    The client has already approved the sign of the typical house model for a subdivision project. The architect continued with the preparation of the construction drawings. At this stage, the client ask the architect to prepare also scale model of the different house model to be used in selling the house and lot packages. how will the architect charge for them?

    the cause of each skill model will be charged in addition to the basic fee

  • 2

    the contractor has the right to terminate the contract or suspend work if there is suspension of work for ______ days through no fault of the contractor

    90 days

  • 3

    The consulting architect in this area of practice must have much more than the basic knowledge of green architecture and environmental and/or sustainable design and sufficient knowledge of the governing environmental laws and environmental investigation processes/ procedure under international protocol, the Philippine Solid Waste, Clean Air and Clean Water Acts, DENR administrative issuances and the like

    Building Environmental Certification

  • 4

    A type of pre-design service where the architect determines the adequate size and appropriate configuration and assemblage for the proposed project in consideration of the use, allocation and interface of spaces for given activities. This is done mainly through primary data gathering such as interviews, consultations, interfaces, focus group discussion (FGDs) space planning surveys, space audits, etc. and subsequent analysis ie. spatial layouts with stacking concepts, specially for multi-storey structures

    space planning

  • 5

    can an architect be the architect-of-record and architect-in-charge of construction at the same time

    yes, it is possible

  • 6

    An architect has completed all the necessary documents under the contract documents phase of a residential project and submitted them to the client. The client subsequently paid all the remaining amount for the basic services of the architect. After a month, the client decided not to proceed with the project since the family business went into the financial trouble. Several months later, the brother of the client decided to use the designs for his house to be constructed on a similar situated that same subdivision. The brother did not ask the permission of the architect anymore since the design were already all paid for what will the architect do

    File a case in court

  • 7

    If an architect is hard to design a supermarket with construction cost of less than 50 million pesos, how much should she/he charge in a minimum basic fee based on the old 1979 SPP

    7% of PCC

  • 8

    the period of making good known defects or faults should not be more than many calendar days

    60 days

  • 9

    in case of death of the architect-on-record, who can give official provision to produce his or her plans

    nobody

  • 10

    repairs and corrective works must be done by the contractor within how many days after written notice of owner

    5 days

  • 11

    Under comparative selection, the first step in the selection process involved invitation. The client issues and invitation which includes the term of reference (ToR) for the project which is based on the ___________ paired by another architect

    Design Brief

  • 12

    Which of the following is a responsibility of the architect in the construction phase of the regular design services

    makes periodic visit to the site

  • 13

    The multiplier applied in the multiple of of direct personnel expense depends on the following except one

    cause of transportation

  • 14

    structures belongs to the Group 1 i. Hangars ii. Industrial Plants iii. Packaging & Processing Plants iv. Supermarket

    i, ii, & iii

  • 15

    period for claims for extra cost caused by instructions from architect or owner or due to delays in owner-supplied materials

    15 days

  • 16

    NOT included in the project construction

    fees for the architect

  • 17

    which is an unethical action with respect to the architects responsibility to his colleagues and subordinates

    serving as professional adviser accepts employment as design architects for a completion project

  • 18

    what do you call the person or group appointed by the owner after completion of the building

    building administrator

  • 19

    not classified under Group 2- buildings of moderate complexity of plan/design

    public market

  • 20

    under comparative selection, what is the stage where the selection committee visit buildings designed by the arctics and check references such as former clients and financial institutions

    verification

  • 21

    an architect suggested to the client that a blank wall is one of the portion of the lobby be provided with a mural painting. The client agreed and asked the architect to present a design for the mural painting. The protect hired a popular painter to make the concept design. Who who will pay for the services of the mural painter

    client

  • 22

    Guarantee to execute the work in accordance with the terms of the contract

    performance bond

  • 23

    Is it possible for a person who earned a degree in architecture to take up master degree in architecture even if he has yet to become a board passer

    yes, a bachelor's degree is in architecture is enough

  • 24

    Doesn't represent work and doesn't involve duration and cost, it only serves as dependency connector or sequence indicator

    dummy activity

  • 25

    The breakdown of work and corresponding value of the contract amount which is used as basis for request for payment must be submitted by the contractor, many days from receipt of the NTP

    15 days

  • 26

    what is the meaning of the acronym IAPOA

    Integrated and Accredited Professional Organization of Architects

  • 27

    What do you call working drawings, specifications, estimates and general conditions

    contract documents

  • 28

    who determines time and cause for the project

    owner

  • 29

    where does physical planning service fall

    specialized allied services

  • 30

    contract time starts how many days after received of notice to proceed

    7 days

  • 31

    A type of pre-design services that involves the procurement, analysis and use of secondary information gathered for the project to aid the CIient in early decision-making. It represents the available / readily identifiable directions/options

    pre-feasibility studies

  • 32

    who shall pay for any materials and furnished with the required royalties and patents

    contractor

  • 33

    printed description of work

    specifications

  • 34

    architect's action or request for payment must be made within how many days

    15 days

  • 35

    NOT a disadvantage of an architectural design completion

    opportunities will be open only to all PRC - registered and license architect (RLAs) or PRC - registered architectural firms (AFs)

  • 36

    who gives the directive to start a project

    owner

  • 37

    guarantee to pay all obligation arising from the contract

    payment bond

  • 38

    An architect refuses to give the original plan to the owner, why

    all of the above

  • 39

    in what phase of the architectural design services does the feasibility study is conducted

    Pre-design services

  • 40

    it is a notice or imitation issued to bidders giving information on the magnitude and extent of the project, nature, etc

    invitation to bid

  • 41

    who prepare schedule of submission of details of shop drawings

    architect & contractor

  • 42

    the consulting architect is concerned with the management and use of lawn as well as the conservation, preservation, and upgrading of the human environment

    Comprehensive Development Planning

  • 43

    Longest path in time through the network, delay in one of the activities will increase the project duration

    critical path

  • 44

    for any decrease or increase quantities of work, under-runs or over-runs must not exceed

    5%

  • 45

    NOT criteria for computing the architect's compensation

    Popularity

  • 46

    NOT classified under Group 2 - buildings of moderate complexity of plan/design

    Hotels

  • 47

    Mr. Juan Dela Cruz commissioned you for a restaurant project last year. Due to the success of the restaurant, he wants you to do the second restaurant using the same design based on the old 1979 SPP, what would be your fee

    80% of basic fee

  • 48

    Period for which claim for adjustment has to be asserted for changes in the work

    15 days

  • 49

    What offense is committed when an architect is found using the seal of an architect

    misdemeanor

  • 50

    The architect in this area of practice engages in methods of producing building components in the highly engineered, efficient and cost effective manner, particularly for residential in commercial application

    building system design

  • 51

    lf an architet assumes the function of going to the project site for monitoring and supervision, what services is being provided

    full-time construction supervision

  • 52

    who will be liable for seeking and soliciting architectural works by a non-registered person

    all of the above

  • 53

    NOT included in the project construction cost

    architecture interiors designed by another architect

  • 54

    upon signing the architect-owner agreement for detailed architectural and engineering design services, what is the PRBoA suggested minimum payment to the architect as a mobilization component of the agreed architect's fee

    25,000 pesos

  • 55

    NOT classified under Group 5-monumental buildings and other facilities required consummate design skill and much precise detailing

    exhibition halls

  • 56

    When the client calls upon the architect to give oral or written advice and direction, to attend conferences, to make evaluation and appraisals regarding a contemplated project and similar activities, to architect renders value inputs whether or not the client pursues the project. what pre-design service is this

    consultation

  • 57

    how many percent completion of work shall the architect and issue the certificate of completion

    98%

  • 58

    The architect may be engaged as the building administrator and/or property manager of a commercial, industrial, residential or situational building, facility or complex to maximize the lifespan of the building/s in order to produce a maximum economic return. In building maintenance, architectural

    all of the above

  • 59

    at what stage are classification done

    contract document phase

  • 60

    a type of predesign service wherein the architecture prepares a technique to minimize the negative effect of simplified operation associated with many cost-reduction programs. The goal is to achieve an unpaired program at minimum cost

    value management

  • 61

    under the multiple of Direct Personne Expense, the multiplier ranges from _______ depending on the office set-up, overhead and experience of the architect the complexity of the project

    1.5 - 2.5

  • 62

    what is the percentage of payment for construction management based on old 1975 SPP

    1.5-3% of PCC

  • 63

    A type of pre-design service where the architect prepares the treated analysis of the site involving the identification of a site development potential through the proper utilization of land. The analysis covers the context of the site as well as that of the environment immediately outside and the development control that apply to the site and its environment

    site utilization and land use studies

  • 64

    which is an unethical action with a respect to the architects responsibility to his client

    guarantee any estimates or cost of the work

  • 65

    The cause of the complete building to the owner, including the structure plumbing/ sanitary and electrical fixtures, mechanical equipment,elevators,escalators, air conditioning system, fire protection system, alarm and clock system, communications and electronic system, elements attached to the building and all item indicated in the plans, design, drawings and specification prepared by the architect and his consultant

    project construction cost

  • 66

    which condition does not correctly satisfy an architectural partnership

    a contractor and a lawyer

  • 67

    who does the architect approach for sound control

    acoustics engineer

  • 68

    which is an unethical action with respect to the architects responsibilities to the people

    take part in paid endorsement of building materials

  • 69

    Plans, models and perspective

    instruments of practice

  • 70

    Project development cause shall include i. construction cost ii. professional fees iii. permits iv. lot acquisition v. clearances

    i, ii, iii, iv, v

  • 71

    which of the following is not covered by the owner-architect agreement

    full time construction supervision

  • 72

    The value o extra work must NOT be calculated using this method

    by actual direct cost not exceeding 25% of original work

  • 73

    In what type of surfaces do making of brochures, leaflets, flyers, posters and promotional advertisement campaign are included

    pre-design Services

  • 74

    This cost base method of compensation is applicable only to non-creative work such as accounting, secretarial, research, data gathering, preparation of reports and the like

    multiple of direct personnel expences

  • 75

    The consulting architect in this area of practice place value on the building/ structure condition and defects, and on its repair and maintenance, including the required improvements. Appraisal miss universally defined as an act or process of estimating value

    building appraisal

  • 76

    You were commissioned to do a Master Plan. What should you first

    Study the existing laws

  • 77

    What type of service involves the detailed planning and design of the light transmission, timing and control for compatibiliy with the architectural design concept

    Architectural lighting Iayout and design services

  • 78

    Refers to the orderly arragement within a piece of land or property on which vertical structures such as buildings, monuments and the like, as well as horizontal developments such as right-of-way (ROWs), open spaces and activity spaces are to be proposed

    physical planning

  • 79

    After an expiration of how many years from the date revocation and upon application and for reasons deemed proper and sufficient, reinstate the validity a revoked certificate of registration

    2

  • Building laws Part 1

    Building laws Part 1

    Mari Alberca · 100問 · 1年前

    Building laws Part 1

    Building laws Part 1

    100問 • 1年前
    Mari Alberca

    Building laws Part 2

    Building laws Part 2

    Mari Alberca · 99問 · 1年前

    Building laws Part 2

    Building laws Part 2

    99問 • 1年前
    Mari Alberca

    Building laws Part 3

    Building laws Part 3

    Mari Alberca · 100問 · 1年前

    Building laws Part 3

    Building laws Part 3

    100問 • 1年前
    Mari Alberca

    Building laws Part 4

    Building laws Part 4

    Mari Alberca · 100問 · 1年前

    Building laws Part 4

    Building laws Part 4

    100問 • 1年前
    Mari Alberca

    Building Iaws Part 5

    Building Iaws Part 5

    Mari Alberca · 100問 · 1年前

    Building Iaws Part 5

    Building Iaws Part 5

    100問 • 1年前
    Mari Alberca

    Building Iaws Part 6

    Building Iaws Part 6

    Mari Alberca · 100問 · 1年前

    Building Iaws Part 6

    Building Iaws Part 6

    100問 • 1年前
    Mari Alberca

    Building Iaws Part 7

    Building Iaws Part 7

    Mari Alberca · 48問 · 1年前

    Building Iaws Part 7

    Building Iaws Part 7

    48問 • 1年前
    Mari Alberca

    Architectural Design & Site Planning Part 1

    Architectural Design & Site Planning Part 1

    Mari Alberca · 100問 · 1年前

    Architectural Design & Site Planning Part 1

    Architectural Design & Site Planning Part 1

    100問 • 1年前
    Mari Alberca

    Architectural Design & Site Planning Part 2

    Architectural Design & Site Planning Part 2

    Mari Alberca · 99問 · 1年前

    Architectural Design & Site Planning Part 2

    Architectural Design & Site Planning Part 2

    99問 • 1年前
    Mari Alberca

    Architectural Design & Site Planning Part 3

    Architectural Design & Site Planning Part 3

    Mari Alberca · 100問 · 1年前

    Architectural Design & Site Planning Part 3

    Architectural Design & Site Planning Part 3

    100問 • 1年前
    Mari Alberca

    Architectural Design & Site Planning Part 5

    Architectural Design & Site Planning Part 5

    Mari Alberca · 100問 · 1年前

    Architectural Design & Site Planning Part 5

    Architectural Design & Site Planning Part 5

    100問 • 1年前
    Mari Alberca

    Architectural Design & Site Planning Part 6

    Architectural Design & Site Planning Part 6

    Mari Alberca · 100問 · 1年前

    Architectural Design & Site Planning Part 6

    Architectural Design & Site Planning Part 6

    100問 • 1年前
    Mari Alberca

    Architectural Design & Site Planning Part 7

    Architectural Design & Site Planning Part 7

    Mari Alberca · 100問 · 1年前

    Architectural Design & Site Planning Part 7

    Architectural Design & Site Planning Part 7

    100問 • 1年前
    Mari Alberca

    Architectural Design & Site Planning Part 8

    Architectural Design & Site Planning Part 8

    Mari Alberca · 100問 · 1年前

    Architectural Design & Site Planning Part 8

    Architectural Design & Site Planning Part 8

    100問 • 1年前
    Mari Alberca

    Architectural Design & Site Planning Part 9

    Architectural Design & Site Planning Part 9

    Mari Alberca · 100問 · 1年前

    Architectural Design & Site Planning Part 9

    Architectural Design & Site Planning Part 9

    100問 • 1年前
    Mari Alberca

    Architectural Design & Site Planning Part 10

    Architectural Design & Site Planning Part 10

    Mari Alberca · 30問 · 1年前

    Architectural Design & Site Planning Part 10

    Architectural Design & Site Planning Part 10

    30問 • 1年前
    Mari Alberca

    Plumbing Part 1

    Plumbing Part 1

    Mari Alberca · 105問 · 1年前

    Plumbing Part 1

    Plumbing Part 1

    105問 • 1年前
    Mari Alberca

    Plumbing Part 2

    Plumbing Part 2

    Mari Alberca · 100問 · 1年前

    Plumbing Part 2

    Plumbing Part 2

    100問 • 1年前
    Mari Alberca

    Plumbing Part 3

    Plumbing Part 3

    Mari Alberca · 104問 · 1年前

    Plumbing Part 3

    Plumbing Part 3

    104問 • 1年前
    Mari Alberca

    Plumbing Part 4

    Plumbing Part 4

    Mari Alberca · 100問 · 1年前

    Plumbing Part 4

    Plumbing Part 4

    100問 • 1年前
    Mari Alberca

    Plumbing Part 5

    Plumbing Part 5

    Mari Alberca · 100問 · 1年前

    Plumbing Part 5

    Plumbing Part 5

    100問 • 1年前
    Mari Alberca

    Plumbing Part 6

    Plumbing Part 6

    Mari Alberca · 101問 · 1年前

    Plumbing Part 6

    Plumbing Part 6

    101問 • 1年前
    Mari Alberca

    Building Material Part 1

    Building Material Part 1

    Mari Alberca · 99問 · 1年前

    Building Material Part 1

    Building Material Part 1

    99問 • 1年前
    Mari Alberca

    Building Material Part 2

    Building Material Part 2

    Mari Alberca · 100問 · 1年前

    Building Material Part 2

    Building Material Part 2

    100問 • 1年前
    Mari Alberca

    Building Material Part 3

    Building Material Part 3

    Mari Alberca · 100問 · 1年前

    Building Material Part 3

    Building Material Part 3

    100問 • 1年前
    Mari Alberca

    Building Materials - Sitework

    Building Materials - Sitework

    Mari Alberca · 104問 · 1年前

    Building Materials - Sitework

    Building Materials - Sitework

    104問 • 1年前
    Mari Alberca

    Building Materials - Concrete Part 1

    Building Materials - Concrete Part 1

    Mari Alberca · 100問 · 1年前

    Building Materials - Concrete Part 1

    Building Materials - Concrete Part 1

    100問 • 1年前
    Mari Alberca

    Building Materials - Concrete Part 2

    Building Materials - Concrete Part 2

    Mari Alberca · 110問 · 1年前

    Building Materials - Concrete Part 2

    Building Materials - Concrete Part 2

    110問 • 1年前
    Mari Alberca

    Building Materials - Concrete Part 3

    Building Materials - Concrete Part 3

    Mari Alberca · 110問 · 1年前

    Building Materials - Concrete Part 3

    Building Materials - Concrete Part 3

    110問 • 1年前
    Mari Alberca

    Building Materials - Masonry Part 1

    Building Materials - Masonry Part 1

    Mari Alberca · 100問 · 1年前

    Building Materials - Masonry Part 1

    Building Materials - Masonry Part 1

    100問 • 1年前
    Mari Alberca

    Structural Conceptualization Part 1

    Structural Conceptualization Part 1

    Mari Alberca · 96問 · 1年前

    Structural Conceptualization Part 1

    Structural Conceptualization Part 1

    96問 • 1年前
    Mari Alberca

    Structural Conceptualization Part 2

    Structural Conceptualization Part 2

    Mari Alberca · 100問 · 1年前

    Structural Conceptualization Part 2

    Structural Conceptualization Part 2

    100問 • 1年前
    Mari Alberca

    Structural Conceptualization Part 3

    Structural Conceptualization Part 3

    Mari Alberca · 100問 · 1年前

    Structural Conceptualization Part 3

    Structural Conceptualization Part 3

    100問 • 1年前
    Mari Alberca

    Structural Conceptualization Part 4

    Structural Conceptualization Part 4

    Mari Alberca · 100問 · 1年前

    Structural Conceptualization Part 4

    Structural Conceptualization Part 4

    100問 • 1年前
    Mari Alberca

    Structural Conceptualization Part 5

    Structural Conceptualization Part 5

    Mari Alberca · 46問 · 1年前

    Structural Conceptualization Part 5

    Structural Conceptualization Part 5

    46問 • 1年前
    Mari Alberca

    Theory of Architecture Part 1

    Theory of Architecture Part 1

    Mari Alberca · 100問 · 1年前

    Theory of Architecture Part 1

    Theory of Architecture Part 1

    100問 • 1年前
    Mari Alberca

    Theory of Architecture Part 2

    Theory of Architecture Part 2

    Mari Alberca · 100問 · 1年前

    Theory of Architecture Part 2

    Theory of Architecture Part 2

    100問 • 1年前
    Mari Alberca

    Theory of Architecture Part 3

    Theory of Architecture Part 3

    Mari Alberca · 100問 · 1年前

    Theory of Architecture Part 3

    Theory of Architecture Part 3

    100問 • 1年前
    Mari Alberca

    Theory of Architecture Part 4

    Theory of Architecture Part 4

    Mari Alberca · 100問 · 1年前

    Theory of Architecture Part 4

    Theory of Architecture Part 4

    100問 • 1年前
    Mari Alberca

    Mock Exam 1

    Mock Exam 1

    Mari Alberca · 27問 · 1年前

    Mock Exam 1

    Mock Exam 1

    27問 • 1年前
    Mari Alberca

    Great Buildings

    Great Buildings

    Mari Alberca · 72問 · 1年前

    Great Buildings

    Great Buildings

    72問 • 1年前
    Mari Alberca

    Electrical & Mechanical Part 1

    Electrical & Mechanical Part 1

    Mari Alberca · 91問 · 1年前

    Electrical & Mechanical Part 1

    Electrical & Mechanical Part 1

    91問 • 1年前
    Mari Alberca

    Filipino Architect

    Filipino Architect

    Mari Alberca · 60問 · 1年前

    Filipino Architect

    Filipino Architect

    60問 • 1年前
    Mari Alberca

    Electrical & Mechanical Part 2

    Electrical & Mechanical Part 2

    Mari Alberca · 26問 · 1年前

    Electrical & Mechanical Part 2

    Electrical & Mechanical Part 2

    26問 • 1年前
    Mari Alberca

    Ph Architecture

    Ph Architecture

    Mari Alberca · 22問 · 1年前

    Ph Architecture

    Ph Architecture

    22問 • 1年前
    Mari Alberca

    vernacular terms filipino

    vernacular terms filipino

    Mari Alberca · 96問 · 1年前

    vernacular terms filipino

    vernacular terms filipino

    96問 • 1年前
    Mari Alberca

    Tropical design

    Tropical design

    Mari Alberca · 100問 · 1年前

    Tropical design

    Tropical design

    100問 • 1年前
    Mari Alberca

    Tropical design 2

    Tropical design 2

    Mari Alberca · 100問 · 1年前

    Tropical design 2

    Tropical design 2

    100問 • 1年前
    Mari Alberca

    Tropical design 3

    Tropical design 3

    Mari Alberca · 100問 · 1年前

    Tropical design 3

    Tropical design 3

    100問 • 1年前
    Mari Alberca

    Tropical design 4

    Tropical design 4

    Mari Alberca · 46問 · 1年前

    Tropical design 4

    Tropical design 4

    46問 • 1年前
    Mari Alberca

    Building Materials - Masonry Part 2

    Building Materials - Masonry Part 2

    Mari Alberca · 56問 · 1年前

    Building Materials - Masonry Part 2

    Building Materials - Masonry Part 2

    56問 • 1年前
    Mari Alberca

    Building Materials - Aluminum Part 1

    Building Materials - Aluminum Part 1

    Mari Alberca · 100問 · 1年前

    Building Materials - Aluminum Part 1

    Building Materials - Aluminum Part 1

    100問 • 1年前
    Mari Alberca

    Building Materials - Aluminum Part 2

    Building Materials - Aluminum Part 2

    Mari Alberca · 98問 · 1年前

    Building Materials - Aluminum Part 2

    Building Materials - Aluminum Part 2

    98問 • 1年前
    Mari Alberca

    Building Materials - Wood Part 1

    Building Materials - Wood Part 1

    Mari Alberca · 100問 · 1年前

    Building Materials - Wood Part 1

    Building Materials - Wood Part 1

    100問 • 1年前
    Mari Alberca

    Building Materials - Wood Part 2

    Building Materials - Wood Part 2

    Mari Alberca · 70問 · 1年前

    Building Materials - Wood Part 2

    Building Materials - Wood Part 2

    70問 • 1年前
    Mari Alberca

    Building Materials - Plastic Part 1

    Building Materials - Plastic Part 1

    Mari Alberca · 101問 · 1年前

    Building Materials - Plastic Part 1

    Building Materials - Plastic Part 1

    101問 • 1年前
    Mari Alberca

    Building Materials - Thermal and Moisture Protection

    Building Materials - Thermal and Moisture Protection

    Mari Alberca · 141問 · 1年前

    Building Materials - Thermal and Moisture Protection

    Building Materials - Thermal and Moisture Protection

    141問 • 1年前
    Mari Alberca

    Building Materials - Doors

    Building Materials - Doors

    Mari Alberca · 107問 · 1年前

    Building Materials - Doors

    Building Materials - Doors

    107問 • 1年前
    Mari Alberca

    HOA - Ancient Architecture

    HOA - Ancient Architecture

    Mari Alberca · 42問 · 1年前

    HOA - Ancient Architecture

    HOA - Ancient Architecture

    42問 • 1年前
    Mari Alberca

    HOA - Western Asia

    HOA - Western Asia

    Mari Alberca · 80問 · 1年前

    HOA - Western Asia

    HOA - Western Asia

    80問 • 1年前
    Mari Alberca

    HOA - Ancient Egypt

    HOA - Ancient Egypt

    Mari Alberca · 90問 · 1年前

    HOA - Ancient Egypt

    HOA - Ancient Egypt

    90問 • 1年前
    Mari Alberca

    HOA - Ancient Greek

    HOA - Ancient Greek

    Mari Alberca · 232問 · 1年前

    HOA - Ancient Greek

    HOA - Ancient Greek

    232問 • 1年前
    Mari Alberca

    Building Materials - Windows

    Building Materials - Windows

    Mari Alberca · 75問 · 1年前

    Building Materials - Windows

    Building Materials - Windows

    75問 • 1年前
    Mari Alberca

    Buildings Materials - Hardwares

    Buildings Materials - Hardwares

    Mari Alberca · 138問 · 1年前

    Buildings Materials - Hardwares

    Buildings Materials - Hardwares

    138問 • 1年前
    Mari Alberca

    Buildings Materials - Hardwares (Images)

    Buildings Materials - Hardwares (Images)

    Mari Alberca · 149問 · 1年前

    Buildings Materials - Hardwares (Images)

    Buildings Materials - Hardwares (Images)

    149問 • 1年前
    Mari Alberca

    Buildings Materials - Finish Hardwares

    Buildings Materials - Finish Hardwares

    Mari Alberca · 119問 · 1年前

    Buildings Materials - Finish Hardwares

    Buildings Materials - Finish Hardwares

    119問 • 1年前
    Mari Alberca

    Buildings Materials - Finish Hardwares (Images)

    Buildings Materials - Finish Hardwares (Images)

    Mari Alberca · 156問 · 1年前

    Buildings Materials - Finish Hardwares (Images)

    Buildings Materials - Finish Hardwares (Images)

    156問 • 1年前
    Mari Alberca

    Building Materials - Glass & Glazing

    Building Materials - Glass & Glazing

    Mari Alberca · 69問 · 1年前

    Building Materials - Glass & Glazing

    Building Materials - Glass & Glazing

    69問 • 1年前
    Mari Alberca

    HOA - Roman

    HOA - Roman

    Mari Alberca · 178問 · 1年前

    HOA - Roman

    HOA - Roman

    178問 • 1年前
    Mari Alberca

    HOA - Mesoamerica

    HOA - Mesoamerica

    Mari Alberca · 20問 · 1年前

    HOA - Mesoamerica

    HOA - Mesoamerica

    20問 • 1年前
    Mari Alberca

    Building Material - Glass & Glazing (Images)

    Building Material - Glass & Glazing (Images)

    Mari Alberca · 25問 · 1年前

    Building Material - Glass & Glazing (Images)

    Building Material - Glass & Glazing (Images)

    25問 • 1年前
    Mari Alberca

    Building Materials - Finishes

    Building Materials - Finishes

    Mari Alberca · 181問 · 1年前

    Building Materials - Finishes

    Building Materials - Finishes

    181問 • 1年前
    Mari Alberca

    HOA - Byzantine

    HOA - Byzantine

    Mari Alberca · 77問 · 1年前

    HOA - Byzantine

    HOA - Byzantine

    77問 • 1年前
    Mari Alberca

    Building Materials - Finishes (Images)

    Building Materials - Finishes (Images)

    Mari Alberca · 39問 · 1年前

    Building Materials - Finishes (Images)

    Building Materials - Finishes (Images)

    39問 • 1年前
    Mari Alberca

    問題一覧

  • 1

    The client has already approved the sign of the typical house model for a subdivision project. The architect continued with the preparation of the construction drawings. At this stage, the client ask the architect to prepare also scale model of the different house model to be used in selling the house and lot packages. how will the architect charge for them?

    the cause of each skill model will be charged in addition to the basic fee

  • 2

    the contractor has the right to terminate the contract or suspend work if there is suspension of work for ______ days through no fault of the contractor

    90 days

  • 3

    The consulting architect in this area of practice must have much more than the basic knowledge of green architecture and environmental and/or sustainable design and sufficient knowledge of the governing environmental laws and environmental investigation processes/ procedure under international protocol, the Philippine Solid Waste, Clean Air and Clean Water Acts, DENR administrative issuances and the like

    Building Environmental Certification

  • 4

    A type of pre-design service where the architect determines the adequate size and appropriate configuration and assemblage for the proposed project in consideration of the use, allocation and interface of spaces for given activities. This is done mainly through primary data gathering such as interviews, consultations, interfaces, focus group discussion (FGDs) space planning surveys, space audits, etc. and subsequent analysis ie. spatial layouts with stacking concepts, specially for multi-storey structures

    space planning

  • 5

    can an architect be the architect-of-record and architect-in-charge of construction at the same time

    yes, it is possible

  • 6

    An architect has completed all the necessary documents under the contract documents phase of a residential project and submitted them to the client. The client subsequently paid all the remaining amount for the basic services of the architect. After a month, the client decided not to proceed with the project since the family business went into the financial trouble. Several months later, the brother of the client decided to use the designs for his house to be constructed on a similar situated that same subdivision. The brother did not ask the permission of the architect anymore since the design were already all paid for what will the architect do

    File a case in court

  • 7

    If an architect is hard to design a supermarket with construction cost of less than 50 million pesos, how much should she/he charge in a minimum basic fee based on the old 1979 SPP

    7% of PCC

  • 8

    the period of making good known defects or faults should not be more than many calendar days

    60 days

  • 9

    in case of death of the architect-on-record, who can give official provision to produce his or her plans

    nobody

  • 10

    repairs and corrective works must be done by the contractor within how many days after written notice of owner

    5 days

  • 11

    Under comparative selection, the first step in the selection process involved invitation. The client issues and invitation which includes the term of reference (ToR) for the project which is based on the ___________ paired by another architect

    Design Brief

  • 12

    Which of the following is a responsibility of the architect in the construction phase of the regular design services

    makes periodic visit to the site

  • 13

    The multiplier applied in the multiple of of direct personnel expense depends on the following except one

    cause of transportation

  • 14

    structures belongs to the Group 1 i. Hangars ii. Industrial Plants iii. Packaging & Processing Plants iv. Supermarket

    i, ii, & iii

  • 15

    period for claims for extra cost caused by instructions from architect or owner or due to delays in owner-supplied materials

    15 days

  • 16

    NOT included in the project construction

    fees for the architect

  • 17

    which is an unethical action with respect to the architects responsibility to his colleagues and subordinates

    serving as professional adviser accepts employment as design architects for a completion project

  • 18

    what do you call the person or group appointed by the owner after completion of the building

    building administrator

  • 19

    not classified under Group 2- buildings of moderate complexity of plan/design

    public market

  • 20

    under comparative selection, what is the stage where the selection committee visit buildings designed by the arctics and check references such as former clients and financial institutions

    verification

  • 21

    an architect suggested to the client that a blank wall is one of the portion of the lobby be provided with a mural painting. The client agreed and asked the architect to present a design for the mural painting. The protect hired a popular painter to make the concept design. Who who will pay for the services of the mural painter

    client

  • 22

    Guarantee to execute the work in accordance with the terms of the contract

    performance bond

  • 23

    Is it possible for a person who earned a degree in architecture to take up master degree in architecture even if he has yet to become a board passer

    yes, a bachelor's degree is in architecture is enough

  • 24

    Doesn't represent work and doesn't involve duration and cost, it only serves as dependency connector or sequence indicator

    dummy activity

  • 25

    The breakdown of work and corresponding value of the contract amount which is used as basis for request for payment must be submitted by the contractor, many days from receipt of the NTP

    15 days

  • 26

    what is the meaning of the acronym IAPOA

    Integrated and Accredited Professional Organization of Architects

  • 27

    What do you call working drawings, specifications, estimates and general conditions

    contract documents

  • 28

    who determines time and cause for the project

    owner

  • 29

    where does physical planning service fall

    specialized allied services

  • 30

    contract time starts how many days after received of notice to proceed

    7 days

  • 31

    A type of pre-design services that involves the procurement, analysis and use of secondary information gathered for the project to aid the CIient in early decision-making. It represents the available / readily identifiable directions/options

    pre-feasibility studies

  • 32

    who shall pay for any materials and furnished with the required royalties and patents

    contractor

  • 33

    printed description of work

    specifications

  • 34

    architect's action or request for payment must be made within how many days

    15 days

  • 35

    NOT a disadvantage of an architectural design completion

    opportunities will be open only to all PRC - registered and license architect (RLAs) or PRC - registered architectural firms (AFs)

  • 36

    who gives the directive to start a project

    owner

  • 37

    guarantee to pay all obligation arising from the contract

    payment bond

  • 38

    An architect refuses to give the original plan to the owner, why

    all of the above

  • 39

    in what phase of the architectural design services does the feasibility study is conducted

    Pre-design services

  • 40

    it is a notice or imitation issued to bidders giving information on the magnitude and extent of the project, nature, etc

    invitation to bid

  • 41

    who prepare schedule of submission of details of shop drawings

    architect & contractor

  • 42

    the consulting architect is concerned with the management and use of lawn as well as the conservation, preservation, and upgrading of the human environment

    Comprehensive Development Planning

  • 43

    Longest path in time through the network, delay in one of the activities will increase the project duration

    critical path

  • 44

    for any decrease or increase quantities of work, under-runs or over-runs must not exceed

    5%

  • 45

    NOT criteria for computing the architect's compensation

    Popularity

  • 46

    NOT classified under Group 2 - buildings of moderate complexity of plan/design

    Hotels

  • 47

    Mr. Juan Dela Cruz commissioned you for a restaurant project last year. Due to the success of the restaurant, he wants you to do the second restaurant using the same design based on the old 1979 SPP, what would be your fee

    80% of basic fee

  • 48

    Period for which claim for adjustment has to be asserted for changes in the work

    15 days

  • 49

    What offense is committed when an architect is found using the seal of an architect

    misdemeanor

  • 50

    The architect in this area of practice engages in methods of producing building components in the highly engineered, efficient and cost effective manner, particularly for residential in commercial application

    building system design

  • 51

    lf an architet assumes the function of going to the project site for monitoring and supervision, what services is being provided

    full-time construction supervision

  • 52

    who will be liable for seeking and soliciting architectural works by a non-registered person

    all of the above

  • 53

    NOT included in the project construction cost

    architecture interiors designed by another architect

  • 54

    upon signing the architect-owner agreement for detailed architectural and engineering design services, what is the PRBoA suggested minimum payment to the architect as a mobilization component of the agreed architect's fee

    25,000 pesos

  • 55

    NOT classified under Group 5-monumental buildings and other facilities required consummate design skill and much precise detailing

    exhibition halls

  • 56

    When the client calls upon the architect to give oral or written advice and direction, to attend conferences, to make evaluation and appraisals regarding a contemplated project and similar activities, to architect renders value inputs whether or not the client pursues the project. what pre-design service is this

    consultation

  • 57

    how many percent completion of work shall the architect and issue the certificate of completion

    98%

  • 58

    The architect may be engaged as the building administrator and/or property manager of a commercial, industrial, residential or situational building, facility or complex to maximize the lifespan of the building/s in order to produce a maximum economic return. In building maintenance, architectural

    all of the above

  • 59

    at what stage are classification done

    contract document phase

  • 60

    a type of predesign service wherein the architecture prepares a technique to minimize the negative effect of simplified operation associated with many cost-reduction programs. The goal is to achieve an unpaired program at minimum cost

    value management

  • 61

    under the multiple of Direct Personne Expense, the multiplier ranges from _______ depending on the office set-up, overhead and experience of the architect the complexity of the project

    1.5 - 2.5

  • 62

    what is the percentage of payment for construction management based on old 1975 SPP

    1.5-3% of PCC

  • 63

    A type of pre-design service where the architect prepares the treated analysis of the site involving the identification of a site development potential through the proper utilization of land. The analysis covers the context of the site as well as that of the environment immediately outside and the development control that apply to the site and its environment

    site utilization and land use studies

  • 64

    which is an unethical action with a respect to the architects responsibility to his client

    guarantee any estimates or cost of the work

  • 65

    The cause of the complete building to the owner, including the structure plumbing/ sanitary and electrical fixtures, mechanical equipment,elevators,escalators, air conditioning system, fire protection system, alarm and clock system, communications and electronic system, elements attached to the building and all item indicated in the plans, design, drawings and specification prepared by the architect and his consultant

    project construction cost

  • 66

    which condition does not correctly satisfy an architectural partnership

    a contractor and a lawyer

  • 67

    who does the architect approach for sound control

    acoustics engineer

  • 68

    which is an unethical action with respect to the architects responsibilities to the people

    take part in paid endorsement of building materials

  • 69

    Plans, models and perspective

    instruments of practice

  • 70

    Project development cause shall include i. construction cost ii. professional fees iii. permits iv. lot acquisition v. clearances

    i, ii, iii, iv, v

  • 71

    which of the following is not covered by the owner-architect agreement

    full time construction supervision

  • 72

    The value o extra work must NOT be calculated using this method

    by actual direct cost not exceeding 25% of original work

  • 73

    In what type of surfaces do making of brochures, leaflets, flyers, posters and promotional advertisement campaign are included

    pre-design Services

  • 74

    This cost base method of compensation is applicable only to non-creative work such as accounting, secretarial, research, data gathering, preparation of reports and the like

    multiple of direct personnel expences

  • 75

    The consulting architect in this area of practice place value on the building/ structure condition and defects, and on its repair and maintenance, including the required improvements. Appraisal miss universally defined as an act or process of estimating value

    building appraisal

  • 76

    You were commissioned to do a Master Plan. What should you first

    Study the existing laws

  • 77

    What type of service involves the detailed planning and design of the light transmission, timing and control for compatibiliy with the architectural design concept

    Architectural lighting Iayout and design services

  • 78

    Refers to the orderly arragement within a piece of land or property on which vertical structures such as buildings, monuments and the like, as well as horizontal developments such as right-of-way (ROWs), open spaces and activity spaces are to be proposed

    physical planning

  • 79

    After an expiration of how many years from the date revocation and upon application and for reasons deemed proper and sufficient, reinstate the validity a revoked certificate of registration

    2