Electrical & Mechanical Part 1

Electrical & Mechanical Part 1
91問 • 1年前
  • Mari Alberca
  • 通報

    問題一覧

  • 1

    is a form of energy generated by friction, induction or chemical change having magnetic chemical, and radiant effect. It is the motion of free electrons through a solid conductor. An electric current travels at the speed of light and therefore at the rate of conduction of an electric current is considered as instantaneous

    Electricity

  • 2

    an english physicist is considered as the father of electricity for his studies on electric attraction and the electric force

    William Gilbert

  • 3

    what are the basic particles of matter that contribute to electricity

    electrons and protons

  • 4

    what are the two general classes of electricity

    dynamic electricity (electrodynamic) and static electricity (electrostatic)

  • 5

    a combination of two or more electric cells capable of strong and supplying direct from electrochemical means

    Battery

  • 6

    delivers electricity as soon as its parts as assembled, put together, provided that it is connected to a circuit

    primary batteries

  • 7

    electricity from external source must be passed through it before it can deliver an electric current (changing the battery. uses art to supply emergency lightings repeats for hallways, stairways, exit to energize police and alarm system and certain types of signal system)

    secondary/ storage batteries

  • 8

    a machine that converts mechanical energy to electrical energy

    generator

  • 9

    the book of electrical energy utilize a day is in the form of alternating current, including energy for power and lighting

    Alternators

  • 10

    this furnish electrical energy for elevators,escalators, intercommunicating telephone systems, control of signal systems, and clock systems

    direct current generators

  • 11

    a machine that converts electrical energy to mechanical energy

    motors

  • 12

    for converting one voltage to another, from lower to higher (set-up transformer) from higher to lower (step-down transformer).

    transformers

  • 13

    what are the two major types of transformers

    oil-insulated transformer & dry-type transformer

  • 14

    for changing altering current to direct current and vice versa

    rotary converters

  • 15

    what is the maximum capacity of a H-frame transformer bank

    1,000 kva

  • 16

    which are cluster-mountain transformer typically located

    on a single pole

  • 17

    what type of liquid is used as insulation in Askarel-insulated transformer

    A synthetic non-flammable liquid

  • 18

    a type of current which flows a constant time rate and in the same direction

    direct current

  • 19

    a current which is periodically varying in time rate and in direction. it rises from zero to maximum, to aero, reverses its direction and again returns to zero.

    alternating current

  • 20

    is a name after H.R Hertz

    hertz

  • 21

    unit of electricity comprises approximately 6.25 x 10 18 electrons

    coulomb

  • 22

    current represent as rate of flow of one coulomb or 6.25 x 10 18 electrons/ second through a given cross section

    ampere

  • 23

    is the current carrying capacity of a water or cable expressing amperes, without undue heating

    ampacity

  • 24

    is the electromotive force or potential difference between two points in the electric field which will move a charge of one coulomb between these points

    volt

  • 25

    volt is named after an italian scientist who discovered that electrons flow when two different metals are connected by a war and then dripped into a liquid that conduct of carry electrons

    Alessandro Volta

  • 26

    the resistance which will allow one ampere of current to flow when one volt is impressed upon it

    ohm

  • 27

    what is the unit of electric power

    watt or kilowatt

  • 28

    how many watts are equal to 1 kilowatt

    1,000 watts

  • 29

    after whom is watt named

    James Watt

  • 30

    according to ohm's law, a current in a DC circuit is directly proportional to what

    voltage

  • 31

    in the formula I (amp) = V (volts) / R (ohms), what does 'R'

    resistance

  • 32

    if the resistance in a circuit increases, what happens to the current, assuming the voltage remain constant

    the current decreases

  • 33

    is the effective utilization of available energy by reducing peak loads and lowering demand charge. the control devices and system are referred to as a load shedding control, pick demand control, pick load regulation and power use control

    electric load control

  • 34

    the installations electric clothes are analyzed and schedule to restrict demand by shifting large load to pick up r and control to avoid coincident operation

    load scheduling and duty-cycle control

  • 35

    in conjunction with a duty cycle controller, the month is continuously mettered and an alarm set on when a bread determine the man level is exceeded

    demand metering alarm

  • 36

    also called "rate control", it is an automated version of the demand meeting alarm system, where it automatically disconnects or reconnects loads as required

    automatic instantaneous demand control

  • 37

    this controller operates by comparing the actual rate of energy usage to the ideal rate, and controls KW demand by controlling the total energy used within a metering interval

    idealcurve control

  • 38

    are computerized system which continuously forecast the amount of energy remaining in the demand interval, then examine the status and priority of each of the connected loads and decide on the proper course of action

    forecasting systems

  • 39

    to measure energy, the factor of time is introduce, such that; energy = power x time. A-C electric meters are basically small motors, whose speed is proportional to the power being used. The number of rotations is counted on the dials which are calibrated directly in kilowatt-hours

    KWH meters

  • 40

    conducting elements are disconnected as to prevent the flow of electricity

    Open circuit

  • 41

    a condition resulting from bridging any part of a circuit with conductor of a very low resistance

    short circuit

  • 42

    is one in which the components are in tandem. All seperate loads of the circuit carry the same equal current and the total resistance, R is the sum of the resistance around the circuit

    series circuit

  • 43

    is one in which the components or loads are so arranged that the current divides between them. Each outlet has a live wire connected to the current carry wire of the circuit and also a neuture wire or grounded wire connected to the return wire of the circuit. with this system, the total current flowing through the circuit is the sum of the current flowing through each outlet

    parallel circuit

  • 44

    supplies outlets for lighting and appliances including convenience receptacles

    general purpose branch circuit

  • 45

    supplies outlets intended for feeding appliances. Fixed lighting is not supplied

    appliance branch circuit

  • 46

    is designed to supply a single specific item, such as a motor load or a unit air-conditioner

    individual branch circuit

  • 47

    the portion of an electrical system extending from the final overcurrent device protecting a circuit

    branch circuit

  • 48

    a panel for distributing power to other panels or to motors and other heavy power-consuming loads. Controls, distributes and protects a number of similar branch circuits in an electrical system

    distribution panel

  • 49

    of or pertaining to a circuit in which alternating current below 50 volts is supplied by a step-down transformer from the normal line voltage used in residential systems to control doorbells, intercoms, heating and cooling systems and remote lighting fixtures. Low-voltage circuits do not require a protective raceway

    low-voltage

  • 50

    how many watts per square meter a branch circuits shall be sufficient to supply a loaded in buildings excluding porches, garages and basements

    30 watts per square

  • 51

    what is the maximum wattage recommended for a 20-ampere circuit, according to good practice guidelines

    1,600 watts

  • 52

    How many 20-ampere applience branch circuts are minimally required to serve small appliances outlest in the kitchen, pantry, dining, and family room, accoting to the National Electrical Code

    2

  • 53

    Why should convenience receptacles in an area be wired to at least two different circuits

    to ensure that the entire area won't be without power if one circuit fails

  • 54

    what is the minimum wire gauge required for general- purpose branch cirents related to at 20 amperes

    No. 12 AWG

  • 55

    On what amperage circuit loads and overcurrent devices should the circuit load for lighting and small appliances be limited

    15 amp and 20 amp respectively

  • 56

    is a triple circuit, the lighting and outlet loads are connected between any phase leg and a neutral line while machineries and other bigger loals are connected to the phase leg only.

    three phase electrical

  • 57

    general term including materials, fittings, appliances, fixtures, apparatuses used as part of, or in connection w/ an electrical installation

    equipment

  • 58

    current consuming equipment/ fixed or portable ex: heating, cooking & small motor operated equipment

    appliance

  • 59

    an accessory ex: locknut, bushing, or other part of a wiring system w/c is intended to perform a mechanical rather electrical function

    fitting(s)

  • 60

    the point of delivery of electricity to a building by a public utility company. The service entrance consists of the following

    service entrance

  • 61

    these are the conductors which extend from the street distribution main or distribution transformer to the service equipment of the building

    service conductors

  • 62

    this affords the means of connecting or disconnecting the entire electrical service and of automatic protect against severe overloads and short circuits

    service entrance switch

  • 63

    the device used by the utility company to determine power consumption

    kilowatt hour meter

  • 64

    the decrease in voltage between two points on a power line, usually caused by resistance or leakage along the line

    Line Drop

  • 65

    the supplying o utilitities required or demanded by the public

    service

  • 66

    an auxilliary power station where electrical current is converted on where voltage is stepped up or down

    substation

  • 67

    The portion of a service conductor extending from a service drop or service lateral to the service equipment of a building

    service entrance conductor

  • 68

    A meter for measuring and recording the quantity of electric power consumed with respect to time

    watt-hour meter

  • 69

    a fire-rated room housing a transformer and auxilliary equipment for a large building

    transformer vault

  • 70

    contains the services equipment for a large building

    switchgear room

  • 71

    equipment necessary for controlling, metering and protecting the electric power supply to a building

    service equipment

  • 72

    one or a group of panels on which are mounted switches, overcurrent devices, metering instruments and buses

    swithboard

  • 73

    for providing emergency power outage

    standby generator

  • 74

    an emergency system designed to provide power automatically and instantaneously

    uninterruptible power supply

  • 75

    A freestanding enclosure housing a disconnect switch, a step-down transformer and switchgear

    unit substation

  • 76

    arey of the conductors extending from the service equipment to various distribution points in a building

    feeder

  • 77

    the overhead portion of service conductors extending from the nearset utility pole to a building

    service drop

  • 78

    the conductor and equipment for delivering energy from the electricity supply system to the wiring system of the premises served

    service entrance

  • 79

    Any of several conducting rode installed at the top of a stucture and ground to divert lightning away from the structure. Also called air teminal

    Lightning Rod

  • 80

    a device for protecting electric equipment from damage by lighting or other high-voltage currents, using spark gaps to carry the current to the ground without passing through the device

    lightning arrester

  • 81

    a space between two terminals or electrodes across which a discharge of electricity may pass at a prescribed voltage

    spark gap

  • 82

    is used by medium-sized and large buildings to step down from a high supply voltage to the service voltage.

    transformer

  • 83

    extend from a main power line or transformer to the service equipment of a building

    service conductors

  • 84

    is a panel on which are mounted switches, overcurrent devices, metering instruments and busbars for controlling, distributing and protecting a number of electric circuits

    main switchboard

  • 85

    includes a main disconnect switch and secondary switches, fuser and circuit breakers for controlling and protecting the electric power supply to a building. It is located in a switchgear room near the entrance of the service conductors

    service equipment

  • 86

    The underground portion of service conductors extending from a main power line or transformer to a building

    service lateral

  • 87

    the portion of a service conductor extending from a service drop or service lateral to the service equipment of a building

    service entrance conductor

  • 88

    measures and records the quantity of electric power consumed with respect to time. Supplied by the public utility, it is always placed switch so that it cannot be disconnected for multiple-occupancy buildings, banks of meters are installed so that each unit can be metered independently

    watt-hour meter

  • 89

    ls firmly embedded in the earth to establish a ground connection

    grounding rod electrode

  • 90

    a service drop is connected from the nearest utility pole to the building service entrance point and enter the building through the weather head or entrance cap down to the electric power meter

    overhead service

  • 91

    consists of a buried concrete enveloped raceway extending from the building to the property line where it is tapped to the main by a service lateral.

    underground service

  • Building laws Part 1

    Building laws Part 1

    Mari Alberca · 100問 · 1年前

    Building laws Part 1

    Building laws Part 1

    100問 • 1年前
    Mari Alberca

    Building laws Part 2

    Building laws Part 2

    Mari Alberca · 99問 · 1年前

    Building laws Part 2

    Building laws Part 2

    99問 • 1年前
    Mari Alberca

    Building laws Part 3

    Building laws Part 3

    Mari Alberca · 100問 · 1年前

    Building laws Part 3

    Building laws Part 3

    100問 • 1年前
    Mari Alberca

    Building laws Part 4

    Building laws Part 4

    Mari Alberca · 100問 · 1年前

    Building laws Part 4

    Building laws Part 4

    100問 • 1年前
    Mari Alberca

    Building Iaws Part 5

    Building Iaws Part 5

    Mari Alberca · 100問 · 1年前

    Building Iaws Part 5

    Building Iaws Part 5

    100問 • 1年前
    Mari Alberca

    Building Iaws Part 6

    Building Iaws Part 6

    Mari Alberca · 100問 · 1年前

    Building Iaws Part 6

    Building Iaws Part 6

    100問 • 1年前
    Mari Alberca

    Building Iaws Part 7

    Building Iaws Part 7

    Mari Alberca · 48問 · 1年前

    Building Iaws Part 7

    Building Iaws Part 7

    48問 • 1年前
    Mari Alberca

    Architectural Design & Site Planning Part 1

    Architectural Design & Site Planning Part 1

    Mari Alberca · 100問 · 1年前

    Architectural Design & Site Planning Part 1

    Architectural Design & Site Planning Part 1

    100問 • 1年前
    Mari Alberca

    Architectural Design & Site Planning Part 2

    Architectural Design & Site Planning Part 2

    Mari Alberca · 99問 · 1年前

    Architectural Design & Site Planning Part 2

    Architectural Design & Site Planning Part 2

    99問 • 1年前
    Mari Alberca

    Architectural Design & Site Planning Part 3

    Architectural Design & Site Planning Part 3

    Mari Alberca · 100問 · 1年前

    Architectural Design & Site Planning Part 3

    Architectural Design & Site Planning Part 3

    100問 • 1年前
    Mari Alberca

    Architectural Design & Site Planning Part 5

    Architectural Design & Site Planning Part 5

    Mari Alberca · 100問 · 1年前

    Architectural Design & Site Planning Part 5

    Architectural Design & Site Planning Part 5

    100問 • 1年前
    Mari Alberca

    Architectural Design & Site Planning Part 6

    Architectural Design & Site Planning Part 6

    Mari Alberca · 100問 · 1年前

    Architectural Design & Site Planning Part 6

    Architectural Design & Site Planning Part 6

    100問 • 1年前
    Mari Alberca

    Architectural Design & Site Planning Part 7

    Architectural Design & Site Planning Part 7

    Mari Alberca · 100問 · 1年前

    Architectural Design & Site Planning Part 7

    Architectural Design & Site Planning Part 7

    100問 • 1年前
    Mari Alberca

    Architectural Design & Site Planning Part 8

    Architectural Design & Site Planning Part 8

    Mari Alberca · 100問 · 1年前

    Architectural Design & Site Planning Part 8

    Architectural Design & Site Planning Part 8

    100問 • 1年前
    Mari Alberca

    Architectural Design & Site Planning Part 9

    Architectural Design & Site Planning Part 9

    Mari Alberca · 100問 · 1年前

    Architectural Design & Site Planning Part 9

    Architectural Design & Site Planning Part 9

    100問 • 1年前
    Mari Alberca

    Architectural Design & Site Planning Part 10

    Architectural Design & Site Planning Part 10

    Mari Alberca · 30問 · 1年前

    Architectural Design & Site Planning Part 10

    Architectural Design & Site Planning Part 10

    30問 • 1年前
    Mari Alberca

    Plumbing Part 1

    Plumbing Part 1

    Mari Alberca · 105問 · 1年前

    Plumbing Part 1

    Plumbing Part 1

    105問 • 1年前
    Mari Alberca

    Plumbing Part 2

    Plumbing Part 2

    Mari Alberca · 100問 · 1年前

    Plumbing Part 2

    Plumbing Part 2

    100問 • 1年前
    Mari Alberca

    Plumbing Part 3

    Plumbing Part 3

    Mari Alberca · 104問 · 1年前

    Plumbing Part 3

    Plumbing Part 3

    104問 • 1年前
    Mari Alberca

    Plumbing Part 4

    Plumbing Part 4

    Mari Alberca · 100問 · 1年前

    Plumbing Part 4

    Plumbing Part 4

    100問 • 1年前
    Mari Alberca

    Plumbing Part 5

    Plumbing Part 5

    Mari Alberca · 100問 · 1年前

    Plumbing Part 5

    Plumbing Part 5

    100問 • 1年前
    Mari Alberca

    Plumbing Part 6

    Plumbing Part 6

    Mari Alberca · 101問 · 1年前

    Plumbing Part 6

    Plumbing Part 6

    101問 • 1年前
    Mari Alberca

    Building Material Part 1

    Building Material Part 1

    Mari Alberca · 99問 · 1年前

    Building Material Part 1

    Building Material Part 1

    99問 • 1年前
    Mari Alberca

    Building Material Part 2

    Building Material Part 2

    Mari Alberca · 100問 · 1年前

    Building Material Part 2

    Building Material Part 2

    100問 • 1年前
    Mari Alberca

    Building Material Part 3

    Building Material Part 3

    Mari Alberca · 100問 · 1年前

    Building Material Part 3

    Building Material Part 3

    100問 • 1年前
    Mari Alberca

    Building Materials - Sitework

    Building Materials - Sitework

    Mari Alberca · 104問 · 1年前

    Building Materials - Sitework

    Building Materials - Sitework

    104問 • 1年前
    Mari Alberca

    Building Materials - Concrete Part 1

    Building Materials - Concrete Part 1

    Mari Alberca · 100問 · 1年前

    Building Materials - Concrete Part 1

    Building Materials - Concrete Part 1

    100問 • 1年前
    Mari Alberca

    Building Materials - Concrete Part 2

    Building Materials - Concrete Part 2

    Mari Alberca · 110問 · 1年前

    Building Materials - Concrete Part 2

    Building Materials - Concrete Part 2

    110問 • 1年前
    Mari Alberca

    Building Materials - Concrete Part 3

    Building Materials - Concrete Part 3

    Mari Alberca · 110問 · 1年前

    Building Materials - Concrete Part 3

    Building Materials - Concrete Part 3

    110問 • 1年前
    Mari Alberca

    Building Materials - Masonry Part 1

    Building Materials - Masonry Part 1

    Mari Alberca · 100問 · 1年前

    Building Materials - Masonry Part 1

    Building Materials - Masonry Part 1

    100問 • 1年前
    Mari Alberca

    Structural Conceptualization Part 1

    Structural Conceptualization Part 1

    Mari Alberca · 96問 · 1年前

    Structural Conceptualization Part 1

    Structural Conceptualization Part 1

    96問 • 1年前
    Mari Alberca

    Structural Conceptualization Part 2

    Structural Conceptualization Part 2

    Mari Alberca · 100問 · 1年前

    Structural Conceptualization Part 2

    Structural Conceptualization Part 2

    100問 • 1年前
    Mari Alberca

    Structural Conceptualization Part 3

    Structural Conceptualization Part 3

    Mari Alberca · 100問 · 1年前

    Structural Conceptualization Part 3

    Structural Conceptualization Part 3

    100問 • 1年前
    Mari Alberca

    Structural Conceptualization Part 4

    Structural Conceptualization Part 4

    Mari Alberca · 100問 · 1年前

    Structural Conceptualization Part 4

    Structural Conceptualization Part 4

    100問 • 1年前
    Mari Alberca

    Structural Conceptualization Part 5

    Structural Conceptualization Part 5

    Mari Alberca · 46問 · 1年前

    Structural Conceptualization Part 5

    Structural Conceptualization Part 5

    46問 • 1年前
    Mari Alberca

    Theory of Architecture Part 1

    Theory of Architecture Part 1

    Mari Alberca · 100問 · 1年前

    Theory of Architecture Part 1

    Theory of Architecture Part 1

    100問 • 1年前
    Mari Alberca

    Theory of Architecture Part 2

    Theory of Architecture Part 2

    Mari Alberca · 100問 · 1年前

    Theory of Architecture Part 2

    Theory of Architecture Part 2

    100問 • 1年前
    Mari Alberca

    Theory of Architecture Part 3

    Theory of Architecture Part 3

    Mari Alberca · 100問 · 1年前

    Theory of Architecture Part 3

    Theory of Architecture Part 3

    100問 • 1年前
    Mari Alberca

    Theory of Architecture Part 4

    Theory of Architecture Part 4

    Mari Alberca · 100問 · 1年前

    Theory of Architecture Part 4

    Theory of Architecture Part 4

    100問 • 1年前
    Mari Alberca

    Professional Practice

    Professional Practice

    Mari Alberca · 79問 · 1年前

    Professional Practice

    Professional Practice

    79問 • 1年前
    Mari Alberca

    Mock Exam 1

    Mock Exam 1

    Mari Alberca · 27問 · 1年前

    Mock Exam 1

    Mock Exam 1

    27問 • 1年前
    Mari Alberca

    Great Buildings

    Great Buildings

    Mari Alberca · 72問 · 1年前

    Great Buildings

    Great Buildings

    72問 • 1年前
    Mari Alberca

    Electrical & Mechanical Part 2

    Electrical & Mechanical Part 2

    Mari Alberca · 26問 · 1年前

    Electrical & Mechanical Part 2

    Electrical & Mechanical Part 2

    26問 • 1年前
    Mari Alberca

    Filipino Architect

    Filipino Architect

    Mari Alberca · 60問 · 1年前

    Filipino Architect

    Filipino Architect

    60問 • 1年前
    Mari Alberca

    Ph Architecture

    Ph Architecture

    Mari Alberca · 22問 · 1年前

    Ph Architecture

    Ph Architecture

    22問 • 1年前
    Mari Alberca

    vernacular terms filipino

    vernacular terms filipino

    Mari Alberca · 96問 · 1年前

    vernacular terms filipino

    vernacular terms filipino

    96問 • 1年前
    Mari Alberca

    Tropical design

    Tropical design

    Mari Alberca · 100問 · 1年前

    Tropical design

    Tropical design

    100問 • 1年前
    Mari Alberca

    Tropical design 2

    Tropical design 2

    Mari Alberca · 100問 · 1年前

    Tropical design 2

    Tropical design 2

    100問 • 1年前
    Mari Alberca

    Tropical design 3

    Tropical design 3

    Mari Alberca · 100問 · 1年前

    Tropical design 3

    Tropical design 3

    100問 • 1年前
    Mari Alberca

    Tropical design 4

    Tropical design 4

    Mari Alberca · 46問 · 1年前

    Tropical design 4

    Tropical design 4

    46問 • 1年前
    Mari Alberca

    Building Materials - Masonry Part 2

    Building Materials - Masonry Part 2

    Mari Alberca · 56問 · 1年前

    Building Materials - Masonry Part 2

    Building Materials - Masonry Part 2

    56問 • 1年前
    Mari Alberca

    Building Materials - Aluminum Part 1

    Building Materials - Aluminum Part 1

    Mari Alberca · 100問 · 1年前

    Building Materials - Aluminum Part 1

    Building Materials - Aluminum Part 1

    100問 • 1年前
    Mari Alberca

    Building Materials - Aluminum Part 2

    Building Materials - Aluminum Part 2

    Mari Alberca · 98問 · 1年前

    Building Materials - Aluminum Part 2

    Building Materials - Aluminum Part 2

    98問 • 1年前
    Mari Alberca

    Building Materials - Wood Part 1

    Building Materials - Wood Part 1

    Mari Alberca · 100問 · 1年前

    Building Materials - Wood Part 1

    Building Materials - Wood Part 1

    100問 • 1年前
    Mari Alberca

    Building Materials - Wood Part 2

    Building Materials - Wood Part 2

    Mari Alberca · 70問 · 1年前

    Building Materials - Wood Part 2

    Building Materials - Wood Part 2

    70問 • 1年前
    Mari Alberca

    Building Materials - Plastic Part 1

    Building Materials - Plastic Part 1

    Mari Alberca · 101問 · 1年前

    Building Materials - Plastic Part 1

    Building Materials - Plastic Part 1

    101問 • 1年前
    Mari Alberca

    Building Materials - Thermal and Moisture Protection

    Building Materials - Thermal and Moisture Protection

    Mari Alberca · 141問 · 1年前

    Building Materials - Thermal and Moisture Protection

    Building Materials - Thermal and Moisture Protection

    141問 • 1年前
    Mari Alberca

    Building Materials - Doors

    Building Materials - Doors

    Mari Alberca · 107問 · 1年前

    Building Materials - Doors

    Building Materials - Doors

    107問 • 1年前
    Mari Alberca

    HOA - Ancient Architecture

    HOA - Ancient Architecture

    Mari Alberca · 42問 · 1年前

    HOA - Ancient Architecture

    HOA - Ancient Architecture

    42問 • 1年前
    Mari Alberca

    HOA - Western Asia

    HOA - Western Asia

    Mari Alberca · 80問 · 1年前

    HOA - Western Asia

    HOA - Western Asia

    80問 • 1年前
    Mari Alberca

    HOA - Ancient Egypt

    HOA - Ancient Egypt

    Mari Alberca · 90問 · 1年前

    HOA - Ancient Egypt

    HOA - Ancient Egypt

    90問 • 1年前
    Mari Alberca

    HOA - Ancient Greek

    HOA - Ancient Greek

    Mari Alberca · 232問 · 1年前

    HOA - Ancient Greek

    HOA - Ancient Greek

    232問 • 1年前
    Mari Alberca

    Building Materials - Windows

    Building Materials - Windows

    Mari Alberca · 75問 · 1年前

    Building Materials - Windows

    Building Materials - Windows

    75問 • 1年前
    Mari Alberca

    Buildings Materials - Hardwares

    Buildings Materials - Hardwares

    Mari Alberca · 138問 · 1年前

    Buildings Materials - Hardwares

    Buildings Materials - Hardwares

    138問 • 1年前
    Mari Alberca

    Buildings Materials - Hardwares (Images)

    Buildings Materials - Hardwares (Images)

    Mari Alberca · 149問 · 1年前

    Buildings Materials - Hardwares (Images)

    Buildings Materials - Hardwares (Images)

    149問 • 1年前
    Mari Alberca

    Buildings Materials - Finish Hardwares

    Buildings Materials - Finish Hardwares

    Mari Alberca · 119問 · 1年前

    Buildings Materials - Finish Hardwares

    Buildings Materials - Finish Hardwares

    119問 • 1年前
    Mari Alberca

    Buildings Materials - Finish Hardwares (Images)

    Buildings Materials - Finish Hardwares (Images)

    Mari Alberca · 156問 · 1年前

    Buildings Materials - Finish Hardwares (Images)

    Buildings Materials - Finish Hardwares (Images)

    156問 • 1年前
    Mari Alberca

    Building Materials - Glass & Glazing

    Building Materials - Glass & Glazing

    Mari Alberca · 69問 · 1年前

    Building Materials - Glass & Glazing

    Building Materials - Glass & Glazing

    69問 • 1年前
    Mari Alberca

    HOA - Roman

    HOA - Roman

    Mari Alberca · 178問 · 1年前

    HOA - Roman

    HOA - Roman

    178問 • 1年前
    Mari Alberca

    HOA - Mesoamerica

    HOA - Mesoamerica

    Mari Alberca · 20問 · 1年前

    HOA - Mesoamerica

    HOA - Mesoamerica

    20問 • 1年前
    Mari Alberca

    Building Material - Glass & Glazing (Images)

    Building Material - Glass & Glazing (Images)

    Mari Alberca · 25問 · 1年前

    Building Material - Glass & Glazing (Images)

    Building Material - Glass & Glazing (Images)

    25問 • 1年前
    Mari Alberca

    HOA - Byzantine

    HOA - Byzantine

    Mari Alberca · 77問 · 1年前

    HOA - Byzantine

    HOA - Byzantine

    77問 • 1年前
    Mari Alberca

    Building Materials - Finishes

    Building Materials - Finishes

    Mari Alberca · 181問 · 1年前

    Building Materials - Finishes

    Building Materials - Finishes

    181問 • 1年前
    Mari Alberca

    Building Materials - Finishes (Images)

    Building Materials - Finishes (Images)

    Mari Alberca · 39問 · 1年前

    Building Materials - Finishes (Images)

    Building Materials - Finishes (Images)

    39問 • 1年前
    Mari Alberca

    問題一覧

  • 1

    is a form of energy generated by friction, induction or chemical change having magnetic chemical, and radiant effect. It is the motion of free electrons through a solid conductor. An electric current travels at the speed of light and therefore at the rate of conduction of an electric current is considered as instantaneous

    Electricity

  • 2

    an english physicist is considered as the father of electricity for his studies on electric attraction and the electric force

    William Gilbert

  • 3

    what are the basic particles of matter that contribute to electricity

    electrons and protons

  • 4

    what are the two general classes of electricity

    dynamic electricity (electrodynamic) and static electricity (electrostatic)

  • 5

    a combination of two or more electric cells capable of strong and supplying direct from electrochemical means

    Battery

  • 6

    delivers electricity as soon as its parts as assembled, put together, provided that it is connected to a circuit

    primary batteries

  • 7

    electricity from external source must be passed through it before it can deliver an electric current (changing the battery. uses art to supply emergency lightings repeats for hallways, stairways, exit to energize police and alarm system and certain types of signal system)

    secondary/ storage batteries

  • 8

    a machine that converts mechanical energy to electrical energy

    generator

  • 9

    the book of electrical energy utilize a day is in the form of alternating current, including energy for power and lighting

    Alternators

  • 10

    this furnish electrical energy for elevators,escalators, intercommunicating telephone systems, control of signal systems, and clock systems

    direct current generators

  • 11

    a machine that converts electrical energy to mechanical energy

    motors

  • 12

    for converting one voltage to another, from lower to higher (set-up transformer) from higher to lower (step-down transformer).

    transformers

  • 13

    what are the two major types of transformers

    oil-insulated transformer & dry-type transformer

  • 14

    for changing altering current to direct current and vice versa

    rotary converters

  • 15

    what is the maximum capacity of a H-frame transformer bank

    1,000 kva

  • 16

    which are cluster-mountain transformer typically located

    on a single pole

  • 17

    what type of liquid is used as insulation in Askarel-insulated transformer

    A synthetic non-flammable liquid

  • 18

    a type of current which flows a constant time rate and in the same direction

    direct current

  • 19

    a current which is periodically varying in time rate and in direction. it rises from zero to maximum, to aero, reverses its direction and again returns to zero.

    alternating current

  • 20

    is a name after H.R Hertz

    hertz

  • 21

    unit of electricity comprises approximately 6.25 x 10 18 electrons

    coulomb

  • 22

    current represent as rate of flow of one coulomb or 6.25 x 10 18 electrons/ second through a given cross section

    ampere

  • 23

    is the current carrying capacity of a water or cable expressing amperes, without undue heating

    ampacity

  • 24

    is the electromotive force or potential difference between two points in the electric field which will move a charge of one coulomb between these points

    volt

  • 25

    volt is named after an italian scientist who discovered that electrons flow when two different metals are connected by a war and then dripped into a liquid that conduct of carry electrons

    Alessandro Volta

  • 26

    the resistance which will allow one ampere of current to flow when one volt is impressed upon it

    ohm

  • 27

    what is the unit of electric power

    watt or kilowatt

  • 28

    how many watts are equal to 1 kilowatt

    1,000 watts

  • 29

    after whom is watt named

    James Watt

  • 30

    according to ohm's law, a current in a DC circuit is directly proportional to what

    voltage

  • 31

    in the formula I (amp) = V (volts) / R (ohms), what does 'R'

    resistance

  • 32

    if the resistance in a circuit increases, what happens to the current, assuming the voltage remain constant

    the current decreases

  • 33

    is the effective utilization of available energy by reducing peak loads and lowering demand charge. the control devices and system are referred to as a load shedding control, pick demand control, pick load regulation and power use control

    electric load control

  • 34

    the installations electric clothes are analyzed and schedule to restrict demand by shifting large load to pick up r and control to avoid coincident operation

    load scheduling and duty-cycle control

  • 35

    in conjunction with a duty cycle controller, the month is continuously mettered and an alarm set on when a bread determine the man level is exceeded

    demand metering alarm

  • 36

    also called "rate control", it is an automated version of the demand meeting alarm system, where it automatically disconnects or reconnects loads as required

    automatic instantaneous demand control

  • 37

    this controller operates by comparing the actual rate of energy usage to the ideal rate, and controls KW demand by controlling the total energy used within a metering interval

    idealcurve control

  • 38

    are computerized system which continuously forecast the amount of energy remaining in the demand interval, then examine the status and priority of each of the connected loads and decide on the proper course of action

    forecasting systems

  • 39

    to measure energy, the factor of time is introduce, such that; energy = power x time. A-C electric meters are basically small motors, whose speed is proportional to the power being used. The number of rotations is counted on the dials which are calibrated directly in kilowatt-hours

    KWH meters

  • 40

    conducting elements are disconnected as to prevent the flow of electricity

    Open circuit

  • 41

    a condition resulting from bridging any part of a circuit with conductor of a very low resistance

    short circuit

  • 42

    is one in which the components are in tandem. All seperate loads of the circuit carry the same equal current and the total resistance, R is the sum of the resistance around the circuit

    series circuit

  • 43

    is one in which the components or loads are so arranged that the current divides between them. Each outlet has a live wire connected to the current carry wire of the circuit and also a neuture wire or grounded wire connected to the return wire of the circuit. with this system, the total current flowing through the circuit is the sum of the current flowing through each outlet

    parallel circuit

  • 44

    supplies outlets for lighting and appliances including convenience receptacles

    general purpose branch circuit

  • 45

    supplies outlets intended for feeding appliances. Fixed lighting is not supplied

    appliance branch circuit

  • 46

    is designed to supply a single specific item, such as a motor load or a unit air-conditioner

    individual branch circuit

  • 47

    the portion of an electrical system extending from the final overcurrent device protecting a circuit

    branch circuit

  • 48

    a panel for distributing power to other panels or to motors and other heavy power-consuming loads. Controls, distributes and protects a number of similar branch circuits in an electrical system

    distribution panel

  • 49

    of or pertaining to a circuit in which alternating current below 50 volts is supplied by a step-down transformer from the normal line voltage used in residential systems to control doorbells, intercoms, heating and cooling systems and remote lighting fixtures. Low-voltage circuits do not require a protective raceway

    low-voltage

  • 50

    how many watts per square meter a branch circuits shall be sufficient to supply a loaded in buildings excluding porches, garages and basements

    30 watts per square

  • 51

    what is the maximum wattage recommended for a 20-ampere circuit, according to good practice guidelines

    1,600 watts

  • 52

    How many 20-ampere applience branch circuts are minimally required to serve small appliances outlest in the kitchen, pantry, dining, and family room, accoting to the National Electrical Code

    2

  • 53

    Why should convenience receptacles in an area be wired to at least two different circuits

    to ensure that the entire area won't be without power if one circuit fails

  • 54

    what is the minimum wire gauge required for general- purpose branch cirents related to at 20 amperes

    No. 12 AWG

  • 55

    On what amperage circuit loads and overcurrent devices should the circuit load for lighting and small appliances be limited

    15 amp and 20 amp respectively

  • 56

    is a triple circuit, the lighting and outlet loads are connected between any phase leg and a neutral line while machineries and other bigger loals are connected to the phase leg only.

    three phase electrical

  • 57

    general term including materials, fittings, appliances, fixtures, apparatuses used as part of, or in connection w/ an electrical installation

    equipment

  • 58

    current consuming equipment/ fixed or portable ex: heating, cooking & small motor operated equipment

    appliance

  • 59

    an accessory ex: locknut, bushing, or other part of a wiring system w/c is intended to perform a mechanical rather electrical function

    fitting(s)

  • 60

    the point of delivery of electricity to a building by a public utility company. The service entrance consists of the following

    service entrance

  • 61

    these are the conductors which extend from the street distribution main or distribution transformer to the service equipment of the building

    service conductors

  • 62

    this affords the means of connecting or disconnecting the entire electrical service and of automatic protect against severe overloads and short circuits

    service entrance switch

  • 63

    the device used by the utility company to determine power consumption

    kilowatt hour meter

  • 64

    the decrease in voltage between two points on a power line, usually caused by resistance or leakage along the line

    Line Drop

  • 65

    the supplying o utilitities required or demanded by the public

    service

  • 66

    an auxilliary power station where electrical current is converted on where voltage is stepped up or down

    substation

  • 67

    The portion of a service conductor extending from a service drop or service lateral to the service equipment of a building

    service entrance conductor

  • 68

    A meter for measuring and recording the quantity of electric power consumed with respect to time

    watt-hour meter

  • 69

    a fire-rated room housing a transformer and auxilliary equipment for a large building

    transformer vault

  • 70

    contains the services equipment for a large building

    switchgear room

  • 71

    equipment necessary for controlling, metering and protecting the electric power supply to a building

    service equipment

  • 72

    one or a group of panels on which are mounted switches, overcurrent devices, metering instruments and buses

    swithboard

  • 73

    for providing emergency power outage

    standby generator

  • 74

    an emergency system designed to provide power automatically and instantaneously

    uninterruptible power supply

  • 75

    A freestanding enclosure housing a disconnect switch, a step-down transformer and switchgear

    unit substation

  • 76

    arey of the conductors extending from the service equipment to various distribution points in a building

    feeder

  • 77

    the overhead portion of service conductors extending from the nearset utility pole to a building

    service drop

  • 78

    the conductor and equipment for delivering energy from the electricity supply system to the wiring system of the premises served

    service entrance

  • 79

    Any of several conducting rode installed at the top of a stucture and ground to divert lightning away from the structure. Also called air teminal

    Lightning Rod

  • 80

    a device for protecting electric equipment from damage by lighting or other high-voltage currents, using spark gaps to carry the current to the ground without passing through the device

    lightning arrester

  • 81

    a space between two terminals or electrodes across which a discharge of electricity may pass at a prescribed voltage

    spark gap

  • 82

    is used by medium-sized and large buildings to step down from a high supply voltage to the service voltage.

    transformer

  • 83

    extend from a main power line or transformer to the service equipment of a building

    service conductors

  • 84

    is a panel on which are mounted switches, overcurrent devices, metering instruments and busbars for controlling, distributing and protecting a number of electric circuits

    main switchboard

  • 85

    includes a main disconnect switch and secondary switches, fuser and circuit breakers for controlling and protecting the electric power supply to a building. It is located in a switchgear room near the entrance of the service conductors

    service equipment

  • 86

    The underground portion of service conductors extending from a main power line or transformer to a building

    service lateral

  • 87

    the portion of a service conductor extending from a service drop or service lateral to the service equipment of a building

    service entrance conductor

  • 88

    measures and records the quantity of electric power consumed with respect to time. Supplied by the public utility, it is always placed switch so that it cannot be disconnected for multiple-occupancy buildings, banks of meters are installed so that each unit can be metered independently

    watt-hour meter

  • 89

    ls firmly embedded in the earth to establish a ground connection

    grounding rod electrode

  • 90

    a service drop is connected from the nearest utility pole to the building service entrance point and enter the building through the weather head or entrance cap down to the electric power meter

    overhead service

  • 91

    consists of a buried concrete enveloped raceway extending from the building to the property line where it is tapped to the main by a service lateral.

    underground service