjacent planes were seepage result.

    Slide

  • 47

    Slides is classified into four:

    Rotation Slide, Translational Slide, Block or Wedge Failure, Flows and Spread

  • 48

    Types of retaining wall:

    Gravity Walls, Cantilevered Retaining Wall, Sheet Pile Retaining Wall, Bored Pile Retaining Wall, Anchored Retaining Wall

  • 49

    Is constructed with high-strength concrete (usually PCC) and behaves like a beam or slab thi spans and distributes loads over a wider area.

    Rigid Pavement

  • 50

    Rigid Pavement Characteristics:

    High flexural strength, Requires joints to accommodate expansion, contraction, and warping, Less deformation under loads, High initial cost but low maintenance

  • 51

    Rigid Pavement Types:

    JPCP - Jointed Plain Concrete Pavement, JRCP - Jointed Reinforced Concrete Pavement, CRCP - Continuously Reinforced Concrete Pavement

  • 52

    consists of multiple layers that bend (or flex) under loads.

    Flexible Pavement

  • 53

    Load distribution occurs layer by layer until it reaches the subgrade.

    Flexible Pavement

  • 54

    Flexible Pavement Characteristics:

    Low flexural strength, Deforms under loading, Easier and cheaper to construct, Requires more frequent maintenance

  • 55

    Typical Structure Flexible Pavement:

    Surface Course (Asphalt), Base Course, Sub-Base, Subgrade

  • 56

    An empirical method based on CBR (California Bearing Ratio).

    McLeod's Method

  • 57

    CBR

    California Bearing Ratio

  • 58

    Used primarily for military and high-traffic pavements.

    U.S. Corps of Engineers Method

  • 59

    Based on R-value obtained from lab tests.

    California Resistance Value (R-Value) Method

  • 60

    Used to determine subgrade support.

    California Resistance Value (R-Value) Method

  • 61

    Charts or empirical equations relate R-value with thickness required for various traffic loads.

    California Resistance Value (R-Value) Method

  • 62

    Used when subgrade contains expansive clays.

    Expansion Pressure Method

  • 63

    Laboratory tests determine __.

    Expansion Pressure Method, Expansion Pressure

  • 64

    __ is designed to resist uplift caused by soil swelling.

    Expansion Pressure Method, Pavement

  • 65

    Required thickness increases with expansion pressure.

    Expansion Pressure Method

  • 66

    Used to calculate tensile stress at the corner of a rigid concrete slab due to wheel load.

    Goldbeck's Formula (Stress at Corner of Rigid Pavement)

  • 67

    To accommodate vehicle off-tracking and ensure safety, extra width is added on curves.

    Widening of Road on Curves

  • 68

    To design the base course thickness based on the soil's shear strength from __.

    Triaxial Test Method

  • Enumeration

    Enumeration

    Sabrina Mikhaela Canindo · 42問 · 1年前

    Enumeration

    Enumeration

    42問 • 1年前
    Sabrina Mikhaela Canindo

    Identification

    Identification

    Sabrina Mikhaela Canindo · 260問 · 1年前

    Identification

    Identification

    260問 • 1年前
    Sabrina Mikhaela Canindo

    Chapter 1

    Chapter 1

    Sabrina Mikhaela Canindo · 125問 · 1年前

    Chapter 1

    Chapter 1

    125問 • 1年前
    Sabrina Mikhaela Canindo

    C1 part 2

    C1 part 2

    Sabrina Mikhaela Canindo · 36問 · 1年前

    C1 part 2

    C1 part 2

    36問 • 1年前
    Sabrina Mikhaela Canindo

    Chap 1&2

    Chap 1&2

    Sabrina Mikhaela Canindo · 73問 · 1年前

    Chap 1&2

    Chap 1&2

    73問 • 1年前
    Sabrina Mikhaela Canindo

    Chap 3&4

    Chap 3&4

    Sabrina Mikhaela Canindo · 84問 · 1年前

    Chap 3&4

    Chap 3&4

    84問 • 1年前
    Sabrina Mikhaela Canindo

    HUM

    HUM

    Sabrina Mikhaela Canindo · 204問 · 1年前

    HUM

    HUM

    204問 • 1年前
    Sabrina Mikhaela Canindo

    Lesson 2,3,4,5,6,7

    Lesson 2,3,4,5,6,7

    Sabrina Mikhaela Canindo · 140問 · 1年前

    Lesson 2,3,4,5,6,7

    Lesson 2,3,4,5,6,7

    140問 • 1年前
    Sabrina Mikhaela Canindo

    Chap 1,2

    Chap 1,2

    Sabrina Mikhaela Canindo · 97問 · 1年前

    Chap 1,2

    Chap 1,2

    97問 • 1年前
    Sabrina Mikhaela Canindo

    Lesson 1

    Lesson 1

    Sabrina Mikhaela Canindo · 64問 · 1年前

    Lesson 1

    Lesson 1

    64問 • 1年前
    Sabrina Mikhaela Canindo

    Chap 3,4

    Chap 3,4

    Sabrina Mikhaela Canindo · 85問 · 1年前

    Chap 3,4

    Chap 3,4

    85問 • 1年前
    Sabrina Mikhaela Canindo

    Chapter 2

    Chapter 2

    Sabrina Mikhaela Canindo · 57問 · 1年前

    Chapter 2

    Chapter 2

    57問 • 1年前
    Sabrina Mikhaela Canindo

    Lesson 1&2

    Lesson 1&2

    Sabrina Mikhaela Canindo · 84問 · 1年前

    Lesson 1&2

    Lesson 1&2

    84問 • 1年前
    Sabrina Mikhaela Canindo

    Chapter 3

    Chapter 3

    Sabrina Mikhaela Canindo · 38問 · 1年前

    Chapter 3

    Chapter 3

    38問 • 1年前
    Sabrina Mikhaela Canindo

    Lesson 3&4

    Lesson 3&4

    Sabrina Mikhaela Canindo · 54問 · 1年前

    Lesson 3&4

    Lesson 3&4

    54問 • 1年前
    Sabrina Mikhaela Canindo

    Chapter 4

    Chapter 4

    Sabrina Mikhaela Canindo · 51問 · 1年前

    Chapter 4

    Chapter 4

    51問 • 1年前
    Sabrina Mikhaela Canindo

    Lesson 5,6&7

    Lesson 5,6&7

    Sabrina Mikhaela Canindo · 73問 · 1年前

    Lesson 5,6&7

    Lesson 5,6&7

    73問 • 1年前
    Sabrina Mikhaela Canindo

    (2)

    (2)

    Sabrina Mikhaela Canindo · 56問 · 1年前

    (2)

    (2)

    56問 • 1年前
    Sabrina Mikhaela Canindo

    Chapter 5

    Chapter 5

    Sabrina Mikhaela Canindo · 84問 · 1年前

    Chapter 5

    Chapter 5

    84問 • 1年前
    Sabrina Mikhaela Canindo

    CE215

    CE215

    Sabrina Mikhaela Canindo · 60問 · 1年前

    CE215

    CE215

    60問 • 1年前
    Sabrina Mikhaela Canindo

    MTE4

    MTE4

    Sabrina Mikhaela Canindo · 17問 · 1年前

    MTE4

    MTE4

    17問 • 1年前
    Sabrina Mikhaela Canindo

    ES

    ES

    Sabrina Mikhaela Canindo · 238問 · 1年前

    ES

    ES

    238問 • 1年前
    Sabrina Mikhaela Canindo

    HUM

    HUM

    Sabrina Mikhaela Canindo · 204問 · 1年前

    HUM

    HUM

    204問 • 1年前
    Sabrina Mikhaela Canindo

    DRAW

    DRAW

    Sabrina Mikhaela Canindo · 71問 · 1年前

    DRAW

    DRAW

    71問 • 1年前
    Sabrina Mikhaela Canindo

    ECON

    ECON

    Sabrina Mikhaela Canindo · 51問 · 1年前

    ECON

    ECON

    51問 • 1年前
    Sabrina Mikhaela Canindo

    Chap1

    Chap1

    Sabrina Mikhaela Canindo · 121問 · 1年前

    Chap1

    Chap1

    121問 • 1年前
    Sabrina Mikhaela Canindo

    MECH

    MECH

    Sabrina Mikhaela Canindo · 39問 · 1年前

    MECH

    MECH

    39問 • 1年前
    Sabrina Mikhaela Canindo

    chap2

    chap2

    Sabrina Mikhaela Canindo · 131問 · 1年前

    chap2

    chap2

    131問 • 1年前
    Sabrina Mikhaela Canindo

    draw

    draw

    Sabrina Mikhaela Canindo · 48問 · 1年前

    draw

    draw

    48問 • 1年前
    Sabrina Mikhaela Canindo

    Enumeration

    Enumeration

    Sabrina Mikhaela Canindo · 31問 · 1年前

    Enumeration

    Enumeration

    31問 • 1年前
    Sabrina Mikhaela Canindo

    ttr

    ttr

    Sabrina Mikhaela Canindo · 92問 · 1年前

    ttr

    ttr

    92問 • 1年前
    Sabrina Mikhaela Canindo

    g ycu

    g ycu

    Sabrina Mikhaela Canindo · 9問 · 1年前

    g ycu

    g ycu

    9問 • 1年前
    Sabrina Mikhaela Canindo

    ENUMERATION

    ENUMERATION

    Sabrina Mikhaela Canindo · 20問 · 1年前

    ENUMERATION

    ENUMERATION

    20問 • 1年前
    Sabrina Mikhaela Canindo

    Enumeration

    Enumeration

    Sabrina Mikhaela Canindo · 35問 · 1年前

    Enumeration

    Enumeration

    35問 • 1年前
    Sabrina Mikhaela Canindo

    Enumeration

    Enumeration

    Sabrina Mikhaela Canindo · 53問 · 1年前

    Enumeration

    Enumeration

    53問 • 1年前
    Sabrina Mikhaela Canindo

    5-8

    5-8

    Sabrina Mikhaela Canindo · 348問 · 1年前

    5-8

    5-8

    348問 • 1年前
    Sabrina Mikhaela Canindo

    Chapter 5

    Chapter 5

    Sabrina Mikhaela Canindo · 84問 · 1年前

    Chapter 5

    Chapter 5

    84問 • 1年前
    Sabrina Mikhaela Canindo

    Chap 6

    Chap 6

    Sabrina Mikhaela Canindo · 71問 · 1年前

    Chap 6

    Chap 6

    71問 • 1年前
    Sabrina Mikhaela Canindo

    Enumeration

    Enumeration

    Sabrina Mikhaela Canindo · 43問 · 1年前

    Enumeration

    Enumeration

    43問 • 1年前
    Sabrina Mikhaela Canindo

    Enu2

    Enu2

    Sabrina Mikhaela Canindo · 23問 · 1年前

    Enu2

    Enu2

    23問 • 1年前
    Sabrina Mikhaela Canindo

    Chap 7

    Chap 7

    Sabrina Mikhaela Canindo · 80問 · 1年前

    Chap 7

    Chap 7

    80問 • 1年前
    Sabrina Mikhaela Canindo

    Enumeration

    Enumeration

    Sabrina Mikhaela Canindo · 39問 · 1年前

    Enumeration

    Enumeration

    39問 • 1年前
    Sabrina Mikhaela Canindo

    Chap 8

    Chap 8

    Sabrina Mikhaela Canindo · 113問 · 1年前

    Chap 8

    Chap 8

    113問 • 1年前
    Sabrina Mikhaela Canindo

    L3

    L3

    Sabrina Mikhaela Canindo · 167問 · 1年前

    L3

    L3

    167問 • 1年前
    Sabrina Mikhaela Canindo

    chap9

    chap9

    Sabrina Mikhaela Canindo · 42問 · 1年前

    chap9

    chap9

    42問 • 1年前
    Sabrina Mikhaela Canindo

    L4

    L4

    Sabrina Mikhaela Canindo · 123問 · 1年前

    L4

    L4

    123問 • 1年前
    Sabrina Mikhaela Canindo

    Natural and Forest Resources

    Natural and Forest Resources

    Sabrina Mikhaela Canindo · 61問 · 1年前

    Natural and Forest Resources

    Natural and Forest Resources

    61問 • 1年前
    Sabrina Mikhaela Canindo

    ECON

    ECON

    Sabrina Mikhaela Canindo · 31問 · 1年前

    ECON

    ECON

    31問 • 1年前
    Sabrina Mikhaela Canindo

    Water and Mineral Resources

    Water and Mineral Resources

    Sabrina Mikhaela Canindo · 71問 · 1年前

    Water and Mineral Resources

    Water and Mineral Resources

    71問 • 1年前
    Sabrina Mikhaela Canindo

    MTE4 PREFI

    MTE4 PREFI

    Sabrina Mikhaela Canindo · 9問 · 1年前

    MTE4 PREFI

    MTE4 PREFI

    9問 • 1年前
    Sabrina Mikhaela Canindo

    Food, Energy, Land Resources

    Food, Energy, Land Resources

    Sabrina Mikhaela Canindo · 56問 · 1年前

    Food, Energy, Land Resources

    Food, Energy, Land Resources

    56問 • 1年前
    Sabrina Mikhaela Canindo

    HUM PREFI

    HUM PREFI

    Sabrina Mikhaela Canindo · 142問 · 1年前

    HUM PREFI

    HUM PREFI

    142問 • 1年前
    Sabrina Mikhaela Canindo

    CE215 PREFI

    CE215 PREFI

    Sabrina Mikhaela Canindo · 19問 · 1年前

    CE215 PREFI

    CE215 PREFI

    19問 • 1年前
    Sabrina Mikhaela Canindo

    Enumeration

    Enumeration

    Sabrina Mikhaela Canindo · 22問 · 1年前

    Enumeration

    Enumeration

    22問 • 1年前
    Sabrina Mikhaela Canindo

    8,9

    8,9

    Sabrina Mikhaela Canindo · 70問 · 1年前

    8,9

    8,9

    70問 • 1年前
    Sabrina Mikhaela Canindo

    10,11

    10,11

    Sabrina Mikhaela Canindo · 72問 · 1年前

    10,11

    10,11

    72問 • 1年前
    Sabrina Mikhaela Canindo

    L8

    L8

    Sabrina Mikhaela Canindo · 38問 · 1年前

    L8

    L8

    38問 • 1年前
    Sabrina Mikhaela Canindo

    L9

    L9

    Sabrina Mikhaela Canindo · 32問 · 1年前

    L9

    L9

    32問 • 1年前
    Sabrina Mikhaela Canindo

    L10

    L10

    Sabrina Mikhaela Canindo · 35問 · 1年前

    L10

    L10

    35問 • 1年前
    Sabrina Mikhaela Canindo

    L11

    L11

    Sabrina Mikhaela Canindo · 37問 · 1年前

    L11

    L11

    37問 • 1年前
    Sabrina Mikhaela Canindo

    Identification

    Identification

    Sabrina Mikhaela Canindo · 5問 · 1年前

    Identification

    Identification

    5問 • 1年前
    Sabrina Mikhaela Canindo

    Ident

    Ident

    Sabrina Mikhaela Canindo · 71問 · 1年前

    Ident

    Ident

    71問 • 1年前
    Sabrina Mikhaela Canindo

    enu

    enu

    Sabrina Mikhaela Canindo · 12問 · 1年前

    enu

    enu

    12問 • 1年前
    Sabrina Mikhaela Canindo

    officials

    officials

    Sabrina Mikhaela Canindo · 17問 · 1年前

    officials

    officials

    17問 • 1年前
    Sabrina Mikhaela Canindo

    events

    events

    Sabrina Mikhaela Canindo · 11問 · 1年前

    events

    events

    11問 • 1年前
    Sabrina Mikhaela Canindo

    Q1

    Q1

    Sabrina Mikhaela Canindo · 54問 · 1年前

    Q1

    Q1

    54問 • 1年前
    Sabrina Mikhaela Canindo

    1

    1

    Sabrina Mikhaela Canindo · 55問 · 1年前

    1

    1

    55問 • 1年前
    Sabrina Mikhaela Canindo

    Enumeration

    Enumeration

    Sabrina Mikhaela Canindo · 39問 · 1年前

    Enumeration

    Enumeration

    39問 • 1年前
    Sabrina Mikhaela Canindo

    1-5

    1-5

    Sabrina Mikhaela Canindo · 146問 · 1年前

    1-5

    1-5

    146問 • 1年前
    Sabrina Mikhaela Canindo

    2,3,4

    2,3,4

    Sabrina Mikhaela Canindo · 81問 · 1年前

    2,3,4

    2,3,4

    81問 • 1年前
    Sabrina Mikhaela Canindo

    1

    1

    Sabrina Mikhaela Canindo · 58問 · 1年前

    1

    1

    58問 • 1年前
    Sabrina Mikhaela Canindo

    2

    2

    Sabrina Mikhaela Canindo · 28問 · 1年前

    2

    2

    28問 • 1年前
    Sabrina Mikhaela Canindo

    3

    3

    Sabrina Mikhaela Canindo · 31問 · 1年前

    3

    3

    31問 • 1年前
    Sabrina Mikhaela Canindo

    4

    4

    Sabrina Mikhaela Canindo · 22問 · 1年前

    4

    4

    22問 • 1年前
    Sabrina Mikhaela Canindo

    enu 2

    enu 2

    Sabrina Mikhaela Canindo · 14問 · 1年前

    enu 2

    enu 2

    14問 • 1年前
    Sabrina Mikhaela Canindo

    5

    5

    Sabrina Mikhaela Canindo · 11問 · 1年前

    5

    5

    11問 • 1年前
    Sabrina Mikhaela Canindo

    ENU

    ENU

    Sabrina Mikhaela Canindo · 21問 · 1年前

    ENU

    ENU

    21問 • 1年前
    Sabrina Mikhaela Canindo

    1

    1

    Sabrina Mikhaela Canindo · 88問 · 1年前

    1

    1

    88問 • 1年前
    Sabrina Mikhaela Canindo

    2

    2

    Sabrina Mikhaela Canindo · 66問 · 1年前

    2

    2

    66問 • 1年前
    Sabrina Mikhaela Canindo

    midterm

    midterm

    Sabrina Mikhaela Canindo · 38問 · 1年前

    midterm

    midterm

    38問 • 1年前
    Sabrina Mikhaela Canindo

    2.1

    2.1

    Sabrina Mikhaela Canindo · 24問 · 1年前

    2.1

    2.1

    24問 • 1年前
    Sabrina Mikhaela Canindo

    L1

    L1

    Sabrina Mikhaela Canindo · 48問 · 1年前

    L1

    L1

    48問 • 1年前
    Sabrina Mikhaela Canindo

    Mech E3

    Mech E3

    Sabrina Mikhaela Canindo · 38問 · 1年前

    Mech E3

    Mech E3

    38問 • 1年前
    Sabrina Mikhaela Canindo

    Techno

    Techno

    Sabrina Mikhaela Canindo · 146問 · 1年前

    Techno

    Techno

    146問 • 1年前
    Sabrina Mikhaela Canindo

    enu L1

    enu L1

    Sabrina Mikhaela Canindo · 27問 · 1年前

    enu L1

    enu L1

    27問 • 1年前
    Sabrina Mikhaela Canindo

    Mech E2

    Mech E2

    Sabrina Mikhaela Canindo · 14問 · 1年前

    Mech E2

    Mech E2

    14問 • 1年前
    Sabrina Mikhaela Canindo

    1-5

    1-5

    Sabrina Mikhaela Canindo · 186問 · 1年前

    1-5

    1-5

    186問 • 1年前
    Sabrina Mikhaela Canindo

    L1

    L1

    Sabrina Mikhaela Canindo · 52問 · 1年前

    L1

    L1

    52問 • 1年前
    Sabrina Mikhaela Canindo

    Book

    Book

    Sabrina Mikhaela Canindo · 72問 · 1年前

    Book

    Book

    72問 • 1年前
    Sabrina Mikhaela Canindo

    L2

    L2

    Sabrina Mikhaela Canindo · 28問 · 1年前

    L2

    L2

    28問 • 1年前
    Sabrina Mikhaela Canindo

    L3

    L3

    Sabrina Mikhaela Canindo · 80問 · 1年前

    L3

    L3

    80問 • 1年前
    Sabrina Mikhaela Canindo

    Hum 3

    Hum 3

    Sabrina Mikhaela Canindo · 186問 · 1年前

    Hum 3

    Hum 3

    186問 • 1年前
    Sabrina Mikhaela Canindo

    L4

    L4

    Sabrina Mikhaela Canindo · 26問 · 1年前

    L4

    L4

    26問 • 1年前
    Sabrina Mikhaela Canindo

    Obtaining Data

    Obtaining Data

    Sabrina Mikhaela Canindo · 16問 · 1年前

    Obtaining Data

    Obtaining Data

    16問 • 1年前
    Sabrina Mikhaela Canindo

    問題一覧

  • 1

    Is defined as the means of collecting, transporting and disposing of surface water originating in or near the right of way, or flowing in stream crossing or bordering the right of way.

    Drainage

  • 2

    It is the artificial removal of water, both surface and subsurface.

    Drainage

  • 3

    Is often a major element in construction projects and is necessary to avoid flooding and other damage.

    Drainage

  • 4

    Is that branch of physical geography that deals with water of the earth.

    Hydrology

  • 5

    Deals with estimating the highest rate of run-off to be handled.

    Hydraulic Design

  • 6

    Deals with the selection of the kinds and sizes of the drainage facilities that is most economical to accommodate the estimated water flow.

    Hydraulic Design

  • 7

    is to ascertain the design will not create the erosion or other unacceptable environmental conditions.

    Erosion Control

  • 8

    Item 501

    Underdrains

  • 9

    Item 501.3.2

    Underdrain Outlets

  • 10

    Item 501.3.3

    Blind Drain

  • 11

    Is categorized under item 502 of DPWH Standard Specifications

    Underdrain

  • 12

    “This item shall consist of constructing underdrain, using pipes and granular filter material underdrain pipe outlets and blind drains using granular material in accordance with the specification and in reasonably close comfomity with the lines and gradess hown on the plans or as established by the engineer.”

    Underdrain

  • 13

    shall be permeable meeting the requirements of AASHTO M-6 specification except that soundness tests will not be required and minor variations in grading and content of deleterious substances may be approved by the engineer. All materials are subject to inspection before acceptance.

    Granular Backfill Filter Materials

  • 14

    Trench are excavated to the depth and width as planned.

    Underdrain Outlet

  • 15

    Pipes are laid in the trench with all ends firmly joined and backfilled after inspection and approval of the pipe installation.

    Underdrain Outlet

  • 16

    Flood water usually carries objectionable objects like brushes, banana trunks, tree branches etc. This floating debris clog culverts entrances and raises the headwater elevation over-flowing the road and damaging adjoining properties.

    Debris Control

  • 17

    Trenches for this shall be excavated to the width and depth shown on the plans, the trench shall be filled with granular backfill material to the depth required by the plans.

    Blind Drain

  • 18

    Any remaining upper portion of trench shall be filled with either granular or impervious material in accordance with item 103-Structure Escalation.

    Blind Drain

  • 19

    Problems usually encountered in the design and constructions of roadways are:

    Stability of Fill and Slope, Drainage, Permafrost, Elasticity and Rutting

  • 20

    Run-off Predicted Based on the following Method:

    By the Rational Methods, By the Empirical Formula, By the Unit Hydrograph, By Statistical Approach, By Simulation

  • 21

    are under item __ of the DPWH standard specification which includes construction or adjustment of manholes, inlets, and catch basin.

    Manhole, Inlets, Catch Basin, 502

  • 22

    Also known as an inspection chamber.

    Manhole

  • 23

    Provides access to underground utilities, most commonly sewer system.

    Manhole

  • 24

    Usually consist of a chamber or ring.

    Manhole

  • 25

    a vertical circular pipe of carrying sizes and depths, which is used to access inspection points.

    Manhole

  • 26

    -Test Load 10 km

    CLASS A

  • 27

    -Test Load 80 kN

    CLASS B

  • 28

    -Test Load 150 kN

    CLASS C

  • 29

    -Test Load 210 kN

    CLASS D

  • 30

    - Test Load 400 kN, 600 KN and 900 kN

    CLASS E,F,G

  • 31

    Its purpose is to determine the cross-section of the canal that will accommodate water flow smoothly and cheapest to construct and maintain.

    Designing a Channel

  • 32

    Water flowing down a mild slope in an open canal.

    Sub-Critical Flow

  • 33

    Water flow on steep slope.

    Super Critical Flow

  • 34

    exist when the depth of water in the channel is greater than the critical depth.

    Sub-Critical Flow

  • 35

    exists when the depth is less than the critical level.

    Super Critical Flow

  • 36

    occurs when the velocity head is one half the average depths.

    Critical Depth

  • 37

    is the cross-sectional area of the flow divided by its width at the liquid surface.

    Average Depth or Mean Depth

  • 38

    Is the tendency of water to seek its own level as if in an open channels flows trough the pores and fine channel of the soil.

    Capillarity

  • 39

    With the exception of storm drain, it includes all closed conduits with standard design repeated used.

    Culverts

  • 40

    ITEM 519

    Concrete Slope Protection

  • 41

    ITEM 511

    Gabions and Matresses

  • 42

    An existing earth slope that have been stable can experience significant movement called.

    Slope Failure or Landslide

  • 43

    Slope Failure or Landslide due to the following changes:

    Changes in Natural Conditions, Changes Induced by Man

  • 44

    Changes in natural conditions may be the result from:

    Occurrence of Earthquake, Subsidence of Underground Cavern, Erosion, Slope weakening due to the development of cracks or shrinkage cracks that are followed by water intrusions, Variations in the elevations of ground water or changes in the slope subsurface flow that create new seepage forces, Weakening of buried soils or rock seems due to ground water flow or chemical leaching

  • 45

    Changes induced by Man.

    Slide

  • 46

    refers to the occurrence where the moving mass is defined and separated from the underlying and adjacent earth by plane, comprising a number of adjacent planes were seepage result.

    Slide

  • 47

    Slides is classified into four:

    Rotation Slide, Translational Slide, Block or Wedge Failure, Flows and Spread

  • 48

    Types of retaining wall:

    Gravity Walls, Cantilevered Retaining Wall, Sheet Pile Retaining Wall, Bored Pile Retaining Wall, Anchored Retaining Wall

  • 49

    Is constructed with high-strength concrete (usually PCC) and behaves like a beam or slab thi spans and distributes loads over a wider area.

    Rigid Pavement

  • 50

    Rigid Pavement Characteristics:

    High flexural strength, Requires joints to accommodate expansion, contraction, and warping, Less deformation under loads, High initial cost but low maintenance

  • 51

    Rigid Pavement Types:

    JPCP - Jointed Plain Concrete Pavement, JRCP - Jointed Reinforced Concrete Pavement, CRCP - Continuously Reinforced Concrete Pavement

  • 52

    consists of multiple layers that bend (or flex) under loads.

    Flexible Pavement

  • 53

    Load distribution occurs layer by layer until it reaches the subgrade.

    Flexible Pavement

  • 54

    Flexible Pavement Characteristics:

    Low flexural strength, Deforms under loading, Easier and cheaper to construct, Requires more frequent maintenance

  • 55

    Typical Structure Flexible Pavement:

    Surface Course (Asphalt), Base Course, Sub-Base, Subgrade

  • 56

    An empirical method based on CBR (California Bearing Ratio).

    McLeod's Method

  • 57

    CBR

    California Bearing Ratio

  • 58

    Used primarily for military and high-traffic pavements.

    U.S. Corps of Engineers Method

  • 59

    Based on R-value obtained from lab tests.

    California Resistance Value (R-Value) Method

  • 60

    Used to determine subgrade support.

    California Resistance Value (R-Value) Method

  • 61

    Charts or empirical equations relate R-value with thickness required for various traffic loads.

    California Resistance Value (R-Value) Method

  • 62

    Used when subgrade contains expansive clays.

    Expansion Pressure Method

  • 63

    Laboratory tests determine __.

    Expansion Pressure Method, Expansion Pressure

  • 64

    __ is designed to resist uplift caused by soil swelling.

    Expansion Pressure Method, Pavement

  • 65

    Required thickness increases with expansion pressure.

    Expansion Pressure Method

  • 66

    Used to calculate tensile stress at the corner of a rigid concrete slab due to wheel load.

    Goldbeck's Formula (Stress at Corner of Rigid Pavement)

  • 67

    To accommodate vehicle off-tracking and ensure safety, extra width is added on curves.

    Widening of Road on Curves

  • 68

    To design the base course thickness based on the soil's shear strength from __.

    Triaxial Test Method