    A variation of pipe wrench with a swiveling serrated jaw and knurled control knob located between the frame forming the head and the handled of the wrench?

    Stillson wrench

  • 2

    As an experienced plumber, what is the recommended size of the drain serving water closet?

    4 in.

  • 3

    A brewery plant requires a piping system to convey beer, ale, spirituous liquor and distilled water What kind of pipe to be used?

    Black Tin Pipe

  • 4

    A red spiral line painted on a pipe identified the pipe as ___.

    Wrought-iron pipe

  • 5

    A hotel requires hot and cold water supplies. What kind of pipes best suited?

    Copper pipe

  • 6

    A registered master plumber is consulted to install piping system for water, gas, steam and oil. What kind of pipe is recommended?

    Cast iron pipe

  • 7

    What kind of pipe to be used where heating panels are considered in concrete slabs for the purpose of melting snow?

    Wrought iron pipe

  • 8

    When cutting pipe that coated internally with enamel or glass, delicate core should be taken to avoid cracking or chipping the internal coating. What kind of tool that should NEVER used for cutting such pipe?

    Wheel pipe cutter

  • 9

    When a very short pipe is threaded. What will you see?

    Nipple chuck

  • 10

    What is the tool used for expanding the ends of lead pipe?

    Turn pin

  • 11

    When using an extension ladder, what will be the maximum sliding sections allowed?

    2 sliding sections

  • 12

    An 8 meters aluminum ladder is used in delivering plumbing fixtures to the second the foot of the ladder be placed from the wall of the building?

    2 meters

  • 13

    As registered master plumber, you have to use a ladder to carry the pipes to the second floor of the building, what will be the horizontal distance from the foot of the ladder to the wall that you considered proper?

    1/4 of the ladders length

  • 14

    What is the valve recommended for installation that call for throttling?

    Globe valve

  • 15

    What is the approximate height above the floor level of a kitchen sink?

    36 inches

  • 16

    What is the approximate height above the floor level of a built-in bathtub floor level?

    16 inches

  • 17

    What is the device used to support the water supply riser?

    Pipe rest

  • 18

    What is that fitting necessary in a water supply system which is used to the water supply in some portion of the installation?

    Valve

  • 19

    What kind of valve is suited for the water main supply lines and pump lines?

    Gate valve

  • 20

    Generally, the registered master plumber must be systematic in connecting the riser branches to the main of the water supply system. What will be the right angle of all branches connection to the main?

    90

  • 21

    What do you call the plugging of an opening with oakum, lead or other materials which are pounded into place or materials pounded into the opening?

    Caulking

  • 22

    The material used to join or connect plastic is called?

    Solvent cement

  • 23

    What is the minimum length of time before a jointed plastic pipe be subjected to pressure test?

    2 hours

  • 24

    In bending plastic, what will be the practical material to be used to prevent fattening of the

    Sand

  • 25

    What is the part of the piping of a plumbing installation which supplies the plumbing fixtures with an adequate flow of water?

    Domestic water distribution system

  • 26

    What is the usual horizontal length that the cast iron be supported to prevel damage at joints caused by sagging?

    1.5m

  • 27

    What will be provided to prevent contamination from the polluted water of the fire truck to the house water supply system?

    Check valves & gate valve

  • 28

    What is the name of the instrument which used in caulking oakum in the joints of cast iron pipe?

    Yarning iron

  • 29

    On what type of building are wet standpipes generally used?

    Tall building

  • 30

    What is that feature which offers a convenient water supply for firemen, making it necessary for the fire department to transport and user much expensive fire fighting apparatus?

    Stand pipe

  • 31

    Fire system piping is usually painted with?

    Red color

  • 32

    What is the device which is to be installed on the water service between the edge of the street and the sidewalk line which serves as a control valve in case water supply in cut-off to the building?

    Curb stop

  • 33

    What circumstances should the curb stop is used?

    When the water has to be controlled.

  • 34

    Why is it corporation stop required when the main water pipe is tapped with pressure on?

    It serves as a control stop.

  • 35

    It is essential that pipe threads to be cut accurately to ensure that threads for fittings will be universal so that the manufacturers of pipe threading equipment follow the American Standard. How many threads per inch for pipes having a diameter of 3 inches diameter?

    8

  • 36

    The allowable tensile stress of wrought iron steel pipe is 750 psi. It is to be used l for hot water supply with working pressure of 300 psi. what schedule of the pipe should you specify? N = 100P

    40

  • 37

    A schedule of 80 wrought iron pipe can withstand a steam pressure up to?

    600 psi

  • 38

    A wrought iron pipe schedule of 40 can withstand a steam pressure up to?

    300 psi

  • 39

    Name that tool which is made of boxwood, dogwood or lignum vitae, and it is used for dressing or working sheetlead, lead pipe bends, and bath traps.

    Dresser

  • 40

    What is the handy tool for threading the end of the pipe in a trench or in the corner of a cellar where a pipe projects too far and threaded in place?

    Rachet stocks

  • 41

    In the trade of piping, the term "tapping" is used to described ___.

    Cutting of internal threads

  • 42

    A pipe vise is needed to

    Keep pipe rigid for cutting

  • 43

    In a certain plumbing installation, a lead pipe is being used. How do you usually join the lead pipe?

    Melting the pipe ends

  • 44

    What should be the maximum length of the ladder when fully extended of a an extension ladders?

    60 feet

  • 45

    What will be the maximum water service pressure at the point where the building distribution system begins?

    80 psi

  • 46

    What is usually the primary cause of troubles in excavating operations for water pipes?

    Lack of shoring

  • 47

    What is the suitable gasket material for a flange union in oil lines?

    Metallic

  • 48

    What is the suitable gasket material for flange union in cold water piping?

    Rubber

  • 49

    What is the suitable gasket material for hange union in gasoline conduction?

    Metallic

  • 50

    What is the smallest plumbing fixture used as the basis in determining the fixture unit value?

    Lavatory or wash basin

  • YT1 Materials Engineer EXAM

    YT1 Materials Engineer EXAM

    ユーザ名非公開 · 100問 · 1ヶ月前

    YT1 Materials Engineer EXAM

    YT1 Materials Engineer EXAM

    100問 • 1ヶ月前
    ユーザ名非公開

    YT2 Materials Engineer EXAM

    YT2 Materials Engineer EXAM

    ユーザ名非公開 · 100問 · 1ヶ月前

    YT2 Materials Engineer EXAM

    YT2 Materials Engineer EXAM

    100問 • 1ヶ月前
    ユーザ名非公開

    Project Engineer YT 1

    Project Engineer YT 1

    ユーザ名非公開 · 100問 · 1ヶ月前

    Project Engineer YT 1

    Project Engineer YT 1

    100問 • 1ヶ月前
    ユーザ名非公開

    Project Engineer EXAM

    Project Engineer EXAM

    ユーザ名非公開 · 62問 · 1ヶ月前

    Project Engineer EXAM

    Project Engineer EXAM

    62問 • 1ヶ月前
    ユーザ名非公開

    Project Engineer EXAM 68

    Project Engineer EXAM 68

    ユーザ名非公開 · 100問 · 1ヶ月前

    Project Engineer EXAM 68

    Project Engineer EXAM 68

    100問 • 1ヶ月前
    ユーザ名非公開

    Project Engineer EXAM 82

    Project Engineer EXAM 82

    ユーザ名非公開 · 100問 · 1ヶ月前

    Project Engineer EXAM 82

    Project Engineer EXAM 82

    100問 • 1ヶ月前
    ユーザ名非公開

    July 2023 PE Refresher

    July 2023 PE Refresher

    ユーザ名非公開 · 70問 · 1ヶ月前

    July 2023 PE Refresher

    July 2023 PE Refresher

    70問 • 1ヶ月前
    ユーザ名非公開

    August 2019 Special PE Exam

    August 2019 Special PE Exam

    ユーザ名非公開 · 93問 · 1ヶ月前

    August 2019 Special PE Exam

    August 2019 Special PE Exam

    93問 • 1ヶ月前
    ユーザ名非公開

    RNPCP Chapter 1 to 5

    RNPCP Chapter 1 to 5

    ユーザ名非公開 · 86問 · 1ヶ月前

    RNPCP Chapter 1 to 5

    RNPCP Chapter 1 to 5

    86問 • 1ヶ月前
    ユーザ名非公開

    Plumbing Code 4

    Plumbing Code 4

    ユーザ名非公開 · 100問 · 1ヶ月前

    Plumbing Code 4

    Plumbing Code 4

    100問 • 1ヶ月前
    ユーザ名非公開

    Plumbing Code 5

    Plumbing Code 5

    ユーザ名非公開 · 100問 · 1ヶ月前

    Plumbing Code 5

    Plumbing Code 5

    100問 • 1ヶ月前
    ユーザ名非公開

    Plumbing Code 6

    Plumbing Code 6

    ユーザ名非公開 · 100問 · 1ヶ月前

    Plumbing Code 6

    Plumbing Code 6

    100問 • 1ヶ月前
    ユーザ名非公開

    Plumbing Code 7

    Plumbing Code 7

    ユーザ名非公開 · 100問 · 1ヶ月前

    Plumbing Code 7

    Plumbing Code 7

    100問 • 1ヶ月前
    ユーザ名非公開

    Plumbing Code 8

    Plumbing Code 8

    ユーザ名非公開 · 100問 · 1ヶ月前

    Plumbing Code 8

    Plumbing Code 8

    100問 • 1ヶ月前
    ユーザ名非公開

    Plumbing Code 3

    Plumbing Code 3

    ユーザ名非公開 · 100問 · 1ヶ月前

    Plumbing Code 3

    Plumbing Code 3

    100問 • 1ヶ月前
    ユーザ名非公開

    Sanitation, Plumbing Design, and Installation 2

    Sanitation, Plumbing Design, and Installation 2

    ユーザ名非公開 · 97問 · 1ヶ月前

    Sanitation, Plumbing Design, and Installation 2

    Sanitation, Plumbing Design, and Installation 2

    97問 • 1ヶ月前
    ユーザ名非公開

    Sanitation, Plumbing Design, and Installation 1

    Sanitation, Plumbing Design, and Installation 1

    ユーザ名非公開 · 99問 · 1ヶ月前

    Sanitation, Plumbing Design, and Installation 1

    Sanitation, Plumbing Design, and Installation 1

    99問 • 1ヶ月前
    ユーザ名非公開

    Sanitation, Plumbing Design, and Installation 3

    Sanitation, Plumbing Design, and Installation 3

    ユーザ名非公開 · 96問 · 1ヶ月前

    Sanitation, Plumbing Design, and Installation 3

    Sanitation, Plumbing Design, and Installation 3

    96問 • 1ヶ月前
    ユーザ名非公開

    Sanitation, Plumbing Design, and Installation 4

    Sanitation, Plumbing Design, and Installation 4

    ユーザ名非公開 · 95問 · 1ヶ月前

    Sanitation, Plumbing Design, and Installation 4

    Sanitation, Plumbing Design, and Installation 4

    95問 • 1ヶ月前
    ユーザ名非公開

    Sanitation, Plumbing Design, and Installation 5

    Sanitation, Plumbing Design, and Installation 5

    ユーザ名非公開 · 97問 · 1ヶ月前

    Sanitation, Plumbing Design, and Installation 5

    Sanitation, Plumbing Design, and Installation 5

    97問 • 1ヶ月前
    ユーザ名非公開

    Sanitation, Plumbing Design, and Installation 7

    Sanitation, Plumbing Design, and Installation 7

    ユーザ名非公開 · 100問 · 1ヶ月前

    Sanitation, Plumbing Design, and Installation 7

    Sanitation, Plumbing Design, and Installation 7

    100問 • 1ヶ月前
    ユーザ名非公開

    Sanitation, Plumbing Design, and Installation 8

    Sanitation, Plumbing Design, and Installation 8

    ユーザ名非公開 · 98問 · 1ヶ月前

    Sanitation, Plumbing Design, and Installation 8

    Sanitation, Plumbing Design, and Installation 8

    98問 • 1ヶ月前
    ユーザ名非公開

    Plumbing Tools 1

    Plumbing Tools 1

    ユーザ名非公開 · 87問 · 1ヶ月前

    Plumbing Tools 1

    Plumbing Tools 1

    87問 • 1ヶ月前
    ユーザ名非公開

    Plumbing Tools 2

    Plumbing Tools 2

    ユーザ名非公開 · 53問 · 1ヶ月前

    Plumbing Tools 2

    Plumbing Tools 2

    53問 • 1ヶ月前
    ユーザ名非公開

    Practical Problems and Experiences 1

    Practical Problems and Experiences 1

    ユーザ名非公開 · 100問 · 1ヶ月前

    Practical Problems and Experiences 1

    Practical Problems and Experiences 1

    100問 • 1ヶ月前
    ユーザ名非公開

    Practical Problems and Experiences 2

    Practical Problems and Experiences 2

    ユーザ名非公開 · 100問 · 1ヶ月前

    Practical Problems and Experiences 2

    Practical Problems and Experiences 2

    100問 • 1ヶ月前
    ユーザ名非公開

    Practical Problems and Experiences 3

    Practical Problems and Experiences 3

    ユーザ名非公開 · 99問 · 1ヶ月前

    Practical Problems and Experiences 3

    Practical Problems and Experiences 3

    99問 • 1ヶ月前
    ユーザ名非公開

    Practical Problems and Experiences 4

    Practical Problems and Experiences 4

    ユーザ名非公開 · 100問 · 1ヶ月前

    Practical Problems and Experiences 4

    Practical Problems and Experiences 4

    100問 • 1ヶ月前
    ユーザ名非公開

    Plumbing Arithmetic Terms 1

    Plumbing Arithmetic Terms 1

    ユーザ名非公開 · 49問 · 1ヶ月前

    Plumbing Arithmetic Terms 1

    Plumbing Arithmetic Terms 1

    49問 • 1ヶ月前
    ユーザ名非公開

    Plumbing Arithmetic Terms 2

    Plumbing Arithmetic Terms 2

    ユーザ名非公開 · 47問 · 1ヶ月前

    Plumbing Arithmetic Terms 2

    Plumbing Arithmetic Terms 2

    47問 • 1ヶ月前
    ユーザ名非公開

    Plumbing Arithmetic Terms 3

    Plumbing Arithmetic Terms 3

    ユーザ名非公開 · 49問 · 1ヶ月前

    Plumbing Arithmetic Terms 3

    Plumbing Arithmetic Terms 3

    49問 • 1ヶ月前
    ユーザ名非公開

    Plumbing Arithmetic Terms 4

    Plumbing Arithmetic Terms 4

    ユーザ名非公開 · 27問 · 1ヶ月前

    Plumbing Arithmetic Terms 4

    Plumbing Arithmetic Terms 4

    27問 • 1ヶ月前
    ユーザ名非公開

    Plumbing Code WSFU

    Plumbing Code WSFU

    ユーザ名非公開 · 58問 · 1ヶ月前

    Plumbing Code WSFU

    Plumbing Code WSFU

    58問 • 1ヶ月前
    ユーザ名非公開

    Practical Problems and Experiences REFRESHER 1

    Practical Problems and Experiences REFRESHER 1

    ユーザ名非公開 · 100問 · 1ヶ月前

    Practical Problems and Experiences REFRESHER 1

    Practical Problems and Experiences REFRESHER 1

    100問 • 1ヶ月前
    ユーザ名非公開

    Practical Problems and Experiences REFRESHER 2

    Practical Problems and Experiences REFRESHER 2

    ユーザ名非公開 · 70問 · 1ヶ月前

    Practical Problems and Experiences REFRESHER 2

    Practical Problems and Experiences REFRESHER 2

    70問 • 1ヶ月前
    ユーザ名非公開

    Item # and Descriptions

    Item # and Descriptions

    ユーザ名非公開 · 24問 · 1ヶ月前

    Item # and Descriptions

    Item # and Descriptions

    24問 • 1ヶ月前
    ユーザ名非公開

    Item 200 Aggregate Subbase Course

    Item 200 Aggregate Subbase Course

    ユーザ名非公開 · 16問 · 1ヶ月前

    Item 200 Aggregate Subbase Course

    Item 200 Aggregate Subbase Course

    16問 • 1ヶ月前
    ユーザ名非公開

    Item 201 Aggregate Base Course

    Item 201 Aggregate Base Course

    ユーザ名非公開 · 16問 · 1ヶ月前

    Item 201 Aggregate Base Course

    Item 201 Aggregate Base Course

    16問 • 1ヶ月前
    ユーザ名非公開

    Item 202 Crushed Aggregate Base Course

    Item 202 Crushed Aggregate Base Course

    ユーザ名非公開 · 18問 · 1ヶ月前

    Item 202 Crushed Aggregate Base Course

    Item 202 Crushed Aggregate Base Course

    18問 • 1ヶ月前
    ユーザ名非公開

    Item 203 Lime Stabilized Road Mix Base Course

    Item 203 Lime Stabilized Road Mix Base Course

    ユーザ名非公開 · 27問 · 1ヶ月前

    Item 203 Lime Stabilized Road Mix Base Course

    Item 203 Lime Stabilized Road Mix Base Course

    27問 • 1ヶ月前
    ユーザ名非公開

    Item 204 Portland Cement Stabilized Road Mix Base Course

    Item 204 Portland Cement Stabilized Road Mix Base Course

    ユーザ名非公開 · 7問 · 1ヶ月前

    Item 204 Portland Cement Stabilized Road Mix Base Course

    Item 204 Portland Cement Stabilized Road Mix Base Course

    7問 • 1ヶ月前
    ユーザ名非公開

    Item 207 Portland Cement Stabilized Treated Plant Mix Base Course

    Item 207 Portland Cement Stabilized Treated Plant Mix Base Course

    ユーザ名非公開 · 13問 · 1ヶ月前

    Item 207 Portland Cement Stabilized Treated Plant Mix Base Course

    Item 207 Portland Cement Stabilized Treated Plant Mix Base Course

    13問 • 1ヶ月前
    ユーザ名非公開

    Item 205 Asphalt Stabilized Road Mix Base Course

    Item 205 Asphalt Stabilized Road Mix Base Course

    ユーザ名非公開 · 7問 · 1ヶ月前

    Item 205 Asphalt Stabilized Road Mix Base Course

    Item 205 Asphalt Stabilized Road Mix Base Course

    7問 • 1ヶ月前
    ユーザ名非公開

    Item 206 Chemically Stabilized Road Mix Subbase/Base Course

    Item 206 Chemically Stabilized Road Mix Subbase/Base Course

    ユーザ名非公開 · 11問 · 1ヶ月前

    Item 206 Chemically Stabilized Road Mix Subbase/Base Course

    Item 206 Chemically Stabilized Road Mix Subbase/Base Course

    11問 • 1ヶ月前
    ユーザ名非公開

    Item 300 Aggregate Surface Course

    Item 300 Aggregate Surface Course

    ユーザ名非公開 · 11問 · 1ヶ月前

    Item 300 Aggregate Surface Course

    Item 300 Aggregate Surface Course

    11問 • 1ヶ月前
    ユーザ名非公開

    Item 301 Bituminous Prime Coat

    Item 301 Bituminous Prime Coat

    ユーザ名非公開 · 10問 · 1ヶ月前

    Item 301 Bituminous Prime Coat

    Item 301 Bituminous Prime Coat

    10問 • 1ヶ月前
    ユーザ名非公開

    Item 303 Bituminous Seal Coat

    Item 303 Bituminous Seal Coat

    ユーザ名非公開 · 20問 · 1ヶ月前

    Item 303 Bituminous Seal Coat

    Item 303 Bituminous Seal Coat

    20問 • 1ヶ月前
    ユーザ名非公開

    RNPCP Chapter 6 to 9

    RNPCP Chapter 6 to 9

    ユーザ名非公開 · 94問 · 1ヶ月前

    RNPCP Chapter 6 to 9

    RNPCP Chapter 6 to 9

    94問 • 1ヶ月前
    ユーザ名非公開

    RNPCP Chapter 10 to 13

    RNPCP Chapter 10 to 13

    ユーザ名非公開 · 93問 · 1ヶ月前

    RNPCP Chapter 10 to 13

    RNPCP Chapter 10 to 13

    93問 • 1ヶ月前
    ユーザ名非公開

    RNPCP Appendix A and B

    RNPCP Appendix A and B

    ユーザ名非公開 · 79問 · 1ヶ月前

    RNPCP Appendix A and B

    RNPCP Appendix A and B

    79問 • 1ヶ月前
    ユーザ名非公開

    Republic Acts

    Republic Acts

    ユーザ名非公開 · 9問 · 1ヶ月前

    Republic Acts

    Republic Acts

    9問 • 1ヶ月前
    ユーザ名非公開

    Plumbing Arithmetic Terms 5

    Plumbing Arithmetic Terms 5

    ユーザ名非公開 · 68問 · 1ヶ月前

    Plumbing Arithmetic Terms 5

    Plumbing Arithmetic Terms 5

    68問 • 1ヶ月前
    ユーザ名非公開

    Principles and Code of Ethics

    Principles and Code of Ethics

    ユーザ名非公開 · 29問 · 1ヶ月前

    Principles and Code of Ethics

    Principles and Code of Ethics

    29問 • 1ヶ月前
    ユーザ名非公開

    Plumbing Arithmetic Problems 1

    Plumbing Arithmetic Problems 1

    ユーザ名非公開 · 75問 · 1ヶ月前

    Plumbing Arithmetic Problems 1

    Plumbing Arithmetic Problems 1

    75問 • 1ヶ月前
    ユーザ名非公開

    Item 406 Prestressed Concrete Structures

    Item 406 Prestressed Concrete Structures

    ユーザ名非公開 · 36問 · 1ヶ月前

    Item 406 Prestressed Concrete Structures

    Item 406 Prestressed Concrete Structures

    36問 • 1ヶ月前
    ユーザ名非公開

    Item 405 Structural Concrete

    Item 405 Structural Concrete

    ユーザ名非公開 · 41問 · 1ヶ月前

    Item 405 Structural Concrete

    Item 405 Structural Concrete

    41問 • 1ヶ月前
    ユーザ名非公開

    Item 400 Piling

    Item 400 Piling

    ユーザ名非公開 · 80問 · 1ヶ月前

    Item 400 Piling

    Item 400 Piling

    80問 • 1ヶ月前
    ユーザ名非公開

    Item 311 Portland Cement Concrete Pavement (PART 2)

    Item 311 Portland Cement Concrete Pavement (PART 2)

    ユーザ名非公開 · 61問 · 1ヶ月前

    Item 311 Portland Cement Concrete Pavement (PART 2)

    Item 311 Portland Cement Concrete Pavement (PART 2)

    61問 • 1ヶ月前
    ユーザ名非公開

    Item 311 Portland Cement Concrete Pavement (PART 1)

    Item 311 Portland Cement Concrete Pavement (PART 1)

    ユーザ名非公開 · 78問 · 1ヶ月前

    Item 311 Portland Cement Concrete Pavement (PART 1)

    Item 311 Portland Cement Concrete Pavement (PART 1)

    78問 • 1ヶ月前
    ユーザ名非公開

    Standpipe Requirements

    Standpipe Requirements

    ユーザ名非公開 · 29問 · 1ヶ月前

    Standpipe Requirements

    Standpipe Requirements

    29問 • 1ヶ月前
    ユーザ名非公開

    Spdi 1

    Spdi 1

    ユーザ名非公開 · 100問 · 1ヶ月前

    Spdi 1

    Spdi 1

    100問 • 1ヶ月前
    ユーザ名非公開

    Spdi 2

    Spdi 2

    ユーザ名非公開 · 98問 · 1ヶ月前

    Spdi 2

    Spdi 2

    98問 • 1ヶ月前
    ユーザ名非公開

    SPI version D pt 2

    SPI version D pt 2

    ユーザ名非公開 · 61問 · 1ヶ月前

    SPI version D pt 2

    SPI version D pt 2

    61問 • 1ヶ月前
    ユーザ名非公開

    plumbing code

    plumbing code

    ユーザ名非公開 · 100問 · 1ヶ月前

    plumbing code

    plumbing code

    100問 • 1ヶ月前
    ユーザ名非公開

    plumbing code 2

    plumbing code 2

    ユーザ名非公開 · 100問 · 1ヶ月前

    plumbing code 2

    plumbing code 2

    100問 • 1ヶ月前
    ユーザ名非公開

    plumbing code 3

    plumbing code 3

    ユーザ名非公開 · 56問 · 1ヶ月前

    plumbing code 3

    plumbing code 3

    56問 • 1ヶ月前
    ユーザ名非公開

    Practice Problem

    Practice Problem

    ユーザ名非公開 · 70問 · 1ヶ月前

    Practice Problem

    Practice Problem

    70問 • 1ヶ月前
    ユーザ名非公開

    PP pre

    PP pre

    ユーザ名非公開 · 100問 · 1ヶ月前

    PP pre

    PP pre

    100問 • 1ヶ月前
    ユーザ名非公開

    PP Pre 2

    PP Pre 2

    ユーザ名非公開 · 100問 · 1ヶ月前

    PP Pre 2

    PP Pre 2

    100問 • 1ヶ月前
    ユーザ名非公開

    PP pre 3

    PP pre 3

    ユーザ名非公開 · 44問 · 1ヶ月前

    PP pre 3

    PP pre 3

    44問 • 1ヶ月前
    ユーザ名非公開

    WT 1

    WT 1

    ユーザ名非公開 · 50問 · 1ヶ月前

    WT 1

    WT 1

    50問 • 1ヶ月前
    ユーザ名非公開

    WT 2

    WT 2

    ユーザ名非公開 · 48問 · 1ヶ月前

    WT 2

    WT 2

    48問 • 1ヶ月前
    ユーザ名非公開

    WT 3

    WT 3

    ユーザ名非公開 · 50問 · 1ヶ月前

    WT 3

    WT 3

    50問 • 1ヶ月前
    ユーザ名非公開

    WT 6

    WT 6

    ユーザ名非公開 · 50問 · 1ヶ月前

    WT 6

    WT 6

    50問 • 1ヶ月前
    ユーザ名非公開

    Definition of Terms 1

    Definition of Terms 1

    ユーザ名非公開 · 90問 · 1ヶ月前

    Definition of Terms 1

    Definition of Terms 1

    90問 • 1ヶ月前
    ユーザ名非公開

    Definition of Terms 2

    Definition of Terms 2

    ユーザ名非公開 · 90問 · 1ヶ月前

    Definition of Terms 2

    Definition of Terms 2

    90問 • 1ヶ月前
    ユーザ名非公開

    Definition of Terms 3

    Definition of Terms 3

    ユーザ名非公開 · 90問 · 1ヶ月前

    Definition of Terms 3

    Definition of Terms 3

    90問 • 1ヶ月前
    ユーザ名非公開

    Refresher SPDI 1

    Refresher SPDI 1

    ユーザ名非公開 · 100問 · 1ヶ月前

    Refresher SPDI 1

    Refresher SPDI 1

    100問 • 1ヶ月前
    ユーザ名非公開

    Refresher SPDI 1

    Refresher SPDI 1

    ユーザ名非公開 · 9問 · 1ヶ月前

    Refresher SPDI 1

    Refresher SPDI 1

    9問 • 1ヶ月前
    ユーザ名非公開

    Weekly Test 1

    Weekly Test 1

    ユーザ名非公開 · 50問 · 1ヶ月前

    Weekly Test 1

    Weekly Test 1

    50問 • 1ヶ月前
    ユーザ名非公開

    Weekly Test 2

    Weekly Test 2

    ユーザ名非公開 · 50問 · 1ヶ月前

    Weekly Test 2

    Weekly Test 2

    50問 • 1ヶ月前
    ユーザ名非公開

    Weekly Test 3

    Weekly Test 3

    ユーザ名非公開 · 50問 · 1ヶ月前

    Weekly Test 3

    Weekly Test 3

    50問 • 1ヶ月前
    ユーザ名非公開

    MPLE

    MPLE

    ユーザ名非公開 · 41問 · 1ヶ月前

    MPLE

    MPLE

    41問 • 1ヶ月前
    ユーザ名非公開

    CDG- Plumbing Code 1

    CDG- Plumbing Code 1

    ユーザ名非公開 · 48問 · 1ヶ月前

    CDG- Plumbing Code 1

    CDG- Plumbing Code 1

    48問 • 1ヶ月前
    ユーザ名非公開

    CDG- Plumbing Code 1.1

    CDG- Plumbing Code 1.1

    ユーザ名非公開 · 50問 · 1ヶ月前

    CDG- Plumbing Code 1.1

    CDG- Plumbing Code 1.1

    50問 • 1ヶ月前
    ユーザ名非公開

    CDG- Plumbing Code 1.4

    CDG- Plumbing Code 1.4

    ユーザ名非公開 · 23問 · 1ヶ月前

    CDG- Plumbing Code 1.4

    CDG- Plumbing Code 1.4

    23問 • 1ヶ月前
    ユーザ名非公開

    CDG- Plumbing Code 1.2

    CDG- Plumbing Code 1.2

    ユーザ名非公開 · 50問 · 1ヶ月前

    CDG- Plumbing Code 1.2

    CDG- Plumbing Code 1.2

    50問 • 1ヶ月前
    ユーザ名非公開

    CGD- Plumbing Code 1.3

    CGD- Plumbing Code 1.3

    ユーザ名非公開 · 50問 · 1ヶ月前

    CGD- Plumbing Code 1.3

    CGD- Plumbing Code 1.3

    50問 • 1ヶ月前
    ユーザ名非公開

    Plumbing Code 1

    Plumbing Code 1

    ユーザ名非公開 · 50問 · 1ヶ月前

    Plumbing Code 1

    Plumbing Code 1

    50問 • 1ヶ月前
    ユーザ名非公開

    Plumbing Code 1.1

    Plumbing Code 1.1

    ユーザ名非公開 · 22問 · 1ヶ月前

    Plumbing Code 1.1

    Plumbing Code 1.1

    22問 • 1ヶ月前
    ユーザ名非公開

    CGD - Sanitary Design

    CGD - Sanitary Design

    ユーザ名非公開 · 19問 · 1ヶ月前

    CGD - Sanitary Design

    CGD - Sanitary Design

    19問 • 1ヶ月前
    ユーザ名非公開

    Practical Problems 1

    Practical Problems 1

    ユーザ名非公開 · 50問 · 1ヶ月前

    Practical Problems 1

    Practical Problems 1

    50問 • 1ヶ月前
    ユーザ名非公開

    Practical Problems 1.1

    Practical Problems 1.1

    ユーザ名非公開 · 47問 · 1ヶ月前

    Practical Problems 1.1

    Practical Problems 1.1

    47問 • 1ヶ月前
    ユーザ名非公開

    Practical Problems 2.1

    Practical Problems 2.1

    ユーザ名非公開 · 50問 · 1ヶ月前

    Practical Problems 2.1

    Practical Problems 2.1

    50問 • 1ヶ月前
    ユーザ名非公開

    Plumbing Arithmetic 1

    Plumbing Arithmetic 1

    ユーザ名非公開 · 50問 · 1ヶ月前

    Plumbing Arithmetic 1

    Plumbing Arithmetic 1

    50問 • 1ヶ月前
    ユーザ名非公開

    Plumbing Arithmetic 1.1

    Plumbing Arithmetic 1.1

    ユーザ名非公開 · 50問 · 1ヶ月前

    Plumbing Arithmetic 1.1

    Plumbing Arithmetic 1.1

    50問 • 1ヶ月前
    ユーザ名非公開

    Plumbing Arithmetic 2

    Plumbing Arithmetic 2

    ユーザ名非公開 · 50問 · 1ヶ月前

    Plumbing Arithmetic 2

    Plumbing Arithmetic 2

    50問 • 1ヶ月前
    ユーザ名非公開

    Plumbing Arithmetic 2.1

    Plumbing Arithmetic 2.1

    ユーザ名非公開 · 50問 · 1ヶ月前

    Plumbing Arithmetic 2.1

    Plumbing Arithmetic 2.1

    50問 • 1ヶ月前
    ユーザ名非公開

    問題一覧

  • 1

    A variation of pipe wrench with a swiveling serrated jaw and knurled control knob located between the frame forming the head and the handled of the wrench?

    Stillson wrench

  • 2

    As an experienced plumber, what is the recommended size of the drain serving water closet?

    4 in.

  • 3

    A brewery plant requires a piping system to convey beer, ale, spirituous liquor and distilled water What kind of pipe to be used?

    Black Tin Pipe

  • 4

    A red spiral line painted on a pipe identified the pipe as ___.

    Wrought-iron pipe

  • 5

    A hotel requires hot and cold water supplies. What kind of pipes best suited?

    Copper pipe

  • 6

    A registered master plumber is consulted to install piping system for water, gas, steam and oil. What kind of pipe is recommended?

    Cast iron pipe

  • 7

    What kind of pipe to be used where heating panels are considered in concrete slabs for the purpose of melting snow?

    Wrought iron pipe

  • 8

    When cutting pipe that coated internally with enamel or glass, delicate core should be taken to avoid cracking or chipping the internal coating. What kind of tool that should NEVER used for cutting such pipe?

    Wheel pipe cutter

  • 9

    When a very short pipe is threaded. What will you see?

    Nipple chuck

  • 10

    What is the tool used for expanding the ends of lead pipe?

    Turn pin

  • 11

    When using an extension ladder, what will be the maximum sliding sections allowed?

    2 sliding sections

  • 12

    An 8 meters aluminum ladder is used in delivering plumbing fixtures to the second the foot of the ladder be placed from the wall of the building?

    2 meters

  • 13

    As registered master plumber, you have to use a ladder to carry the pipes to the second floor of the building, what will be the horizontal distance from the foot of the ladder to the wall that you considered proper?

    1/4 of the ladders length

  • 14

    What is the valve recommended for installation that call for throttling?

    Globe valve

  • 15

    What is the approximate height above the floor level of a kitchen sink?

    36 inches

  • 16

    What is the approximate height above the floor level of a built-in bathtub floor level?

    16 inches

  • 17

    What is the device used to support the water supply riser?

    Pipe rest

  • 18

    What is that fitting necessary in a water supply system which is used to the water supply in some portion of the installation?

    Valve

  • 19

    What kind of valve is suited for the water main supply lines and pump lines?

    Gate valve

  • 20

    Generally, the registered master plumber must be systematic in connecting the riser branches to the main of the water supply system. What will be the right angle of all branches connection to the main?

    90

  • 21

    What do you call the plugging of an opening with oakum, lead or other materials which are pounded into place or materials pounded into the opening?

    Caulking

  • 22

    The material used to join or connect plastic is called?

    Solvent cement

  • 23

    What is the minimum length of time before a jointed plastic pipe be subjected to pressure test?

    2 hours

  • 24

    In bending plastic, what will be the practical material to be used to prevent fattening of the

    Sand

  • 25

    What is the part of the piping of a plumbing installation which supplies the plumbing fixtures with an adequate flow of water?

    Domestic water distribution system

  • 26

    What is the usual horizontal length that the cast iron be supported to prevel damage at joints caused by sagging?

    1.5m

  • 27

    What will be provided to prevent contamination from the polluted water of the fire truck to the house water supply system?

    Check valves & gate valve

  • 28

    What is the name of the instrument which used in caulking oakum in the joints of cast iron pipe?

    Yarning iron

  • 29

    On what type of building are wet standpipes generally used?

    Tall building

  • 30

    What is that feature which offers a convenient water supply for firemen, making it necessary for the fire department to transport and user much expensive fire fighting apparatus?

    Stand pipe

  • 31

    Fire system piping is usually painted with?

    Red color

  • 32

    What is the device which is to be installed on the water service between the edge of the street and the sidewalk line which serves as a control valve in case water supply in cut-off to the building?

    Curb stop

  • 33

    What circumstances should the curb stop is used?

    When the water has to be controlled.

  • 34

    Why is it corporation stop required when the main water pipe is tapped with pressure on?

    It serves as a control stop.

  • 35

    It is essential that pipe threads to be cut accurately to ensure that threads for fittings will be universal so that the manufacturers of pipe threading equipment follow the American Standard. How many threads per inch for pipes having a diameter of 3 inches diameter?

    8

  • 36

    The allowable tensile stress of wrought iron steel pipe is 750 psi. It is to be used l for hot water supply with working pressure of 300 psi. what schedule of the pipe should you specify? N = 100P

    40

  • 37

    A schedule of 80 wrought iron pipe can withstand a steam pressure up to?

    600 psi

  • 38

    A wrought iron pipe schedule of 40 can withstand a steam pressure up to?

    300 psi

  • 39

    Name that tool which is made of boxwood, dogwood or lignum vitae, and it is used for dressing or working sheetlead, lead pipe bends, and bath traps.

    Dresser

  • 40

    What is the handy tool for threading the end of the pipe in a trench or in the corner of a cellar where a pipe projects too far and threaded in place?

    Rachet stocks

  • 41

    In the trade of piping, the term "tapping" is used to described ___.

    Cutting of internal threads

  • 42

    A pipe vise is needed to

    Keep pipe rigid for cutting

  • 43

    In a certain plumbing installation, a lead pipe is being used. How do you usually join the lead pipe?

    Melting the pipe ends

  • 44

    What should be the maximum length of the ladder when fully extended of a an extension ladders?

    60 feet

  • 45

    What will be the maximum water service pressure at the point where the building distribution system begins?

    80 psi

  • 46

    What is usually the primary cause of troubles in excavating operations for water pipes?

    Lack of shoring

  • 47

    What is the suitable gasket material for a flange union in oil lines?

    Metallic

  • 48

    What is the suitable gasket material for flange union in cold water piping?

    Rubber

  • 49

    What is the suitable gasket material for hange union in gasoline conduction?

    Metallic

  • 50

    What is the smallest plumbing fixture used as the basis in determining the fixture unit value?

    Lavatory or wash basin