Sign in

RNPCP Chapter 6 to 9

RNPCP Chapter 6 to 9
94 questions • 2 mo ago
  • Anonymous
  • Report

    Question list

  • 1

    Minimum air gap for fixtures not affected by sidewalls

    2x diameter

  • 2

    Minimum air gap for fixtures affected by sidewalls

    3x diameter

  • 3

    Airgap less than 25mm shall only be approved if tested with vacuums of mercury from 0 to ____

    63.5cm

  • 4

    Minimum distance of Atmospheric Vacuum Breaker (AVB) above all downstream piping and floor level rim of receptor

    150mm or 6"

  • 5

    Mininum space clearance between the lowest portion of the assembly and the grade, floor or platform for access and clearance

    30.5cm

  • 6

    Minimum temperature of the AVB critical pevel above overflow rim of a water closet bowl or the highest part of a urinal

    43.3°C (110°F)

  • 7

    Minimum height of the AVB critical level above the overflow rim of a water closet bowl or the highest part of a urinal

    152mm

  • 8

    Mininum distance of Double Check Valve (DC) assembly above all downstream piping and floor level rim of receptor

    30.5cm

  • 9

    Elevation of installations above the floor or grade to be provided with a permanent platform.

    1.52m or 5'

  • 10

    Minimum airgap for water distribution, or a mininum of 2x diameter

    25mm

  • 11

    Mininum height of ballcock's critical level above the full opening of the overflow pipe

    25mm

  • 12

    Mininum installation height of listed non removable hose bibb type backflow preventer above the highest point of usage.

    152mm

  • 13

    Size of iron cast fittings to be galvanized when used in water piping

    51mm or smaller

  • 14

    Maximum lead content for water pipes and fittings

    8%

  • 15

    Number of mesh per 25mm for gravity tanks vent screen

    14 to 18

  • 16

    Inadequate water pressure is less than:

    103kPa

  • 17

    Excessive water pressure is more than:

    551kPa

  • 18

    Percentage of reduced pressure used for all pipe size determination

    80%

  • 19

    Maximum pressure setting for pressure relief valve

    1033 kPa

  • 20

    Height of the drain pipe of pressure relief valve above the ground and pointing downward

    152mm to 600mm

  • 21

    Distance between bottom of water pipe and top of the sewer or drain line

    0.30m

  • 22

    Horizontal distance between the water line and the sewer or drain line

    0.30m

  • 23

    Distance between sewer or drainage piping and water pipes crossing above such pipes

    0.30m

  • 24

    Maximum distance of unions away from regulating equipment, water heater, conditioning tank, or similar.

    0.30m

  • 25

    Maximum intervals of piping supports

    4' or 1219mm

  • 26

    Support trap arms more than _____ in length shall be as close as possible

    3' or 914mm

  • 27

    Closet rings shall be tightly fastened up to the floor with top surface _____ above finish floor.

    1/4"

  • 28

    Mininum size of water service pipe

    19mm

  • 29

    Minimum size of building supply and branches

    13mm

  • 30

    Minimum clearance of galvanized wrought iron or galvanized steel pipe above ground

    152mm or 6"

  • 31

    Minimum depth of vitrified clay pipes or fittings below the ground

    0.3m

  • 32

    Allowable grades for the threads of drainage fittings

    2%

  • 33

    Fixture rating of clotheswasher in groups of 3

    6 FU

  • 34

    Fixture unit rating for every 0.063 L/s (1gpm) of contiuous flow from sump pump or ejector

    2 FU

  • 35

    Intervals of cleanouts on each run of piping

    15m

  • 36

    Length of horizontal drain line where cleanouts maybe omitted, except in lines serving sinks or urinals.

    < 1.5m

  • 37

    Slope of horizontal drainage pipe where cleanouts may be omitted

    72° or less

  • 38

    Aggregate offset angle to be provided with an additional cleanout

    135° or more

  • 39

    Front clearance for cleanouts 51mm or less

    305mm or 12"

  • 40

    Front clearance for cleanouts more than 51mm

    450mm or 18"

  • 41

    Vertical clearance from the means of access for cleanouts installed in underground piping

    0.45m

  • 42

    Horizontal clearance from the means of access for cleanouts installed in underground piping

    0.75m

  • 43

    Maximum distance of underfloor cleanout from an access door, trap door or crawl hole.

    6.1m

  • 44

    Minimum size of pump discharge pipe from a sump having a water closet

    51mm or 2"

  • 45

    Minimum distance of the invert of the lowest inlet above the high water or starting level of sumps and receiving tanks

    51mm or 2"

  • 46

    Minimum size of vent for sumps and receiving tanks

    51mm or 2"

  • 47

    Minimum air pressure to be maintained for each meter of height the sewage is raised

    3 kg/m

  • 48

    Distance within the vertical to horizontal change of a stack containing suds producing fixtures where no drainage connection shall be made

    2.4

  • 49

    Number of water closets or 6 fixture unit traps allowed on any vertical stack

    4

  • 50

    Number of water closets or 6 fixture unit traps allowed on any horizontal branch or drain

    3

  • 51

    Minimum diameter of individual vent, or not less than 1/2 of the diameter of the drain

    32mm or 1 1/4"

  • 52

    Fraction of the total permitted length of any vent allowed to be installed in a horizontal position

    1/3

  • 53

    Length of indirect waste pipe to be directly trapped but no need to be vented

    1.5m to 4.6m (5' to 15')

  • 54

    Length of indirect waste pipe if diameter is less than the drain outlet or tailpiece

    <4.6m

  • 55

    Minimum diameter of indirect waste pipe

    13mm or 1/2"

  • 56

    Extension of standpipe receptor of clotheswasher above its pipe

    0.45m to 0.8m (16" to 30")

  • 57

    Height of trap of clotheswasher standpipe receptor above the floor

    0.15m to 0.45m (6" to 16")

  • 58

    Maximum temperature allowed for water to be discharged under pressure directly into the drainage system

    60°C (140°F)

  • 59

    For condensers and sumps, the extension of the deep seal trap within the bottom of the trap

    152mm (6")

  • 60

    For condensers and sumps, diameter of the opening serving as siphon breaker at the top of the deep seal trap.

    19mm (3/4")

  • 61

    Outlets shall be taken off from the side in a manner to allow a water line to be maintained that permanently occupies not less than ___ the capacity of the condensers or sump.

    1/2

  • 62

    Minimum thickness of walls and bottom of sumps, condensers or intercepting tanks constructed of concrete

    102mm (4")

  • 63

    Minimum thickness of plaster on the inside walls of sumps and condensers, etc

    13mm (1/2")

  • 64

    Minimum thickness of metal condensers

    GA 12 (2.77mm)

  • 65

    Sumps and condensers shall contain a volume of not less than twice the volume of water removed from the boiler connected thereto when the normal water level is reduced not less than ___

    102mm (4")

  • 66

    Minimum thickness of chemical-resistant glass lined pipe, high silicon iron pipe or lead pipe receiving acid or corrosive chemicals.

    3.2mm

  • 67

    Minimum area of CW & VS vent

    1/2 the area of drain

  • 68

    Fixture unit limit for wet venting

    2FU

  • 69

    Maximum number of fixtures can be served by a vertical wet vent.

    4

  • 70

    Minimum size of wet vent

    1 pipe size larger or 51mm

  • 71

    Connection of the returned vent for island fixtures to the horizontal drain above the flood level rim

    152mm (6")

  • 72

    In CW & VS, length of branch that must be separately vented.

    more than 4.6m

  • 73

    Minimum size of waste pipe and trap in any CW & VS, in reference to the sizes required and tailpiece size

    2 pipe size larger

  • 74

    Maximum length of tailpiece

    0.6m

  • 75

    Cleanouts may not be required on any wet-vented branch serving a single trap when the fixture tailpiece or connection is larger than ___

    51mm (2")

  • 76

    1 inlet serving not more than 2.8 cu.m refrigeration space

    32mm (1 1/4")

  • 77

    1 inlet serving 4-12 cu.m of refrigeration space

    51mm (2")

  • 78

    1 inlet serving 13-36 cu.m of refrigeration space

    76mm (3")

  • 79

    Minimum rise of each vent above the highest flood level rim before offsetting horizontally to join the vent stack or stack vent

    152mm (6")

  • 80

    Increase in size of vent stack above the reconnection point of stack and horizontal vent

    1 pipe size

  • 81

    Minimum extension of a vent pipe above the roof or firewall

    0.15m or 6"

  • 82

    Minimum clearance of a vent through the roof from any vertical surface nearby.

    0.30m or 12"

  • 83

    Horizontal distance of a vent opening away from any openable window, door opening, air intake, or vent shaft

    3m

  • 84

    Vertical distance of a vent opening above any openable window, door opening, air intake, or vent shaft

    0.90m or 3'

  • 85

    Horizontal distance of a vent opening away from any lot line, alley, and street boundary lines

    0.90m or 3'

  • 86

    Horizontal distance of a vertical vent away from any part of the roof that is used for other purposes

    3m

  • 87

    Vertical extension of a vent above any roof that is used for other purposes.

    2.1m

  • 88

    Each soil or waste stack which extends _____ or more stories above the building drain shall be served by a parallel vent stack

    10

  • 89

    Intervals of yoke vent

    every 5 floors

  • 90

    Yoke vent connection with the vent stack above the floor level

    not more than 1m

  • 91

    Minimum size of an individual vent

    32mm or 1 1/4"

  • 92

    Minimum size of an individual vent but not less than 32 mm

    1/2 the diameter

  • 93

    Fraction of the total permitted length of any vent allowed to be installed in a horizontal position

    1/3

  • 94

    May be served by a common vertical vent

    2 fixtures

  • YT1 Materials Engineer EXAM

    YT1 Materials Engineer EXAM

    Anonymous · 100 questions · 2 mo ago

    YT1 Materials Engineer EXAM

    YT1 Materials Engineer EXAM

    100 questions • 2 mo ago
    Anonymous

    YT2 Materials Engineer EXAM

    YT2 Materials Engineer EXAM

    Anonymous · 100 questions · 2 mo ago

    YT2 Materials Engineer EXAM

    YT2 Materials Engineer EXAM

    100 questions • 2 mo ago
    Anonymous

    Project Engineer YT 1

    Project Engineer YT 1

    Anonymous · 100 questions · 2 mo ago

    Project Engineer YT 1

    Project Engineer YT 1

    100 questions • 2 mo ago
    Anonymous

    Project Engineer EXAM

    Project Engineer EXAM

    Anonymous · 62 questions · 2 mo ago

    Project Engineer EXAM

    Project Engineer EXAM

    62 questions • 2 mo ago
    Anonymous

    Project Engineer EXAM 68

    Project Engineer EXAM 68

    Anonymous · 100 questions · 2 mo ago

    Project Engineer EXAM 68

    Project Engineer EXAM 68

    100 questions • 2 mo ago
    Anonymous

    Project Engineer EXAM 82

    Project Engineer EXAM 82

    Anonymous · 100 questions · 2 mo ago

    Project Engineer EXAM 82

    Project Engineer EXAM 82

    100 questions • 2 mo ago
    Anonymous

    July 2023 PE Refresher

    July 2023 PE Refresher

    Anonymous · 70 questions · 2 mo ago

    July 2023 PE Refresher

    July 2023 PE Refresher

    70 questions • 2 mo ago
    Anonymous

    August 2019 Special PE Exam

    August 2019 Special PE Exam

    Anonymous · 93 questions · 2 mo ago

    August 2019 Special PE Exam

    August 2019 Special PE Exam

    93 questions • 2 mo ago
    Anonymous

    RNPCP Chapter 1 to 5

    RNPCP Chapter 1 to 5

    Anonymous · 86 questions · 2 mo ago

    RNPCP Chapter 1 to 5

    RNPCP Chapter 1 to 5

    86 questions • 2 mo ago
    Anonymous

    Plumbing Code 4

    Plumbing Code 4

    Anonymous · 100 questions · 2 mo ago

    Plumbing Code 4

    Plumbing Code 4

    100 questions • 2 mo ago
    Anonymous

    Plumbing Code 5

    Plumbing Code 5

    Anonymous · 100 questions · 2 mo ago

    Plumbing Code 5

    Plumbing Code 5

    100 questions • 2 mo ago
    Anonymous

    Plumbing Code 6

    Plumbing Code 6

    Anonymous · 100 questions · 2 mo ago

    Plumbing Code 6

    Plumbing Code 6

    100 questions • 2 mo ago
    Anonymous

    Plumbing Code 7

    Plumbing Code 7

    Anonymous · 100 questions · 2 mo ago

    Plumbing Code 7

    Plumbing Code 7

    100 questions • 2 mo ago
    Anonymous

    Plumbing Code 8

    Plumbing Code 8

    Anonymous · 100 questions · 2 mo ago

    Plumbing Code 8

    Plumbing Code 8

    100 questions • 2 mo ago
    Anonymous

    Plumbing Code 3

    Plumbing Code 3

    Anonymous · 100 questions · 2 mo ago

    Plumbing Code 3

    Plumbing Code 3

    100 questions • 2 mo ago
    Anonymous

    Sanitation, Plumbing Design, and Installation 2

    Sanitation, Plumbing Design, and Installation 2

    Anonymous · 97 questions · 2 mo ago

    Sanitation, Plumbing Design, and Installation 2

    Sanitation, Plumbing Design, and Installation 2

    97 questions • 2 mo ago
    Anonymous

    Sanitation, Plumbing Design, and Installation 1

    Sanitation, Plumbing Design, and Installation 1

    Anonymous · 99 questions · 2 mo ago

    Sanitation, Plumbing Design, and Installation 1

    Sanitation, Plumbing Design, and Installation 1

    99 questions • 2 mo ago
    Anonymous

    Sanitation, Plumbing Design, and Installation 3

    Sanitation, Plumbing Design, and Installation 3

    Anonymous · 96 questions · 2 mo ago

    Sanitation, Plumbing Design, and Installation 3

    Sanitation, Plumbing Design, and Installation 3

    96 questions • 2 mo ago
    Anonymous

    Sanitation, Plumbing Design, and Installation 4

    Sanitation, Plumbing Design, and Installation 4

    Anonymous · 95 questions · 2 mo ago

    Sanitation, Plumbing Design, and Installation 4

    Sanitation, Plumbing Design, and Installation 4

    95 questions • 2 mo ago
    Anonymous

    Sanitation, Plumbing Design, and Installation 5

    Sanitation, Plumbing Design, and Installation 5

    Anonymous · 97 questions · 2 mo ago

    Sanitation, Plumbing Design, and Installation 5

    Sanitation, Plumbing Design, and Installation 5

    97 questions • 2 mo ago
    Anonymous

    Sanitation, Plumbing Design, and Installation 7

    Sanitation, Plumbing Design, and Installation 7

    Anonymous · 100 questions · 2 mo ago

    Sanitation, Plumbing Design, and Installation 7

    Sanitation, Plumbing Design, and Installation 7

    100 questions • 2 mo ago
    Anonymous

    Sanitation, Plumbing Design, and Installation 8

    Sanitation, Plumbing Design, and Installation 8

    Anonymous · 98 questions · 2 mo ago

    Sanitation, Plumbing Design, and Installation 8

    Sanitation, Plumbing Design, and Installation 8

    98 questions • 2 mo ago
    Anonymous

    Plumbing Tools 1

    Plumbing Tools 1

    Anonymous · 87 questions · 2 mo ago

    Plumbing Tools 1

    Plumbing Tools 1

    87 questions • 2 mo ago
    Anonymous

    Plumbing Tools 2

    Plumbing Tools 2

    Anonymous · 53 questions · 2 mo ago

    Plumbing Tools 2

    Plumbing Tools 2

    53 questions • 2 mo ago
    Anonymous

    Practical Problems and Experiences 1

    Practical Problems and Experiences 1

    Anonymous · 100 questions · 2 mo ago

    Practical Problems and Experiences 1

    Practical Problems and Experiences 1

    100 questions • 2 mo ago
    Anonymous

    Practical Problems and Experiences 2

    Practical Problems and Experiences 2

    Anonymous · 100 questions · 2 mo ago

    Practical Problems and Experiences 2

    Practical Problems and Experiences 2

    100 questions • 2 mo ago
    Anonymous

    Practical Problems and Experiences 3

    Practical Problems and Experiences 3

    Anonymous · 99 questions · 2 mo ago

    Practical Problems and Experiences 3

    Practical Problems and Experiences 3

    99 questions • 2 mo ago
    Anonymous

    Practical Problems and Experiences 4

    Practical Problems and Experiences 4

    Anonymous · 100 questions · 2 mo ago

    Practical Problems and Experiences 4

    Practical Problems and Experiences 4

    100 questions • 2 mo ago
    Anonymous

    Plumbing Arithmetic Terms 1

    Plumbing Arithmetic Terms 1

    Anonymous · 49 questions · 2 mo ago

    Plumbing Arithmetic Terms 1

    Plumbing Arithmetic Terms 1

    49 questions • 2 mo ago
    Anonymous

    Plumbing Arithmetic Terms 2

    Plumbing Arithmetic Terms 2

    Anonymous · 47 questions · 2 mo ago

    Plumbing Arithmetic Terms 2

    Plumbing Arithmetic Terms 2

    47 questions • 2 mo ago
    Anonymous

    Plumbing Arithmetic Terms 3

    Plumbing Arithmetic Terms 3

    Anonymous · 49 questions · 2 mo ago

    Plumbing Arithmetic Terms 3

    Plumbing Arithmetic Terms 3

    49 questions • 2 mo ago
    Anonymous

    Plumbing Arithmetic Terms 4

    Plumbing Arithmetic Terms 4

    Anonymous · 27 questions · 2 mo ago

    Plumbing Arithmetic Terms 4

    Plumbing Arithmetic Terms 4

    27 questions • 2 mo ago
    Anonymous

    Plumbing Code WSFU

    Plumbing Code WSFU

    Anonymous · 58 questions · 2 mo ago

    Plumbing Code WSFU

    Plumbing Code WSFU

    58 questions • 2 mo ago
    Anonymous

    Practical Problems and Experiences REFRESHER 1

    Practical Problems and Experiences REFRESHER 1

    Anonymous · 100 questions · 2 mo ago

    Practical Problems and Experiences REFRESHER 1

    Practical Problems and Experiences REFRESHER 1

    100 questions • 2 mo ago
    Anonymous

    Practical Problems and Experiences REFRESHER 2

    Practical Problems and Experiences REFRESHER 2

    Anonymous · 70 questions · 2 mo ago

    Practical Problems and Experiences REFRESHER 2

    Practical Problems and Experiences REFRESHER 2

    70 questions • 2 mo ago
    Anonymous

    Item # and Descriptions

    Item # and Descriptions

    Anonymous · 24 questions · 2 mo ago

    Item # and Descriptions

    Item # and Descriptions

    24 questions • 2 mo ago
    Anonymous

    Item 200 Aggregate Subbase Course

    Item 200 Aggregate Subbase Course

    Anonymous · 16 questions · 2 mo ago

    Item 200 Aggregate Subbase Course

    Item 200 Aggregate Subbase Course

    16 questions • 2 mo ago
    Anonymous

    Item 201 Aggregate Base Course

    Item 201 Aggregate Base Course

    Anonymous · 16 questions · 2 mo ago

    Item 201 Aggregate Base Course

    Item 201 Aggregate Base Course

    16 questions • 2 mo ago
    Anonymous

    Item 202 Crushed Aggregate Base Course

    Item 202 Crushed Aggregate Base Course

    Anonymous · 18 questions · 2 mo ago

    Item 202 Crushed Aggregate Base Course

    Item 202 Crushed Aggregate Base Course

    18 questions • 2 mo ago
    Anonymous

    Item 203 Lime Stabilized Road Mix Base Course

    Item 203 Lime Stabilized Road Mix Base Course

    Anonymous · 27 questions · 2 mo ago

    Item 203 Lime Stabilized Road Mix Base Course

    Item 203 Lime Stabilized Road Mix Base Course

    27 questions • 2 mo ago
    Anonymous

    Item 204 Portland Cement Stabilized Road Mix Base Course

    Item 204 Portland Cement Stabilized Road Mix Base Course

    Anonymous · 7 questions · 2 mo ago

    Item 204 Portland Cement Stabilized Road Mix Base Course

    Item 204 Portland Cement Stabilized Road Mix Base Course

    7 questions • 2 mo ago
    Anonymous

    Item 207 Portland Cement Stabilized Treated Plant Mix Base Course

    Item 207 Portland Cement Stabilized Treated Plant Mix Base Course

    Anonymous · 13 questions · 2 mo ago

    Item 207 Portland Cement Stabilized Treated Plant Mix Base Course

    Item 207 Portland Cement Stabilized Treated Plant Mix Base Course

    13 questions • 2 mo ago
    Anonymous

    Item 205 Asphalt Stabilized Road Mix Base Course

    Item 205 Asphalt Stabilized Road Mix Base Course

    Anonymous · 7 questions · 2 mo ago

    Item 205 Asphalt Stabilized Road Mix Base Course

    Item 205 Asphalt Stabilized Road Mix Base Course

    7 questions • 2 mo ago
    Anonymous

    Item 206 Chemically Stabilized Road Mix Subbase/Base Course

    Item 206 Chemically Stabilized Road Mix Subbase/Base Course

    Anonymous · 11 questions · 2 mo ago

    Item 206 Chemically Stabilized Road Mix Subbase/Base Course

    Item 206 Chemically Stabilized Road Mix Subbase/Base Course

    11 questions • 2 mo ago
    Anonymous

    Item 300 Aggregate Surface Course

    Item 300 Aggregate Surface Course

    Anonymous · 11 questions · 2 mo ago

    Item 300 Aggregate Surface Course

    Item 300 Aggregate Surface Course

    11 questions • 2 mo ago
    Anonymous

    Item 301 Bituminous Prime Coat

    Item 301 Bituminous Prime Coat

    Anonymous · 10 questions · 2 mo ago

    Item 301 Bituminous Prime Coat

    Item 301 Bituminous Prime Coat

    10 questions • 2 mo ago
    Anonymous

    Item 303 Bituminous Seal Coat

    Item 303 Bituminous Seal Coat

    Anonymous · 20 questions · 2 mo ago

    Item 303 Bituminous Seal Coat

    Item 303 Bituminous Seal Coat

    20 questions • 2 mo ago
    Anonymous

    RNPCP Chapter 10 to 13

    RNPCP Chapter 10 to 13

    Anonymous · 93 questions · 2 mo ago

    RNPCP Chapter 10 to 13

    RNPCP Chapter 10 to 13

    93 questions • 2 mo ago
    Anonymous

    RNPCP Appendix A and B

    RNPCP Appendix A and B

    Anonymous · 79 questions · 2 mo ago

    RNPCP Appendix A and B

    RNPCP Appendix A and B

    79 questions • 2 mo ago
    Anonymous

    Republic Acts

    Republic Acts

    Anonymous · 9 questions · 2 mo ago

    Republic Acts

    Republic Acts

    9 questions • 2 mo ago
    Anonymous

    Plumbing Arithmetic Terms 5

    Plumbing Arithmetic Terms 5

    Anonymous · 68 questions · 2 mo ago

    Plumbing Arithmetic Terms 5

    Plumbing Arithmetic Terms 5

    68 questions • 2 mo ago
    Anonymous

    Principles and Code of Ethics

    Principles and Code of Ethics

    Anonymous · 29 questions · 2 mo ago

    Principles and Code of Ethics

    Principles and Code of Ethics

    29 questions • 2 mo ago
    Anonymous

    Plumbing Arithmetic Problems 1

    Plumbing Arithmetic Problems 1

    Anonymous · 75 questions · 2 mo ago

    Plumbing Arithmetic Problems 1

    Plumbing Arithmetic Problems 1

    75 questions • 2 mo ago
    Anonymous

    Item 406 Prestressed Concrete Structures

    Item 406 Prestressed Concrete Structures

    Anonymous · 36 questions · 2 mo ago

    Item 406 Prestressed Concrete Structures

    Item 406 Prestressed Concrete Structures

    36 questions • 2 mo ago
    Anonymous

    Item 405 Structural Concrete

    Item 405 Structural Concrete

    Anonymous · 41 questions · 2 mo ago

    Item 405 Structural Concrete

    Item 405 Structural Concrete

    41 questions • 2 mo ago
    Anonymous

    Item 400 Piling

    Item 400 Piling

    Anonymous · 80 questions · 2 mo ago

    Item 400 Piling

    Item 400 Piling

    80 questions • 2 mo ago
    Anonymous

    Item 311 Portland Cement Concrete Pavement (PART 2)

    Item 311 Portland Cement Concrete Pavement (PART 2)

    Anonymous · 61 questions · 2 mo ago

    Item 311 Portland Cement Concrete Pavement (PART 2)

    Item 311 Portland Cement Concrete Pavement (PART 2)

    61 questions • 2 mo ago
    Anonymous

    Item 311 Portland Cement Concrete Pavement (PART 1)

    Item 311 Portland Cement Concrete Pavement (PART 1)

    Anonymous · 78 questions · 2 mo ago

    Item 311 Portland Cement Concrete Pavement (PART 1)

    Item 311 Portland Cement Concrete Pavement (PART 1)

    78 questions • 2 mo ago
    Anonymous

    Standpipe Requirements

    Standpipe Requirements

    Anonymous · 29 questions · 2 mo ago

    Standpipe Requirements

    Standpipe Requirements

    29 questions • 2 mo ago
    Anonymous

    Spdi 1

    Spdi 1

    Anonymous · 100 questions · 2 mo ago

    Spdi 1

    Spdi 1

    100 questions • 2 mo ago
    Anonymous

    Spdi 2

    Spdi 2

    Anonymous · 98 questions · 2 mo ago

    Spdi 2

    Spdi 2

    98 questions • 2 mo ago
    Anonymous

    SPI version D pt 2

    SPI version D pt 2

    Anonymous · 61 questions · 2 mo ago

    SPI version D pt 2

    SPI version D pt 2

    61 questions • 2 mo ago
    Anonymous

    plumbing code

    plumbing code

    Anonymous · 100 questions · 2 mo ago

    plumbing code

    plumbing code

    100 questions • 2 mo ago
    Anonymous

    plumbing code 2

    plumbing code 2

    Anonymous · 100 questions · 2 mo ago

    plumbing code 2

    plumbing code 2

    100 questions • 2 mo ago
    Anonymous

    plumbing code 3

    plumbing code 3

    Anonymous · 56 questions · 2 mo ago

    plumbing code 3

    plumbing code 3

    56 questions • 2 mo ago
    Anonymous

    Practice Problem

    Practice Problem

    Anonymous · 70 questions · 2 mo ago

    Practice Problem

    Practice Problem

    70 questions • 2 mo ago
    Anonymous

    PP pre

    PP pre

    Anonymous · 100 questions · 2 mo ago

    PP pre

    PP pre

    100 questions • 2 mo ago
    Anonymous

    PP Pre 2

    PP Pre 2

    Anonymous · 100 questions · 2 mo ago

    PP Pre 2

    PP Pre 2

    100 questions • 2 mo ago
    Anonymous

    PP pre 3

    PP pre 3

    Anonymous · 44 questions · 2 mo ago

    PP pre 3

    PP pre 3

    44 questions • 2 mo ago
    Anonymous

    WT 1

    WT 1

    Anonymous · 50 questions · 2 mo ago

    WT 1

    WT 1

    50 questions • 2 mo ago
    Anonymous

    WT 2

    WT 2

    Anonymous · 48 questions · 2 mo ago

    WT 2

    WT 2

    48 questions • 2 mo ago
    Anonymous

    WT 3

    WT 3

    Anonymous · 50 questions · 2 mo ago

    WT 3

    WT 3

    50 questions • 2 mo ago
    Anonymous

    WT 6

    WT 6

    Anonymous · 50 questions · 2 mo ago

    WT 6

    WT 6

    50 questions • 2 mo ago
    Anonymous

    Definition of Terms 1

    Definition of Terms 1

    Anonymous · 90 questions · 2 mo ago

    Definition of Terms 1

    Definition of Terms 1

    90 questions • 2 mo ago
    Anonymous

    Definition of Terms 2

    Definition of Terms 2

    Anonymous · 90 questions · 2 mo ago

    Definition of Terms 2

    Definition of Terms 2

    90 questions • 2 mo ago
    Anonymous

    Definition of Terms 3

    Definition of Terms 3

    Anonymous · 90 questions · 2 mo ago

    Definition of Terms 3

    Definition of Terms 3

    90 questions • 2 mo ago
    Anonymous

    Refresher SPDI 1

    Refresher SPDI 1

    Anonymous · 100 questions · 2 mo ago

    Refresher SPDI 1

    Refresher SPDI 1

    100 questions • 2 mo ago
    Anonymous

    Refresher SPDI 1

    Refresher SPDI 1

    Anonymous · 9 questions · 2 mo ago

    Refresher SPDI 1

    Refresher SPDI 1

    9 questions • 2 mo ago
    Anonymous

    Weekly Test 1

    Weekly Test 1

    Anonymous · 50 questions · 2 mo ago

    Weekly Test 1

    Weekly Test 1

    50 questions • 2 mo ago
    Anonymous

    Weekly Test 2

    Weekly Test 2

    Anonymous · 50 questions · 2 mo ago

    Weekly Test 2

    Weekly Test 2

    50 questions • 2 mo ago
    Anonymous

    Weekly Test 3

    Weekly Test 3

    Anonymous · 50 questions · 2 mo ago

    Weekly Test 3

    Weekly Test 3

    50 questions • 2 mo ago
    Anonymous

    MPLE

    MPLE

    Anonymous · 41 questions · 2 mo ago

    MPLE

    MPLE

    41 questions • 2 mo ago
    Anonymous

    CDG- Plumbing Code 1

    CDG- Plumbing Code 1

    Anonymous · 48 questions · 2 mo ago

    CDG- Plumbing Code 1

    CDG- Plumbing Code 1

    48 questions • 2 mo ago
    Anonymous

    CDG- Plumbing Code 1.1

    CDG- Plumbing Code 1.1

    Anonymous · 50 questions · 2 mo ago

    CDG- Plumbing Code 1.1

    CDG- Plumbing Code 1.1

    50 questions • 2 mo ago
    Anonymous

    CDG- Plumbing Code 1.4

    CDG- Plumbing Code 1.4

    Anonymous · 23 questions · 2 mo ago

    CDG- Plumbing Code 1.4

    CDG- Plumbing Code 1.4

    23 questions • 2 mo ago
    Anonymous

    CDG- Plumbing Code 1.2

    CDG- Plumbing Code 1.2

    Anonymous · 50 questions · 2 mo ago

    CDG- Plumbing Code 1.2

    CDG- Plumbing Code 1.2

    50 questions • 2 mo ago
    Anonymous

    CGD- Plumbing Code 1.3

    CGD- Plumbing Code 1.3

    Anonymous · 50 questions · 2 mo ago

    CGD- Plumbing Code 1.3

    CGD- Plumbing Code 1.3

    50 questions • 2 mo ago
    Anonymous

    Plumbing Code 1

    Plumbing Code 1

    Anonymous · 50 questions · 2 mo ago

    Plumbing Code 1

    Plumbing Code 1

    50 questions • 2 mo ago
    Anonymous

    Plumbing Code 1.1

    Plumbing Code 1.1

    Anonymous · 22 questions · 2 mo ago

    Plumbing Code 1.1

    Plumbing Code 1.1

    22 questions • 2 mo ago
    Anonymous

    CGD - Sanitary Design

    CGD - Sanitary Design

    Anonymous · 19 questions · 2 mo ago

    CGD - Sanitary Design

    CGD - Sanitary Design

    19 questions • 2 mo ago
    Anonymous

    Practical Problems 1

    Practical Problems 1

    Anonymous · 50 questions · 2 mo ago

    Practical Problems 1

    Practical Problems 1

    50 questions • 2 mo ago
    Anonymous

    Practical Problems 1.1

    Practical Problems 1.1

    Anonymous · 47 questions · 2 mo ago

    Practical Problems 1.1

    Practical Problems 1.1

    47 questions • 2 mo ago
    Anonymous

    Practical Problems 2

    Practical Problems 2

    Anonymous · 50 questions · 2 mo ago

    Practical Problems 2

    Practical Problems 2

    50 questions • 2 mo ago
    Anonymous

    Practical Problems 2.1

    Practical Problems 2.1

    Anonymous · 50 questions · 2 mo ago

    Practical Problems 2.1

    Practical Problems 2.1

    50 questions • 2 mo ago
    Anonymous

    Plumbing Arithmetic 1

    Plumbing Arithmetic 1

    Anonymous · 50 questions · 2 mo ago

    Plumbing Arithmetic 1

    Plumbing Arithmetic 1

    50 questions • 2 mo ago
    Anonymous

    Plumbing Arithmetic 1.1

    Plumbing Arithmetic 1.1

    Anonymous · 50 questions · 2 mo ago

    Plumbing Arithmetic 1.1

    Plumbing Arithmetic 1.1

    50 questions • 2 mo ago
    Anonymous

    Plumbing Arithmetic 2

    Plumbing Arithmetic 2

    Anonymous · 50 questions · 2 mo ago

    Plumbing Arithmetic 2

    Plumbing Arithmetic 2

    50 questions • 2 mo ago
    Anonymous

    Plumbing Arithmetic 2.1

    Plumbing Arithmetic 2.1

    Anonymous · 50 questions · 2 mo ago

    Plumbing Arithmetic 2.1

    Plumbing Arithmetic 2.1

    50 questions • 2 mo ago
    Anonymous

    Question list

  • 1

    Minimum air gap for fixtures not affected by sidewalls

    2x diameter

  • 2

    Minimum air gap for fixtures affected by sidewalls

    3x diameter

  • 3

    Airgap less than 25mm shall only be approved if tested with vacuums of mercury from 0 to ____

    63.5cm

  • 4

    Minimum distance of Atmospheric Vacuum Breaker (AVB) above all downstream piping and floor level rim of receptor

    150mm or 6"

  • 5

    Mininum space clearance between the lowest portion of the assembly and the grade, floor or platform for access and clearance

    30.5cm

  • 6

    Minimum temperature of the AVB critical pevel above overflow rim of a water closet bowl or the highest part of a urinal

    43.3°C (110°F)

  • 7

    Minimum height of the AVB critical level above the overflow rim of a water closet bowl or the highest part of a urinal

    152mm

  • 8

    Mininum distance of Double Check Valve (DC) assembly above all downstream piping and floor level rim of receptor

    30.5cm

  • 9

    Elevation of installations above the floor or grade to be provided with a permanent platform.

    1.52m or 5'

  • 10

    Minimum airgap for water distribution, or a mininum of 2x diameter

    25mm

  • 11

    Mininum height of ballcock's critical level above the full opening of the overflow pipe

    25mm

  • 12

    Mininum installation height of listed non removable hose bibb type backflow preventer above the highest point of usage.

    152mm

  • 13

    Size of iron cast fittings to be galvanized when used in water piping

    51mm or smaller

  • 14

    Maximum lead content for water pipes and fittings

    8%

  • 15

    Number of mesh per 25mm for gravity tanks vent screen

    14 to 18

  • 16

    Inadequate water pressure is less than:

    103kPa

  • 17

    Excessive water pressure is more than:

    551kPa

  • 18

    Percentage of reduced pressure used for all pipe size determination

    80%

  • 19

    Maximum pressure setting for pressure relief valve

    1033 kPa

  • 20

    Height of the drain pipe of pressure relief valve above the ground and pointing downward

    152mm to 600mm

  • 21

    Distance between bottom of water pipe and top of the sewer or drain line

    0.30m

  • 22

    Horizontal distance between the water line and the sewer or drain line

    0.30m

  • 23

    Distance between sewer or drainage piping and water pipes crossing above such pipes

    0.30m

  • 24

    Maximum distance of unions away from regulating equipment, water heater, conditioning tank, or similar.

    0.30m

  • 25

    Maximum intervals of piping supports

    4' or 1219mm

  • 26

    Support trap arms more than _____ in length shall be as close as possible

    3' or 914mm

  • 27

    Closet rings shall be tightly fastened up to the floor with top surface _____ above finish floor.

    1/4"

  • 28

    Mininum size of water service pipe

    19mm

  • 29

    Minimum size of building supply and branches

    13mm

  • 30

    Minimum clearance of galvanized wrought iron or galvanized steel pipe above ground

    152mm or 6"

  • 31

    Minimum depth of vitrified clay pipes or fittings below the ground

    0.3m

  • 32

    Allowable grades for the threads of drainage fittings

    2%

  • 33

    Fixture rating of clotheswasher in groups of 3

    6 FU

  • 34

    Fixture unit rating for every 0.063 L/s (1gpm) of contiuous flow from sump pump or ejector

    2 FU

  • 35

    Intervals of cleanouts on each run of piping

    15m

  • 36

    Length of horizontal drain line where cleanouts maybe omitted, except in lines serving sinks or urinals.

    < 1.5m

  • 37

    Slope of horizontal drainage pipe where cleanouts may be omitted

    72° or less

  • 38

    Aggregate offset angle to be provided with an additional cleanout

    135° or more

  • 39

    Front clearance for cleanouts 51mm or less

    305mm or 12"

  • 40

    Front clearance for cleanouts more than 51mm

    450mm or 18"

  • 41

    Vertical clearance from the means of access for cleanouts installed in underground piping

    0.45m

  • 42

    Horizontal clearance from the means of access for cleanouts installed in underground piping

    0.75m

  • 43

    Maximum distance of underfloor cleanout from an access door, trap door or crawl hole.

    6.1m

  • 44

    Minimum size of pump discharge pipe from a sump having a water closet

    51mm or 2"

  • 45

    Minimum distance of the invert of the lowest inlet above the high water or starting level of sumps and receiving tanks

    51mm or 2"

  • 46

    Minimum size of vent for sumps and receiving tanks

    51mm or 2"

  • 47

    Minimum air pressure to be maintained for each meter of height the sewage is raised

    3 kg/m

  • 48

    Distance within the vertical to horizontal change of a stack containing suds producing fixtures where no drainage connection shall be made

    2.4

  • 49

    Number of water closets or 6 fixture unit traps allowed on any vertical stack

    4

  • 50

    Number of water closets or 6 fixture unit traps allowed on any horizontal branch or drain

    3

  • 51

    Minimum diameter of individual vent, or not less than 1/2 of the diameter of the drain

    32mm or 1 1/4"

  • 52

    Fraction of the total permitted length of any vent allowed to be installed in a horizontal position

    1/3

  • 53

    Length of indirect waste pipe to be directly trapped but no need to be vented

    1.5m to 4.6m (5' to 15')

  • 54

    Length of indirect waste pipe if diameter is less than the drain outlet or tailpiece

    <4.6m

  • 55

    Minimum diameter of indirect waste pipe

    13mm or 1/2"

  • 56

    Extension of standpipe receptor of clotheswasher above its pipe

    0.45m to 0.8m (16" to 30")

  • 57

    Height of trap of clotheswasher standpipe receptor above the floor

    0.15m to 0.45m (6" to 16")

  • 58

    Maximum temperature allowed for water to be discharged under pressure directly into the drainage system

    60°C (140°F)

  • 59

    For condensers and sumps, the extension of the deep seal trap within the bottom of the trap

    152mm (6")

  • 60

    For condensers and sumps, diameter of the opening serving as siphon breaker at the top of the deep seal trap.

    19mm (3/4")

  • 61

    Outlets shall be taken off from the side in a manner to allow a water line to be maintained that permanently occupies not less than ___ the capacity of the condensers or sump.

    1/2

  • 62

    Minimum thickness of walls and bottom of sumps, condensers or intercepting tanks constructed of concrete

    102mm (4")

  • 63

    Minimum thickness of plaster on the inside walls of sumps and condensers, etc

    13mm (1/2")

  • 64

    Minimum thickness of metal condensers

    GA 12 (2.77mm)

  • 65

    Sumps and condensers shall contain a volume of not less than twice the volume of water removed from the boiler connected thereto when the normal water level is reduced not less than ___

    102mm (4")

  • 66

    Minimum thickness of chemical-resistant glass lined pipe, high silicon iron pipe or lead pipe receiving acid or corrosive chemicals.

    3.2mm

  • 67

    Minimum area of CW & VS vent

    1/2 the area of drain

  • 68

    Fixture unit limit for wet venting

    2FU

  • 69

    Maximum number of fixtures can be served by a vertical wet vent.

    4

  • 70

    Minimum size of wet vent

    1 pipe size larger or 51mm

  • 71

    Connection of the returned vent for island fixtures to the horizontal drain above the flood level rim

    152mm (6")

  • 72

    In CW & VS, length of branch that must be separately vented.

    more than 4.6m

  • 73

    Minimum size of waste pipe and trap in any CW & VS, in reference to the sizes required and tailpiece size

    2 pipe size larger

  • 74

    Maximum length of tailpiece

    0.6m

  • 75

    Cleanouts may not be required on any wet-vented branch serving a single trap when the fixture tailpiece or connection is larger than ___

    51mm (2")

  • 76

    1 inlet serving not more than 2.8 cu.m refrigeration space

    32mm (1 1/4")

  • 77

    1 inlet serving 4-12 cu.m of refrigeration space

    51mm (2")

  • 78

    1 inlet serving 13-36 cu.m of refrigeration space

    76mm (3")

  • 79

    Minimum rise of each vent above the highest flood level rim before offsetting horizontally to join the vent stack or stack vent

    152mm (6")

  • 80

    Increase in size of vent stack above the reconnection point of stack and horizontal vent

    1 pipe size

  • 81

    Minimum extension of a vent pipe above the roof or firewall

    0.15m or 6"

  • 82

    Minimum clearance of a vent through the roof from any vertical surface nearby.

    0.30m or 12"

  • 83

    Horizontal distance of a vent opening away from any openable window, door opening, air intake, or vent shaft

    3m

  • 84

    Vertical distance of a vent opening above any openable window, door opening, air intake, or vent shaft

    0.90m or 3'

  • 85

    Horizontal distance of a vent opening away from any lot line, alley, and street boundary lines

    0.90m or 3'

  • 86

    Horizontal distance of a vertical vent away from any part of the roof that is used for other purposes

    3m

  • 87

    Vertical extension of a vent above any roof that is used for other purposes.

    2.1m

  • 88

    Each soil or waste stack which extends _____ or more stories above the building drain shall be served by a parallel vent stack

    10

  • 89

    Intervals of yoke vent

    every 5 floors

  • 90

    Yoke vent connection with the vent stack above the floor level

    not more than 1m

  • 91

    Minimum size of an individual vent

    32mm or 1 1/4"

  • 92

    Minimum size of an individual vent but not less than 32 mm

    1/2 the diameter

  • 93

    Fraction of the total permitted length of any vent allowed to be installed in a horizontal position

    1/3

  • 94

    May be served by a common vertical vent

    2 fixtures