  • 1

    what factors are prime determinants in weather and how a parcel of land can be developed

    availability and capacity of roads

  • 2

    which of the following is not mentioned as an important aspect of circulation gateway in the analysis of site design

    bridges

  • 3

    what should be inventoried in relation to the site when studying link

    both adjacent properties and community facilities

  • 4

    accord what is considered a critical piece of data in early analysis of a site

    discovering the site has historical features and archaeological materials

  • 5

    may required to determine the most desirable way to orient buildings,outdoor areas and approaches to the buildings.undesirable views can be minimized or blocked within landscaping or other manufactured features

    view analysis

  • 6

    also spatial pattern are all important in relating design elements sites and endowed with outstanding natural features with cynic and aesthetic values must be taken advantage by the designer

    natural features

  • 7

    on a site maybe pleasing or objectionable they may have a very orientation of the building and therefore should be carefully studied

    views

  • 8

    what is considered as a strong direction element lily to observer toward a focal point or closer observation

    the open space or line of sight of the vista

  • 9

    orientation always merit consideration

    orientation for sun and refilling summer breezes

  • 10

    chismos successful when sunshine is made available in the kitchen and some sandwiches each room and sometime of the day

    orientation for sun

  • 11

    guidance by deflection and filtration

    plants control by wind obstruction

  • 12

    as with other barriers reduce the wind speed by increasing the resistance to wind flow

    obstruction with trees

  • 13

    use individually or in combination affects air movement

    coniferous and deciduous trees and shrubs

  • 14

    within what distance from a site should all major roles be considered when evaluating exposure to roadway noise

    1000 feet (304 meters)

  • 15

    noise control can be achieved by which of the following barrier adjustments

    by any means of the above methods

  • 16

    for empire to be an effective noise shield, what condition must be met

    it must be block all residential levels of all buildings from line of sight

  • 17

    is a level space,shelf or raise barrier usually made by compact soil separating two areas

    berm

  • 18

    is a practice of building a wall of earth around outside of the home

    earth berming

  • 19

    offers the planner the pest and easier solution to site development its economical in site development, adaptable to great variety of planning forms it is adequate to all types of street patterns

    level site

  • 20

    provides the planner with variety of building types and groupings different street patterns with the employed.drainage problem are simpler but more difficult to manage but creates a far more interesting land development

    sloping site

  • 21

    building itself could serve as the retaining wall and disadvantage of a rolling terrain excessive development cost,adaptability to terrain is imperative,drainage problem through posting difficulty may require a workable system of channeling from one area to another,less variety of street patterns and less variety of building patterns

    very steep sites

  • 22

    can do considerable damage often to area much larger than that cover by the building so is loop analysis is necessary to ensure the minimal area of disturbance

    earth shifting

  • 23

    shape of the building (building ground level perimeter profile)what is strongly related to the site form especially for the tight site where the buildings covers a major portion of the site surface.building slope is both restricted by the site form and strongly limits the potential for developing other site areas

    site configuration

  • 24

    which of the following is not a design challenge typically associated with an irregular shaped plot

    abundant natural platforms

  • 25

    an irregularly shaped lot

    limited natural platforms space for buildings

  • 26

    what type of greeting arrangement is commonly associated with irregular shaped lots

    abnormal grading arrangement

  • 27

    irregularly shaped lots often results in

    unusable fragments areas

  • 28

    what financial impact is often associated with developing an irregularly shaped lots

    higher site improvement cost and recurring maintenance problems

  • 29

    the design of unity system on an irregularly shaped flat is often described as

    inefficient and extensive

  • 30

    enclosed within space

    isolated buildings

  • 31

    interior space becomes cohesive therefore no elements to alienate buildings

    building and closing space and space enclosing building

  • 32

    isolated but cut up the traffic lines

    enclosed space

  • 33

    less isolated

    space cohesive

  • 34

    unifies isolated buildings

    under or overpass

  • 35

    corners are built up making the design of buildings restricted since a similar shape must be adapt to hold design together

    build up corners

  • 36

    introducing a monument,statue,fountains create a visual identity for the space

    monuments

  • 37

    use of terminal points is essential in setting a building such as the Piazza San Marco in Venice

    terminal points

  • 38

    site is divided into square or rectangle blocks

    gridion

  • 39

    used in highly mountainous sites. following the contours of the topography

    Meandering

  • 40

    using both the geometric and yandering straight patterns.geometric street pattern is used where that the rain is flat and mendering where is terrain is rolling

    combination

  • 41

    the advantage of the grid system is its ability to lay out straight in a easy and direct manner as well as the easy insulation of services following the grade of the street. one disadvantage of the grid is its relative monotony. to avoid monotonous treat layouts in modified grid would be used.

    modified grids

  • 42

    the grouping of houses presents a fireless difficult problem than that of the straight street. is shaped so that the fronting house automatic to create and an enclosed space

    cul-de-sac

  • 43

    what is the maximum length of cul-de-sac

    500 ft (152.4 meters)

  • 44

    good opportunities exist for varied and interesting house groups on lots planking loop street. one disadvantage is the eventual narrowness of certain lot frontage along the curvature

    loops

  • 45

    Name the street pattern

    cul-de-sac

  • 46

    Name the street pattern

    loops

  • 47

    Major arterial: highways, bi-ways, expressway, super highways, freeways, motorways, autobahns, etc Provide unity throughout contagious urban area usually from boundaries or neighborhood

    major roads

  • 48

    Minor arterial avenue, boulevard etc Main feeder streets, signal were needed and stop signs on side streets occasionally from boundaries for neighborhood

    secondary roads

  • 49

    Main interior street and has top sign on side street

    collector street

  • 50

    Local service street and non-conducive through traffic

    local street

  • 51

    Street oak pen only to one end with provision of a partial turn around at the other

    cul-de-sac, dead ends, turn around, T- junction, Y- junction, hammer, loop

  • 52

    Involves the remodeling of the existing landform to facilitate the function and circulation of the site

    grading

  • 53

    What are the two principal relationships between building and land

    The land may be graded to suit the building's needs, or the building's design can be adapted to the existing land.

  • 54

    Refers to area where soil is removed

    cut area

  • 55

    Refers to area where soil is added

    fill area

  • 56

    Removal of soil

    excavation

  • 57

    Addition of soil

    embankment

  • 58

    Which of the following is an advantage of grading by cut

    greater soil stability

  • 59

    What is the disadvantage of grading by fill

    possible of setting especially for large area

  • 60

    What is the primary advantage of combining cut and fill grading method

    it is the most economical approach

  • 61

    Which of the grading method is best suited for raising low spot where drainage is an issue

    grading by fill

  • 62

    What is the potential disadvantage of combining cut and fill techniques

    it might be possible to arrange spaces suitable to the users needs

  • 63

    What is the significant disadvantage of grading by cut

    loss of topsoil resulting in exposure of non fertile soil

  • 64

    Best suited for linear construction such as road, path and utility trenching

    average end area method

  • 65

    Appropriate for large relatively uncomplicated grading plants and may also be used to compute volumes of water in ponds and lakes mostly used by landscape architects because it's most accurate

    contour area method

  • 66

    Is appropriate for complex reading projects and urban conditions example excavation of buildings

    borrow pit method or grid method

  • 67

    The final grade after all landscape develop has been completed it is the top surface of lawns, planting beds, pavements, and so on, and is normally designed by contours and spot elevations on grading plan

    finished grade

  • 68

    The top of the material on which the surface materials such as topsoil and pavement including base materials is placed

    subgrade

  • 69

    A subgray that must attain a specified density

    compacted subgrade

  • 70

    Soil that has not been excavated or charged in any way

    undistributed subgrade

  • 71

    Imported materials normally coarse or fine aggregate, that is typically placed under pavement

    base or sub base

  • 72

    Television of the first floor of a structure the term may be used to designate the elevation of any floor

    finish floor elevation

  • 73

    A layer of a soul soil profile. Because of its high organic content it is subject to decomposition and therefore is not appropriate subgrade materials for structure

    topsoil

  • 74

    What is the term used to describe the practice of training water away from building to avoid moisture and structural problems

    positive drainage

  • 75

    For economic reasons, where should the cut area ideally be located in the relation of the fill area

    as close as possible

  • 76

    Which soil type are considered easier to load, spread and compact during grading

    clay, silt and loam

  • 77

    What is the approximate angle of response for average soil in cut

    55°

  • 78

    What is the approximate angle of response for average soil in fill

    17°

  • 79

    Generally, slope greater than what percentage are considered unsafe

    25°

  • 80

    Above what slope presentation does the use of grass cutting machinery become impractical

    30%

  • 81

    What is dimensioned as a significant cost factor associated with retaining walls over 3 ft in height

    reinforcing, gravel backfill, and whip holes

  • 82

    Essay complex process that combines practical with a artful in a unified functional composition. It combines elements of arts and science to create functional aesthetic a placing extensions of door living to outdoors

    landscape design

  • 83

    Has been over done in residential landscape this approach seems formal and monotonous

    symmetrical balance

  • 84

    Name the balance of landscape

    symmetrical balance

  • 85

    Is often more desirable for residential landscape and balance is created without monotony

    asymmetrical balance

  • 86

    Can be made to appear taller in relation to its length by proper placement of plant materials. Larger trees planted as a background break the horizontal roof line. Smaller tree at a few feet from end or corner would also help the house in taller relation to its length

    a long low house or ranch style

  • 87

    Seems longer when few or no trees are placed in the background but medium sized, rounded trees are positioned on the side of the house. Plants place near this tree should decrease in height the further from the house they are positioned to create a sloping line replacing the vertical line of the house

    a tall slender house

  • 88

    Name the balance in landscape

    asymmetrical balance

  • 89

    Name the balance in landscape

    a long low house or ranch style

  • 90

    Name the balance in landscape

    a tall slender house

  • 91

    May compliment an office building but probably dwarf a single story residence

    one large towering tree

  • 92

    Can be achieved through repetition of plants masses

    focalization of the entrance

  • 93

    Can be used to and frame and or focalize a scene or direct view

    direct views

  • 94

    transition from shorter to taller plants and from fine to coarse texture wood and frame the scene and make it appear closer like a painting on a wall

  • 95

    Transition from taller to shorter plants with textural changes from coarse to find along focal lines emphasize the beauty of a lake scene

  • 96

    What is a primary purpose of using tree as visual screen in the landscape design

    to provide privacy or block negative views

  • 97

    Where should a visual screen be placed in relation to the item being screened

    as close as possible

  • 98

    What elements can be combined to create effective noise screens in landscape design

    raised land forms, ground covers, shrubs and trees

  • 99

    What was a historical use of foundation plantings

    to block the view of race foundation and slow cold air movement

  • 100

    What is the maximum recommended height of plants in the foundation planting relative to the height of the house wall at the corners

    2/3 the wall height

  • Building laws Part 1

    Building laws Part 1

    Mari Alberca · 100問 · 1年前

    Building laws Part 1

    Building laws Part 1

    100問 • 1年前
    Mari Alberca

    Building laws Part 2

    Building laws Part 2

    Mari Alberca · 99問 · 1年前

    Building laws Part 2

    Building laws Part 2

    99問 • 1年前
    Mari Alberca

    Building laws Part 3

    Building laws Part 3

    Mari Alberca · 100問 · 1年前

    Building laws Part 3

    Building laws Part 3

    100問 • 1年前
    Mari Alberca

    Building laws Part 4

    Building laws Part 4

    Mari Alberca · 100問 · 1年前

    Building laws Part 4

    Building laws Part 4

    100問 • 1年前
    Mari Alberca

    Building Iaws Part 5

    Building Iaws Part 5

    Mari Alberca · 100問 · 1年前

    Building Iaws Part 5

    Building Iaws Part 5

    100問 • 1年前
    Mari Alberca

    Building Iaws Part 6

    Building Iaws Part 6

    Mari Alberca · 100問 · 1年前

    Building Iaws Part 6

    Building Iaws Part 6

    100問 • 1年前
    Mari Alberca

    Building Iaws Part 7

    Building Iaws Part 7

    Mari Alberca · 48問 · 1年前

    Building Iaws Part 7

    Building Iaws Part 7

    48問 • 1年前
    Mari Alberca

    Architectural Design & Site Planning Part 1

    Architectural Design & Site Planning Part 1

    Mari Alberca · 100問 · 1年前

    Architectural Design & Site Planning Part 1

    Architectural Design & Site Planning Part 1

    100問 • 1年前
    Mari Alberca

    Architectural Design & Site Planning Part 2

    Architectural Design & Site Planning Part 2

    Mari Alberca · 99問 · 1年前

    Architectural Design & Site Planning Part 2

    Architectural Design & Site Planning Part 2

    99問 • 1年前
    Mari Alberca

    Architectural Design & Site Planning Part 3

    Architectural Design & Site Planning Part 3

    Mari Alberca · 100問 · 1年前

    Architectural Design & Site Planning Part 3

    Architectural Design & Site Planning Part 3

    100問 • 1年前
    Mari Alberca

    Architectural Design & Site Planning Part 5

    Architectural Design & Site Planning Part 5

    Mari Alberca · 100問 · 1年前

    Architectural Design & Site Planning Part 5

    Architectural Design & Site Planning Part 5

    100問 • 1年前
    Mari Alberca

    Architectural Design & Site Planning Part 6

    Architectural Design & Site Planning Part 6

    Mari Alberca · 100問 · 1年前

    Architectural Design & Site Planning Part 6

    Architectural Design & Site Planning Part 6

    100問 • 1年前
    Mari Alberca

    Architectural Design & Site Planning Part 8

    Architectural Design & Site Planning Part 8

    Mari Alberca · 100問 · 1年前

    Architectural Design & Site Planning Part 8

    Architectural Design & Site Planning Part 8

    100問 • 1年前
    Mari Alberca

    Architectural Design & Site Planning Part 9

    Architectural Design & Site Planning Part 9

    Mari Alberca · 100問 · 1年前

    Architectural Design & Site Planning Part 9

    Architectural Design & Site Planning Part 9

    100問 • 1年前
    Mari Alberca

    Architectural Design & Site Planning Part 10

    Architectural Design & Site Planning Part 10

    Mari Alberca · 30問 · 1年前

    Architectural Design & Site Planning Part 10

    Architectural Design & Site Planning Part 10

    30問 • 1年前
    Mari Alberca

    Plumbing Part 1

    Plumbing Part 1

    Mari Alberca · 105問 · 1年前

    Plumbing Part 1

    Plumbing Part 1

    105問 • 1年前
    Mari Alberca

    Plumbing Part 2

    Plumbing Part 2

    Mari Alberca · 100問 · 1年前

    Plumbing Part 2

    Plumbing Part 2

    100問 • 1年前
    Mari Alberca

    Plumbing Part 3

    Plumbing Part 3

    Mari Alberca · 104問 · 1年前

    Plumbing Part 3

    Plumbing Part 3

    104問 • 1年前
    Mari Alberca

    Plumbing Part 4

    Plumbing Part 4

    Mari Alberca · 100問 · 1年前

    Plumbing Part 4

    Plumbing Part 4

    100問 • 1年前
    Mari Alberca

    Plumbing Part 5

    Plumbing Part 5

    Mari Alberca · 100問 · 1年前

    Plumbing Part 5

    Plumbing Part 5

    100問 • 1年前
    Mari Alberca

    Plumbing Part 6

    Plumbing Part 6

    Mari Alberca · 101問 · 1年前

    Plumbing Part 6

    Plumbing Part 6

    101問 • 1年前
    Mari Alberca

    Building Material Part 1

    Building Material Part 1

    Mari Alberca · 99問 · 1年前

    Building Material Part 1

    Building Material Part 1

    99問 • 1年前
    Mari Alberca

    Building Material Part 2

    Building Material Part 2

    Mari Alberca · 100問 · 1年前

    Building Material Part 2

    Building Material Part 2

    100問 • 1年前
    Mari Alberca

    Building Material Part 3

    Building Material Part 3

    Mari Alberca · 100問 · 1年前

    Building Material Part 3

    Building Material Part 3

    100問 • 1年前
    Mari Alberca

    Building Materials - Sitework

    Building Materials - Sitework

    Mari Alberca · 104問 · 1年前

    Building Materials - Sitework

    Building Materials - Sitework

    104問 • 1年前
    Mari Alberca

    Building Materials - Concrete Part 1

    Building Materials - Concrete Part 1

    Mari Alberca · 100問 · 1年前

    Building Materials - Concrete Part 1

    Building Materials - Concrete Part 1

    100問 • 1年前
    Mari Alberca

    Building Materials - Concrete Part 2

    Building Materials - Concrete Part 2

    Mari Alberca · 110問 · 1年前

    Building Materials - Concrete Part 2

    Building Materials - Concrete Part 2

    110問 • 1年前
    Mari Alberca

    Building Materials - Concrete Part 3

    Building Materials - Concrete Part 3

    Mari Alberca · 110問 · 1年前

    Building Materials - Concrete Part 3

    Building Materials - Concrete Part 3

    110問 • 1年前
    Mari Alberca

    Building Materials - Masonry Part 1

    Building Materials - Masonry Part 1

    Mari Alberca · 100問 · 1年前

    Building Materials - Masonry Part 1

    Building Materials - Masonry Part 1

    100問 • 1年前
    Mari Alberca

    Structural Conceptualization Part 1

    Structural Conceptualization Part 1

    Mari Alberca · 96問 · 1年前

    Structural Conceptualization Part 1

    Structural Conceptualization Part 1

    96問 • 1年前
    Mari Alberca

    Structural Conceptualization Part 2

    Structural Conceptualization Part 2

    Mari Alberca · 100問 · 1年前

    Structural Conceptualization Part 2

    Structural Conceptualization Part 2

    100問 • 1年前
    Mari Alberca

    Structural Conceptualization Part 3

    Structural Conceptualization Part 3

    Mari Alberca · 100問 · 1年前

    Structural Conceptualization Part 3

    Structural Conceptualization Part 3

    100問 • 1年前
    Mari Alberca

    Structural Conceptualization Part 4

    Structural Conceptualization Part 4

    Mari Alberca · 100問 · 1年前

    Structural Conceptualization Part 4

    Structural Conceptualization Part 4

    100問 • 1年前
    Mari Alberca

    Structural Conceptualization Part 5

    Structural Conceptualization Part 5

    Mari Alberca · 46問 · 1年前

    Structural Conceptualization Part 5

    Structural Conceptualization Part 5

    46問 • 1年前
    Mari Alberca

    Theory of Architecture Part 1

    Theory of Architecture Part 1

    Mari Alberca · 100問 · 1年前

    Theory of Architecture Part 1

    Theory of Architecture Part 1

    100問 • 1年前
    Mari Alberca

    Theory of Architecture Part 2

    Theory of Architecture Part 2

    Mari Alberca · 100問 · 1年前

    Theory of Architecture Part 2

    Theory of Architecture Part 2

    100問 • 1年前
    Mari Alberca

    Theory of Architecture Part 3

    Theory of Architecture Part 3

    Mari Alberca · 100問 · 1年前

    Theory of Architecture Part 3

    Theory of Architecture Part 3

    100問 • 1年前
    Mari Alberca

    Theory of Architecture Part 4

    Theory of Architecture Part 4

    Mari Alberca · 100問 · 1年前

    Theory of Architecture Part 4

    Theory of Architecture Part 4

    100問 • 1年前
    Mari Alberca

    Professional Practice

    Professional Practice

    Mari Alberca · 79問 · 1年前

    Professional Practice

    Professional Practice

    79問 • 1年前
    Mari Alberca

    Mock Exam 1

    Mock Exam 1

    Mari Alberca · 27問 · 1年前

    Mock Exam 1

    Mock Exam 1

    27問 • 1年前
    Mari Alberca

    Great Buildings

    Great Buildings

    Mari Alberca · 72問 · 1年前

    Great Buildings

    Great Buildings

    72問 • 1年前
    Mari Alberca

    Electrical & Mechanical Part 1

    Electrical & Mechanical Part 1

    Mari Alberca · 91問 · 1年前

    Electrical & Mechanical Part 1

    Electrical & Mechanical Part 1

    91問 • 1年前
    Mari Alberca

    Filipino Architect

    Filipino Architect

    Mari Alberca · 60問 · 1年前

    Filipino Architect

    Filipino Architect

    60問 • 1年前
    Mari Alberca

    Electrical & Mechanical Part 2

    Electrical & Mechanical Part 2

    Mari Alberca · 26問 · 1年前

    Electrical & Mechanical Part 2

    Electrical & Mechanical Part 2

    26問 • 1年前
    Mari Alberca

    Ph Architecture

    Ph Architecture

    Mari Alberca · 22問 · 1年前

    Ph Architecture

    Ph Architecture

    22問 • 1年前
    Mari Alberca

    vernacular terms filipino

    vernacular terms filipino

    Mari Alberca · 96問 · 1年前

    vernacular terms filipino

    vernacular terms filipino

    96問 • 1年前
    Mari Alberca

    Tropical design

    Tropical design

    Mari Alberca · 100問 · 1年前

    Tropical design

    Tropical design

    100問 • 1年前
    Mari Alberca

    Tropical design 2

    Tropical design 2

    Mari Alberca · 100問 · 1年前

    Tropical design 2

    Tropical design 2

    100問 • 1年前
    Mari Alberca

    Tropical design 3

    Tropical design 3

    Mari Alberca · 100問 · 1年前

    Tropical design 3

    Tropical design 3

    100問 • 1年前
    Mari Alberca

    Tropical design 4

    Tropical design 4

    Mari Alberca · 46問 · 1年前

    Tropical design 4

    Tropical design 4

    46問 • 1年前
    Mari Alberca

    Building Materials - Masonry Part 2

    Building Materials - Masonry Part 2

    Mari Alberca · 56問 · 1年前

    Building Materials - Masonry Part 2

    Building Materials - Masonry Part 2

    56問 • 1年前
    Mari Alberca

    Building Materials - Aluminum Part 1

    Building Materials - Aluminum Part 1

    Mari Alberca · 100問 · 1年前

    Building Materials - Aluminum Part 1

    Building Materials - Aluminum Part 1

    100問 • 1年前
    Mari Alberca

    Building Materials - Aluminum Part 2

    Building Materials - Aluminum Part 2

    Mari Alberca · 98問 · 1年前

    Building Materials - Aluminum Part 2

    Building Materials - Aluminum Part 2

    98問 • 1年前
    Mari Alberca

    Building Materials - Wood Part 1

    Building Materials - Wood Part 1

    Mari Alberca · 100問 · 1年前

    Building Materials - Wood Part 1

    Building Materials - Wood Part 1

    100問 • 1年前
    Mari Alberca

    Building Materials - Wood Part 2

    Building Materials - Wood Part 2

    Mari Alberca · 70問 · 1年前

    Building Materials - Wood Part 2

    Building Materials - Wood Part 2

    70問 • 1年前
    Mari Alberca

    Building Materials - Plastic Part 1

    Building Materials - Plastic Part 1

    Mari Alberca · 101問 · 1年前

    Building Materials - Plastic Part 1

    Building Materials - Plastic Part 1

    101問 • 1年前
    Mari Alberca

    Building Materials - Thermal and Moisture Protection

    Building Materials - Thermal and Moisture Protection

    Mari Alberca · 141問 · 1年前

    Building Materials - Thermal and Moisture Protection

    Building Materials - Thermal and Moisture Protection

    141問 • 1年前
    Mari Alberca

    Building Materials - Doors

    Building Materials - Doors

    Mari Alberca · 107問 · 1年前

    Building Materials - Doors

    Building Materials - Doors

    107問 • 1年前
    Mari Alberca

    HOA - Ancient Architecture

    HOA - Ancient Architecture

    Mari Alberca · 42問 · 1年前

    HOA - Ancient Architecture

    HOA - Ancient Architecture

    42問 • 1年前
    Mari Alberca

    HOA - Western Asia

    HOA - Western Asia

    Mari Alberca · 80問 · 1年前

    HOA - Western Asia

    HOA - Western Asia

    80問 • 1年前
    Mari Alberca

    HOA - Ancient Egypt

    HOA - Ancient Egypt

    Mari Alberca · 90問 · 1年前

    HOA - Ancient Egypt

    HOA - Ancient Egypt

    90問 • 1年前
    Mari Alberca

    HOA - Ancient Greek

    HOA - Ancient Greek

    Mari Alberca · 232問 · 1年前

    HOA - Ancient Greek

    HOA - Ancient Greek

    232問 • 1年前
    Mari Alberca

    Building Materials - Windows

    Building Materials - Windows

    Mari Alberca · 75問 · 1年前

    Building Materials - Windows

    Building Materials - Windows

    75問 • 1年前
    Mari Alberca

    Buildings Materials - Hardwares

    Buildings Materials - Hardwares

    Mari Alberca · 138問 · 1年前

    Buildings Materials - Hardwares

    Buildings Materials - Hardwares

    138問 • 1年前
    Mari Alberca

    Buildings Materials - Hardwares (Images)

    Buildings Materials - Hardwares (Images)

    Mari Alberca · 149問 · 1年前

    Buildings Materials - Hardwares (Images)

    Buildings Materials - Hardwares (Images)

    149問 • 1年前
    Mari Alberca

    Buildings Materials - Finish Hardwares

    Buildings Materials - Finish Hardwares

    Mari Alberca · 119問 · 1年前

    Buildings Materials - Finish Hardwares

    Buildings Materials - Finish Hardwares

    119問 • 1年前
    Mari Alberca

    Buildings Materials - Finish Hardwares (Images)

    Buildings Materials - Finish Hardwares (Images)

    Mari Alberca · 156問 · 1年前

    Buildings Materials - Finish Hardwares (Images)

    Buildings Materials - Finish Hardwares (Images)

    156問 • 1年前
    Mari Alberca

    Building Materials - Glass & Glazing

    Building Materials - Glass & Glazing

    Mari Alberca · 69問 · 1年前

    Building Materials - Glass & Glazing

    Building Materials - Glass & Glazing

    69問 • 1年前
    Mari Alberca

    HOA - Roman

    HOA - Roman

    Mari Alberca · 178問 · 1年前

    HOA - Roman

    HOA - Roman

    178問 • 1年前
    Mari Alberca

    HOA - Mesoamerica

    HOA - Mesoamerica

    Mari Alberca · 20問 · 1年前

    HOA - Mesoamerica

    HOA - Mesoamerica

    20問 • 1年前
    Mari Alberca

    Building Material - Glass & Glazing (Images)

    Building Material - Glass & Glazing (Images)

    Mari Alberca · 25問 · 1年前

    Building Material - Glass & Glazing (Images)

    Building Material - Glass & Glazing (Images)

    25問 • 1年前
    Mari Alberca

    Building Materials - Finishes

    Building Materials - Finishes

    Mari Alberca · 181問 · 1年前

    Building Materials - Finishes

    Building Materials - Finishes

    181問 • 1年前
    Mari Alberca

    HOA - Byzantine

    HOA - Byzantine

    Mari Alberca · 77問 · 1年前

    HOA - Byzantine

    HOA - Byzantine

    77問 • 1年前
    Mari Alberca

    Building Materials - Finishes (Images)

    Building Materials - Finishes (Images)

    Mari Alberca · 39問 · 1年前

    Building Materials - Finishes (Images)

    Building Materials - Finishes (Images)

    39問 • 1年前
    Mari Alberca

    問題一覧

  • 1

    what factors are prime determinants in weather and how a parcel of land can be developed

    availability and capacity of roads

  • 2

    which of the following is not mentioned as an important aspect of circulation gateway in the analysis of site design

    bridges

  • 3

    what should be inventoried in relation to the site when studying link

    both adjacent properties and community facilities

  • 4

    accord what is considered a critical piece of data in early analysis of a site

    discovering the site has historical features and archaeological materials

  • 5

    may required to determine the most desirable way to orient buildings,outdoor areas and approaches to the buildings.undesirable views can be minimized or blocked within landscaping or other manufactured features

    view analysis

  • 6

    also spatial pattern are all important in relating design elements sites and endowed with outstanding natural features with cynic and aesthetic values must be taken advantage by the designer

    natural features

  • 7

    on a site maybe pleasing or objectionable they may have a very orientation of the building and therefore should be carefully studied

    views

  • 8

    what is considered as a strong direction element lily to observer toward a focal point or closer observation

    the open space or line of sight of the vista

  • 9

    orientation always merit consideration

    orientation for sun and refilling summer breezes

  • 10

    chismos successful when sunshine is made available in the kitchen and some sandwiches each room and sometime of the day

    orientation for sun

  • 11

    guidance by deflection and filtration

    plants control by wind obstruction

  • 12

    as with other barriers reduce the wind speed by increasing the resistance to wind flow

    obstruction with trees

  • 13

    use individually or in combination affects air movement

    coniferous and deciduous trees and shrubs

  • 14

    within what distance from a site should all major roles be considered when evaluating exposure to roadway noise

    1000 feet (304 meters)

  • 15

    noise control can be achieved by which of the following barrier adjustments

    by any means of the above methods

  • 16

    for empire to be an effective noise shield, what condition must be met

    it must be block all residential levels of all buildings from line of sight

  • 17

    is a level space,shelf or raise barrier usually made by compact soil separating two areas

    berm

  • 18

    is a practice of building a wall of earth around outside of the home

    earth berming

  • 19

    offers the planner the pest and easier solution to site development its economical in site development, adaptable to great variety of planning forms it is adequate to all types of street patterns

    level site

  • 20

    provides the planner with variety of building types and groupings different street patterns with the employed.drainage problem are simpler but more difficult to manage but creates a far more interesting land development

    sloping site

  • 21

    building itself could serve as the retaining wall and disadvantage of a rolling terrain excessive development cost,adaptability to terrain is imperative,drainage problem through posting difficulty may require a workable system of channeling from one area to another,less variety of street patterns and less variety of building patterns

    very steep sites

  • 22

    can do considerable damage often to area much larger than that cover by the building so is loop analysis is necessary to ensure the minimal area of disturbance

    earth shifting

  • 23

    shape of the building (building ground level perimeter profile)what is strongly related to the site form especially for the tight site where the buildings covers a major portion of the site surface.building slope is both restricted by the site form and strongly limits the potential for developing other site areas

    site configuration

  • 24

    which of the following is not a design challenge typically associated with an irregular shaped plot

    abundant natural platforms

  • 25

    an irregularly shaped lot

    limited natural platforms space for buildings

  • 26

    what type of greeting arrangement is commonly associated with irregular shaped lots

    abnormal grading arrangement

  • 27

    irregularly shaped lots often results in

    unusable fragments areas

  • 28

    what financial impact is often associated with developing an irregularly shaped lots

    higher site improvement cost and recurring maintenance problems

  • 29

    the design of unity system on an irregularly shaped flat is often described as

    inefficient and extensive

  • 30

    enclosed within space

    isolated buildings

  • 31

    interior space becomes cohesive therefore no elements to alienate buildings

    building and closing space and space enclosing building

  • 32

    isolated but cut up the traffic lines

    enclosed space

  • 33

    less isolated

    space cohesive

  • 34

    unifies isolated buildings

    under or overpass

  • 35

    corners are built up making the design of buildings restricted since a similar shape must be adapt to hold design together

    build up corners

  • 36

    introducing a monument,statue,fountains create a visual identity for the space

    monuments

  • 37

    use of terminal points is essential in setting a building such as the Piazza San Marco in Venice

    terminal points

  • 38

    site is divided into square or rectangle blocks

    gridion

  • 39

    used in highly mountainous sites. following the contours of the topography

    Meandering

  • 40

    using both the geometric and yandering straight patterns.geometric street pattern is used where that the rain is flat and mendering where is terrain is rolling

    combination

  • 41

    the advantage of the grid system is its ability to lay out straight in a easy and direct manner as well as the easy insulation of services following the grade of the street. one disadvantage of the grid is its relative monotony. to avoid monotonous treat layouts in modified grid would be used.

    modified grids

  • 42

    the grouping of houses presents a fireless difficult problem than that of the straight street. is shaped so that the fronting house automatic to create and an enclosed space

    cul-de-sac

  • 43

    what is the maximum length of cul-de-sac

    500 ft (152.4 meters)

  • 44

    good opportunities exist for varied and interesting house groups on lots planking loop street. one disadvantage is the eventual narrowness of certain lot frontage along the curvature

    loops

  • 45

    Name the street pattern

    cul-de-sac

  • 46

    Name the street pattern

    loops

  • 47

    Major arterial: highways, bi-ways, expressway, super highways, freeways, motorways, autobahns, etc Provide unity throughout contagious urban area usually from boundaries or neighborhood

    major roads

  • 48

    Minor arterial avenue, boulevard etc Main feeder streets, signal were needed and stop signs on side streets occasionally from boundaries for neighborhood

    secondary roads

  • 49

    Main interior street and has top sign on side street

    collector street

  • 50

    Local service street and non-conducive through traffic

    local street

  • 51

    Street oak pen only to one end with provision of a partial turn around at the other

    cul-de-sac, dead ends, turn around, T- junction, Y- junction, hammer, loop

  • 52

    Involves the remodeling of the existing landform to facilitate the function and circulation of the site

    grading

  • 53

    What are the two principal relationships between building and land

    The land may be graded to suit the building's needs, or the building's design can be adapted to the existing land.

  • 54

    Refers to area where soil is removed

    cut area

  • 55

    Refers to area where soil is added

    fill area

  • 56

    Removal of soil

    excavation

  • 57

    Addition of soil

    embankment

  • 58

    Which of the following is an advantage of grading by cut

    greater soil stability

  • 59

    What is the disadvantage of grading by fill

    possible of setting especially for large area

  • 60

    What is the primary advantage of combining cut and fill grading method

    it is the most economical approach

  • 61

    Which of the grading method is best suited for raising low spot where drainage is an issue

    grading by fill

  • 62

    What is the potential disadvantage of combining cut and fill techniques

    it might be possible to arrange spaces suitable to the users needs

  • 63

    What is the significant disadvantage of grading by cut

    loss of topsoil resulting in exposure of non fertile soil

  • 64

    Best suited for linear construction such as road, path and utility trenching

    average end area method

  • 65

    Appropriate for large relatively uncomplicated grading plants and may also be used to compute volumes of water in ponds and lakes mostly used by landscape architects because it's most accurate

    contour area method

  • 66

    Is appropriate for complex reading projects and urban conditions example excavation of buildings

    borrow pit method or grid method

  • 67

    The final grade after all landscape develop has been completed it is the top surface of lawns, planting beds, pavements, and so on, and is normally designed by contours and spot elevations on grading plan

    finished grade

  • 68

    The top of the material on which the surface materials such as topsoil and pavement including base materials is placed

    subgrade

  • 69

    A subgray that must attain a specified density

    compacted subgrade

  • 70

    Soil that has not been excavated or charged in any way

    undistributed subgrade

  • 71

    Imported materials normally coarse or fine aggregate, that is typically placed under pavement

    base or sub base

  • 72

    Television of the first floor of a structure the term may be used to designate the elevation of any floor

    finish floor elevation

  • 73

    A layer of a soul soil profile. Because of its high organic content it is subject to decomposition and therefore is not appropriate subgrade materials for structure

    topsoil

  • 74

    What is the term used to describe the practice of training water away from building to avoid moisture and structural problems

    positive drainage

  • 75

    For economic reasons, where should the cut area ideally be located in the relation of the fill area

    as close as possible

  • 76

    Which soil type are considered easier to load, spread and compact during grading

    clay, silt and loam

  • 77

    What is the approximate angle of response for average soil in cut

    55°

  • 78

    What is the approximate angle of response for average soil in fill

    17°

  • 79

    Generally, slope greater than what percentage are considered unsafe

    25°

  • 80

    Above what slope presentation does the use of grass cutting machinery become impractical

    30%

  • 81

    What is dimensioned as a significant cost factor associated with retaining walls over 3 ft in height

    reinforcing, gravel backfill, and whip holes

  • 82

    Essay complex process that combines practical with a artful in a unified functional composition. It combines elements of arts and science to create functional aesthetic a placing extensions of door living to outdoors

    landscape design

  • 83

    Has been over done in residential landscape this approach seems formal and monotonous

    symmetrical balance

  • 84

    Name the balance of landscape

    symmetrical balance

  • 85

    Is often more desirable for residential landscape and balance is created without monotony

    asymmetrical balance

  • 86

    Can be made to appear taller in relation to its length by proper placement of plant materials. Larger trees planted as a background break the horizontal roof line. Smaller tree at a few feet from end or corner would also help the house in taller relation to its length

    a long low house or ranch style

  • 87

    Seems longer when few or no trees are placed in the background but medium sized, rounded trees are positioned on the side of the house. Plants place near this tree should decrease in height the further from the house they are positioned to create a sloping line replacing the vertical line of the house

    a tall slender house

  • 88

    Name the balance in landscape

    asymmetrical balance

  • 89

    Name the balance in landscape

    a long low house or ranch style

  • 90

    Name the balance in landscape

    a tall slender house

  • 91

    May compliment an office building but probably dwarf a single story residence

    one large towering tree

  • 92

    Can be achieved through repetition of plants masses

    focalization of the entrance

  • 93

    Can be used to and frame and or focalize a scene or direct view

    direct views

  • 94

    transition from shorter to taller plants and from fine to coarse texture wood and frame the scene and make it appear closer like a painting on a wall

  • 95

    Transition from taller to shorter plants with textural changes from coarse to find along focal lines emphasize the beauty of a lake scene

  • 96

    What is a primary purpose of using tree as visual screen in the landscape design

    to provide privacy or block negative views

  • 97

    Where should a visual screen be placed in relation to the item being screened

    as close as possible

  • 98

    What elements can be combined to create effective noise screens in landscape design

    raised land forms, ground covers, shrubs and trees

  • 99

    What was a historical use of foundation plantings

    to block the view of race foundation and slow cold air movement

  • 100

    What is the maximum recommended height of plants in the foundation planting relative to the height of the house wall at the corners

    2/3 the wall height