Plumbing Part 3

Plumbing Part 3
104問 • 1年前
  • Mari Alberca
  • 通報

    問題一覧

  • 1

    Large, tall urinals built to the wall. Not recommended because the large surface is more prone to fouling. Usually with direct flush valves, while older versions have overhead tanks.

    Stall

  • 2

    Which of the following is the required minimum measurement when setting regulations for individual urinals regarding the urinal center to side

    0.30m

  • 3

    What is the required minimum distance when setting regulations for individual urinals from urinal center to urinal center?

    0.60m

  • 4

    How should through urinals be flushed?

    automatically using flushing tanks

  • 5

    Minimum requirements for urinals for elementary school per 75 males

    1

  • 6

    Minimum requirements for urinals for Second school per 35 males

    1

  • 7

    Minimum requirements for urinals for office or public building per 1-100 males

    1

  • 8

    Minimum requirements for urinals for office or public building per 101-200 males

    2

  • 9

    Minimum requirements for urinals for office or public building per 201-400 males

    3

  • 10

    Minimum requirements for urinals for office or public building per 401-600 males

    4

  • 11

    Minimum requirements for urinals for office or public building for each additional 300 males

    1

  • 12

    Minimum requirements for urinals for Assembly Places (Theaters and auditoriums - for public use) per 1-100 males

    1

  • 13

    Minimum requirements for urinals for Assembly Places (Theaters and auditoriums - for public use) per 101-200 males

    2

  • 14

    Minimum requirements for urinals for Assembly Places (Theaters and auditoriums - for public use) per 201-400 males

    3

  • 15

    Minimum requirements for urinals for Assembly Places (Theaters and auditoriums - for public use) per 401-600 males

    4

  • 16

    Minimum requirements for urinals for Assembly Places (Theaters and auditoriums - for public use) for each additional 500 males

    1

  • 17

    Minimum requirements for urinals for Dormitories per 25 males

    1

  • 18

    Minimum requirements for urinals for Dormitories per 50 males in excess of 150

    1

  • 19

    Minimum requirements for urinals for Industrial and Commerial

    0

  • 20

    Where janitor clean and leave their mops. it's made of pre-cast concrete, cast iron enamel or concrete with tiles

    Slop sinks

  • 21

    What are the configurations of kitchen sinks

    Shallow or Deep well, Single, Double or Triple well

  • 22

    Material use for kitchen sinks

    Cast iron enemeI, Formed steet coated with porcelain enamel, Stainless steel

  • 23

    Material used for Laundry tubs

    cement on cement with tiles, porcelain

  • 24

    Name scullery fixture #1

    Bar sink

  • 25

    Name scullery fixture #2

    Laurdry tubs

  • 26

    Name the types lavatory #1

    Wall-hung

  • 27

    Name classifications of counter lavatories #1

    Flush

  • 28

    with remove panel of sufficient dimension to access pump

    Whirlpool bath

  • 29

    Fixture that appears like a water closet but it is more like a tub. It is used to clean private parts after using the water closet

    Bidets

  • 30

    What is a standard minimum setting of bidet center to side wall

    0.375 m

  • 31

    What is a standard minimum setting of bidet center to bidet center

    0.75 m

  • 32

    A luxury type of bathtubs

    Jacuzzis

  • 33

    A type hinged strainer plate having a sum of area of the small holes or the waterway equal to cross sectional area of the tailpiece

    Floor drains

  • 34

    receptor floors shall drain not less than 2% slope or more than 4% slope. thresholds shall accommodate a minimum 559 wide door. for wheelchair use, dam or curb must be eliminated

    Shower receptors

  • 35

    A metal or alternative enclosure of showers. Have a minimum interior area of 0.60 m² and shelby capable of compassing a 762 mm diameter circle.

    Shower compartments

  • 36

    this area shall be maintained from a point above the shower drain to a height of 1.78 m with no protrusions other than the fixtures valve, shower head and safety grab rails. drains for gang shower rooms shall be space not more than 4.9 m apart

    Shower compartments

  • 37

    Select the general rules in designing the sanitary system

    The pipe should take the shortest possible road to the house sewer or the terminating point of the sanitary system, Control components such as clean-out, traps and vents, should be located strategically so to ensure efficiency

  • 38

    Select the sub-system of the sanitary system

    Waste collection system & Ventilation system

  • 39

    conveys only waterways or liquid waste of feral matter

    Waste pipe

  • 40

    use for ensuring the circulation of the air in a plumbing system and for revealing the negative pressure exerted on the trap seals

    Vent pipe

  • 41

    A fitting or device designed and constructed to provide, when properly vented, a liquid seal which prevented the backflow of foul full air or nothing gas without materially affecting the flow of switch or waterways through it

    Trap

  • 42

    A vertical main of a system of soil, waste or vent pipings extended through one or more stories or wastewater through it.

    Stack

  • 43

    Any part of the piping system other than the main, riser or stack

    Branch

  • 44

    Part of the lowest horizontal piping of the plumbing system, which receives the discharge from the soil waste and other drainage pipe inside of a building and conveys it to the house sewer outside the building

    House or building drain

  • 45

    extended from the house train to a point 0.60 m from the outside face of the foundation wall of a building to the junction with the street sewer or to any point of discharge and conveying the drainage of one building site

    House or building sewer

  • 46

    what is the recommended fitting for the horizontal to horizontal change in direction for sanitary drainage line

    45° wye branch

  • 47

    for a vertical to horizontal change in direction, which fitting is acceptable

    45° wye branch

  • 48

    which fitting should not be used in sanitary drainage lines

    sanitary cross with multiple inlets at the same level

  • 49

    when a double sanitary tees be used in sanitary drainage lines

    when the barrel is at least two pipe size larger than the largest inlet

  • 50

    which is not the following pipe size (in mm) is not recognized for use with double sanitary tees

    160mm

  • 51

    what primarily determines the size of waste pipes or waste soil

    the amount of waste it carries

  • 52

    A Iavatories discharges 0.47 liters/ sec or 28.3 liters/min (7.5 gallons per min or 1 cu ft per min)what is the equivalent to

    one fixture unit (F.U)

  • 53

    for a continuous flow into drainage system (e.g., from a sump pump), how many fixture units are allowed for every 0.063 L/s of flow

    two fixture units

  • 54

    what are the maximum Itrap loading

    32 mm, 38 mm, 51 mm, 76 mm, 102 mm

  • 55

    i plumbing fixture discharge at a rate of 10 gallons per minute (GPM). based on the table, which of the following fixtures unit and (F.U.) ratings best represent this fixtures

    2 F.U.

  • 56

    what is the range of discharge rates, in liters per seconds (L/s), for a fixtures requiring for fixtures units (F.U.)

    1 to 1.89 L/s

  • 57

    if a fixture has a discharge rate of 25 GPM, what is its equivalent fixture unit (F.U.) rating according to the table

    4 F.U.

  • 58

    which of the following discharge rates in the gallons per minute (GPM) would not be accurately represent by the fixture unit ratings in the table

    60 GPM

  • 59

    for a continuous flow into a drainage system from a device like a sump pump or air conditioning equipment, how many fixture units (F.U.) are allocated for every 0.063 L/s of flow?

    2 F.U.

  • 60

    what is the minimum slope or pitch required for horizontal drainage pipes

    2% or 20 mm/m (1/4" per foot)

  • 61

    under what condition might a smaller slope than the standard be allowed for horizontal drainage pipes

    when it is impractical due to factors like sewer depth or building plans, and approved by the administrative authority

  • 62

    use for lavatories, kitchen sinks, laundry tubs, & urinals. the materials commonly used for the nickel, chrome plated brass, galvanized malleable copper & PVC

    common P-Trap

  • 63

    water seal is about twice the size of the common P-trap

    .Deep Seal P-Trap

  • 64

    used for fixture such as slot sinks that are usually built low in the ground giving very to space for a foundation and a trap. serves as a water seal and structural support for the fixture

    Stand Trap

  • 65

    has a large diameter (around 0.16m) and lengths ranging from 0.22 to 0.32 m. use for fixtures that discharge large amount of water (bathtubs, shower or floor drains)

    Drum Trap

  • 66

    type of Permissible Traps

    Common P-Trap, Deep Seal P-Trap, Stand Trap, Drum Trap, Running Trap, Full S - Trap, 3/4 S - Trap

  • 67

    which of the following statement is TRUE regarding a plumbing fixture straps

    only one trap is allowed on a trap arm which is the portion of a fixture train between the trap and the vent

  • 68

    a certain location trap is permitted to serve how many single compartment sinks are laundry tabs in the same room, provided their waste outlets are no more than 0.75 m apart

    3

  • 69

    according to the regulation on trap size, what must be true about the relationship between the trap and its connection trap arm

    the trap and trap must be the same size

  • 70

    what is the required minimum and maximum depth of the water sale in each fixture trap according to the regulation

    51 mm minimum, 102 mm maximum

  • 71

    Bathtubs What is the trap & trap arm size:_______ What is the drainage fixture units:_______

    38mm, 2

  • 72

    Bidets What is the trap & trap arm size:_______ What is the drainage fixture units:_______

    38mm, 2

  • 73

    Floor drains What is the trap & trap arm size:_______ What is the drainage fixture units:_______

    51mm, 2

  • 74

    shower, single stall What is the trap & trap arm size:_______ What is the drainage fixture units:_______

    51mm, 2

  • 75

    sink (residential) What is the trap & trap arm size:_______ What is the drainage fixture units:_______

    38mm, 2

  • 76

    urinals, wall mounted, integral trap What is the trap & trap arm size:_______ What is the drainage fixture units:_______

    51mm, 3

  • 77

    wash basin (single) What is the trap & trap arm size:_______ What is the drainage fixture units:_______

    32mm, 1

  • 78

    water closet (private installation) What is the trap & trap arm size:_______ What is the drainage fixture units:_______

    76mm, 4

  • 79

    water closet (public installation) What is the trap & trap arm size:_______ What is the drainage fixture units:_______

    76mm, 6

  • 80

    what is the maximum allowable vertical distance between fixtures outlet tail piece and the trap where weir

    0.60 m

  • 81

    what is the recommended distance to prevent for trap arm with diameter of 38 m

    1.07 m

  • 82

    the trap distance should never be less than what multiple of the trap arm diameter

    2 times

  • 83

    what's the maximum developed length of a trap arm (measuring from the top of the closet ring to the inner edge of the vent) for a water closet or similar fixture

    1.80 m

  • 84

    for trap arms of what diameter or larger is a clean out required for a change of direction greater than 22%

    76 mm

  • 85

    the horizontal distance of trap arms for what type of textures and is not applicable

    water closet

  • 86

    what is the minimum depth of the water seal required for interceptors that separate deleterious, hazardous, or undesirable matters normal waste

    152 mm

  • 87

    what must be done to each interceptor

    it must be properly vented

  • 88

    which of the following establishment is specifically mentioned as needed to drain wastewater through a screening device and into grease interceptor

    slaughter houses

  • 89

    what type of wastewater is mentioned as requiring a grease interceptor

    wastewater with considerable amount of grease, hair, and feathers

  • 90

    what is the purpose of the interceptor regarding auto wash racks and floor slabs

    separate oil and greases before effluent reaches the public stream

  • 91

    clean out are required at the upper terminal of every horizontal sewer or waste line under what condition

    for lines more than 15 m (50 feet) in total developed length, and at every 15 m (50 ft) of total developed length or a fraction thereof

  • 92

    when is an additional clean-out required on a horizontal line

    when there is an aggregate offset angle exceeding 135°

  • 93

    where else are clean-out required based on the upper terminal of horizontal lines

    inside the building near the connection between the building drain and the building sewer, or outside at the lower end of the building drain and extended to grade

  • 94

    under what condition are clean-outs NOT required on a horizontal drain less than 1.5 m in length

    if the lines is is installed at slope of 72° or less from the vertical line (or at the angle of 1/5 bend)

  • 95

    what is the approximate equivalent in feet of 15 m

    50 feet

  • 96

    what is the size of clean out is required for a 38 mm pipe, What is the threads per 25.4 mm.

    38 mm, 11-1/2

  • 97

    what is the size of clean out is required for a 51 mm pipe. What is the threads per 25.4 mm

    38 m, 11-1/2

  • 98

    what is the size of clean out is required for a 64 mm pipe. What is the threads per 25.4 mm

    64 mm, 8

  • 99

    what is the size of clean out is required for a 76 mm pipe. What is the threads per 25.4 mm

    64 mm, 8

  • 100

    What is the size of clean-out is required for a 102 mm & larger pipe.? What is the threads per 25.4 mm?

    89 mm, 8

  • Building laws Part 1

    Building laws Part 1

    Mari Alberca · 100問 · 1年前

    Building laws Part 1

    Building laws Part 1

    100問 • 1年前
    Mari Alberca

    Building laws Part 2

    Building laws Part 2

    Mari Alberca · 99問 · 1年前

    Building laws Part 2

    Building laws Part 2

    99問 • 1年前
    Mari Alberca

    Building laws Part 3

    Building laws Part 3

    Mari Alberca · 100問 · 1年前

    Building laws Part 3

    Building laws Part 3

    100問 • 1年前
    Mari Alberca

    Building laws Part 4

    Building laws Part 4

    Mari Alberca · 100問 · 1年前

    Building laws Part 4

    Building laws Part 4

    100問 • 1年前
    Mari Alberca

    Building Iaws Part 5

    Building Iaws Part 5

    Mari Alberca · 100問 · 1年前

    Building Iaws Part 5

    Building Iaws Part 5

    100問 • 1年前
    Mari Alberca

    Building Iaws Part 6

    Building Iaws Part 6

    Mari Alberca · 100問 · 1年前

    Building Iaws Part 6

    Building Iaws Part 6

    100問 • 1年前
    Mari Alberca

    Building Iaws Part 7

    Building Iaws Part 7

    Mari Alberca · 48問 · 1年前

    Building Iaws Part 7

    Building Iaws Part 7

    48問 • 1年前
    Mari Alberca

    Architectural Design & Site Planning Part 1

    Architectural Design & Site Planning Part 1

    Mari Alberca · 100問 · 1年前

    Architectural Design & Site Planning Part 1

    Architectural Design & Site Planning Part 1

    100問 • 1年前
    Mari Alberca

    Architectural Design & Site Planning Part 2

    Architectural Design & Site Planning Part 2

    Mari Alberca · 99問 · 1年前

    Architectural Design & Site Planning Part 2

    Architectural Design & Site Planning Part 2

    99問 • 1年前
    Mari Alberca

    Architectural Design & Site Planning Part 3

    Architectural Design & Site Planning Part 3

    Mari Alberca · 100問 · 1年前

    Architectural Design & Site Planning Part 3

    Architectural Design & Site Planning Part 3

    100問 • 1年前
    Mari Alberca

    Architectural Design & Site Planning Part 5

    Architectural Design & Site Planning Part 5

    Mari Alberca · 100問 · 1年前

    Architectural Design & Site Planning Part 5

    Architectural Design & Site Planning Part 5

    100問 • 1年前
    Mari Alberca

    Architectural Design & Site Planning Part 6

    Architectural Design & Site Planning Part 6

    Mari Alberca · 100問 · 1年前

    Architectural Design & Site Planning Part 6

    Architectural Design & Site Planning Part 6

    100問 • 1年前
    Mari Alberca

    Architectural Design & Site Planning Part 7

    Architectural Design & Site Planning Part 7

    Mari Alberca · 100問 · 1年前

    Architectural Design & Site Planning Part 7

    Architectural Design & Site Planning Part 7

    100問 • 1年前
    Mari Alberca

    Architectural Design & Site Planning Part 8

    Architectural Design & Site Planning Part 8

    Mari Alberca · 100問 · 1年前

    Architectural Design & Site Planning Part 8

    Architectural Design & Site Planning Part 8

    100問 • 1年前
    Mari Alberca

    Architectural Design & Site Planning Part 9

    Architectural Design & Site Planning Part 9

    Mari Alberca · 100問 · 1年前

    Architectural Design & Site Planning Part 9

    Architectural Design & Site Planning Part 9

    100問 • 1年前
    Mari Alberca

    Architectural Design & Site Planning Part 10

    Architectural Design & Site Planning Part 10

    Mari Alberca · 30問 · 1年前

    Architectural Design & Site Planning Part 10

    Architectural Design & Site Planning Part 10

    30問 • 1年前
    Mari Alberca

    Plumbing Part 1

    Plumbing Part 1

    Mari Alberca · 105問 · 1年前

    Plumbing Part 1

    Plumbing Part 1

    105問 • 1年前
    Mari Alberca

    Plumbing Part 2

    Plumbing Part 2

    Mari Alberca · 100問 · 1年前

    Plumbing Part 2

    Plumbing Part 2

    100問 • 1年前
    Mari Alberca

    Plumbing Part 4

    Plumbing Part 4

    Mari Alberca · 100問 · 1年前

    Plumbing Part 4

    Plumbing Part 4

    100問 • 1年前
    Mari Alberca

    Plumbing Part 5

    Plumbing Part 5

    Mari Alberca · 100問 · 1年前

    Plumbing Part 5

    Plumbing Part 5

    100問 • 1年前
    Mari Alberca

    Plumbing Part 6

    Plumbing Part 6

    Mari Alberca · 101問 · 1年前

    Plumbing Part 6

    Plumbing Part 6

    101問 • 1年前
    Mari Alberca

    Building Material Part 1

    Building Material Part 1

    Mari Alberca · 99問 · 1年前

    Building Material Part 1

    Building Material Part 1

    99問 • 1年前
    Mari Alberca

    Building Material Part 2

    Building Material Part 2

    Mari Alberca · 100問 · 1年前

    Building Material Part 2

    Building Material Part 2

    100問 • 1年前
    Mari Alberca

    Building Material Part 3

    Building Material Part 3

    Mari Alberca · 100問 · 1年前

    Building Material Part 3

    Building Material Part 3

    100問 • 1年前
    Mari Alberca

    Building Materials - Sitework

    Building Materials - Sitework

    Mari Alberca · 104問 · 1年前

    Building Materials - Sitework

    Building Materials - Sitework

    104問 • 1年前
    Mari Alberca

    Building Materials - Concrete Part 1

    Building Materials - Concrete Part 1

    Mari Alberca · 100問 · 1年前

    Building Materials - Concrete Part 1

    Building Materials - Concrete Part 1

    100問 • 1年前
    Mari Alberca

    Building Materials - Concrete Part 2

    Building Materials - Concrete Part 2

    Mari Alberca · 110問 · 1年前

    Building Materials - Concrete Part 2

    Building Materials - Concrete Part 2

    110問 • 1年前
    Mari Alberca

    Building Materials - Concrete Part 3

    Building Materials - Concrete Part 3

    Mari Alberca · 110問 · 1年前

    Building Materials - Concrete Part 3

    Building Materials - Concrete Part 3

    110問 • 1年前
    Mari Alberca

    Building Materials - Masonry Part 1

    Building Materials - Masonry Part 1

    Mari Alberca · 100問 · 1年前

    Building Materials - Masonry Part 1

    Building Materials - Masonry Part 1

    100問 • 1年前
    Mari Alberca

    Structural Conceptualization Part 1

    Structural Conceptualization Part 1

    Mari Alberca · 96問 · 1年前

    Structural Conceptualization Part 1

    Structural Conceptualization Part 1

    96問 • 1年前
    Mari Alberca

    Structural Conceptualization Part 2

    Structural Conceptualization Part 2

    Mari Alberca · 100問 · 1年前

    Structural Conceptualization Part 2

    Structural Conceptualization Part 2

    100問 • 1年前
    Mari Alberca

    Structural Conceptualization Part 3

    Structural Conceptualization Part 3

    Mari Alberca · 100問 · 1年前

    Structural Conceptualization Part 3

    Structural Conceptualization Part 3

    100問 • 1年前
    Mari Alberca

    Structural Conceptualization Part 4

    Structural Conceptualization Part 4

    Mari Alberca · 100問 · 1年前

    Structural Conceptualization Part 4

    Structural Conceptualization Part 4

    100問 • 1年前
    Mari Alberca

    Structural Conceptualization Part 5

    Structural Conceptualization Part 5

    Mari Alberca · 46問 · 1年前

    Structural Conceptualization Part 5

    Structural Conceptualization Part 5

    46問 • 1年前
    Mari Alberca

    Theory of Architecture Part 1

    Theory of Architecture Part 1

    Mari Alberca · 100問 · 1年前

    Theory of Architecture Part 1

    Theory of Architecture Part 1

    100問 • 1年前
    Mari Alberca

    Theory of Architecture Part 2

    Theory of Architecture Part 2

    Mari Alberca · 100問 · 1年前

    Theory of Architecture Part 2

    Theory of Architecture Part 2

    100問 • 1年前
    Mari Alberca

    Theory of Architecture Part 3

    Theory of Architecture Part 3

    Mari Alberca · 100問 · 1年前

    Theory of Architecture Part 3

    Theory of Architecture Part 3

    100問 • 1年前
    Mari Alberca

    Theory of Architecture Part 4

    Theory of Architecture Part 4

    Mari Alberca · 100問 · 1年前

    Theory of Architecture Part 4

    Theory of Architecture Part 4

    100問 • 1年前
    Mari Alberca

    Professional Practice

    Professional Practice

    Mari Alberca · 79問 · 1年前

    Professional Practice

    Professional Practice

    79問 • 1年前
    Mari Alberca

    Mock Exam 1

    Mock Exam 1

    Mari Alberca · 27問 · 1年前

    Mock Exam 1

    Mock Exam 1

    27問 • 1年前
    Mari Alberca

    Great Buildings

    Great Buildings

    Mari Alberca · 72問 · 1年前

    Great Buildings

    Great Buildings

    72問 • 1年前
    Mari Alberca

    Electrical & Mechanical Part 1

    Electrical & Mechanical Part 1

    Mari Alberca · 91問 · 1年前

    Electrical & Mechanical Part 1

    Electrical & Mechanical Part 1

    91問 • 1年前
    Mari Alberca

    Filipino Architect

    Filipino Architect

    Mari Alberca · 60問 · 1年前

    Filipino Architect

    Filipino Architect

    60問 • 1年前
    Mari Alberca

    Electrical & Mechanical Part 2

    Electrical & Mechanical Part 2

    Mari Alberca · 26問 · 1年前

    Electrical & Mechanical Part 2

    Electrical & Mechanical Part 2

    26問 • 1年前
    Mari Alberca

    Ph Architecture

    Ph Architecture

    Mari Alberca · 22問 · 1年前

    Ph Architecture

    Ph Architecture

    22問 • 1年前
    Mari Alberca

    vernacular terms filipino

    vernacular terms filipino

    Mari Alberca · 96問 · 1年前

    vernacular terms filipino

    vernacular terms filipino

    96問 • 1年前
    Mari Alberca

    Tropical design

    Tropical design

    Mari Alberca · 100問 · 1年前

    Tropical design

    Tropical design

    100問 • 1年前
    Mari Alberca

    Tropical design 2

    Tropical design 2

    Mari Alberca · 100問 · 1年前

    Tropical design 2

    Tropical design 2

    100問 • 1年前
    Mari Alberca

    Tropical design 3

    Tropical design 3

    Mari Alberca · 100問 · 1年前

    Tropical design 3

    Tropical design 3

    100問 • 1年前
    Mari Alberca

    Tropical design 4

    Tropical design 4

    Mari Alberca · 46問 · 1年前

    Tropical design 4

    Tropical design 4

    46問 • 1年前
    Mari Alberca

    Building Materials - Masonry Part 2

    Building Materials - Masonry Part 2

    Mari Alberca · 56問 · 1年前

    Building Materials - Masonry Part 2

    Building Materials - Masonry Part 2

    56問 • 1年前
    Mari Alberca

    Building Materials - Aluminum Part 1

    Building Materials - Aluminum Part 1

    Mari Alberca · 100問 · 1年前

    Building Materials - Aluminum Part 1

    Building Materials - Aluminum Part 1

    100問 • 1年前
    Mari Alberca

    Building Materials - Aluminum Part 2

    Building Materials - Aluminum Part 2

    Mari Alberca · 98問 · 1年前

    Building Materials - Aluminum Part 2

    Building Materials - Aluminum Part 2

    98問 • 1年前
    Mari Alberca

    Building Materials - Wood Part 1

    Building Materials - Wood Part 1

    Mari Alberca · 100問 · 1年前

    Building Materials - Wood Part 1

    Building Materials - Wood Part 1

    100問 • 1年前
    Mari Alberca

    Building Materials - Wood Part 2

    Building Materials - Wood Part 2

    Mari Alberca · 70問 · 1年前

    Building Materials - Wood Part 2

    Building Materials - Wood Part 2

    70問 • 1年前
    Mari Alberca

    Building Materials - Plastic Part 1

    Building Materials - Plastic Part 1

    Mari Alberca · 101問 · 1年前

    Building Materials - Plastic Part 1

    Building Materials - Plastic Part 1

    101問 • 1年前
    Mari Alberca

    Building Materials - Thermal and Moisture Protection

    Building Materials - Thermal and Moisture Protection

    Mari Alberca · 141問 · 1年前

    Building Materials - Thermal and Moisture Protection

    Building Materials - Thermal and Moisture Protection

    141問 • 1年前
    Mari Alberca

    Building Materials - Doors

    Building Materials - Doors

    Mari Alberca · 107問 · 1年前

    Building Materials - Doors

    Building Materials - Doors

    107問 • 1年前
    Mari Alberca

    HOA - Ancient Architecture

    HOA - Ancient Architecture

    Mari Alberca · 42問 · 1年前

    HOA - Ancient Architecture

    HOA - Ancient Architecture

    42問 • 1年前
    Mari Alberca

    HOA - Western Asia

    HOA - Western Asia

    Mari Alberca · 80問 · 1年前

    HOA - Western Asia

    HOA - Western Asia

    80問 • 1年前
    Mari Alberca

    HOA - Ancient Egypt

    HOA - Ancient Egypt

    Mari Alberca · 90問 · 1年前

    HOA - Ancient Egypt

    HOA - Ancient Egypt

    90問 • 1年前
    Mari Alberca

    HOA - Ancient Greek

    HOA - Ancient Greek

    Mari Alberca · 232問 · 1年前

    HOA - Ancient Greek

    HOA - Ancient Greek

    232問 • 1年前
    Mari Alberca

    Building Materials - Windows

    Building Materials - Windows

    Mari Alberca · 75問 · 1年前

    Building Materials - Windows

    Building Materials - Windows

    75問 • 1年前
    Mari Alberca

    Buildings Materials - Hardwares

    Buildings Materials - Hardwares

    Mari Alberca · 138問 · 1年前

    Buildings Materials - Hardwares

    Buildings Materials - Hardwares

    138問 • 1年前
    Mari Alberca

    Buildings Materials - Hardwares (Images)

    Buildings Materials - Hardwares (Images)

    Mari Alberca · 149問 · 1年前

    Buildings Materials - Hardwares (Images)

    Buildings Materials - Hardwares (Images)

    149問 • 1年前
    Mari Alberca

    Buildings Materials - Finish Hardwares

    Buildings Materials - Finish Hardwares

    Mari Alberca · 119問 · 1年前

    Buildings Materials - Finish Hardwares

    Buildings Materials - Finish Hardwares

    119問 • 1年前
    Mari Alberca

    Buildings Materials - Finish Hardwares (Images)

    Buildings Materials - Finish Hardwares (Images)

    Mari Alberca · 156問 · 1年前

    Buildings Materials - Finish Hardwares (Images)

    Buildings Materials - Finish Hardwares (Images)

    156問 • 1年前
    Mari Alberca

    Building Materials - Glass & Glazing

    Building Materials - Glass & Glazing

    Mari Alberca · 69問 · 1年前

    Building Materials - Glass & Glazing

    Building Materials - Glass & Glazing

    69問 • 1年前
    Mari Alberca

    HOA - Roman

    HOA - Roman

    Mari Alberca · 178問 · 1年前

    HOA - Roman

    HOA - Roman

    178問 • 1年前
    Mari Alberca

    HOA - Mesoamerica

    HOA - Mesoamerica

    Mari Alberca · 20問 · 1年前

    HOA - Mesoamerica

    HOA - Mesoamerica

    20問 • 1年前
    Mari Alberca

    Building Material - Glass & Glazing (Images)

    Building Material - Glass & Glazing (Images)

    Mari Alberca · 25問 · 1年前

    Building Material - Glass & Glazing (Images)

    Building Material - Glass & Glazing (Images)

    25問 • 1年前
    Mari Alberca

    Building Materials - Finishes

    Building Materials - Finishes

    Mari Alberca · 181問 · 1年前

    Building Materials - Finishes

    Building Materials - Finishes

    181問 • 1年前
    Mari Alberca

    HOA - Byzantine

    HOA - Byzantine

    Mari Alberca · 77問 · 1年前

    HOA - Byzantine

    HOA - Byzantine

    77問 • 1年前
    Mari Alberca

    Building Materials - Finishes (Images)

    Building Materials - Finishes (Images)

    Mari Alberca · 39問 · 1年前

    Building Materials - Finishes (Images)

    Building Materials - Finishes (Images)

    39問 • 1年前
    Mari Alberca

    問題一覧

  • 1

    Large, tall urinals built to the wall. Not recommended because the large surface is more prone to fouling. Usually with direct flush valves, while older versions have overhead tanks.

    Stall

  • 2

    Which of the following is the required minimum measurement when setting regulations for individual urinals regarding the urinal center to side

    0.30m

  • 3

    What is the required minimum distance when setting regulations for individual urinals from urinal center to urinal center?

    0.60m

  • 4

    How should through urinals be flushed?

    automatically using flushing tanks

  • 5

    Minimum requirements for urinals for elementary school per 75 males

    1

  • 6

    Minimum requirements for urinals for Second school per 35 males

    1

  • 7

    Minimum requirements for urinals for office or public building per 1-100 males

    1

  • 8

    Minimum requirements for urinals for office or public building per 101-200 males

    2

  • 9

    Minimum requirements for urinals for office or public building per 201-400 males

    3

  • 10

    Minimum requirements for urinals for office or public building per 401-600 males

    4

  • 11

    Minimum requirements for urinals for office or public building for each additional 300 males

    1

  • 12

    Minimum requirements for urinals for Assembly Places (Theaters and auditoriums - for public use) per 1-100 males

    1

  • 13

    Minimum requirements for urinals for Assembly Places (Theaters and auditoriums - for public use) per 101-200 males

    2

  • 14

    Minimum requirements for urinals for Assembly Places (Theaters and auditoriums - for public use) per 201-400 males

    3

  • 15

    Minimum requirements for urinals for Assembly Places (Theaters and auditoriums - for public use) per 401-600 males

    4

  • 16

    Minimum requirements for urinals for Assembly Places (Theaters and auditoriums - for public use) for each additional 500 males

    1

  • 17

    Minimum requirements for urinals for Dormitories per 25 males

    1

  • 18

    Minimum requirements for urinals for Dormitories per 50 males in excess of 150

    1

  • 19

    Minimum requirements for urinals for Industrial and Commerial

    0

  • 20

    Where janitor clean and leave their mops. it's made of pre-cast concrete, cast iron enamel or concrete with tiles

    Slop sinks

  • 21

    What are the configurations of kitchen sinks

    Shallow or Deep well, Single, Double or Triple well

  • 22

    Material use for kitchen sinks

    Cast iron enemeI, Formed steet coated with porcelain enamel, Stainless steel

  • 23

    Material used for Laundry tubs

    cement on cement with tiles, porcelain

  • 24

    Name scullery fixture #1

    Bar sink

  • 25

    Name scullery fixture #2

    Laurdry tubs

  • 26

    Name the types lavatory #1

    Wall-hung

  • 27

    Name classifications of counter lavatories #1

    Flush

  • 28

    with remove panel of sufficient dimension to access pump

    Whirlpool bath

  • 29

    Fixture that appears like a water closet but it is more like a tub. It is used to clean private parts after using the water closet

    Bidets

  • 30

    What is a standard minimum setting of bidet center to side wall

    0.375 m

  • 31

    What is a standard minimum setting of bidet center to bidet center

    0.75 m

  • 32

    A luxury type of bathtubs

    Jacuzzis

  • 33

    A type hinged strainer plate having a sum of area of the small holes or the waterway equal to cross sectional area of the tailpiece

    Floor drains

  • 34

    receptor floors shall drain not less than 2% slope or more than 4% slope. thresholds shall accommodate a minimum 559 wide door. for wheelchair use, dam or curb must be eliminated

    Shower receptors

  • 35

    A metal or alternative enclosure of showers. Have a minimum interior area of 0.60 m² and shelby capable of compassing a 762 mm diameter circle.

    Shower compartments

  • 36

    this area shall be maintained from a point above the shower drain to a height of 1.78 m with no protrusions other than the fixtures valve, shower head and safety grab rails. drains for gang shower rooms shall be space not more than 4.9 m apart

    Shower compartments

  • 37

    Select the general rules in designing the sanitary system

    The pipe should take the shortest possible road to the house sewer or the terminating point of the sanitary system, Control components such as clean-out, traps and vents, should be located strategically so to ensure efficiency

  • 38

    Select the sub-system of the sanitary system

    Waste collection system & Ventilation system

  • 39

    conveys only waterways or liquid waste of feral matter

    Waste pipe

  • 40

    use for ensuring the circulation of the air in a plumbing system and for revealing the negative pressure exerted on the trap seals

    Vent pipe

  • 41

    A fitting or device designed and constructed to provide, when properly vented, a liquid seal which prevented the backflow of foul full air or nothing gas without materially affecting the flow of switch or waterways through it

    Trap

  • 42

    A vertical main of a system of soil, waste or vent pipings extended through one or more stories or wastewater through it.

    Stack

  • 43

    Any part of the piping system other than the main, riser or stack

    Branch

  • 44

    Part of the lowest horizontal piping of the plumbing system, which receives the discharge from the soil waste and other drainage pipe inside of a building and conveys it to the house sewer outside the building

    House or building drain

  • 45

    extended from the house train to a point 0.60 m from the outside face of the foundation wall of a building to the junction with the street sewer or to any point of discharge and conveying the drainage of one building site

    House or building sewer

  • 46

    what is the recommended fitting for the horizontal to horizontal change in direction for sanitary drainage line

    45° wye branch

  • 47

    for a vertical to horizontal change in direction, which fitting is acceptable

    45° wye branch

  • 48

    which fitting should not be used in sanitary drainage lines

    sanitary cross with multiple inlets at the same level

  • 49

    when a double sanitary tees be used in sanitary drainage lines

    when the barrel is at least two pipe size larger than the largest inlet

  • 50

    which is not the following pipe size (in mm) is not recognized for use with double sanitary tees

    160mm

  • 51

    what primarily determines the size of waste pipes or waste soil

    the amount of waste it carries

  • 52

    A Iavatories discharges 0.47 liters/ sec or 28.3 liters/min (7.5 gallons per min or 1 cu ft per min)what is the equivalent to

    one fixture unit (F.U)

  • 53

    for a continuous flow into drainage system (e.g., from a sump pump), how many fixture units are allowed for every 0.063 L/s of flow

    two fixture units

  • 54

    what are the maximum Itrap loading

    32 mm, 38 mm, 51 mm, 76 mm, 102 mm

  • 55

    i plumbing fixture discharge at a rate of 10 gallons per minute (GPM). based on the table, which of the following fixtures unit and (F.U.) ratings best represent this fixtures

    2 F.U.

  • 56

    what is the range of discharge rates, in liters per seconds (L/s), for a fixtures requiring for fixtures units (F.U.)

    1 to 1.89 L/s

  • 57

    if a fixture has a discharge rate of 25 GPM, what is its equivalent fixture unit (F.U.) rating according to the table

    4 F.U.

  • 58

    which of the following discharge rates in the gallons per minute (GPM) would not be accurately represent by the fixture unit ratings in the table

    60 GPM

  • 59

    for a continuous flow into a drainage system from a device like a sump pump or air conditioning equipment, how many fixture units (F.U.) are allocated for every 0.063 L/s of flow?

    2 F.U.

  • 60

    what is the minimum slope or pitch required for horizontal drainage pipes

    2% or 20 mm/m (1/4" per foot)

  • 61

    under what condition might a smaller slope than the standard be allowed for horizontal drainage pipes

    when it is impractical due to factors like sewer depth or building plans, and approved by the administrative authority

  • 62

    use for lavatories, kitchen sinks, laundry tubs, & urinals. the materials commonly used for the nickel, chrome plated brass, galvanized malleable copper & PVC

    common P-Trap

  • 63

    water seal is about twice the size of the common P-trap

    .Deep Seal P-Trap

  • 64

    used for fixture such as slot sinks that are usually built low in the ground giving very to space for a foundation and a trap. serves as a water seal and structural support for the fixture

    Stand Trap

  • 65

    has a large diameter (around 0.16m) and lengths ranging from 0.22 to 0.32 m. use for fixtures that discharge large amount of water (bathtubs, shower or floor drains)

    Drum Trap

  • 66

    type of Permissible Traps

    Common P-Trap, Deep Seal P-Trap, Stand Trap, Drum Trap, Running Trap, Full S - Trap, 3/4 S - Trap

  • 67

    which of the following statement is TRUE regarding a plumbing fixture straps

    only one trap is allowed on a trap arm which is the portion of a fixture train between the trap and the vent

  • 68

    a certain location trap is permitted to serve how many single compartment sinks are laundry tabs in the same room, provided their waste outlets are no more than 0.75 m apart

    3

  • 69

    according to the regulation on trap size, what must be true about the relationship between the trap and its connection trap arm

    the trap and trap must be the same size

  • 70

    what is the required minimum and maximum depth of the water sale in each fixture trap according to the regulation

    51 mm minimum, 102 mm maximum

  • 71

    Bathtubs What is the trap & trap arm size:_______ What is the drainage fixture units:_______

    38mm, 2

  • 72

    Bidets What is the trap & trap arm size:_______ What is the drainage fixture units:_______

    38mm, 2

  • 73

    Floor drains What is the trap & trap arm size:_______ What is the drainage fixture units:_______

    51mm, 2

  • 74

    shower, single stall What is the trap & trap arm size:_______ What is the drainage fixture units:_______

    51mm, 2

  • 75

    sink (residential) What is the trap & trap arm size:_______ What is the drainage fixture units:_______

    38mm, 2

  • 76

    urinals, wall mounted, integral trap What is the trap & trap arm size:_______ What is the drainage fixture units:_______

    51mm, 3

  • 77

    wash basin (single) What is the trap & trap arm size:_______ What is the drainage fixture units:_______

    32mm, 1

  • 78

    water closet (private installation) What is the trap & trap arm size:_______ What is the drainage fixture units:_______

    76mm, 4

  • 79

    water closet (public installation) What is the trap & trap arm size:_______ What is the drainage fixture units:_______

    76mm, 6

  • 80

    what is the maximum allowable vertical distance between fixtures outlet tail piece and the trap where weir

    0.60 m

  • 81

    what is the recommended distance to prevent for trap arm with diameter of 38 m

    1.07 m

  • 82

    the trap distance should never be less than what multiple of the trap arm diameter

    2 times

  • 83

    what's the maximum developed length of a trap arm (measuring from the top of the closet ring to the inner edge of the vent) for a water closet or similar fixture

    1.80 m

  • 84

    for trap arms of what diameter or larger is a clean out required for a change of direction greater than 22%

    76 mm

  • 85

    the horizontal distance of trap arms for what type of textures and is not applicable

    water closet

  • 86

    what is the minimum depth of the water seal required for interceptors that separate deleterious, hazardous, or undesirable matters normal waste

    152 mm

  • 87

    what must be done to each interceptor

    it must be properly vented

  • 88

    which of the following establishment is specifically mentioned as needed to drain wastewater through a screening device and into grease interceptor

    slaughter houses

  • 89

    what type of wastewater is mentioned as requiring a grease interceptor

    wastewater with considerable amount of grease, hair, and feathers

  • 90

    what is the purpose of the interceptor regarding auto wash racks and floor slabs

    separate oil and greases before effluent reaches the public stream

  • 91

    clean out are required at the upper terminal of every horizontal sewer or waste line under what condition

    for lines more than 15 m (50 feet) in total developed length, and at every 15 m (50 ft) of total developed length or a fraction thereof

  • 92

    when is an additional clean-out required on a horizontal line

    when there is an aggregate offset angle exceeding 135°

  • 93

    where else are clean-out required based on the upper terminal of horizontal lines

    inside the building near the connection between the building drain and the building sewer, or outside at the lower end of the building drain and extended to grade

  • 94

    under what condition are clean-outs NOT required on a horizontal drain less than 1.5 m in length

    if the lines is is installed at slope of 72° or less from the vertical line (or at the angle of 1/5 bend)

  • 95

    what is the approximate equivalent in feet of 15 m

    50 feet

  • 96

    what is the size of clean out is required for a 38 mm pipe, What is the threads per 25.4 mm.

    38 mm, 11-1/2

  • 97

    what is the size of clean out is required for a 51 mm pipe. What is the threads per 25.4 mm

    38 m, 11-1/2

  • 98

    what is the size of clean out is required for a 64 mm pipe. What is the threads per 25.4 mm

    64 mm, 8

  • 99

    what is the size of clean out is required for a 76 mm pipe. What is the threads per 25.4 mm

    64 mm, 8

  • 100

    What is the size of clean-out is required for a 102 mm & larger pipe.? What is the threads per 25.4 mm?

    89 mm, 8