Question
The Contractor shall furnish and use an accurate 300-cm straight-edge swung from _____ handles longer than one-half the width of the slab
Question
Advances along the road shall be in successive stages of not more than ____ the length of the straight-edge
Question
The brooming operation should be so executed that the corrugations produced in the surface shall be uniform in appearance and not more than ____ in depth
Question
If the surface texture is belt finished, when straight-edging is completed and water sheen has practically disappeared and just before the concrete becomes non-plastic, the surface shall be belted with 2-ply canvas belt not less than _____, and at least _____ longer than the pavement width
Question
For pavement ____ or more in width, the drag shall be mounted on a bridge which travels on the forms
Question
The dimensions of the drag shall be such that a strip of burlap or fabric at least ______ wide is in contact with the full width of pavement surface while the drag is used
Question
The drag shall consist of not less than ___ layers of burlap
Question
The drag shall have a bottom layer approximately ____ wider than the layer
Question
The drag shall be maintained in such condition that the resultant surface is of uniform appearance and reasonably free from grooves over ____ in depth
Question
Regardless of the method used for final finish, the hardened surface of pavement shall have a coefficient of friction of ____ or more
Item 311 Portland Cement Concrete Pavement (PART 2)
Score
0 / 10
Correct rate
0%
Correct: 0
Incorrect: 0
Unanswered: 10
Question list
1
The Contractor shall furnish and use an accurate 300-cm straight-edge swung from _____ handles longer than one-half the width of the slab100cm
2
Advances along the road shall be in successive stages of not more than ____ the length of the straight-edge1/2
3
The brooming operation should be so executed that the corrugations produced in the surface shall be uniform in appearance and not more than ____ in depth1.5mm
4
If the surface texture is belt finished, when straight-edging is completed and water sheen has practically disappeared and just before the concrete becomes non-plastic, the surface shall be belted with 2-ply canvas belt not less than _____, and at least _____ longer than the pavement width20cm, 100cm
5
For pavement ____ or more in width, the drag shall be mounted on a bridge which travels on the forms5m
6
The dimensions of the drag shall be such that a strip of burlap or fabric at least ______ wide is in contact with the full width of pavement surface while the drag is used100cm
7
The drag shall consist of not less than ___ layers of burlap2
8
The drag shall have a bottom layer approximately ____ wider than the layer15cm
9
The drag shall be maintained in such condition that the resultant surface is of uniform appearance and reasonably free from grooves over ____ in depth1.5mm
10
Regardless of the method used for final finish, the hardened surface of pavement shall have a coefficient of friction of ____ or more0.25
11
As soon as the concrete has hardened sufficiently, the pavement surface shall be tested with a _____________ or other specified device3m straight-edge
12
Areas showing high spots of more than ____, but not exceeding ____ in 3 m shall be marked and immediately ground down with an approved grinding tool to an elevation where the area or spot will not show surface deviations in excess of 3 mm when tested with 3 m straight-edge3mm, 12mm
13
Where the departure from correct cross-section exceeds ____ , the pavement shall be removed and replaced by and at the expense of the Contractor12mm
14
Any area or section so removed shall be not less than ____ in length and not less than the full width of the lane involved1.5m
15
When it is necessary to remove and replace a section of pavement, any remaining portion of the slab adjacent to the joints that are less than ____ in length, shall also be removed and replaced1.5m
16
The concrete shall not be left exposed for more than ____ between stages of curing or during the curing period1/2 hour
17
The mats used shall be of such length (or width) that as laid they will extend at least ____ the thickness of the pavement beyond the edges of the slabtwice
18
The mat shall be maintained fully wetted and in position for ________ after the concrete has been placed unless otherwise specified72 hours
19
The top surface and sides of the pavement shall be entirely covered with waterproof paper, the units shall be lapped at least _____45cm
20
The paper shall have such dimension that each unit as laid will extend beyond the edges of the slab at least twice the thickness of the pavement, or at pavement width and _____ strips of paper for the edges60cm
21
Unless otherwise specified, the covering shall be maintained in place for 72 hours after the concrete has been placed72 hours
22
In Straw Curing, the pavement shall be cured initially with burlap or cotton mats, until after final set of the concrete or, in any case, for _____ after placing the concrete12 hours
23
As soon as the mats are removed, the surface and sides of the pavement shall be thoroughly wetted and covered with at least ____ of straw or hay, thickness of which is to be measured after wetting20cm
24
Straw curing shall be kept thoroughly saturated with water for ______ and thoroughly wetted down during the morning of the fourth day, and the cover shall remain in place until the concrete has attained the required strength72 hours
25
The curing compound shall be applied under pressure at the rate of ____, to not more than ____ by mechanical sprayers4L, 14sq.m
26
Curing compound shall not be applied to the inside faces of joints to be sealed, but approved means shall be used to insure proper curing at least ____ and to prevent intrusion of foreign material into the joint before sealing has been completed72 hours
27
The curing compound shall be of such character that the film will harden within ______ after application30 minutes
28
When the film is damaged from any cause within the _____ curing period, the damaged portions shall be repaired immediately with additional compound72 hour
29
The top surface and sides of the pavement shall be entirely covered with polyethylene sheeting. The units used shall be lapped at least ____45cm
30
The sheeting as prepared for use shall have such dimension that each unit as laid will extend beyond the edges of the slab at least ____ the thickness of the pavementtwice
31
Unless otherwise specified, the covering shall be maintained in place for _____ after the concrete has been placed72 hours
32
Forms for concrete shall remain in place undisturbed for not less than _____ after concrete pouring24 hours
33
In case portions of the concrete are spalled, they shall be immediately repaired with fresh mortar mixed in the proportion of ____ of Portland Cement and ____ fine aggregates1 part, 2 parts
34
The seals shall be installed in a compressive condition and shall at time of placement be below the level of the pavement surface by approximately ____6mm
35
The concrete shall be placed with an approved slip-form paver designed to spread, consolidate, screed and float-finish the freshly placed concrete in ________ of the machine1 complete pass
36
Any edge slump of the pavement, exclusive of edge rounding, in excess of ____ shall be corrected before the concrete has hardened6mm
37
The concrete shall be held at a uniform consistency, having a slump of not more than _____40cm
38
The contractor will be required to have materials for the protection of the edges and surface of the unhardened concrete, such protective materials shall consist of standard metal forms or wood planks having a nominal thickness of not less than _____ and a nominal width of not less than the thickness of the pavement at its edge for the protection of the pavement edges50mm
39
The strength level of the concrete will be considered satisfactory if the averages of all sets of ___ consecutive strength test results equal or exceed the specified strength and no individual strength test result is deficient by more than ___ of the specified strength3, 15%
40
A set for testing the strength level of the concrete shall consist of a minimum of ___ concrete beam specimens3
41
In core test, at least ___ representative cores shall be taken from each member or area of concrete in place that is considered deficient3
42
Concrete in the area represented by the cores will be considered adequate if the average strength of the cores is equal to at least ___, and if no single core is less than ___ of, the specified strength85%, 75%
43
The road will not be opened to traffic until test specimens are molded, if such tests are not conducted prior to the specified age, the pavement shall not be operated to traffic until ___ days after the concrete was placed14
44
The completed pavement shall be accepted on a lot basis, a lot shall be considered as _____________ of pavement when a single traffic lane is poured1000 linear meters
45
When two lanes are poured concurrently, a lot shall be considered as __________500 linear meters
46
The last unit in each slab constitutes a lot in itself when its length is at least ___ of the normal lot length1/2
47
If the length of the last unit is shorter than ___ of the normal lot length, it shall be included with the previous lot1/2
48
Small irregular areas may be included with other unit areas to form a lot. Each lot will be divided into ___ equal segments and ______ will be obtained from each segment in accordance with AASHTO T245, 1 core
49
In calculating the average thickness of the pavement, individual measurements which are in excess of the specified thickness by more than ____ will be considered as the specified thickness plus 5mm5mm
50
Measurements which are less than the specified thickness by more than _____ shall not be included in the average25mm
51
Individual areas within a segment found deficient in thickness by more than _____ shall be evaluated by the Engineer, and if in his judgment, the deficient areas warrant removal, they shall be removed and replaced by the Contractor with pavement of the specified thickness at his entire expense25mm
52
The area of slab for which no payment will be made shall be the product of the paving width multiplied by the distance along the center line of the road between transverse sections found not deficient in thickness by more than _____25mm
53
The thickness of the remainder of the segment to be used to get the average thickness of each lot shall be determined by taking the average thickness of additional cores which are not deficient by more than _____25mm
54
1 quality test for every ____ bags of cement2000
55
For every _______ or fraction thereof of fine aggregates a.) For a source not yet tested or failed in previous quality test: 1 – Q, Quality Test (Grading, Elutriation – wash, Bulk Specific Gravity, Absorption, Mortar Strength, Soundness, Organic Impurities, Unit Weight, % clay lumps and % shale) b.) For a source previously tested and passed quality test: 1 – Q, Quality Test (Grading, Elutriation – wash, Bulk Specific Gravity, Absorption, Mortar Strength)1500cu.m
56
For every _______ or fraction thereof of fine aggregates 1 – G, Grading Test75cu.m
57
For every _____ or fraction thereof of course aggregates: a.) For a source not yet tested or failed in previous quality test: 1 – Q, Quality Test (Grading, Bulk Specific Gravity, Absorption, Abrasion, Soundness and Unit Weight) b.) For a source previously tested and passed quality test: 1 – Q, Quality Test (Grading, Bulk Specific Gravity, Absorption and Abrasion)1500cu.m
58
For every _______ or fraction thereof of course aggregates 1 – G, Grading Test75cu.m
59
For water, 1 – Certificate from Project Engineer or 1 – ______ Test if source is questionableQuality
60
For every ______ kg or fraction thereof for each size: 1 – Q, Quality Test (Bending, Tension and Quality Analysis)10000
61
Flexural Strength Test on concrete beam samples: 1 – Set consisting of __ beam samples shall represent a ____ of pavement, 230 mm depth or fraction thereof placed each day3, 330