ログイン

8 Work Study and Time Study
53問 • 1年前
  • Sab Sescon
  • 通報

    問題一覧

  • 1

    Is a generic term for those techniques, particularly METHOD STUDY AND WORK MEASUREMENT, which are used in all its context and which lead systematically to the investigation of all the factors, which affect the efficiency and economy of the situation being reviewed in order to affect improvement

    work study

  • 2

    Is the systematic examination of the methods of carrying on activities so as to improve the effective use of resources and to set up standards of performance for the activities being carried out

    work study

  • 3

    Increase efficiency Better product quality To choose the fastest method to do job To improve the working process Las fatigue to operators and workers Effective labor control Effective utilization of resources To decide equipment requirements To pay fair wages To aid and calculating exact delivery To formulate realistic labor budgeting To decide the required manpower to do a job

    objectives of work study

  • 4

    Work study ensures higher productivity

    advantages of work study

  • 5

    Better working conditions with less fatigue

    advantages of work study

  • 6

    Higher wages to workers

    advantages of work study

  • 7

    Uniform production flow

    advantages of work study

  • 8

    Job satisfaction and job security to worker

    advantages of work study

  • 9

    Reduction in unit cost of production

    advantages of work study

  • 10

    Quality products to consumers

    advantages of work study

  • 11

    Fast delivery schedule

    advantages of work study

  • 12

    Harmonious employer employee relation

    advantages of work study

  • 13

    Better service to customers

    advantages of work study

  • 14

    Is to obtain facts and to use those facts as a means of improvement

    purpose of work study

  • 15

    Consequently, work study may be regarded principally as a procedure for determining the truth about the activities existing people and existing plant and equipment as a means of improvement of those activities

    purpose of work study

  • 16

    It will provide the means of achieving higher productive efficiency under prevailing circumstances

    purpose of work study

  • 17

    To improve methods of production

    method study

  • 18

    To assess human effectiveness

    work measurement

  • 19

    Two types of work study

    method study and work measurement

  • 20

    Resulting in more effective use of materials plant and equipment and human resources

    method study

  • 21

    Baking possible improved planning and control staffing levels and as a basis for sound incentive schemes

    work measurement

  • 22

    The determination of a particular work or job of production

    method study

  • 23

    It helps the current method of production

    method study

  • 24

    Work measurement is also called as

    time study

  • 25

    Time study is also called as

    work measurement

  • 26

    Is the determination of time allotted to worker to finish a certain job, defines level of performance

    time study

  • 27

    Select the procedure to analyze Record the information Examination of collect data Modification and improvement in current data Installation of new method Periodic verification of method

    procedure of method study

  • 28

    Select the procedure to be analyzed Divide the selected procedure into small work elements Record information or data of those small work elements Examination of collected data Measurement of work wrt time of work element Modification in current measurement Installation of new method Convert the work content into standard time

    procedure of time study

  • 29

    The ______ among teams may be a simple as one operator handling apart to another or as complex as a cardiovascular surgical theme of doctors nurses anesthesiologist operator of an artificial heart machine

    degree of interaction

  • 30

    Is useful in plotting each individuals activities on a time scale similar to that of the worker-machine chart

    an activity or gantt process chart

  • 31

    Is usually employed to trace the interaction of a number of workers with machines in a specified operating cycle to find the best combination of workers and machines

    gantt process chart

  • 32

    Is less restrictive and maybe used to follow the interaction of any group of operators with or without equipment being involved

    activity chart

  • 33

    Such charts are often used to study and define each operation in an ongoing repetitive process and they are extremely valuable and developing a standardized procedure of a specific task

    activity chart

  • 34

    The fundamental purpose of ______ is to set time standards for a job

    work measurement

  • 35

    All scheduling approaches require some estimate of how much time it takes to do the work being scheduled

    the schedule work and allocate capacity

  • 36

    The schedule work and allocate capacity To provide an objective basis for motivating the workforce and measuring workers performance The bed for new contracts and to evaluate performance on existing ones To provide benchmarks for improvement

    work measurement and standards

  • 37

    Measured standards are particularly critical where output based incentive plans are employed

    to provide an objective basis for motivating the workforce and measuring workers performance

  • 38

    Questions such as "can we do it?" and "how are we doing?" presume the existence of standards

    to bed for new contracts and to evaluate performance on existing ones

  • 39

    In addition to internal evaluation benchmarking themes regularly compare work standards and their company with those of similar jobs in other organizations

    to provide benchmarks for improvement

  • 40

    Work measurement and its resulting work standards have been controversial since_____ time

    taylors

  • 41

    There is also the argument that workers who find a better way of doing the job get penalized by having a revised rate set which is commonly called

    rate cutting

  • 42

    Argue that work standards and quotas inhibit process improvement and tent to focus the workers efforts on speed rather than quality

    w edwards deming

  • 43

    Despite criticism these have proved effective and much depends on social technical aspects of the work

    work measurement and standards

  • 44

    There are two common techniques for measuring work and setting standards

    time study and work sampling

  • 45

    Highly detailed repetitive work usually calls for this type of analysis

    time study

  • 46

    When work is in frequent or entails along cycle this is the tool of choice

    work sampling

  • 47

    Is generally made with a stopwatch either on the spot or by analyzing a video tape for the job

    time study

  • 48

    The job or task to be studied is separated into measurable parts or elements and each element is timed individually

    time study

  • 49

    The application of a rating factor gives what is called a

    normal time

  • 50

    Normal time formula

    observe performance time per unit × performance rating

  • 51

    Operator is observed for a period of time and the number of units produced during the time along with the performance rating gives this type of normal time formula

    normal time = (time worked/number of units produced) × performance rating

  • 52

    Is derived by adding to normal time allowances for personal needs such as breaks or work delays

    standard time

  • 53

    Standard time formula

    standard time = normal time + (ALLOWANCES × normal time)

  • Business Finance

    Business Finance

    Sab Sescon · 46問 · 2年前

    Business Finance

    Business Finance

    46問 • 2年前
    Sab Sescon

    21st century

    21st century

    Sab Sescon · 62問 · 2年前

    21st century

    21st century

    62問 • 2年前
    Sab Sescon

    intro to philosophy of the human person

    intro to philosophy of the human person

    Sab Sescon · 12問 · 2年前

    intro to philosophy of the human person

    intro to philosophy of the human person

    12問 • 2年前
    Sab Sescon

    UCSP

    UCSP

    Sab Sescon · 22問 · 2年前

    UCSP

    UCSP

    22問 • 2年前
    Sab Sescon

    Business Math

    Business Math

    Sab Sescon · 33問 · 2年前

    Business Math

    Business Math

    33問 • 2年前
    Sab Sescon

    Business Finance Quiz

    Business Finance Quiz

    Sab Sescon · 40問 · 2年前

    Business Finance Quiz

    Business Finance Quiz

    40問 • 2年前
    Sab Sescon

    Business Finance

    Business Finance

    Sab Sescon · 126問 · 2年前

    Business Finance

    Business Finance

    126問 • 2年前
    Sab Sescon

    Business Finance

    Business Finance

    Sab Sescon · 43問 · 2年前

    Business Finance

    Business Finance

    43問 • 2年前
    Sab Sescon

    Business Math

    Business Math

    Sab Sescon · 12問 · 2年前

    Business Math

    Business Math

    12問 • 2年前
    Sab Sescon

    business finance

    business finance

    Sab Sescon · 78問 · 2年前

    business finance

    business finance

    78問 • 2年前
    Sab Sescon

    Business Finance

    Business Finance

    Sab Sescon · 36問 · 2年前

    Business Finance

    Business Finance

    36問 • 2年前
    Sab Sescon

    Business Math

    Business Math

    Sab Sescon · 20問 · 2年前

    Business Math

    Business Math

    20問 • 2年前
    Sab Sescon

    Applied Economics

    Applied Economics

    Sab Sescon · 97問 · 1年前

    Applied Economics

    Applied Economics

    97問 • 1年前
    Sab Sescon

    Business Ethics Lesson 1

    Business Ethics Lesson 1

    Sab Sescon · 72問 · 1年前

    Business Ethics Lesson 1

    Business Ethics Lesson 1

    72問 • 1年前
    Sab Sescon

    Business Ethics Lesson 2

    Business Ethics Lesson 2

    Sab Sescon · 30問 · 1年前

    Business Ethics Lesson 2

    Business Ethics Lesson 2

    30問 • 1年前
    Sab Sescon

    Principles of Marketing

    Principles of Marketing

    Sab Sescon · 82問 · 1年前

    Principles of Marketing

    Principles of Marketing

    82問 • 1年前
    Sab Sescon

    Approaches tp Marketing Continuation

    Approaches tp Marketing Continuation

    Sab Sescon · 49問 · 1年前

    Approaches tp Marketing Continuation

    Approaches tp Marketing Continuation

    49問 • 1年前
    Sab Sescon

    investment and interest rates

    investment and interest rates

    Sab Sescon · 24問 · 1年前

    investment and interest rates

    investment and interest rates

    24問 • 1年前
    Sab Sescon

    Market Structure

    Market Structure

    Sab Sescon · 22問 · 1年前

    Market Structure

    Market Structure

    22問 • 1年前
    Sab Sescon

    business ethics

    business ethics

    Sab Sescon · 52問 · 1年前

    business ethics

    business ethics

    52問 • 1年前
    Sab Sescon

    問題一覧

  • 1

    Is a generic term for those techniques, particularly METHOD STUDY AND WORK MEASUREMENT, which are used in all its context and which lead systematically to the investigation of all the factors, which affect the efficiency and economy of the situation being reviewed in order to affect improvement

    work study

  • 2

    Is the systematic examination of the methods of carrying on activities so as to improve the effective use of resources and to set up standards of performance for the activities being carried out

    work study

  • 3

    Increase efficiency Better product quality To choose the fastest method to do job To improve the working process Las fatigue to operators and workers Effective labor control Effective utilization of resources To decide equipment requirements To pay fair wages To aid and calculating exact delivery To formulate realistic labor budgeting To decide the required manpower to do a job

    objectives of work study

  • 4

    Work study ensures higher productivity

    advantages of work study

  • 5

    Better working conditions with less fatigue

    advantages of work study

  • 6

    Higher wages to workers

    advantages of work study

  • 7

    Uniform production flow

    advantages of work study

  • 8

    Job satisfaction and job security to worker

    advantages of work study

  • 9

    Reduction in unit cost of production

    advantages of work study

  • 10

    Quality products to consumers

    advantages of work study

  • 11

    Fast delivery schedule

    advantages of work study

  • 12

    Harmonious employer employee relation

    advantages of work study

  • 13

    Better service to customers

    advantages of work study

  • 14

    Is to obtain facts and to use those facts as a means of improvement

    purpose of work study

  • 15

    Consequently, work study may be regarded principally as a procedure for determining the truth about the activities existing people and existing plant and equipment as a means of improvement of those activities

    purpose of work study

  • 16

    It will provide the means of achieving higher productive efficiency under prevailing circumstances

    purpose of work study

  • 17

    To improve methods of production

    method study

  • 18

    To assess human effectiveness

    work measurement

  • 19

    Two types of work study

    method study and work measurement

  • 20

    Resulting in more effective use of materials plant and equipment and human resources

    method study

  • 21

    Baking possible improved planning and control staffing levels and as a basis for sound incentive schemes

    work measurement

  • 22

    The determination of a particular work or job of production

    method study

  • 23

    It helps the current method of production

    method study

  • 24

    Work measurement is also called as

    time study

  • 25

    Time study is also called as

    work measurement

  • 26

    Is the determination of time allotted to worker to finish a certain job, defines level of performance

    time study

  • 27

    Select the procedure to analyze Record the information Examination of collect data Modification and improvement in current data Installation of new method Periodic verification of method

    procedure of method study

  • 28

    Select the procedure to be analyzed Divide the selected procedure into small work elements Record information or data of those small work elements Examination of collected data Measurement of work wrt time of work element Modification in current measurement Installation of new method Convert the work content into standard time

    procedure of time study

  • 29

    The ______ among teams may be a simple as one operator handling apart to another or as complex as a cardiovascular surgical theme of doctors nurses anesthesiologist operator of an artificial heart machine

    degree of interaction

  • 30

    Is useful in plotting each individuals activities on a time scale similar to that of the worker-machine chart

    an activity or gantt process chart

  • 31

    Is usually employed to trace the interaction of a number of workers with machines in a specified operating cycle to find the best combination of workers and machines

    gantt process chart

  • 32

    Is less restrictive and maybe used to follow the interaction of any group of operators with or without equipment being involved

    activity chart

  • 33

    Such charts are often used to study and define each operation in an ongoing repetitive process and they are extremely valuable and developing a standardized procedure of a specific task

    activity chart

  • 34

    The fundamental purpose of ______ is to set time standards for a job

    work measurement

  • 35

    All scheduling approaches require some estimate of how much time it takes to do the work being scheduled

    the schedule work and allocate capacity

  • 36

    The schedule work and allocate capacity To provide an objective basis for motivating the workforce and measuring workers performance The bed for new contracts and to evaluate performance on existing ones To provide benchmarks for improvement

    work measurement and standards

  • 37

    Measured standards are particularly critical where output based incentive plans are employed

    to provide an objective basis for motivating the workforce and measuring workers performance

  • 38

    Questions such as "can we do it?" and "how are we doing?" presume the existence of standards

    to bed for new contracts and to evaluate performance on existing ones

  • 39

    In addition to internal evaluation benchmarking themes regularly compare work standards and their company with those of similar jobs in other organizations

    to provide benchmarks for improvement

  • 40

    Work measurement and its resulting work standards have been controversial since_____ time

    taylors

  • 41

    There is also the argument that workers who find a better way of doing the job get penalized by having a revised rate set which is commonly called

    rate cutting

  • 42

    Argue that work standards and quotas inhibit process improvement and tent to focus the workers efforts on speed rather than quality

    w edwards deming

  • 43

    Despite criticism these have proved effective and much depends on social technical aspects of the work

    work measurement and standards

  • 44

    There are two common techniques for measuring work and setting standards

    time study and work sampling

  • 45

    Highly detailed repetitive work usually calls for this type of analysis

    time study

  • 46

    When work is in frequent or entails along cycle this is the tool of choice

    work sampling

  • 47

    Is generally made with a stopwatch either on the spot or by analyzing a video tape for the job

    time study

  • 48

    The job or task to be studied is separated into measurable parts or elements and each element is timed individually

    time study

  • 49

    The application of a rating factor gives what is called a

    normal time

  • 50

    Normal time formula

    observe performance time per unit × performance rating

  • 51

    Operator is observed for a period of time and the number of units produced during the time along with the performance rating gives this type of normal time formula

    normal time = (time worked/number of units produced) × performance rating

  • 52

    Is derived by adding to normal time allowances for personal needs such as breaks or work delays

    standard time

  • 53

    Standard time formula

    standard time = normal time + (ALLOWANCES × normal time)