  • 1

    what is the minimum required right-of-way (ROW) for interior subdivisions connecting the public road base in BP 220

    10 m

  • 2

    what is the purpose of "interconnecting road"

    to connect different subdivisions within a large development

  • 3

    the diagram of subdivision entrance shows a specific setback requirement. what is a primary purpose of the setback

    to ensure efficient space for load and unloading passengers

  • 4

    what is the total width of the subdivision entrance

    13.0 meters

  • 5

    what is the primary function of alley and pathway according to BP 220

    to serve a block breakers

  • 6

    what is the maximum allowable length for an alleyway or pathway

    60 meters

  • 7

    what is the specified right-of-way (ROW) for alleys and pathway

    3 meters

  • 8

    what material is typically used to pave alleys and pathways

    macadam

  • 9

    what type of lot cut should be avoided in lot planning

    deep and irregular cuts

  • 10

    where should the lot frontage be located relatively to the street level

    at street level

  • 11

    what should be avoided when plumbing lot layouts

    lots bisected by administrative boundaries, water courses or utility lines

  • 12

    what is the maximum allowable length of block according to BP 220

    400 meters

  • 13

    under what condition is a 3 meter pathway or alley required

    for blocks exceeding 250 meters

  • 14

    what is the minimum lot required for an for a socialized single-detached unit

    72 sq. m

  • 15

    what is the minimum lot required for an economic single test unit

    64 sq. m

  • 16

    what is the minimum frontage required for a corner lot

    8 m

  • 17

    what is the minimum frontage required for regular lot

    8 m

  • 18

    what is the minimum frontage required for an irregular lot

    4 m

  • 19

    what is the meaning of fantage required for an interior lot

    3 m

  • 20

    what is the minimum lot required for an economic duplex or single attached unit

    54 square meters

  • 21

    what is the minimum lot required for a socialized duplex or single attached unit

    48 square meters

  • 22

    what is the minimum frontage required for economic duplex/single-attached unit

    6 m

  • 23

    what is the minimum frontage required for a socialized duplex/single-attached unit

    6 m

  • 24

    what is the minimum lot area required for an economic rowhouse unit

    36 sq.m

  • 25

    what is the minimum lot required for socialized rowhouse unit

    32 sq.m

  • 26

    what is the minimum frontage required for a socialized rowhouse unit

    3.5 meters

  • 27

    what is the minimum frontage required for an economic rowhouse unit

    3.5 meters

  • 28

    what is the maximum number of rowhouse unit allowed per block or cluster

    20

  • 29

    what is the maximum allowable block length for rowhouse

    100 meters

  • 30

    what is the minimum floor area for an economic housing unit

    22 sq.m.

  • 31

    what is the meaning of floor area for the socialized housing unit

    18 sq.m.

  • 32

    what is the minimum front setback required according to BP 220

    1.5 m

  • 33

    the minimum side set pack required according to BP 220

    2.0 m

  • 34

    what is the minimum rare setback required according to BP 220

    2.0 m

  • 35

    what is the minimum level of completion for an economic housing unit

    house based on specification of BP 220

  • 36

    what is the minimum level of completion for socialized housing unit

    shell house with doors and windows to enclose the unit

  • 37

    what is the minimum water supply requirement per capita per day according to BP 220

    150 liters

  • 38

    how far from a pollution source should a ground reservo be located according to BP 220

    25 meters

  • 39

    according to BP 220, what type of genes system is required

    communal or individual septic tanks conforming the sanitation code

  • 40

    what is the maximum allowable floor area for non-residential use in a building relative to the total residential area

    25%

  • 41

    when is the provision of an elevator mandatory based on BP 220

    for buildings with more than 5 storeys

  • 42

    What is PD 957

    Revised Rules and Regulations Implementing the Subdivision and Condominium Buyer's Protective Decree cul Other Related Laws

  • 43

    according to the PD 957,what is the minimum selling price of an open market subdivision or condominium project

    above 2,000,000 Pesos

  • 44

    what percentage of planning subdivision or quantum medium project is allocated for open space as per PD 950

    30%

  • 45

    what is the minimum selling price for medium cost subdivision or condominium project, according to PD 957

    500,000 Peso

  • 46

    What percentage of land is designated as a non-saleable according to the provided land allocation, according to PD 957

    70%

  • 47

    according to the PD 957, what percentage of land is designated as a non-saleble according to the provided land allocation

    30%

  • 48

    according to PD 957, what is the minimum lot area of open market for a single detached units

    120 sq.m

  • 49

    according to PD 957, what is the minimum lot area of medium-cost for a single detached units

    100 sq.m

  • 50

    according to PD 957, what is the minimum floor areas for open market

    42 sq.m

  • 51

    according to PD 957, what is the minimum floor areas for Medium-cost

    30 sq.m

  • 52

    according to PD 957, what is the minimum frontage of Corner lot

    12 m

  • 53

    according to PD 957, what is the minimum frontage of Regular lot

    10 m

  • 54

    according to PD 957, what is the minimum frontage of Irregular lot

    6 m

  • 55

    according to PD 957, what is the minimum frontage of Interior lot

    3 m

  • 56

    according to PD 957, what is the minimum setbacks for front

    3 m

  • 57

    according to PD 957, what is the minimum setbacks of side and rear

    2 m

  • 58

    according to PD 957, what is the minimum lot areas for duplex/single-attached open market

    96 sq.m

  • 59

    according to PD 957, what is the minimum lot areas for duplex/single-attached open market

    80 sq.m

  • 60

    according to PD 957, what is the minimum frontage of duplex/single-attached

    8 m

  • 61

    according to PD 957, what is the minimum lot area of open market for rowhouse

    60 sq.m

  • 62

    according to PD 957, what is the minimum lot area of open medium-cost for rowhouse

    50 sq.m

  • 63

    according to PD 957, what is the minimum frontage of rowhouse

    4 m

  • 64

    according to PD 957, what is the required water supply for socialized housing

    43 LCPD or Handpump

  • 65

    according to PD 957, what is the required drainage for socialized housing

    lined open canal

  • 66

    according to PD 957, what is the required sewage for socialized housing

    individual or communal

  • 67

    according to PD 957, what is the required power for socialized housing

    optional individual connection

  • 68

    according to PD 957, what is the required water supply for Economic housing

    150 LCPD for household connection

  • 69

    according to PD 957, what is the required drainage for Economic housing

    underground for major roads

  • 70

    according to PD 957, what is the required power for Economic housing

    mandatory individual connection

  • 71

    according to PD 957, what is the required sewage for Economic housing

    individual or communal

  • 72

    according to PD 957, what is the required water supply for Open Market

    150 LCPD for household connection

  • 73

    according to PD 957, what is the required drainage for Open Market

    underground for major roads

  • 74

    according to PD 957, what is the required power for Open Market

    mandatory individual connection

  • 75

    according to PD 957, what is the required sewage for Open Market

    individual or communal

  • 76

    what is RA 4726

    The Condominium Act

  • 77

    is an interest or real property consists of separate interest in a unit in a residential, industrial or commercial building and undivided interest in common directly or indirectly, in the land on which it is located and in other common areas of the building

    condominium

  • 78

    holders to separate interest and portions of common areas

    condominium corporation

  • 79

    means the entire parcel of real property divided into be divided into condominiums

    condominium project

  • 80

    a part of a condominium project intended for any type of independent use or ownership, including one or more rooms or spaces located in one or more floors in a building

    unit

  • 81

    the enter project excepting all unit separately granted or held or reserved

    common areas

  • 82

    what are master deed or declaration of restriction

    boundaries of the unit, ownership of common areas, non-exclusive easement for ingress, egress and support, refurbishing, right to mortgage, sell

  • 83

    What is PD 1151

    Philippine Environmental Policy

  • 84

    according to section 1 of PD 1151,what is a primary focus on the Philippine Environment Policy

    harmony between man and nature

  • 85

    which of the following is NOT listed as a goal of section 2 of PD 1151

    prioritizing industrial development over environmental concern

  • 86

    what is the main subject of section 3 of PD 1151

    the right to helpful environment

  • 87

    according to the Environment Impacts Statement,what information is included in section 1

    name and address of project proponent

  • 88

    which section of Environmental Impact Statement outline addresses the potential environmental impacts of a project over five year period

    7.0

  • 89

    what topic is covered under the Title IV the documents in PD 1151

    natural resources management and conservation

  • 90

    which of the section of the Environmental Impact Statement deals with plans for unexpected events or problems

    9.0 contingency plan

  • 91

    what is the purpose of section 15.0 of the Environmental Impact Statement outline

    to gather consultation and comments, including public recommendations

  • 92

    which section of Environmental Impact Statement outline focuses on measure to reduce negative environmental effects

    11.0 mitigation measures

  • 93

    what is the standard setback of the beach shoreline to high watermark according to tourism development guideline and standards

    30 meters

  • 94

    what is the standard setback of the be lagoons, swamps, mangrove to high watermark according to tourism development guideline and standards

    15 meters

  • 95

    what is the regulated slope according to tourism development guidelines and standards

    18% or more

  • 96

    what is the maximum trail width for mountaineers with 15% max of slope, according to tourism development guidelines and standards

    90-1.80 meters

  • 97

    what is the maximum trail width for mountaineers with steep slope, according to tourism development guidelines and standards

    2-2.50 meters

  • 98

    what is the distance between structures on slopes, according to tourism development guidelines and standards

    the distance a structure should be at least three times from the other structure

  • 99

    according to tourism development guidelines and standards, what is the road radius form mountainous sites

    30 meters

  • 100

    according to tourism development guidelines and standards, what is the road radius form flat sites

    100 meters

  • Building laws Part 1

    Building laws Part 1

    Mari Alberca · 100問 · 1年前

    Building laws Part 1

    Building laws Part 1

    100問 • 1年前
    Mari Alberca

    Building laws Part 2

    Building laws Part 2

    Mari Alberca · 99問 · 1年前

    Building laws Part 2

    Building laws Part 2

    99問 • 1年前
    Mari Alberca

    Building laws Part 3

    Building laws Part 3

    Mari Alberca · 100問 · 1年前

    Building laws Part 3

    Building laws Part 3

    100問 • 1年前
    Mari Alberca

    Building laws Part 4

    Building laws Part 4

    Mari Alberca · 100問 · 1年前

    Building laws Part 4

    Building laws Part 4

    100問 • 1年前
    Mari Alberca

    Building Iaws Part 5

    Building Iaws Part 5

    Mari Alberca · 100問 · 1年前

    Building Iaws Part 5

    Building Iaws Part 5

    100問 • 1年前
    Mari Alberca

    Building Iaws Part 7

    Building Iaws Part 7

    Mari Alberca · 48問 · 1年前

    Building Iaws Part 7

    Building Iaws Part 7

    48問 • 1年前
    Mari Alberca

    Architectural Design & Site Planning Part 1

    Architectural Design & Site Planning Part 1

    Mari Alberca · 100問 · 1年前

    Architectural Design & Site Planning Part 1

    Architectural Design & Site Planning Part 1

    100問 • 1年前
    Mari Alberca

    Architectural Design & Site Planning Part 2

    Architectural Design & Site Planning Part 2

    Mari Alberca · 99問 · 1年前

    Architectural Design & Site Planning Part 2

    Architectural Design & Site Planning Part 2

    99問 • 1年前
    Mari Alberca

    Architectural Design & Site Planning Part 3

    Architectural Design & Site Planning Part 3

    Mari Alberca · 100問 · 1年前

    Architectural Design & Site Planning Part 3

    Architectural Design & Site Planning Part 3

    100問 • 1年前
    Mari Alberca

    Architectural Design & Site Planning Part 5

    Architectural Design & Site Planning Part 5

    Mari Alberca · 100問 · 1年前

    Architectural Design & Site Planning Part 5

    Architectural Design & Site Planning Part 5

    100問 • 1年前
    Mari Alberca

    Architectural Design & Site Planning Part 6

    Architectural Design & Site Planning Part 6

    Mari Alberca · 100問 · 1年前

    Architectural Design & Site Planning Part 6

    Architectural Design & Site Planning Part 6

    100問 • 1年前
    Mari Alberca

    Architectural Design & Site Planning Part 7

    Architectural Design & Site Planning Part 7

    Mari Alberca · 100問 · 1年前

    Architectural Design & Site Planning Part 7

    Architectural Design & Site Planning Part 7

    100問 • 1年前
    Mari Alberca

    Architectural Design & Site Planning Part 8

    Architectural Design & Site Planning Part 8

    Mari Alberca · 100問 · 1年前

    Architectural Design & Site Planning Part 8

    Architectural Design & Site Planning Part 8

    100問 • 1年前
    Mari Alberca

    Architectural Design & Site Planning Part 9

    Architectural Design & Site Planning Part 9

    Mari Alberca · 100問 · 1年前

    Architectural Design & Site Planning Part 9

    Architectural Design & Site Planning Part 9

    100問 • 1年前
    Mari Alberca

    Architectural Design & Site Planning Part 10

    Architectural Design & Site Planning Part 10

    Mari Alberca · 30問 · 1年前

    Architectural Design & Site Planning Part 10

    Architectural Design & Site Planning Part 10

    30問 • 1年前
    Mari Alberca

    Plumbing Part 1

    Plumbing Part 1

    Mari Alberca · 105問 · 1年前

    Plumbing Part 1

    Plumbing Part 1

    105問 • 1年前
    Mari Alberca

    Plumbing Part 2

    Plumbing Part 2

    Mari Alberca · 100問 · 1年前

    Plumbing Part 2

    Plumbing Part 2

    100問 • 1年前
    Mari Alberca

    Plumbing Part 3

    Plumbing Part 3

    Mari Alberca · 104問 · 1年前

    Plumbing Part 3

    Plumbing Part 3

    104問 • 1年前
    Mari Alberca

    Plumbing Part 4

    Plumbing Part 4

    Mari Alberca · 100問 · 1年前

    Plumbing Part 4

    Plumbing Part 4

    100問 • 1年前
    Mari Alberca

    Plumbing Part 5

    Plumbing Part 5

    Mari Alberca · 100問 · 1年前

    Plumbing Part 5

    Plumbing Part 5

    100問 • 1年前
    Mari Alberca

    Plumbing Part 6

    Plumbing Part 6

    Mari Alberca · 101問 · 1年前

    Plumbing Part 6

    Plumbing Part 6

    101問 • 1年前
    Mari Alberca

    Building Material Part 1

    Building Material Part 1

    Mari Alberca · 99問 · 1年前

    Building Material Part 1

    Building Material Part 1

    99問 • 1年前
    Mari Alberca

    Building Material Part 2

    Building Material Part 2

    Mari Alberca · 100問 · 1年前

    Building Material Part 2

    Building Material Part 2

    100問 • 1年前
    Mari Alberca

    Building Material Part 3

    Building Material Part 3

    Mari Alberca · 100問 · 1年前

    Building Material Part 3

    Building Material Part 3

    100問 • 1年前
    Mari Alberca

    Building Materials - Sitework

    Building Materials - Sitework

    Mari Alberca · 104問 · 1年前

    Building Materials - Sitework

    Building Materials - Sitework

    104問 • 1年前
    Mari Alberca

    Building Materials - Concrete Part 1

    Building Materials - Concrete Part 1

    Mari Alberca · 100問 · 1年前

    Building Materials - Concrete Part 1

    Building Materials - Concrete Part 1

    100問 • 1年前
    Mari Alberca

    Building Materials - Concrete Part 2

    Building Materials - Concrete Part 2

    Mari Alberca · 110問 · 1年前

    Building Materials - Concrete Part 2

    Building Materials - Concrete Part 2

    110問 • 1年前
    Mari Alberca

    Building Materials - Concrete Part 3

    Building Materials - Concrete Part 3

    Mari Alberca · 110問 · 1年前

    Building Materials - Concrete Part 3

    Building Materials - Concrete Part 3

    110問 • 1年前
    Mari Alberca

    Building Materials - Masonry Part 1

    Building Materials - Masonry Part 1

    Mari Alberca · 100問 · 1年前

    Building Materials - Masonry Part 1

    Building Materials - Masonry Part 1

    100問 • 1年前
    Mari Alberca

    Structural Conceptualization Part 1

    Structural Conceptualization Part 1

    Mari Alberca · 96問 · 1年前

    Structural Conceptualization Part 1

    Structural Conceptualization Part 1

    96問 • 1年前
    Mari Alberca

    Structural Conceptualization Part 2

    Structural Conceptualization Part 2

    Mari Alberca · 100問 · 1年前

    Structural Conceptualization Part 2

    Structural Conceptualization Part 2

    100問 • 1年前
    Mari Alberca

    Structural Conceptualization Part 3

    Structural Conceptualization Part 3

    Mari Alberca · 100問 · 1年前

    Structural Conceptualization Part 3

    Structural Conceptualization Part 3

    100問 • 1年前
    Mari Alberca

    Structural Conceptualization Part 4

    Structural Conceptualization Part 4

    Mari Alberca · 100問 · 1年前

    Structural Conceptualization Part 4

    Structural Conceptualization Part 4

    100問 • 1年前
    Mari Alberca

    Structural Conceptualization Part 5

    Structural Conceptualization Part 5

    Mari Alberca · 46問 · 1年前

    Structural Conceptualization Part 5

    Structural Conceptualization Part 5

    46問 • 1年前
    Mari Alberca

    Theory of Architecture Part 1

    Theory of Architecture Part 1

    Mari Alberca · 100問 · 1年前

    Theory of Architecture Part 1

    Theory of Architecture Part 1

    100問 • 1年前
    Mari Alberca

    Theory of Architecture Part 2

    Theory of Architecture Part 2

    Mari Alberca · 100問 · 1年前

    Theory of Architecture Part 2

    Theory of Architecture Part 2

    100問 • 1年前
    Mari Alberca

    Theory of Architecture Part 3

    Theory of Architecture Part 3

    Mari Alberca · 100問 · 1年前

    Theory of Architecture Part 3

    Theory of Architecture Part 3

    100問 • 1年前
    Mari Alberca

    Theory of Architecture Part 4

    Theory of Architecture Part 4

    Mari Alberca · 100問 · 1年前

    Theory of Architecture Part 4

    Theory of Architecture Part 4

    100問 • 1年前
    Mari Alberca

    Professional Practice

    Professional Practice

    Mari Alberca · 79問 · 1年前

    Professional Practice

    Professional Practice

    79問 • 1年前
    Mari Alberca

    Mock Exam 1

    Mock Exam 1

    Mari Alberca · 27問 · 1年前

    Mock Exam 1

    Mock Exam 1

    27問 • 1年前
    Mari Alberca

    Great Buildings

    Great Buildings

    Mari Alberca · 72問 · 1年前

    Great Buildings

    Great Buildings

    72問 • 1年前
    Mari Alberca

    Electrical & Mechanical Part 1

    Electrical & Mechanical Part 1

    Mari Alberca · 91問 · 1年前

    Electrical & Mechanical Part 1

    Electrical & Mechanical Part 1

    91問 • 1年前
    Mari Alberca

    Filipino Architect

    Filipino Architect

    Mari Alberca · 60問 · 1年前

    Filipino Architect

    Filipino Architect

    60問 • 1年前
    Mari Alberca

    Electrical & Mechanical Part 2

    Electrical & Mechanical Part 2

    Mari Alberca · 26問 · 1年前

    Electrical & Mechanical Part 2

    Electrical & Mechanical Part 2

    26問 • 1年前
    Mari Alberca

    Ph Architecture

    Ph Architecture

    Mari Alberca · 22問 · 1年前

    Ph Architecture

    Ph Architecture

    22問 • 1年前
    Mari Alberca

    vernacular terms filipino

    vernacular terms filipino

    Mari Alberca · 96問 · 1年前

    vernacular terms filipino

    vernacular terms filipino

    96問 • 1年前
    Mari Alberca

    Tropical design

    Tropical design

    Mari Alberca · 100問 · 1年前

    Tropical design

    Tropical design

    100問 • 1年前
    Mari Alberca

    Tropical design 2

    Tropical design 2

    Mari Alberca · 100問 · 1年前

    Tropical design 2

    Tropical design 2

    100問 • 1年前
    Mari Alberca

    Tropical design 3

    Tropical design 3

    Mari Alberca · 100問 · 1年前

    Tropical design 3

    Tropical design 3

    100問 • 1年前
    Mari Alberca

    Tropical design 4

    Tropical design 4

    Mari Alberca · 46問 · 1年前

    Tropical design 4

    Tropical design 4

    46問 • 1年前
    Mari Alberca

    Building Materials - Masonry Part 2

    Building Materials - Masonry Part 2

    Mari Alberca · 56問 · 1年前

    Building Materials - Masonry Part 2

    Building Materials - Masonry Part 2

    56問 • 1年前
    Mari Alberca

    Building Materials - Aluminum Part 1

    Building Materials - Aluminum Part 1

    Mari Alberca · 100問 · 1年前

    Building Materials - Aluminum Part 1

    Building Materials - Aluminum Part 1

    100問 • 1年前
    Mari Alberca

    Building Materials - Aluminum Part 2

    Building Materials - Aluminum Part 2

    Mari Alberca · 98問 · 1年前

    Building Materials - Aluminum Part 2

    Building Materials - Aluminum Part 2

    98問 • 1年前
    Mari Alberca

    Building Materials - Wood Part 1

    Building Materials - Wood Part 1

    Mari Alberca · 100問 · 1年前

    Building Materials - Wood Part 1

    Building Materials - Wood Part 1

    100問 • 1年前
    Mari Alberca

    Building Materials - Wood Part 2

    Building Materials - Wood Part 2

    Mari Alberca · 70問 · 1年前

    Building Materials - Wood Part 2

    Building Materials - Wood Part 2

    70問 • 1年前
    Mari Alberca

    Building Materials - Plastic Part 1

    Building Materials - Plastic Part 1

    Mari Alberca · 101問 · 1年前

    Building Materials - Plastic Part 1

    Building Materials - Plastic Part 1

    101問 • 1年前
    Mari Alberca

    Building Materials - Thermal and Moisture Protection

    Building Materials - Thermal and Moisture Protection

    Mari Alberca · 141問 · 1年前

    Building Materials - Thermal and Moisture Protection

    Building Materials - Thermal and Moisture Protection

    141問 • 1年前
    Mari Alberca

    Building Materials - Doors

    Building Materials - Doors

    Mari Alberca · 107問 · 1年前

    Building Materials - Doors

    Building Materials - Doors

    107問 • 1年前
    Mari Alberca

    HOA - Ancient Architecture

    HOA - Ancient Architecture

    Mari Alberca · 42問 · 1年前

    HOA - Ancient Architecture

    HOA - Ancient Architecture

    42問 • 1年前
    Mari Alberca

    HOA - Western Asia

    HOA - Western Asia

    Mari Alberca · 80問 · 1年前

    HOA - Western Asia

    HOA - Western Asia

    80問 • 1年前
    Mari Alberca

    HOA - Ancient Egypt

    HOA - Ancient Egypt

    Mari Alberca · 90問 · 1年前

    HOA - Ancient Egypt

    HOA - Ancient Egypt

    90問 • 1年前
    Mari Alberca

    HOA - Ancient Greek

    HOA - Ancient Greek

    Mari Alberca · 232問 · 1年前

    HOA - Ancient Greek

    HOA - Ancient Greek

    232問 • 1年前
    Mari Alberca

    Building Materials - Windows

    Building Materials - Windows

    Mari Alberca · 75問 · 1年前

    Building Materials - Windows

    Building Materials - Windows

    75問 • 1年前
    Mari Alberca

    Buildings Materials - Hardwares

    Buildings Materials - Hardwares

    Mari Alberca · 138問 · 1年前

    Buildings Materials - Hardwares

    Buildings Materials - Hardwares

    138問 • 1年前
    Mari Alberca

    Buildings Materials - Hardwares (Images)

    Buildings Materials - Hardwares (Images)

    Mari Alberca · 149問 · 1年前

    Buildings Materials - Hardwares (Images)

    Buildings Materials - Hardwares (Images)

    149問 • 1年前
    Mari Alberca

    Buildings Materials - Finish Hardwares

    Buildings Materials - Finish Hardwares

    Mari Alberca · 119問 · 1年前

    Buildings Materials - Finish Hardwares

    Buildings Materials - Finish Hardwares

    119問 • 1年前
    Mari Alberca

    Buildings Materials - Finish Hardwares (Images)

    Buildings Materials - Finish Hardwares (Images)

    Mari Alberca · 156問 · 1年前

    Buildings Materials - Finish Hardwares (Images)

    Buildings Materials - Finish Hardwares (Images)

    156問 • 1年前
    Mari Alberca

    Building Materials - Glass & Glazing

    Building Materials - Glass & Glazing

    Mari Alberca · 69問 · 1年前

    Building Materials - Glass & Glazing

    Building Materials - Glass & Glazing

    69問 • 1年前
    Mari Alberca

    HOA - Roman

    HOA - Roman

    Mari Alberca · 178問 · 1年前

    HOA - Roman

    HOA - Roman

    178問 • 1年前
    Mari Alberca

    HOA - Mesoamerica

    HOA - Mesoamerica

    Mari Alberca · 20問 · 1年前

    HOA - Mesoamerica

    HOA - Mesoamerica

    20問 • 1年前
    Mari Alberca

    Building Material - Glass & Glazing (Images)

    Building Material - Glass & Glazing (Images)

    Mari Alberca · 25問 · 1年前

    Building Material - Glass & Glazing (Images)

    Building Material - Glass & Glazing (Images)

    25問 • 1年前
    Mari Alberca

    Building Materials - Finishes

    Building Materials - Finishes

    Mari Alberca · 181問 · 1年前

    Building Materials - Finishes

    Building Materials - Finishes

    181問 • 1年前
    Mari Alberca

    HOA - Byzantine

    HOA - Byzantine

    Mari Alberca · 77問 · 1年前

    HOA - Byzantine

    HOA - Byzantine

    77問 • 1年前
    Mari Alberca

    Building Materials - Finishes (Images)

    Building Materials - Finishes (Images)

    Mari Alberca · 39問 · 1年前

    Building Materials - Finishes (Images)

    Building Materials - Finishes (Images)

    39問 • 1年前
    Mari Alberca

    問題一覧

  • 1

    what is the minimum required right-of-way (ROW) for interior subdivisions connecting the public road base in BP 220

    10 m

  • 2

    what is the purpose of "interconnecting road"

    to connect different subdivisions within a large development

  • 3

    the diagram of subdivision entrance shows a specific setback requirement. what is a primary purpose of the setback

    to ensure efficient space for load and unloading passengers

  • 4

    what is the total width of the subdivision entrance

    13.0 meters

  • 5

    what is the primary function of alley and pathway according to BP 220

    to serve a block breakers

  • 6

    what is the maximum allowable length for an alleyway or pathway

    60 meters

  • 7

    what is the specified right-of-way (ROW) for alleys and pathway

    3 meters

  • 8

    what material is typically used to pave alleys and pathways

    macadam

  • 9

    what type of lot cut should be avoided in lot planning

    deep and irregular cuts

  • 10

    where should the lot frontage be located relatively to the street level

    at street level

  • 11

    what should be avoided when plumbing lot layouts

    lots bisected by administrative boundaries, water courses or utility lines

  • 12

    what is the maximum allowable length of block according to BP 220

    400 meters

  • 13

    under what condition is a 3 meter pathway or alley required

    for blocks exceeding 250 meters

  • 14

    what is the minimum lot required for an for a socialized single-detached unit

    72 sq. m

  • 15

    what is the minimum lot required for an economic single test unit

    64 sq. m

  • 16

    what is the minimum frontage required for a corner lot

    8 m

  • 17

    what is the minimum frontage required for regular lot

    8 m

  • 18

    what is the minimum frontage required for an irregular lot

    4 m

  • 19

    what is the meaning of fantage required for an interior lot

    3 m

  • 20

    what is the minimum lot required for an economic duplex or single attached unit

    54 square meters

  • 21

    what is the minimum lot required for a socialized duplex or single attached unit

    48 square meters

  • 22

    what is the minimum frontage required for economic duplex/single-attached unit

    6 m

  • 23

    what is the minimum frontage required for a socialized duplex/single-attached unit

    6 m

  • 24

    what is the minimum lot area required for an economic rowhouse unit

    36 sq.m

  • 25

    what is the minimum lot required for socialized rowhouse unit

    32 sq.m

  • 26

    what is the minimum frontage required for a socialized rowhouse unit

    3.5 meters

  • 27

    what is the minimum frontage required for an economic rowhouse unit

    3.5 meters

  • 28

    what is the maximum number of rowhouse unit allowed per block or cluster

    20

  • 29

    what is the maximum allowable block length for rowhouse

    100 meters

  • 30

    what is the minimum floor area for an economic housing unit

    22 sq.m.

  • 31

    what is the meaning of floor area for the socialized housing unit

    18 sq.m.

  • 32

    what is the minimum front setback required according to BP 220

    1.5 m

  • 33

    the minimum side set pack required according to BP 220

    2.0 m

  • 34

    what is the minimum rare setback required according to BP 220

    2.0 m

  • 35

    what is the minimum level of completion for an economic housing unit

    house based on specification of BP 220

  • 36

    what is the minimum level of completion for socialized housing unit

    shell house with doors and windows to enclose the unit

  • 37

    what is the minimum water supply requirement per capita per day according to BP 220

    150 liters

  • 38

    how far from a pollution source should a ground reservo be located according to BP 220

    25 meters

  • 39

    according to BP 220, what type of genes system is required

    communal or individual septic tanks conforming the sanitation code

  • 40

    what is the maximum allowable floor area for non-residential use in a building relative to the total residential area

    25%

  • 41

    when is the provision of an elevator mandatory based on BP 220

    for buildings with more than 5 storeys

  • 42

    What is PD 957

    Revised Rules and Regulations Implementing the Subdivision and Condominium Buyer's Protective Decree cul Other Related Laws

  • 43

    according to the PD 957,what is the minimum selling price of an open market subdivision or condominium project

    above 2,000,000 Pesos

  • 44

    what percentage of planning subdivision or quantum medium project is allocated for open space as per PD 950

    30%

  • 45

    what is the minimum selling price for medium cost subdivision or condominium project, according to PD 957

    500,000 Peso

  • 46

    What percentage of land is designated as a non-saleable according to the provided land allocation, according to PD 957

    70%

  • 47

    according to the PD 957, what percentage of land is designated as a non-saleble according to the provided land allocation

    30%

  • 48

    according to PD 957, what is the minimum lot area of open market for a single detached units

    120 sq.m

  • 49

    according to PD 957, what is the minimum lot area of medium-cost for a single detached units

    100 sq.m

  • 50

    according to PD 957, what is the minimum floor areas for open market

    42 sq.m

  • 51

    according to PD 957, what is the minimum floor areas for Medium-cost

    30 sq.m

  • 52

    according to PD 957, what is the minimum frontage of Corner lot

    12 m

  • 53

    according to PD 957, what is the minimum frontage of Regular lot

    10 m

  • 54

    according to PD 957, what is the minimum frontage of Irregular lot

    6 m

  • 55

    according to PD 957, what is the minimum frontage of Interior lot

    3 m

  • 56

    according to PD 957, what is the minimum setbacks for front

    3 m

  • 57

    according to PD 957, what is the minimum setbacks of side and rear

    2 m

  • 58

    according to PD 957, what is the minimum lot areas for duplex/single-attached open market

    96 sq.m

  • 59

    according to PD 957, what is the minimum lot areas for duplex/single-attached open market

    80 sq.m

  • 60

    according to PD 957, what is the minimum frontage of duplex/single-attached

    8 m

  • 61

    according to PD 957, what is the minimum lot area of open market for rowhouse

    60 sq.m

  • 62

    according to PD 957, what is the minimum lot area of open medium-cost for rowhouse

    50 sq.m

  • 63

    according to PD 957, what is the minimum frontage of rowhouse

    4 m

  • 64

    according to PD 957, what is the required water supply for socialized housing

    43 LCPD or Handpump

  • 65

    according to PD 957, what is the required drainage for socialized housing

    lined open canal

  • 66

    according to PD 957, what is the required sewage for socialized housing

    individual or communal

  • 67

    according to PD 957, what is the required power for socialized housing

    optional individual connection

  • 68

    according to PD 957, what is the required water supply for Economic housing

    150 LCPD for household connection

  • 69

    according to PD 957, what is the required drainage for Economic housing

    underground for major roads

  • 70

    according to PD 957, what is the required power for Economic housing

    mandatory individual connection

  • 71

    according to PD 957, what is the required sewage for Economic housing

    individual or communal

  • 72

    according to PD 957, what is the required water supply for Open Market

    150 LCPD for household connection

  • 73

    according to PD 957, what is the required drainage for Open Market

    underground for major roads

  • 74

    according to PD 957, what is the required power for Open Market

    mandatory individual connection

  • 75

    according to PD 957, what is the required sewage for Open Market

    individual or communal

  • 76

    what is RA 4726

    The Condominium Act

  • 77

    is an interest or real property consists of separate interest in a unit in a residential, industrial or commercial building and undivided interest in common directly or indirectly, in the land on which it is located and in other common areas of the building

    condominium

  • 78

    holders to separate interest and portions of common areas

    condominium corporation

  • 79

    means the entire parcel of real property divided into be divided into condominiums

    condominium project

  • 80

    a part of a condominium project intended for any type of independent use or ownership, including one or more rooms or spaces located in one or more floors in a building

    unit

  • 81

    the enter project excepting all unit separately granted or held or reserved

    common areas

  • 82

    what are master deed or declaration of restriction

    boundaries of the unit, ownership of common areas, non-exclusive easement for ingress, egress and support, refurbishing, right to mortgage, sell

  • 83

    What is PD 1151

    Philippine Environmental Policy

  • 84

    according to section 1 of PD 1151,what is a primary focus on the Philippine Environment Policy

    harmony between man and nature

  • 85

    which of the following is NOT listed as a goal of section 2 of PD 1151

    prioritizing industrial development over environmental concern

  • 86

    what is the main subject of section 3 of PD 1151

    the right to helpful environment

  • 87

    according to the Environment Impacts Statement,what information is included in section 1

    name and address of project proponent

  • 88

    which section of Environmental Impact Statement outline addresses the potential environmental impacts of a project over five year period

    7.0

  • 89

    what topic is covered under the Title IV the documents in PD 1151

    natural resources management and conservation

  • 90

    which of the section of the Environmental Impact Statement deals with plans for unexpected events or problems

    9.0 contingency plan

  • 91

    what is the purpose of section 15.0 of the Environmental Impact Statement outline

    to gather consultation and comments, including public recommendations

  • 92

    which section of Environmental Impact Statement outline focuses on measure to reduce negative environmental effects

    11.0 mitigation measures

  • 93

    what is the standard setback of the beach shoreline to high watermark according to tourism development guideline and standards

    30 meters

  • 94

    what is the standard setback of the be lagoons, swamps, mangrove to high watermark according to tourism development guideline and standards

    15 meters

  • 95

    what is the regulated slope according to tourism development guidelines and standards

    18% or more

  • 96

    what is the maximum trail width for mountaineers with 15% max of slope, according to tourism development guidelines and standards

    90-1.80 meters

  • 97

    what is the maximum trail width for mountaineers with steep slope, according to tourism development guidelines and standards

    2-2.50 meters

  • 98

    what is the distance between structures on slopes, according to tourism development guidelines and standards

    the distance a structure should be at least three times from the other structure

  • 99

    according to tourism development guidelines and standards, what is the road radius form mountainous sites

    30 meters

  • 100

    according to tourism development guidelines and standards, what is the road radius form flat sites

    100 meters