Question
1 Quality Test for every ____ or ____.
Question
Shall be only applied to surfaces which are dry or slightly moist
Question
The liquid bituminous material shall be sprayed by means of a pressure distributor of not less than ____ capacity.
1000L
1500L
Skip
Question
Pressure distributor mounted on pneumatic tires of such width and number that the load produced on the road surface will not ____ per cm width of tire.
1kN
2kN
Skip
Question
The tank shall have a heating device able to heat a complete change of bituminous liquid to ____.
135°C
180°C
Skip
Question
The drop on temperature when the tank is filled with bituminous liquid and not heated will be less than:
2°C per hour
3°C per hour
Skip
Question
The distributor shall be designed so that the deviation from the prescribed rate of application does not exceed ___ and shall be equipped with a device for hand spraying of the bituminous liquid.
10%
15%
Skip
Question
The rate of application of the bituminous material shall be within the range of ____.
0.2 to 0.7 L/sq.m
1 to 2 L/sq.m
Skip
Question
The prime coat shall be left undisturbed for a period of at least ___ or until such time it has sufficiently cured as determined by the engineer and shall not be opened to traffic.
12 hrs
24 hrs
Skip
Question
Bituminous Prime Coat shall be measured by:
Item 301 Bituminous Prime Coat
Score
0 / 10
Correct rate
0%
Correct: 0
Incorrect: 0
Unanswered: 10
YT1 Materials Engineer EXAM
YT1 Materials Engineer EXAM
Anonymous · 100 questions · 10 mo agoYT1 Materials Engineer EXAM
YT1 Materials Engineer EXAM
100 questions • 10 mo agoYT2 Materials Engineer EXAM
YT2 Materials Engineer EXAM
Anonymous · 100 questions · 10 mo agoYT2 Materials Engineer EXAM
YT2 Materials Engineer EXAM
100 questions • 10 mo agoProject Engineer YT 1
Project Engineer YT 1
Anonymous · 100 questions · 10 mo agoProject Engineer YT 1
Project Engineer YT 1
100 questions • 10 mo agoProject Engineer EXAM
Project Engineer EXAM
Anonymous · 62 questions · 10 mo agoProject Engineer EXAM
Project Engineer EXAM
62 questions • 10 mo agoProject Engineer EXAM 68
Project Engineer EXAM 68
Anonymous · 100 questions · 10 mo agoProject Engineer EXAM 68
Project Engineer EXAM 68
100 questions • 10 mo agoProject Engineer EXAM 82
Project Engineer EXAM 82
Anonymous · 100 questions · 10 mo agoProject Engineer EXAM 82
Project Engineer EXAM 82
100 questions • 10 mo agoJuly 2023 PE Refresher
July 2023 PE Refresher
Anonymous · 70 questions · 10 mo agoJuly 2023 PE Refresher
July 2023 PE Refresher
70 questions • 10 mo agoAugust 2019 Special PE Exam
August 2019 Special PE Exam
Anonymous · 93 questions · 10 mo agoAugust 2019 Special PE Exam
August 2019 Special PE Exam
93 questions • 10 mo agoRNPCP Chapter 1 to 5
RNPCP Chapter 1 to 5
Anonymous · 86 questions · 10 mo agoRNPCP Chapter 1 to 5
RNPCP Chapter 1 to 5
86 questions • 10 mo agoPlumbing Code 4
Plumbing Code 4
Anonymous · 100 questions · 10 mo agoPlumbing Code 4
Plumbing Code 4
100 questions • 10 mo agoPlumbing Code 5
Plumbing Code 5
Anonymous · 100 questions · 10 mo agoPlumbing Code 5
Plumbing Code 5
100 questions • 10 mo agoPlumbing Code 6
Plumbing Code 6
Anonymous · 100 questions · 10 mo agoPlumbing Code 6
Plumbing Code 6
100 questions • 10 mo agoPlumbing Code 7
Plumbing Code 7
Anonymous · 100 questions · 10 mo agoPlumbing Code 7
Plumbing Code 7
100 questions • 10 mo agoPlumbing Code 8
Plumbing Code 8
Anonymous · 100 questions · 10 mo agoPlumbing Code 8
Plumbing Code 8
100 questions • 10 mo agoPlumbing Code 3
Plumbing Code 3
Anonymous · 100 questions · 10 mo agoPlumbing Code 3
Plumbing Code 3
100 questions • 10 mo agoSanitation, Plumbing Design, and Installation 2
Sanitation, Plumbing Design, and Installation 2
Anonymous · 97 questions · 10 mo agoSanitation, Plumbing Design, and Installation 2
Sanitation, Plumbing Design, and Installation 2
97 questions • 10 mo agoSanitation, Plumbing Design, and Installation 1
Sanitation, Plumbing Design, and Installation 1
Anonymous · 99 questions · 10 mo agoSanitation, Plumbing Design, and Installation 1
Sanitation, Plumbing Design, and Installation 1
99 questions • 10 mo agoSanitation, Plumbing Design, and Installation 3
Sanitation, Plumbing Design, and Installation 3
Anonymous · 96 questions · 10 mo agoSanitation, Plumbing Design, and Installation 3
Sanitation, Plumbing Design, and Installation 3
96 questions • 10 mo agoSanitation, Plumbing Design, and Installation 4
Sanitation, Plumbing Design, and Installation 4
Anonymous · 95 questions · 10 mo agoSanitation, Plumbing Design, and Installation 4
Sanitation, Plumbing Design, and Installation 4
95 questions • 10 mo agoSanitation, Plumbing Design, and Installation 5
Sanitation, Plumbing Design, and Installation 5
Anonymous · 97 questions · 10 mo agoSanitation, Plumbing Design, and Installation 5
Sanitation, Plumbing Design, and Installation 5
97 questions • 10 mo agoSanitation, Plumbing Design, and Installation 7
Sanitation, Plumbing Design, and Installation 7
Anonymous · 100 questions · 10 mo agoSanitation, Plumbing Design, and Installation 7
Sanitation, Plumbing Design, and Installation 7
100 questions • 10 mo agoSanitation, Plumbing Design, and Installation 8
Sanitation, Plumbing Design, and Installation 8
Anonymous · 98 questions · 10 mo agoSanitation, Plumbing Design, and Installation 8
Sanitation, Plumbing Design, and Installation 8
98 questions • 10 mo agoPlumbing Tools 1
Plumbing Tools 1
Anonymous · 87 questions · 10 mo agoPlumbing Tools 1
Plumbing Tools 1
87 questions • 10 mo agoPlumbing Tools 2
Plumbing Tools 2
Anonymous · 53 questions · 10 mo agoPlumbing Tools 2
Plumbing Tools 2
53 questions • 10 mo agoPractical Problems and Experiences 1
Practical Problems and Experiences 1
Anonymous · 100 questions · 10 mo agoPractical Problems and Experiences 1
Practical Problems and Experiences 1
100 questions • 10 mo agoPractical Problems and Experiences 2
Practical Problems and Experiences 2
Anonymous · 100 questions · 10 mo agoPractical Problems and Experiences 2
Practical Problems and Experiences 2
100 questions • 10 mo agoPractical Problems and Experiences 3
Practical Problems and Experiences 3
Anonymous · 99 questions · 10 mo agoPractical Problems and Experiences 3
Practical Problems and Experiences 3
99 questions • 10 mo agoPractical Problems and Experiences 4
Practical Problems and Experiences 4
Anonymous · 100 questions · 10 mo agoPractical Problems and Experiences 4
Practical Problems and Experiences 4
100 questions • 10 mo agoPlumbing Arithmetic Terms 1
Plumbing Arithmetic Terms 1
Anonymous · 49 questions · 10 mo agoPlumbing Arithmetic Terms 1
Plumbing Arithmetic Terms 1
49 questions • 10 mo agoPlumbing Arithmetic Terms 2
Plumbing Arithmetic Terms 2
Anonymous · 47 questions · 10 mo agoPlumbing Arithmetic Terms 2
Plumbing Arithmetic Terms 2
47 questions • 10 mo agoPlumbing Arithmetic Terms 3
Plumbing Arithmetic Terms 3
Anonymous · 49 questions · 10 mo agoPlumbing Arithmetic Terms 3
Plumbing Arithmetic Terms 3
49 questions • 10 mo agoPlumbing Arithmetic Terms 4
Plumbing Arithmetic Terms 4
Anonymous · 27 questions · 10 mo agoPlumbing Arithmetic Terms 4
Plumbing Arithmetic Terms 4
27 questions • 10 mo agoPlumbing Code WSFU
Plumbing Code WSFU
Anonymous · 58 questions · 10 mo agoPlumbing Code WSFU
Plumbing Code WSFU
58 questions • 10 mo agoPractical Problems and Experiences REFRESHER 1
Practical Problems and Experiences REFRESHER 1
Anonymous · 100 questions · 10 mo agoPractical Problems and Experiences REFRESHER 1
Practical Problems and Experiences REFRESHER 1
100 questions • 10 mo agoPractical Problems and Experiences REFRESHER 2
Practical Problems and Experiences REFRESHER 2
Anonymous · 70 questions · 10 mo agoPractical Problems and Experiences REFRESHER 2
Practical Problems and Experiences REFRESHER 2
70 questions • 10 mo agoItem # and Descriptions
Item # and Descriptions
Anonymous · 24 questions · 10 mo agoItem # and Descriptions
Item # and Descriptions
24 questions • 10 mo agoItem 200 Aggregate Subbase Course
Item 200 Aggregate Subbase Course
Anonymous · 16 questions · 10 mo agoItem 200 Aggregate Subbase Course
Item 200 Aggregate Subbase Course
16 questions • 10 mo agoItem 201 Aggregate Base Course
Item 201 Aggregate Base Course
Anonymous · 16 questions · 10 mo agoItem 201 Aggregate Base Course
Item 201 Aggregate Base Course
16 questions • 10 mo agoItem 202 Crushed Aggregate Base Course
Item 202 Crushed Aggregate Base Course
Anonymous · 18 questions · 10 mo agoItem 202 Crushed Aggregate Base Course
Item 202 Crushed Aggregate Base Course
18 questions • 10 mo agoItem 203 Lime Stabilized Road Mix Base Course
Item 203 Lime Stabilized Road Mix Base Course
Anonymous · 27 questions · 10 mo agoItem 203 Lime Stabilized Road Mix Base Course
Item 203 Lime Stabilized Road Mix Base Course
27 questions • 10 mo agoItem 204 Portland Cement Stabilized Road Mix Base Course
Item 204 Portland Cement Stabilized Road Mix Base Course
Anonymous · 7 questions · 10 mo agoItem 204 Portland Cement Stabilized Road Mix Base Course
Item 204 Portland Cement Stabilized Road Mix Base Course
7 questions • 10 mo agoItem 207 Portland Cement Stabilized Treated Plant Mix Base Course
Item 207 Portland Cement Stabilized Treated Plant Mix Base Course
Anonymous · 13 questions · 10 mo agoItem 207 Portland Cement Stabilized Treated Plant Mix Base Course
Item 207 Portland Cement Stabilized Treated Plant Mix Base Course
13 questions • 10 mo agoItem 205 Asphalt Stabilized Road Mix Base Course
Item 205 Asphalt Stabilized Road Mix Base Course
Anonymous · 7 questions · 10 mo agoItem 205 Asphalt Stabilized Road Mix Base Course
Item 205 Asphalt Stabilized Road Mix Base Course
7 questions • 10 mo agoItem 206 Chemically Stabilized Road Mix Subbase/Base Course
Item 206 Chemically Stabilized Road Mix Subbase/Base Course
Anonymous · 11 questions · 10 mo agoItem 206 Chemically Stabilized Road Mix Subbase/Base Course
Item 206 Chemically Stabilized Road Mix Subbase/Base Course
11 questions • 10 mo agoItem 300 Aggregate Surface Course
Item 300 Aggregate Surface Course
Anonymous · 11 questions · 10 mo agoItem 300 Aggregate Surface Course
Item 300 Aggregate Surface Course
11 questions • 10 mo agoItem 303 Bituminous Seal Coat
Item 303 Bituminous Seal Coat
Anonymous · 20 questions · 10 mo agoItem 303 Bituminous Seal Coat
Item 303 Bituminous Seal Coat
20 questions • 10 mo agoRNPCP Chapter 6 to 9
RNPCP Chapter 6 to 9
Anonymous · 94 questions · 10 mo agoRNPCP Chapter 6 to 9
RNPCP Chapter 6 to 9
94 questions • 10 mo agoRNPCP Chapter 10 to 13
RNPCP Chapter 10 to 13
Anonymous · 93 questions · 10 mo agoRNPCP Chapter 10 to 13
RNPCP Chapter 10 to 13
93 questions • 10 mo agoRNPCP Appendix A and B
RNPCP Appendix A and B
Anonymous · 79 questions · 10 mo agoRNPCP Appendix A and B
RNPCP Appendix A and B
79 questions • 10 mo agoRepublic Acts
Republic Acts
Anonymous · 9 questions · 10 mo agoRepublic Acts
Republic Acts
9 questions • 10 mo agoPlumbing Arithmetic Terms 5
Plumbing Arithmetic Terms 5
Anonymous · 68 questions · 10 mo agoPlumbing Arithmetic Terms 5
Plumbing Arithmetic Terms 5
68 questions • 10 mo agoPrinciples and Code of Ethics
Principles and Code of Ethics
Anonymous · 29 questions · 10 mo agoPrinciples and Code of Ethics
Principles and Code of Ethics
29 questions • 10 mo agoPlumbing Arithmetic Problems 1
Plumbing Arithmetic Problems 1
Anonymous · 75 questions · 10 mo agoPlumbing Arithmetic Problems 1
Plumbing Arithmetic Problems 1
75 questions • 10 mo agoItem 406 Prestressed Concrete Structures
Item 406 Prestressed Concrete Structures
Anonymous · 36 questions · 10 mo agoItem 406 Prestressed Concrete Structures
Item 406 Prestressed Concrete Structures
36 questions • 10 mo agoItem 405 Structural Concrete
Item 405 Structural Concrete
Anonymous · 41 questions · 10 mo agoItem 405 Structural Concrete
Item 405 Structural Concrete
41 questions • 10 mo agoItem 400 Piling
Item 400 Piling
Anonymous · 80 questions · 10 mo agoItem 400 Piling
Item 400 Piling
80 questions • 10 mo agoItem 311 Portland Cement Concrete Pavement (PART 2)
Item 311 Portland Cement Concrete Pavement (PART 2)
Anonymous · 61 questions · 10 mo agoItem 311 Portland Cement Concrete Pavement (PART 2)
Item 311 Portland Cement Concrete Pavement (PART 2)
61 questions • 10 mo agoItem 311 Portland Cement Concrete Pavement (PART 1)
Item 311 Portland Cement Concrete Pavement (PART 1)
Anonymous · 78 questions · 10 mo agoItem 311 Portland Cement Concrete Pavement (PART 1)
Item 311 Portland Cement Concrete Pavement (PART 1)
78 questions • 10 mo agoStandpipe Requirements
Standpipe Requirements
Anonymous · 29 questions · 10 mo agoStandpipe Requirements
Standpipe Requirements
29 questions • 10 mo agoSpdi 1
Spdi 1
Anonymous · 100 questions · 10 mo agoSpdi 1
Spdi 1
100 questions • 10 mo agoSpdi 2
Spdi 2
Anonymous · 98 questions · 10 mo agoSpdi 2
Spdi 2
98 questions • 10 mo agoSPI version D pt 2
SPI version D pt 2
Anonymous · 61 questions · 10 mo agoSPI version D pt 2
SPI version D pt 2
61 questions • 10 mo agoplumbing code
plumbing code
Anonymous · 100 questions · 10 mo agoplumbing code
plumbing code
100 questions • 10 mo agoplumbing code 2
plumbing code 2
Anonymous · 100 questions · 10 mo agoplumbing code 2
plumbing code 2
100 questions • 10 mo agoplumbing code 3
plumbing code 3
Anonymous · 56 questions · 10 mo agoplumbing code 3
plumbing code 3
56 questions • 10 mo agoPractice Problem
Practice Problem
Anonymous · 70 questions · 10 mo agoPractice Problem
Practice Problem
70 questions • 10 mo agoPP pre
PP pre
Anonymous · 100 questions · 10 mo agoPP pre
PP pre
100 questions • 10 mo agoPP Pre 2
PP Pre 2
Anonymous · 100 questions · 10 mo agoPP Pre 2
PP Pre 2
100 questions • 10 mo agoPP pre 3
PP pre 3
Anonymous · 44 questions · 10 mo agoPP pre 3
PP pre 3
44 questions • 10 mo agoWT 1
WT 1
Anonymous · 50 questions · 10 mo agoWT 1
WT 1
50 questions • 10 mo agoWT 2
WT 2
Anonymous · 48 questions · 10 mo agoWT 2
WT 2
48 questions • 10 mo agoWT 3
WT 3
Anonymous · 50 questions · 10 mo agoWT 3
WT 3
50 questions • 10 mo agoWT 6
WT 6
Anonymous · 50 questions · 10 mo agoWT 6
WT 6
50 questions • 10 mo agoDefinition of Terms 1
Definition of Terms 1
Anonymous · 90 questions · 10 mo agoDefinition of Terms 1
Definition of Terms 1
90 questions • 10 mo agoDefinition of Terms 2
Definition of Terms 2
Anonymous · 90 questions · 10 mo agoDefinition of Terms 2
Definition of Terms 2
90 questions • 10 mo agoDefinition of Terms 3
Definition of Terms 3
Anonymous · 90 questions · 10 mo agoDefinition of Terms 3
Definition of Terms 3
90 questions • 10 mo agoRefresher SPDI 1
Refresher SPDI 1
Anonymous · 100 questions · 10 mo agoRefresher SPDI 1
Refresher SPDI 1
100 questions • 10 mo agoRefresher SPDI 1
Refresher SPDI 1
Anonymous · 9 questions · 10 mo agoRefresher SPDI 1
Refresher SPDI 1
9 questions • 10 mo agoWeekly Test 1
Weekly Test 1
Anonymous · 50 questions · 10 mo agoWeekly Test 1
Weekly Test 1
50 questions • 10 mo agoWeekly Test 2
Weekly Test 2
Anonymous · 50 questions · 10 mo agoWeekly Test 2
Weekly Test 2
50 questions • 10 mo agoWeekly Test 3
Weekly Test 3
Anonymous · 50 questions · 10 mo agoWeekly Test 3
Weekly Test 3
50 questions • 10 mo agoMPLE
MPLE
Anonymous · 41 questions · 10 mo agoMPLE
MPLE
41 questions • 10 mo agoCDG- Plumbing Code 1
CDG- Plumbing Code 1
Anonymous · 48 questions · 10 mo agoCDG- Plumbing Code 1
CDG- Plumbing Code 1
48 questions • 10 mo agoCDG- Plumbing Code 1.1
CDG- Plumbing Code 1.1
Anonymous · 50 questions · 10 mo agoCDG- Plumbing Code 1.1
CDG- Plumbing Code 1.1
50 questions • 10 mo agoCDG- Plumbing Code 1.4
CDG- Plumbing Code 1.4
Anonymous · 23 questions · 10 mo agoCDG- Plumbing Code 1.4
CDG- Plumbing Code 1.4
23 questions • 10 mo agoCDG- Plumbing Code 1.2
CDG- Plumbing Code 1.2
Anonymous · 3 views · 50 questions · 10 mo agoCDG- Plumbing Code 1.2
CDG- Plumbing Code 1.2
3 views • 50 questions • 10 mo agoCGD- Plumbing Code 1.3
CGD- Plumbing Code 1.3
Anonymous · 50 questions · 10 mo agoCGD- Plumbing Code 1.3
CGD- Plumbing Code 1.3
50 questions • 10 mo agoPlumbing Code 1
Plumbing Code 1
Anonymous · 50 questions · 10 mo agoPlumbing Code 1
Plumbing Code 1
50 questions • 10 mo agoPlumbing Code 1.1
Plumbing Code 1.1
Anonymous · 22 questions · 10 mo agoPlumbing Code 1.1
Plumbing Code 1.1
22 questions • 10 mo agoCGD - Sanitary Design
CGD - Sanitary Design
Anonymous · 19 questions · 10 mo agoCGD - Sanitary Design
CGD - Sanitary Design
19 questions • 10 mo agoPractical Problems 1
Practical Problems 1
Anonymous · 50 questions · 10 mo agoPractical Problems 1
Practical Problems 1
50 questions • 10 mo agoPractical Problems 1.1
Practical Problems 1.1
Anonymous · 47 questions · 10 mo agoPractical Problems 1.1
Practical Problems 1.1
47 questions • 10 mo agoPractical Problems 2
Practical Problems 2
Anonymous · 50 questions · 10 mo agoPractical Problems 2
Practical Problems 2
50 questions • 10 mo agoPractical Problems 2.1
Practical Problems 2.1
Anonymous · 50 questions · 10 mo agoPractical Problems 2.1
Practical Problems 2.1
50 questions • 10 mo agoPlumbing Arithmetic 1
Plumbing Arithmetic 1
Anonymous · 50 questions · 10 mo agoPlumbing Arithmetic 1
Plumbing Arithmetic 1
50 questions • 10 mo agoPlumbing Arithmetic 1.1
Plumbing Arithmetic 1.1
Anonymous · 50 questions · 10 mo agoPlumbing Arithmetic 1.1
Plumbing Arithmetic 1.1
50 questions • 10 mo agoPlumbing Arithmetic 2
Plumbing Arithmetic 2
Anonymous · 50 questions · 10 mo agoPlumbing Arithmetic 2
Plumbing Arithmetic 2
50 questions • 10 mo agoPlumbing Arithmetic 2.1
Plumbing Arithmetic 2.1
Anonymous · 50 questions · 10 mo agoPlumbing Arithmetic 2.1
Plumbing Arithmetic 2.1
50 questions • 10 mo agoQuestion list
1
1 Quality Test for every ____ or ____.40T, 200 drums
2
Shall be only applied to surfaces which are dry or slightly moistprime coat
3
The liquid bituminous material shall be sprayed by means of a pressure distributor of not less than ____ capacity.1000L
4
Pressure distributor mounted on pneumatic tires of such width and number that the load produced on the road surface will not ____ per cm width of tire.1kN
5
The tank shall have a heating device able to heat a complete change of bituminous liquid to ____.180°C
6
The drop on temperature when the tank is filled with bituminous liquid and not heated will be less than:2°C per hour
7
The distributor shall be designed so that the deviation from the prescribed rate of application does not exceed ___ and shall be equipped with a device for hand spraying of the bituminous liquid.10%
8
The rate of application of the bituminous material shall be within the range of ____.1 to 2 L/sq.m
9
The prime coat shall be left undisturbed for a period of at least ___ or until such time it has sufficiently cured as determined by the engineer and shall not be opened to traffic.24 hrs
10
Bituminous Prime Coat shall be measured by:square meter