Building Materials - Sitework
  • Mari Alberca

  • 問題数 104 • 1/9/2025

    記憶度

    完璧

    15

    覚えた

    38

    うろ覚え

    0

    苦手

    0

    未解答

    0

    アカウント登録して、解答結果を保存しよう

    問題一覧

  • 1

    American Association of State Highway and Transportation Officials

  • 2

    American Nurserymen's Specifications Institute

  • 3

    American Society of Testing Materials

  • 4

    Department of Public Works and Highway

  • 5

    Unified Soil Classification System

  • 6

    AASHTO Soil Classification System

  • 7

    Boulders

  • 8

    75 mm to No. 10 sieve (2.00mm)

  • 9

    Coarse sand

  • 10

    Fine sand

  • 11

    Silt-clay particles

  • 12

    Pass the No. 40 sieve

  • 13

    The moisture content at which a soil changes from liquid to plastic state

  • 14

    The groove closes after 25 drops

  • 15

    a silt or clay materials crumbles when rolled into a thread

  • 16

    LL - PL

  • 17

    The range of water content over which the sediment behaves plastically

  • 18

    Fill Materials

  • 19

    GW, GM, GP

  • 20

    Sand (SW, SP, SM, or SC) under the Unified Soil Classification System (USCS)

  • 21

    Granular Fill or Filters

  • 22

    Borrow Fill

  • 23

    Base Course Materials

  • 24

    20%-45%

  • 25

    1-1/2"

  • 26

    5%-12%

  • 27

    Ecombro-Bulik

  • 28

    Riprap (Rock Lining)

  • 29

    Riprap

  • 30

    Special class of very large aggregate

  • 31

    50 mm (2 inches) to 1148 mm (42 inches)

  • 32

    Erosion control and channel stabilization

  • 33

    The ability to use molar rocks for the same level of erosion protection

  • 34

    wire-enclosed riprap

  • 35

    Areas in accessible to trucks are large construction equipment

  • 36

    The allow for steeper vertical channel linings

  • 37

    Commercially available wire units, wire fencing material, or No.19 or No.12 galvanized wire

  • 38

    Geosynthetics

  • 39

    Geotextiles

  • 40

    Seperation

  • 41

    Reinforcement

  • 42

    Filtration

  • 43

    sub-surface drainage, such as filters around underdrains and edge drains or under paving

  • 44

    protect cut slopes or drainage features

  • 45

    Secondary Separation

  • 46

    Sufficient in-plain flow capacity

  • 47

    Continuous polymeric sheets that are impermeable

  • 48

    High-Density Polyethylene (HDPE) and Polyvinyl Chloride (PVC)

  • 49

    Geocomposites

  • 50

    Geocomposite Drain

  • 51

    Geonet

  • 52

    Geocells

  • 53

    Geotextiles and Erosion Control Blankets (ECBs)

  • 54

    Open mesh polymeric systems, biodegradable mesh systems (e.g., coir, jute), or a combination of both

  • 55

    To act as a semi-permanent mulch, anchoring seed and soil particles

  • 56

    To prevent termites from accessing a structure by creating an impenetrable barrier

  • 57

    To prevent termites from accessing a structure by creating an impenetrable barrier

  • 58

    Prevent it from being used as a tunnel by termites

  • 59

    Steel mesh

  • 60

    Prevents termites from easily accessing the structure from the ground

  • 61

    Building the home on high concrete pillars

  • 62

    Establish a continuous termiticidal barrier between potential soil access routes and the structure

  • 63

    preconstruction chemical barriers are typically applied to

    the soil and foundation during construction

  • 64

    4 gallons

  • 65

    Each 300 mm of depth should receive an additional 4 gallons (16 liters) per 3 linear meters

  • 66

    4 gallons (16 liters)

  • 67

    Low-pressure coarse spray

  • 68

    Applying termiticidal solution to the soil using a low-pressure coarse spray before construction

  • 69

    Eliminate the entire termite colony, including the queen

  • 70

    Hexaflumuron

  • 71

    A thin layer of fine aggregate placed over the base course to create a smoother surface

  • 72

    Provide a stabilized foundation for of fine-grained aggregate for pavement construction

  • 73

    A dark brown to black cementitious material composed of bitumens and upgraded aggregates

  • 74

    Placing, shaping, and compacting while hot over a prepared based

  • 75

    Uses unheated aggregates and bitumen emulsions or cutbacks

  • 76

    Less firm and durable

  • 77

    Laying coarse aggregates and binding them with bitumen through penetration

  • 78

    One or more layers of asphalts mixture placed on existing pavement to level the surface and correct its contour

  • 79

    Above 75mm

  • 80

    75mm to No. 10 sieve

  • 81

    According to ASSHTO, Coarse sand has particle size of:

    No. 10 to No. 40 sieve

  • 82

    No. 40 to No. 200 sieve

  • 83

    passing through No. 200 seive

  • 84

    Welded Wire Mesh (WWM)

  • 85

    Termite Resistant Sand

  • 86

    Sand barrier

  • 87

    To prevent soil erosion on slopes.

  • 88

    Gravel and crushed stone

  • 89

    To physically isolate the home from termites

  • 90

    Slab Treatment

  • 91

    Flexible Pavements

  • 92

    Rigid Pavement

  • 93

    Rigid Pavement

  • 94

    Turf Pavement

  • 95

    Permeable Pavement

  • 96

    Pavers / Paving unit

  • 97

    Pavers