    An adequate ___ is one of the most important governances in modern and healthful human existence that involves air, water and food which is the basic necessities of life.

    Plumbing Code

  • 2

    Modern or state-of-the-art plumbing installation now require the close coordination of works among Master Plumbers, Architects and Engineers to come up with the ost ___ and ___ plumbing installation.

    sufficient / approved

  • 3

    All premises intended for human habitation, occupancy or use shall be provided with a supply of __ and ___water, neither connected with unsafe water supplies nor subject to hazards of backflow or back-siphonage.

    pure / wholesome

  • 4

    Plumbing fixtures, devices and appurtenances shall be supplied with water in ___ volume and a pressure ___ to enable them to function satisfactorily and without undue noise under all normal conditions of use.

    sufficient / adequate

  • 5

    Plumbing shall be designed and adjusted to use the ___ quantity of water consistent with proper performance and cleaning.

    minimum

  • 6

    Devices for heating and storing water shall be so ___ and ___explosion through overheating.

    designed / installed

  • 7

    Every building having plumbing fixtures installed and intended for ___, occupancy or use on premises abutting on a street, alley or easement where is a public sewer, shall be connected to the sewer system.

    human habitation

  • 8

    Each family dwelling unit on premises abutting on a sewer or with a private sewage-disposal system shall have at least ___ and ___. Further, a lavatory and bathtub or shower shall be installed to meet the basic requirements of sanitation and personal hygiene.

    one water closet / one kitchen sink

  • 9

    Plumbing fixtures shall be made of material, free from concealed fouling surfaces and shall be located in ventilated enclosures.

    smooth non-absorbent

  • 10

    The drainage system shall be designed, constructed and maintained to ___ against fouling, deposit of solids, clogging and with adequate cleanouts so arranged that the pipes may be readily cleaned.

    safeguard

  • 11

    All pipings of plumbing systems shall be of NAMPAP-APPROVED materials, free from defective workmanship, designed and constructed by Registered Master Plumbers to ensure satisfactorily service.

    durable

  • 12

    Each fixture directly connected to the drainage system shall be equipped with a ___.

    water-sealed trap

  • 13

    ____ be designed to provide adequate circulation of air free from siphonage, aspiration for forcing of trap seals under ordinary use.

    Drainage piping system

  • 14

    ___ shall extend to the outer air and installed to preempt clogging and the return of foul air to the building.

    Vent terminals

  • 15

    Plumbing system shall be subjected to such test to ___ disclose all leaks and defects in the workmanship.

    effectively

  • 16

    ____ which will clog the pipes, produce explosive mixtures, destroy the pipes or their joints or interfere unduly with the sewage-disposal process shall be allowed to enter the building drainage system.

    No substance

  • 17

    ____ shall be provided to prevent contamination of food, water, sterile goods and similar materials by backflow of sewage. When necessary, the fixture, device or appliance shall be connected indirectly with the building drainage system.

    Proper protection

  • 18

    No ___ shall be located in a room or compartment which is not properly lighted and ventilated.

    water closet

  • 19

    If water closets or other plumbing fixtures are installed in buildings where there is no sewer within a reasonable distance, ___ shall be made for disposing of the building sewage by some accepted method of sewage treatment and disposal, such as ___.

    suitable provision / septic tank

  • 20

    Where a plumbing drainage system may be subject to backflow of sewage, suitable provision shall be made to ____ its overflow in the building.

    prevent

  • 21

    All plumbing fixtures shall be installe ___ to be accessible for their intended use.

    properly spaced

  • 22

    Plumbing shall be installed by Registered Master Plumbers with due regard to the ___ of the strength of structural members and the ___ of damage to walls and other surfaces through fixture usage.

    preservation / prevention

  • 23

    Sewage or other waste from a plumbing system which may be ___ to surface or sub-surface waters shall not be discharge into the ground or into any waterway, unless first rendered ___ through subjection to some acceptable form of treatment.

    deleterious / innocuous

  • YT1 Materials Engineer EXAM

    YT1 Materials Engineer EXAM

    ユーザ名非公開 · 100問 · 1ヶ月前

    YT1 Materials Engineer EXAM

    YT1 Materials Engineer EXAM

    100問 • 1ヶ月前
    ユーザ名非公開

    YT2 Materials Engineer EXAM

    YT2 Materials Engineer EXAM

    ユーザ名非公開 · 100問 · 1ヶ月前

    YT2 Materials Engineer EXAM

    YT2 Materials Engineer EXAM

    100問 • 1ヶ月前
    ユーザ名非公開

    Project Engineer YT 1

    Project Engineer YT 1

    ユーザ名非公開 · 100問 · 1ヶ月前

    Project Engineer YT 1

    Project Engineer YT 1

    100問 • 1ヶ月前
    ユーザ名非公開

    Project Engineer EXAM

    Project Engineer EXAM

    ユーザ名非公開 · 62問 · 1ヶ月前

    Project Engineer EXAM

    Project Engineer EXAM

    62問 • 1ヶ月前
    ユーザ名非公開

    Project Engineer EXAM 68

    Project Engineer EXAM 68

    ユーザ名非公開 · 100問 · 1ヶ月前

    Project Engineer EXAM 68

    Project Engineer EXAM 68

    100問 • 1ヶ月前
    ユーザ名非公開

    Project Engineer EXAM 82

    Project Engineer EXAM 82

    ユーザ名非公開 · 100問 · 1ヶ月前

    Project Engineer EXAM 82

    Project Engineer EXAM 82

    100問 • 1ヶ月前
    ユーザ名非公開

    July 2023 PE Refresher

    July 2023 PE Refresher

    ユーザ名非公開 · 70問 · 1ヶ月前

    July 2023 PE Refresher

    July 2023 PE Refresher

    70問 • 1ヶ月前
    ユーザ名非公開

    August 2019 Special PE Exam

    August 2019 Special PE Exam

    ユーザ名非公開 · 93問 · 1ヶ月前

    August 2019 Special PE Exam

    August 2019 Special PE Exam

    93問 • 1ヶ月前
    ユーザ名非公開

    RNPCP Chapter 1 to 5

    RNPCP Chapter 1 to 5

    ユーザ名非公開 · 86問 · 1ヶ月前

    RNPCP Chapter 1 to 5

    RNPCP Chapter 1 to 5

    86問 • 1ヶ月前
    ユーザ名非公開

    Plumbing Code 4

    Plumbing Code 4

    ユーザ名非公開 · 100問 · 1ヶ月前

    Plumbing Code 4

    Plumbing Code 4

    100問 • 1ヶ月前
    ユーザ名非公開

    Plumbing Code 5

    Plumbing Code 5

    ユーザ名非公開 · 100問 · 1ヶ月前

    Plumbing Code 5

    Plumbing Code 5

    100問 • 1ヶ月前
    ユーザ名非公開

    Plumbing Code 6

    Plumbing Code 6

    ユーザ名非公開 · 100問 · 1ヶ月前

    Plumbing Code 6

    Plumbing Code 6

    100問 • 1ヶ月前
    ユーザ名非公開

    Plumbing Code 7

    Plumbing Code 7

    ユーザ名非公開 · 100問 · 1ヶ月前

    Plumbing Code 7

    Plumbing Code 7

    100問 • 1ヶ月前
    ユーザ名非公開

    Plumbing Code 8

    Plumbing Code 8

    ユーザ名非公開 · 100問 · 1ヶ月前

    Plumbing Code 8

    Plumbing Code 8

    100問 • 1ヶ月前
    ユーザ名非公開

    Plumbing Code 3

    Plumbing Code 3

    ユーザ名非公開 · 100問 · 1ヶ月前

    Plumbing Code 3

    Plumbing Code 3

    100問 • 1ヶ月前
    ユーザ名非公開

    Sanitation, Plumbing Design, and Installation 2

    Sanitation, Plumbing Design, and Installation 2

    ユーザ名非公開 · 97問 · 1ヶ月前

    Sanitation, Plumbing Design, and Installation 2

    Sanitation, Plumbing Design, and Installation 2

    97問 • 1ヶ月前
    ユーザ名非公開

    Sanitation, Plumbing Design, and Installation 1

    Sanitation, Plumbing Design, and Installation 1

    ユーザ名非公開 · 99問 · 1ヶ月前

    Sanitation, Plumbing Design, and Installation 1

    Sanitation, Plumbing Design, and Installation 1

    99問 • 1ヶ月前
    ユーザ名非公開

    Sanitation, Plumbing Design, and Installation 3

    Sanitation, Plumbing Design, and Installation 3

    ユーザ名非公開 · 96問 · 1ヶ月前

    Sanitation, Plumbing Design, and Installation 3

    Sanitation, Plumbing Design, and Installation 3

    96問 • 1ヶ月前
    ユーザ名非公開

    Sanitation, Plumbing Design, and Installation 4

    Sanitation, Plumbing Design, and Installation 4

    ユーザ名非公開 · 95問 · 1ヶ月前

    Sanitation, Plumbing Design, and Installation 4

    Sanitation, Plumbing Design, and Installation 4

    95問 • 1ヶ月前
    ユーザ名非公開

    Sanitation, Plumbing Design, and Installation 5

    Sanitation, Plumbing Design, and Installation 5

    ユーザ名非公開 · 97問 · 1ヶ月前

    Sanitation, Plumbing Design, and Installation 5

    Sanitation, Plumbing Design, and Installation 5

    97問 • 1ヶ月前
    ユーザ名非公開

    Sanitation, Plumbing Design, and Installation 7

    Sanitation, Plumbing Design, and Installation 7

    ユーザ名非公開 · 100問 · 1ヶ月前

    Sanitation, Plumbing Design, and Installation 7

    Sanitation, Plumbing Design, and Installation 7

    100問 • 1ヶ月前
    ユーザ名非公開

    Sanitation, Plumbing Design, and Installation 8

    Sanitation, Plumbing Design, and Installation 8

    ユーザ名非公開 · 98問 · 1ヶ月前

    Sanitation, Plumbing Design, and Installation 8

    Sanitation, Plumbing Design, and Installation 8

    98問 • 1ヶ月前
    ユーザ名非公開

    Plumbing Tools 1

    Plumbing Tools 1

    ユーザ名非公開 · 87問 · 1ヶ月前

    Plumbing Tools 1

    Plumbing Tools 1

    87問 • 1ヶ月前
    ユーザ名非公開

    Plumbing Tools 2

    Plumbing Tools 2

    ユーザ名非公開 · 53問 · 1ヶ月前

    Plumbing Tools 2

    Plumbing Tools 2

    53問 • 1ヶ月前
    ユーザ名非公開

    Practical Problems and Experiences 1

    Practical Problems and Experiences 1

    ユーザ名非公開 · 100問 · 1ヶ月前

    Practical Problems and Experiences 1

    Practical Problems and Experiences 1

    100問 • 1ヶ月前
    ユーザ名非公開

    Practical Problems and Experiences 2

    Practical Problems and Experiences 2

    ユーザ名非公開 · 100問 · 1ヶ月前

    Practical Problems and Experiences 2

    Practical Problems and Experiences 2

    100問 • 1ヶ月前
    ユーザ名非公開

    Practical Problems and Experiences 3

    Practical Problems and Experiences 3

    ユーザ名非公開 · 99問 · 1ヶ月前

    Practical Problems and Experiences 3

    Practical Problems and Experiences 3

    99問 • 1ヶ月前
    ユーザ名非公開

    Practical Problems and Experiences 4

    Practical Problems and Experiences 4

    ユーザ名非公開 · 100問 · 1ヶ月前

    Practical Problems and Experiences 4

    Practical Problems and Experiences 4

    100問 • 1ヶ月前
    ユーザ名非公開

    Plumbing Arithmetic Terms 1

    Plumbing Arithmetic Terms 1

    ユーザ名非公開 · 49問 · 1ヶ月前

    Plumbing Arithmetic Terms 1

    Plumbing Arithmetic Terms 1

    49問 • 1ヶ月前
    ユーザ名非公開

    Plumbing Arithmetic Terms 2

    Plumbing Arithmetic Terms 2

    ユーザ名非公開 · 47問 · 1ヶ月前

    Plumbing Arithmetic Terms 2

    Plumbing Arithmetic Terms 2

    47問 • 1ヶ月前
    ユーザ名非公開

    Plumbing Arithmetic Terms 3

    Plumbing Arithmetic Terms 3

    ユーザ名非公開 · 49問 · 1ヶ月前

    Plumbing Arithmetic Terms 3

    Plumbing Arithmetic Terms 3

    49問 • 1ヶ月前
    ユーザ名非公開

    Plumbing Arithmetic Terms 4

    Plumbing Arithmetic Terms 4

    ユーザ名非公開 · 27問 · 1ヶ月前

    Plumbing Arithmetic Terms 4

    Plumbing Arithmetic Terms 4

    27問 • 1ヶ月前
    ユーザ名非公開

    Plumbing Code WSFU

    Plumbing Code WSFU

    ユーザ名非公開 · 58問 · 1ヶ月前

    Plumbing Code WSFU

    Plumbing Code WSFU

    58問 • 1ヶ月前
    ユーザ名非公開

    Practical Problems and Experiences REFRESHER 1

    Practical Problems and Experiences REFRESHER 1

    ユーザ名非公開 · 100問 · 1ヶ月前

    Practical Problems and Experiences REFRESHER 1

    Practical Problems and Experiences REFRESHER 1

    100問 • 1ヶ月前
    ユーザ名非公開

    Practical Problems and Experiences REFRESHER 2

    Practical Problems and Experiences REFRESHER 2

    ユーザ名非公開 · 70問 · 1ヶ月前

    Practical Problems and Experiences REFRESHER 2

    Practical Problems and Experiences REFRESHER 2

    70問 • 1ヶ月前
    ユーザ名非公開

    Item # and Descriptions

    Item # and Descriptions

    ユーザ名非公開 · 24問 · 1ヶ月前

    Item # and Descriptions

    Item # and Descriptions

    24問 • 1ヶ月前
    ユーザ名非公開

    Item 200 Aggregate Subbase Course

    Item 200 Aggregate Subbase Course

    ユーザ名非公開 · 16問 · 1ヶ月前

    Item 200 Aggregate Subbase Course

    Item 200 Aggregate Subbase Course

    16問 • 1ヶ月前
    ユーザ名非公開

    Item 201 Aggregate Base Course

    Item 201 Aggregate Base Course

    ユーザ名非公開 · 16問 · 1ヶ月前

    Item 201 Aggregate Base Course

    Item 201 Aggregate Base Course

    16問 • 1ヶ月前
    ユーザ名非公開

    Item 202 Crushed Aggregate Base Course

    Item 202 Crushed Aggregate Base Course

    ユーザ名非公開 · 18問 · 1ヶ月前

    Item 202 Crushed Aggregate Base Course

    Item 202 Crushed Aggregate Base Course

    18問 • 1ヶ月前
    ユーザ名非公開

    Item 203 Lime Stabilized Road Mix Base Course

    Item 203 Lime Stabilized Road Mix Base Course

    ユーザ名非公開 · 27問 · 1ヶ月前

    Item 203 Lime Stabilized Road Mix Base Course

    Item 203 Lime Stabilized Road Mix Base Course

    27問 • 1ヶ月前
    ユーザ名非公開

    Item 204 Portland Cement Stabilized Road Mix Base Course

    Item 204 Portland Cement Stabilized Road Mix Base Course

    ユーザ名非公開 · 7問 · 1ヶ月前

    Item 204 Portland Cement Stabilized Road Mix Base Course

    Item 204 Portland Cement Stabilized Road Mix Base Course

    7問 • 1ヶ月前
    ユーザ名非公開

    Item 207 Portland Cement Stabilized Treated Plant Mix Base Course

    Item 207 Portland Cement Stabilized Treated Plant Mix Base Course

    ユーザ名非公開 · 13問 · 1ヶ月前

    Item 207 Portland Cement Stabilized Treated Plant Mix Base Course

    Item 207 Portland Cement Stabilized Treated Plant Mix Base Course

    13問 • 1ヶ月前
    ユーザ名非公開

    Item 205 Asphalt Stabilized Road Mix Base Course

    Item 205 Asphalt Stabilized Road Mix Base Course

    ユーザ名非公開 · 7問 · 1ヶ月前

    Item 205 Asphalt Stabilized Road Mix Base Course

    Item 205 Asphalt Stabilized Road Mix Base Course

    7問 • 1ヶ月前
    ユーザ名非公開

    Item 206 Chemically Stabilized Road Mix Subbase/Base Course

    Item 206 Chemically Stabilized Road Mix Subbase/Base Course

    ユーザ名非公開 · 11問 · 1ヶ月前

    Item 206 Chemically Stabilized Road Mix Subbase/Base Course

    Item 206 Chemically Stabilized Road Mix Subbase/Base Course

    11問 • 1ヶ月前
    ユーザ名非公開

    Item 300 Aggregate Surface Course

    Item 300 Aggregate Surface Course

    ユーザ名非公開 · 11問 · 1ヶ月前

    Item 300 Aggregate Surface Course

    Item 300 Aggregate Surface Course

    11問 • 1ヶ月前
    ユーザ名非公開

    Item 301 Bituminous Prime Coat

    Item 301 Bituminous Prime Coat

    ユーザ名非公開 · 10問 · 1ヶ月前

    Item 301 Bituminous Prime Coat

    Item 301 Bituminous Prime Coat

    10問 • 1ヶ月前
    ユーザ名非公開

    Item 303 Bituminous Seal Coat

    Item 303 Bituminous Seal Coat

    ユーザ名非公開 · 20問 · 1ヶ月前

    Item 303 Bituminous Seal Coat

    Item 303 Bituminous Seal Coat

    20問 • 1ヶ月前
    ユーザ名非公開

    RNPCP Chapter 6 to 9

    RNPCP Chapter 6 to 9

    ユーザ名非公開 · 94問 · 1ヶ月前

    RNPCP Chapter 6 to 9

    RNPCP Chapter 6 to 9

    94問 • 1ヶ月前
    ユーザ名非公開

    RNPCP Chapter 10 to 13

    RNPCP Chapter 10 to 13

    ユーザ名非公開 · 93問 · 1ヶ月前

    RNPCP Chapter 10 to 13

    RNPCP Chapter 10 to 13

    93問 • 1ヶ月前
    ユーザ名非公開

    RNPCP Appendix A and B

    RNPCP Appendix A and B

    ユーザ名非公開 · 79問 · 1ヶ月前

    RNPCP Appendix A and B

    RNPCP Appendix A and B

    79問 • 1ヶ月前
    ユーザ名非公開

    Republic Acts

    Republic Acts

    ユーザ名非公開 · 9問 · 1ヶ月前

    Republic Acts

    Republic Acts

    9問 • 1ヶ月前
    ユーザ名非公開

    Plumbing Arithmetic Terms 5

    Plumbing Arithmetic Terms 5

    ユーザ名非公開 · 68問 · 1ヶ月前

    Plumbing Arithmetic Terms 5

    Plumbing Arithmetic Terms 5

    68問 • 1ヶ月前
    ユーザ名非公開

    Principles and Code of Ethics

    Principles and Code of Ethics

    ユーザ名非公開 · 29問 · 1ヶ月前

    Principles and Code of Ethics

    Principles and Code of Ethics

    29問 • 1ヶ月前
    ユーザ名非公開

    Plumbing Arithmetic Problems 1

    Plumbing Arithmetic Problems 1

    ユーザ名非公開 · 75問 · 1ヶ月前

    Plumbing Arithmetic Problems 1

    Plumbing Arithmetic Problems 1

    75問 • 1ヶ月前
    ユーザ名非公開

    Item 406 Prestressed Concrete Structures

    Item 406 Prestressed Concrete Structures

    ユーザ名非公開 · 36問 · 1ヶ月前

    Item 406 Prestressed Concrete Structures

    Item 406 Prestressed Concrete Structures

    36問 • 1ヶ月前
    ユーザ名非公開

    Item 405 Structural Concrete

    Item 405 Structural Concrete

    ユーザ名非公開 · 41問 · 1ヶ月前

    Item 405 Structural Concrete

    Item 405 Structural Concrete

    41問 • 1ヶ月前
    ユーザ名非公開

    Item 400 Piling

    Item 400 Piling

    ユーザ名非公開 · 80問 · 1ヶ月前

    Item 400 Piling

    Item 400 Piling

    80問 • 1ヶ月前
    ユーザ名非公開

    Item 311 Portland Cement Concrete Pavement (PART 2)

    Item 311 Portland Cement Concrete Pavement (PART 2)

    ユーザ名非公開 · 61問 · 1ヶ月前

    Item 311 Portland Cement Concrete Pavement (PART 2)

    Item 311 Portland Cement Concrete Pavement (PART 2)

    61問 • 1ヶ月前
    ユーザ名非公開

    Item 311 Portland Cement Concrete Pavement (PART 1)

    Item 311 Portland Cement Concrete Pavement (PART 1)

    ユーザ名非公開 · 78問 · 1ヶ月前

    Item 311 Portland Cement Concrete Pavement (PART 1)

    Item 311 Portland Cement Concrete Pavement (PART 1)

    78問 • 1ヶ月前
    ユーザ名非公開

    Standpipe Requirements

    Standpipe Requirements

    ユーザ名非公開 · 29問 · 1ヶ月前

    Standpipe Requirements

    Standpipe Requirements

    29問 • 1ヶ月前
    ユーザ名非公開

    Spdi 1

    Spdi 1

    ユーザ名非公開 · 100問 · 1ヶ月前

    Spdi 1

    Spdi 1

    100問 • 1ヶ月前
    ユーザ名非公開

    Spdi 2

    Spdi 2

    ユーザ名非公開 · 98問 · 1ヶ月前

    Spdi 2

    Spdi 2

    98問 • 1ヶ月前
    ユーザ名非公開

    SPI version D pt 2

    SPI version D pt 2

    ユーザ名非公開 · 61問 · 1ヶ月前

    SPI version D pt 2

    SPI version D pt 2

    61問 • 1ヶ月前
    ユーザ名非公開

    plumbing code

    plumbing code

    ユーザ名非公開 · 100問 · 1ヶ月前

    plumbing code

    plumbing code

    100問 • 1ヶ月前
    ユーザ名非公開

    plumbing code 2

    plumbing code 2

    ユーザ名非公開 · 100問 · 1ヶ月前

    plumbing code 2

    plumbing code 2

    100問 • 1ヶ月前
    ユーザ名非公開

    plumbing code 3

    plumbing code 3

    ユーザ名非公開 · 56問 · 1ヶ月前

    plumbing code 3

    plumbing code 3

    56問 • 1ヶ月前
    ユーザ名非公開

    Practice Problem

    Practice Problem

    ユーザ名非公開 · 70問 · 1ヶ月前

    Practice Problem

    Practice Problem

    70問 • 1ヶ月前
    ユーザ名非公開

    PP pre

    PP pre

    ユーザ名非公開 · 100問 · 1ヶ月前

    PP pre

    PP pre

    100問 • 1ヶ月前
    ユーザ名非公開

    PP Pre 2

    PP Pre 2

    ユーザ名非公開 · 100問 · 1ヶ月前

    PP Pre 2

    PP Pre 2

    100問 • 1ヶ月前
    ユーザ名非公開

    PP pre 3

    PP pre 3

    ユーザ名非公開 · 44問 · 1ヶ月前

    PP pre 3

    PP pre 3

    44問 • 1ヶ月前
    ユーザ名非公開

    WT 1

    WT 1

    ユーザ名非公開 · 50問 · 1ヶ月前

    WT 1

    WT 1

    50問 • 1ヶ月前
    ユーザ名非公開

    WT 2

    WT 2

    ユーザ名非公開 · 48問 · 1ヶ月前

    WT 2

    WT 2

    48問 • 1ヶ月前
    ユーザ名非公開

    WT 3

    WT 3

    ユーザ名非公開 · 50問 · 1ヶ月前

    WT 3

    WT 3

    50問 • 1ヶ月前
    ユーザ名非公開

    WT 6

    WT 6

    ユーザ名非公開 · 50問 · 1ヶ月前

    WT 6

    WT 6

    50問 • 1ヶ月前
    ユーザ名非公開

    Definition of Terms 1

    Definition of Terms 1

    ユーザ名非公開 · 90問 · 1ヶ月前

    Definition of Terms 1

    Definition of Terms 1

    90問 • 1ヶ月前
    ユーザ名非公開

    Definition of Terms 2

    Definition of Terms 2

    ユーザ名非公開 · 90問 · 1ヶ月前

    Definition of Terms 2

    Definition of Terms 2

    90問 • 1ヶ月前
    ユーザ名非公開

    Definition of Terms 3

    Definition of Terms 3

    ユーザ名非公開 · 90問 · 1ヶ月前

    Definition of Terms 3

    Definition of Terms 3

    90問 • 1ヶ月前
    ユーザ名非公開

    Refresher SPDI 1

    Refresher SPDI 1

    ユーザ名非公開 · 100問 · 1ヶ月前

    Refresher SPDI 1

    Refresher SPDI 1

    100問 • 1ヶ月前
    ユーザ名非公開

    Refresher SPDI 1

    Refresher SPDI 1

    ユーザ名非公開 · 9問 · 1ヶ月前

    Refresher SPDI 1

    Refresher SPDI 1

    9問 • 1ヶ月前
    ユーザ名非公開

    Weekly Test 1

    Weekly Test 1

    ユーザ名非公開 · 50問 · 1ヶ月前

    Weekly Test 1

    Weekly Test 1

    50問 • 1ヶ月前
    ユーザ名非公開

    Weekly Test 2

    Weekly Test 2

    ユーザ名非公開 · 50問 · 1ヶ月前

    Weekly Test 2

    Weekly Test 2

    50問 • 1ヶ月前
    ユーザ名非公開

    Weekly Test 3

    Weekly Test 3

    ユーザ名非公開 · 50問 · 1ヶ月前

    Weekly Test 3

    Weekly Test 3

    50問 • 1ヶ月前
    ユーザ名非公開

    MPLE

    MPLE

    ユーザ名非公開 · 41問 · 1ヶ月前

    MPLE

    MPLE

    41問 • 1ヶ月前
    ユーザ名非公開

    CDG- Plumbing Code 1

    CDG- Plumbing Code 1

    ユーザ名非公開 · 48問 · 1ヶ月前

    CDG- Plumbing Code 1

    CDG- Plumbing Code 1

    48問 • 1ヶ月前
    ユーザ名非公開

    CDG- Plumbing Code 1.1

    CDG- Plumbing Code 1.1

    ユーザ名非公開 · 50問 · 1ヶ月前

    CDG- Plumbing Code 1.1

    CDG- Plumbing Code 1.1

    50問 • 1ヶ月前
    ユーザ名非公開

    CDG- Plumbing Code 1.2

    CDG- Plumbing Code 1.2

    ユーザ名非公開 · 50問 · 1ヶ月前

    CDG- Plumbing Code 1.2

    CDG- Plumbing Code 1.2

    50問 • 1ヶ月前
    ユーザ名非公開

    CGD- Plumbing Code 1.3

    CGD- Plumbing Code 1.3

    ユーザ名非公開 · 50問 · 1ヶ月前

    CGD- Plumbing Code 1.3

    CGD- Plumbing Code 1.3

    50問 • 1ヶ月前
    ユーザ名非公開

    Plumbing Code 1

    Plumbing Code 1

    ユーザ名非公開 · 50問 · 1ヶ月前

    Plumbing Code 1

    Plumbing Code 1

    50問 • 1ヶ月前
    ユーザ名非公開

    Plumbing Code 1.1

    Plumbing Code 1.1

    ユーザ名非公開 · 22問 · 1ヶ月前

    Plumbing Code 1.1

    Plumbing Code 1.1

    22問 • 1ヶ月前
    ユーザ名非公開

    CGD - Sanitary Design

    CGD - Sanitary Design

    ユーザ名非公開 · 19問 · 1ヶ月前

    CGD - Sanitary Design

    CGD - Sanitary Design

    19問 • 1ヶ月前
    ユーザ名非公開

    Practical Problems 1

    Practical Problems 1

    ユーザ名非公開 · 50問 · 1ヶ月前

    Practical Problems 1

    Practical Problems 1

    50問 • 1ヶ月前
    ユーザ名非公開

    Practical Problems 1.1

    Practical Problems 1.1

    ユーザ名非公開 · 47問 · 1ヶ月前

    Practical Problems 1.1

    Practical Problems 1.1

    47問 • 1ヶ月前
    ユーザ名非公開

    Practical Problems 2

    Practical Problems 2

    ユーザ名非公開 · 50問 · 1ヶ月前

    Practical Problems 2

    Practical Problems 2

    50問 • 1ヶ月前
    ユーザ名非公開

    Practical Problems 2.1

    Practical Problems 2.1

    ユーザ名非公開 · 50問 · 1ヶ月前

    Practical Problems 2.1

    Practical Problems 2.1

    50問 • 1ヶ月前
    ユーザ名非公開

    Plumbing Arithmetic 1

    Plumbing Arithmetic 1

    ユーザ名非公開 · 50問 · 1ヶ月前

    Plumbing Arithmetic 1

    Plumbing Arithmetic 1

    50問 • 1ヶ月前
    ユーザ名非公開

    Plumbing Arithmetic 1.1

    Plumbing Arithmetic 1.1

    ユーザ名非公開 · 50問 · 1ヶ月前

    Plumbing Arithmetic 1.1

    Plumbing Arithmetic 1.1

    50問 • 1ヶ月前
    ユーザ名非公開

    Plumbing Arithmetic 2

    Plumbing Arithmetic 2

    ユーザ名非公開 · 50問 · 1ヶ月前

    Plumbing Arithmetic 2

    Plumbing Arithmetic 2

    50問 • 1ヶ月前
    ユーザ名非公開

    Plumbing Arithmetic 2.1

    Plumbing Arithmetic 2.1

    ユーザ名非公開 · 50問 · 1ヶ月前

    Plumbing Arithmetic 2.1

    Plumbing Arithmetic 2.1

    50問 • 1ヶ月前
    ユーザ名非公開

    問題一覧

  • 1

    An adequate ___ is one of the most important governances in modern and healthful human existence that involves air, water and food which is the basic necessities of life.

    Plumbing Code

  • 2

    Modern or state-of-the-art plumbing installation now require the close coordination of works among Master Plumbers, Architects and Engineers to come up with the ost ___ and ___ plumbing installation.

    sufficient / approved

  • 3

    All premises intended for human habitation, occupancy or use shall be provided with a supply of __ and ___water, neither connected with unsafe water supplies nor subject to hazards of backflow or back-siphonage.

    pure / wholesome

  • 4

    Plumbing fixtures, devices and appurtenances shall be supplied with water in ___ volume and a pressure ___ to enable them to function satisfactorily and without undue noise under all normal conditions of use.

    sufficient / adequate

  • 5

    Plumbing shall be designed and adjusted to use the ___ quantity of water consistent with proper performance and cleaning.

    minimum

  • 6

    Devices for heating and storing water shall be so ___ and ___explosion through overheating.

    designed / installed

  • 7

    Every building having plumbing fixtures installed and intended for ___, occupancy or use on premises abutting on a street, alley or easement where is a public sewer, shall be connected to the sewer system.

    human habitation

  • 8

    Each family dwelling unit on premises abutting on a sewer or with a private sewage-disposal system shall have at least ___ and ___. Further, a lavatory and bathtub or shower shall be installed to meet the basic requirements of sanitation and personal hygiene.

    one water closet / one kitchen sink

  • 9

    Plumbing fixtures shall be made of material, free from concealed fouling surfaces and shall be located in ventilated enclosures.

    smooth non-absorbent

  • 10

    The drainage system shall be designed, constructed and maintained to ___ against fouling, deposit of solids, clogging and with adequate cleanouts so arranged that the pipes may be readily cleaned.

    safeguard

  • 11

    All pipings of plumbing systems shall be of NAMPAP-APPROVED materials, free from defective workmanship, designed and constructed by Registered Master Plumbers to ensure satisfactorily service.

    durable

  • 12

    Each fixture directly connected to the drainage system shall be equipped with a ___.

    water-sealed trap

  • 13

    ____ be designed to provide adequate circulation of air free from siphonage, aspiration for forcing of trap seals under ordinary use.

    Drainage piping system

  • 14

    ___ shall extend to the outer air and installed to preempt clogging and the return of foul air to the building.

    Vent terminals

  • 15

    Plumbing system shall be subjected to such test to ___ disclose all leaks and defects in the workmanship.

    effectively

  • 16

    ____ which will clog the pipes, produce explosive mixtures, destroy the pipes or their joints or interfere unduly with the sewage-disposal process shall be allowed to enter the building drainage system.

    No substance

  • 17

    ____ shall be provided to prevent contamination of food, water, sterile goods and similar materials by backflow of sewage. When necessary, the fixture, device or appliance shall be connected indirectly with the building drainage system.

    Proper protection

  • 18

    No ___ shall be located in a room or compartment which is not properly lighted and ventilated.

    water closet

  • 19

    If water closets or other plumbing fixtures are installed in buildings where there is no sewer within a reasonable distance, ___ shall be made for disposing of the building sewage by some accepted method of sewage treatment and disposal, such as ___.

    suitable provision / septic tank

  • 20

    Where a plumbing drainage system may be subject to backflow of sewage, suitable provision shall be made to ____ its overflow in the building.

    prevent

  • 21

    All plumbing fixtures shall be installe ___ to be accessible for their intended use.

    properly spaced

  • 22

    Plumbing shall be installed by Registered Master Plumbers with due regard to the ___ of the strength of structural members and the ___ of damage to walls and other surfaces through fixture usage.

    preservation / prevention

  • 23

    Sewage or other waste from a plumbing system which may be ___ to surface or sub-surface waters shall not be discharge into the ground or into any waterway, unless first rendered ___ through subjection to some acceptable form of treatment.

    deleterious / innocuous