Building laws Part 4
問題一覧
1
3.25 sq. m/ person
2
healthcare facilities, residential custodial care, residential restrained care
3
hotels, apartment buildings, dormitories, lodging and roaming houses, single and two family dwelling
4
18.60 / person (except for single & 2- family dwellings)
5
class A
6
class B
7
class C
8
2.8 sq m/person
9
5.6 sq m/person
10
9.3 sq m/person
11
2.8 sq. m/ person
12
light hazard occupancy
13
9.3 sq m/person
14
high rise buildings
15
9.3 sq m/ person
16
general industrial
17
special purpose
18
open industrial
19
ordinary hazard, high hazard, hello hazard
20
for garages, four aircraft hangars, for green elevators
21
ordinary hazard, high hazard, low hazard
22
9.3 sq m/person
23
scope, exit obstruction, doors, corridor and exterior balconies, stairways, ramps
24
horizontal exit, exit enclosures, smokeproof enclosures, exit courts, exit passageway, signs and illumination
25
exit obstruction
26
doors
27
corridors and exterior exit balconies
28
stairways
29
ramps
30
horizontal exit
31
horizontal exit
32
smokeproof enclosure
33
exit courts
34
signals and illumination
35
installation, removal, maintenance, foam fire protection, vaporizing liquid, parking stations, detailed installation requirements, building under construction
36
combination standpipe
37
dry standpipe
38
wet standpipe
39
fire department house connection
40
will with stand 21 kg per square cm of water pressure, 20% slope for horizontal runs, 102 mm where highest outlet is 23 m or less above fire service connection, 153 mm where highest outlet for higher that 23 m above fire service connection
41
all 102 mm dry stand pipes to be equipped with a four-way connection, fire service connections on street front 40 cm to 122 cm above grade, for each stand pipe a 6.4 cm outlet 61 cm to 122 cm above floor level of each story, for less than 34% roof slope, 6.4 cm outlet above the roof line
42
required for seller to topmost story for assembly buildings for more than 1,000 occupants, required for hazardous storage,business and mercantile occupancies with more than 186 square meters per floor, not required in buildings with automatic fire suspension system, not required in assembly area for worship, all portions of building must be within 6 m of a nozzle attached to 22 m of hose
43
each side of stage,balcony area of auditorium, 64 mm when height of riser is 15 m or more above the source, 51 mm when height of riser is less than 15 m above the source, 38 mm valve per storey, 91 cm -19 2 cm above floor, water supply at 132 l per minute with 1/8 kg/sq cm residual pressure from each outlet for 30 minutes, hose of not less than 38 mm required per standpipe
44
at least 15 cm diameter, four way service connection required for combination of two system, 2 of 4way service connection for combination of three or more system, for each stand pipe a 64 mm outlet, 61 cm -122 cm above floor level at each storey, sign saying 'combination stand pipe and test connections'
45
fire extinguisher
46
high rise building
47
smoke control
48
automatic fire suspension system
49
exits
50
first aid protection
51
emergency escape
52
National Structural Code for Buildings
53
dead load
54
live load
55
lateral load
56
unit live load
57
uniformly distributed loads
58
stresses on steel (tension, shear, compression, bending)
59
specification of cements, aggregates, water, metal,reinforcements and admixtures
60
Bolts & Rivets
61
Chapter 5 - Concrete
62
appliance
63
assembly
64
bonding
65
branch circuit
66
demand factor
67
cable
68
overcurrent protection
69
switches, boxes and fittings
70
generators
71
equipment for general use
72
chapter 7
73
chapter 8
74
chapter 9
75
Chapter 11
76
plumbing functions
77
drainage
78
sewer
79
water
80
Accessibility Law
81
confinement to wheelchair, requiring use of braces, clutches, artificial supports, impairment of hearing or sight, aging or incoordination, acquired or congenital mental impairments
82
accessibility
83
reachability
84
usability
85
orientation
86
safety
87
workability and efficiency
88
Residential, Commercial, Education and industrial, Agricultural, Ancillary
89
5 designated seats near door
90
4 seats near door
91
passenger trains
92
jeepneys
93
domestic shipping
94
Magna Carta of Disabled Person
95
owner, contractor, architect, ergineer, building official or other public official
96
accessible
97
alcove
98
anthropometric
99
barrier-free
100
buildings
Building laws Part 1
Building laws Part 1
Mari Alberca · 100問 · 1年前Building laws Part 1
Building laws Part 1
100問 • 1年前Building laws Part 2
Building laws Part 2
Mari Alberca · 99問 · 1年前Building laws Part 2
Building laws Part 2
99問 • 1年前Building laws Part 3
Building laws Part 3
Mari Alberca · 100問 · 1年前Building laws Part 3
Building laws Part 3
100問 • 1年前Building Iaws Part 5
Building Iaws Part 5
Mari Alberca · 100問 · 1年前Building Iaws Part 5
Building Iaws Part 5
100問 • 1年前Building Iaws Part 6
Building Iaws Part 6
Mari Alberca · 100問 · 1年前Building Iaws Part 6
Building Iaws Part 6
100問 • 1年前Building Iaws Part 7
Building Iaws Part 7
Mari Alberca · 48問 · 1年前Building Iaws Part 7
Building Iaws Part 7
48問 • 1年前Architectural Design & Site Planning Part 1
Architectural Design & Site Planning Part 1
Mari Alberca · 100問 · 1年前Architectural Design & Site Planning Part 1
Architectural Design & Site Planning Part 1
100問 • 1年前Architectural Design & Site Planning Part 2
Architectural Design & Site Planning Part 2
Mari Alberca · 99問 · 1年前Architectural Design & Site Planning Part 2
Architectural Design & Site Planning Part 2
99問 • 1年前Architectural Design & Site Planning Part 3
Architectural Design & Site Planning Part 3
Mari Alberca · 100問 · 1年前Architectural Design & Site Planning Part 3
Architectural Design & Site Planning Part 3
100問 • 1年前Architectural Design & Site Planning Part 5
Architectural Design & Site Planning Part 5
Mari Alberca · 100問 · 1年前Architectural Design & Site Planning Part 5
Architectural Design & Site Planning Part 5
100問 • 1年前Architectural Design & Site Planning Part 6
Architectural Design & Site Planning Part 6
Mari Alberca · 100問 · 1年前Architectural Design & Site Planning Part 6
Architectural Design & Site Planning Part 6
100問 • 1年前Architectural Design & Site Planning Part 7
Architectural Design & Site Planning Part 7
Mari Alberca · 100問 · 1年前Architectural Design & Site Planning Part 7
Architectural Design & Site Planning Part 7
100問 • 1年前Architectural Design & Site Planning Part 8
Architectural Design & Site Planning Part 8
Mari Alberca · 100問 · 1年前Architectural Design & Site Planning Part 8
Architectural Design & Site Planning Part 8
100問 • 1年前Architectural Design & Site Planning Part 9
Architectural Design & Site Planning Part 9
Mari Alberca · 100問 · 1年前Architectural Design & Site Planning Part 9
Architectural Design & Site Planning Part 9
100問 • 1年前Architectural Design & Site Planning Part 10
Architectural Design & Site Planning Part 10
Mari Alberca · 30問 · 1年前Architectural Design & Site Planning Part 10
Architectural Design & Site Planning Part 10
30問 • 1年前Plumbing Part 1
Plumbing Part 1
Mari Alberca · 105問 · 1年前Plumbing Part 1
Plumbing Part 1
105問 • 1年前Plumbing Part 2
Plumbing Part 2
Mari Alberca · 100問 · 1年前Plumbing Part 2
Plumbing Part 2
100問 • 1年前Plumbing Part 3
Plumbing Part 3
Mari Alberca · 104問 · 1年前Plumbing Part 3
Plumbing Part 3
104問 • 1年前Plumbing Part 4
Plumbing Part 4
Mari Alberca · 100問 · 1年前Plumbing Part 4
Plumbing Part 4
100問 • 1年前Plumbing Part 5
Plumbing Part 5
Mari Alberca · 100問 · 1年前Plumbing Part 5
Plumbing Part 5
100問 • 1年前Plumbing Part 6
Plumbing Part 6
Mari Alberca · 101問 · 1年前Plumbing Part 6
Plumbing Part 6
101問 • 1年前Building Material Part 1
Building Material Part 1
Mari Alberca · 99問 · 1年前Building Material Part 1
Building Material Part 1
99問 • 1年前Building Material Part 2
Building Material Part 2
Mari Alberca · 100問 · 1年前Building Material Part 2
Building Material Part 2
100問 • 1年前Building Material Part 3
Building Material Part 3
Mari Alberca · 100問 · 1年前Building Material Part 3
Building Material Part 3
100問 • 1年前Building Materials - Sitework
Building Materials - Sitework
Mari Alberca · 104問 · 1年前Building Materials - Sitework
Building Materials - Sitework
104問 • 1年前Building Materials - Concrete Part 1
Building Materials - Concrete Part 1
Mari Alberca · 100問 · 1年前Building Materials - Concrete Part 1
Building Materials - Concrete Part 1
100問 • 1年前Building Materials - Concrete Part 2
Building Materials - Concrete Part 2
Mari Alberca · 110問 · 1年前Building Materials - Concrete Part 2
Building Materials - Concrete Part 2
110問 • 1年前Building Materials - Concrete Part 3
Building Materials - Concrete Part 3
Mari Alberca · 110問 · 1年前Building Materials - Concrete Part 3
Building Materials - Concrete Part 3
110問 • 1年前Building Materials - Masonry Part 1
Building Materials - Masonry Part 1
Mari Alberca · 100問 · 1年前Building Materials - Masonry Part 1
Building Materials - Masonry Part 1
100問 • 1年前Structural Conceptualization Part 1
Structural Conceptualization Part 1
Mari Alberca · 96問 · 1年前Structural Conceptualization Part 1
Structural Conceptualization Part 1
96問 • 1年前Structural Conceptualization Part 2
Structural Conceptualization Part 2
Mari Alberca · 100問 · 1年前Structural Conceptualization Part 2
Structural Conceptualization Part 2
100問 • 1年前Structural Conceptualization Part 3
Structural Conceptualization Part 3
Mari Alberca · 100問 · 1年前Structural Conceptualization Part 3
Structural Conceptualization Part 3
100問 • 1年前Structural Conceptualization Part 4
Structural Conceptualization Part 4
Mari Alberca · 100問 · 1年前Structural Conceptualization Part 4
Structural Conceptualization Part 4
100問 • 1年前Structural Conceptualization Part 5
Structural Conceptualization Part 5
Mari Alberca · 46問 · 1年前Structural Conceptualization Part 5
Structural Conceptualization Part 5
46問 • 1年前Theory of Architecture Part 1
Theory of Architecture Part 1
Mari Alberca · 100問 · 1年前Theory of Architecture Part 1
Theory of Architecture Part 1
100問 • 1年前Theory of Architecture Part 2
Theory of Architecture Part 2
Mari Alberca · 100問 · 1年前Theory of Architecture Part 2
Theory of Architecture Part 2
100問 • 1年前Theory of Architecture Part 3
Theory of Architecture Part 3
Mari Alberca · 100問 · 1年前Theory of Architecture Part 3
Theory of Architecture Part 3
100問 • 1年前Theory of Architecture Part 4
Theory of Architecture Part 4
Mari Alberca · 100問 · 1年前Theory of Architecture Part 4
Theory of Architecture Part 4
100問 • 1年前Professional Practice
Professional Practice
Mari Alberca · 79問 · 1年前Professional Practice
Professional Practice
79問 • 1年前Mock Exam 1
Mock Exam 1
Mari Alberca · 27問 · 1年前Mock Exam 1
Mock Exam 1
27問 • 1年前Great Buildings
Great Buildings
Mari Alberca · 72問 · 1年前Great Buildings
Great Buildings
72問 • 1年前Electrical & Mechanical Part 1
Electrical & Mechanical Part 1
Mari Alberca · 91問 · 1年前Electrical & Mechanical Part 1
Electrical & Mechanical Part 1
91問 • 1年前Electrical & Mechanical Part 2
Electrical & Mechanical Part 2
Mari Alberca · 26問 · 1年前Electrical & Mechanical Part 2
Electrical & Mechanical Part 2
26問 • 1年前Filipino Architect
Filipino Architect
Mari Alberca · 60問 · 1年前Filipino Architect
Filipino Architect
60問 • 1年前Ph Architecture
Ph Architecture
Mari Alberca · 22問 · 1年前Ph Architecture
Ph Architecture
22問 • 1年前vernacular terms filipino
vernacular terms filipino
Mari Alberca · 96問 · 1年前vernacular terms filipino
vernacular terms filipino
96問 • 1年前Tropical design
Tropical design
Mari Alberca · 100問 · 1年前Tropical design
Tropical design
100問 • 1年前Tropical design 2
Tropical design 2
Mari Alberca · 100問 · 1年前Tropical design 2
Tropical design 2
100問 • 1年前Tropical design 3
Tropical design 3
Mari Alberca · 100問 · 1年前Tropical design 3
Tropical design 3
100問 • 1年前Tropical design 4
Tropical design 4
Mari Alberca · 46問 · 1年前Tropical design 4
Tropical design 4
46問 • 1年前Building Materials - Masonry Part 2
Building Materials - Masonry Part 2
Mari Alberca · 56問 · 1年前Building Materials - Masonry Part 2
Building Materials - Masonry Part 2
56問 • 1年前Building Materials - Aluminum Part 1
Building Materials - Aluminum Part 1
Mari Alberca · 100問 · 1年前Building Materials - Aluminum Part 1
Building Materials - Aluminum Part 1
100問 • 1年前Building Materials - Aluminum Part 2
Building Materials - Aluminum Part 2
Mari Alberca · 98問 · 1年前Building Materials - Aluminum Part 2
Building Materials - Aluminum Part 2
98問 • 1年前Building Materials - Wood Part 1
Building Materials - Wood Part 1
Mari Alberca · 100問 · 1年前Building Materials - Wood Part 1
Building Materials - Wood Part 1
100問 • 1年前Building Materials - Wood Part 2
Building Materials - Wood Part 2
Mari Alberca · 70問 · 1年前Building Materials - Wood Part 2
Building Materials - Wood Part 2
70問 • 1年前Building Materials - Plastic Part 1
Building Materials - Plastic Part 1
Mari Alberca · 101問 · 1年前Building Materials - Plastic Part 1
Building Materials - Plastic Part 1
101問 • 1年前Building Materials - Thermal and Moisture Protection
Building Materials - Thermal and Moisture Protection
Mari Alberca · 141問 · 1年前Building Materials - Thermal and Moisture Protection
Building Materials - Thermal and Moisture Protection
141問 • 1年前Building Materials - Doors
Building Materials - Doors
Mari Alberca · 107問 · 1年前Building Materials - Doors
Building Materials - Doors
107問 • 1年前HOA - Ancient Architecture
HOA - Ancient Architecture
Mari Alberca · 42問 · 1年前HOA - Ancient Architecture
HOA - Ancient Architecture
42問 • 1年前HOA - Western Asia
HOA - Western Asia
Mari Alberca · 80問 · 1年前HOA - Western Asia
HOA - Western Asia
80問 • 1年前HOA - Ancient Egypt
HOA - Ancient Egypt
Mari Alberca · 90問 · 1年前HOA - Ancient Egypt
HOA - Ancient Egypt
90問 • 1年前HOA - Ancient Greek
HOA - Ancient Greek
Mari Alberca · 232問 · 1年前HOA - Ancient Greek
HOA - Ancient Greek
232問 • 1年前Building Materials - Windows
Building Materials - Windows
Mari Alberca · 75問 · 1年前Building Materials - Windows
Building Materials - Windows
75問 • 1年前Buildings Materials - Hardwares
Buildings Materials - Hardwares
Mari Alberca · 138問 · 1年前Buildings Materials - Hardwares
Buildings Materials - Hardwares
138問 • 1年前Buildings Materials - Hardwares (Images)
Buildings Materials - Hardwares (Images)
Mari Alberca · 149問 · 1年前Buildings Materials - Hardwares (Images)
Buildings Materials - Hardwares (Images)
149問 • 1年前Buildings Materials - Finish Hardwares
Buildings Materials - Finish Hardwares
Mari Alberca · 119問 · 1年前Buildings Materials - Finish Hardwares
Buildings Materials - Finish Hardwares
119問 • 1年前Buildings Materials - Finish Hardwares (Images)
Buildings Materials - Finish Hardwares (Images)
Mari Alberca · 156問 · 1年前Buildings Materials - Finish Hardwares (Images)
Buildings Materials - Finish Hardwares (Images)
156問 • 1年前Building Materials - Glass & Glazing
Building Materials - Glass & Glazing
Mari Alberca · 69問 · 1年前Building Materials - Glass & Glazing
Building Materials - Glass & Glazing
69問 • 1年前HOA - Roman
HOA - Roman
Mari Alberca · 178問 · 1年前HOA - Roman
HOA - Roman
178問 • 1年前HOA - Mesoamerica
HOA - Mesoamerica
Mari Alberca · 20問 · 1年前HOA - Mesoamerica
HOA - Mesoamerica
20問 • 1年前Building Material - Glass & Glazing (Images)
Building Material - Glass & Glazing (Images)
Mari Alberca · 25問 · 1年前Building Material - Glass & Glazing (Images)
Building Material - Glass & Glazing (Images)
25問 • 1年前HOA - Byzantine
HOA - Byzantine
Mari Alberca · 77問 · 1年前HOA - Byzantine
HOA - Byzantine
77問 • 1年前Building Materials - Finishes
Building Materials - Finishes
Mari Alberca · 181問 · 1年前Building Materials - Finishes
Building Materials - Finishes
181問 • 1年前Building Materials - Finishes (Images)
Building Materials - Finishes (Images)
Mari Alberca · 39問 · 1年前Building Materials - Finishes (Images)
Building Materials - Finishes (Images)
39問 • 1年前問題一覧
1
3.25 sq. m/ person
2
healthcare facilities, residential custodial care, residential restrained care
3
hotels, apartment buildings, dormitories, lodging and roaming houses, single and two family dwelling
4
18.60 / person (except for single & 2- family dwellings)
5
class A
6
class B
7
class C
8
2.8 sq m/person
9
5.6 sq m/person
10
9.3 sq m/person
11
2.8 sq. m/ person
12
light hazard occupancy
13
9.3 sq m/person
14
high rise buildings
15
9.3 sq m/ person
16
general industrial
17
special purpose
18
open industrial
19
ordinary hazard, high hazard, hello hazard
20
for garages, four aircraft hangars, for green elevators
21
ordinary hazard, high hazard, low hazard
22
9.3 sq m/person
23
scope, exit obstruction, doors, corridor and exterior balconies, stairways, ramps
24
horizontal exit, exit enclosures, smokeproof enclosures, exit courts, exit passageway, signs and illumination
25
exit obstruction
26
doors
27
corridors and exterior exit balconies
28
stairways
29
ramps
30
horizontal exit
31
horizontal exit
32
smokeproof enclosure
33
exit courts
34
signals and illumination
35
installation, removal, maintenance, foam fire protection, vaporizing liquid, parking stations, detailed installation requirements, building under construction
36
combination standpipe
37
dry standpipe
38
wet standpipe
39
fire department house connection
40
will with stand 21 kg per square cm of water pressure, 20% slope for horizontal runs, 102 mm where highest outlet is 23 m or less above fire service connection, 153 mm where highest outlet for higher that 23 m above fire service connection
41
all 102 mm dry stand pipes to be equipped with a four-way connection, fire service connections on street front 40 cm to 122 cm above grade, for each stand pipe a 6.4 cm outlet 61 cm to 122 cm above floor level of each story, for less than 34% roof slope, 6.4 cm outlet above the roof line
42
required for seller to topmost story for assembly buildings for more than 1,000 occupants, required for hazardous storage,business and mercantile occupancies with more than 186 square meters per floor, not required in buildings with automatic fire suspension system, not required in assembly area for worship, all portions of building must be within 6 m of a nozzle attached to 22 m of hose
43
each side of stage,balcony area of auditorium, 64 mm when height of riser is 15 m or more above the source, 51 mm when height of riser is less than 15 m above the source, 38 mm valve per storey, 91 cm -19 2 cm above floor, water supply at 132 l per minute with 1/8 kg/sq cm residual pressure from each outlet for 30 minutes, hose of not less than 38 mm required per standpipe
44
at least 15 cm diameter, four way service connection required for combination of two system, 2 of 4way service connection for combination of three or more system, for each stand pipe a 64 mm outlet, 61 cm -122 cm above floor level at each storey, sign saying 'combination stand pipe and test connections'
45
fire extinguisher
46
high rise building
47
smoke control
48
automatic fire suspension system
49
exits
50
first aid protection
51
emergency escape
52
National Structural Code for Buildings
53
dead load
54
live load
55
lateral load
56
unit live load
57
uniformly distributed loads
58
stresses on steel (tension, shear, compression, bending)
59
specification of cements, aggregates, water, metal,reinforcements and admixtures
60
Bolts & Rivets
61
Chapter 5 - Concrete
62
appliance
63
assembly
64
bonding
65
branch circuit
66
demand factor
67
cable
68
overcurrent protection
69
switches, boxes and fittings
70
generators
71
equipment for general use
72
chapter 7
73
chapter 8
74
chapter 9
75
Chapter 11
76
plumbing functions
77
drainage
78
sewer
79
water
80
Accessibility Law
81
confinement to wheelchair, requiring use of braces, clutches, artificial supports, impairment of hearing or sight, aging or incoordination, acquired or congenital mental impairments
82
accessibility
83
reachability
84
usability
85
orientation
86
safety
87
workability and efficiency
88
Residential, Commercial, Education and industrial, Agricultural, Ancillary
89
5 designated seats near door
90
4 seats near door
91
passenger trains
92
jeepneys
93
domestic shipping
94
Magna Carta of Disabled Person
95
owner, contractor, architect, ergineer, building official or other public official
96
accessible
97
alcove
98
anthropometric
99
barrier-free
100
buildings