問題一覧
1
100mm
2
32
3
Fast removal of the waste with a minimum probability of leakage and stoppage of drain
4
8 gpm
5
4 gpm
6
4 gpm
7
3 gpm
8
3/4
9
Nipple
10
Close nipple
11
Short pipe
12
3/4 inch
13
5%
14
5%
15
85%
16
4
17
1/8 in per foot
18
1/4 in per foot
19
3’-0”
20
2’-1”
21
3 gpm
22
Dry standpipe
23
4 in.
24
6 in.
25
It is being served by the domestic water supply under constant pressure.
26
The danger of contamination of the building water supply from the unknown source.
27
Cut and insert coupling
28
Short offset and unnecessary fittings
29
Poor workmanship
30
Iron inserted on the tough floor sheating and slushed into the concrete slab
31
It will fail to close tightly.
32
It is convenient to provide a drum valve to make it possible to drain the entire water system.
33
In between the main supply line and pump line.
34
6 in.
35
Drainage cannot be affected by gravity.
36
Wrought iron pipe.
37
Cast iropn pipe
38
Adequate cleanouts
39
Excessive rainwater hinders the treatment of the sewage.
40
Smoke tight
41
200,000m^3
42
Circle
43
29.4
44
Indicating
45
Parallel
46
30 psi
47
None of the above
48
1.78m
49
Low pressure
50
5%
YT1 Materials Engineer EXAM
YT1 Materials Engineer EXAM
ユーザ名非公開 · 100問 · 13日前YT1 Materials Engineer EXAM
YT1 Materials Engineer EXAM
100問 • 13日前YT2 Materials Engineer EXAM
YT2 Materials Engineer EXAM
ユーザ名非公開 · 100問 · 13日前YT2 Materials Engineer EXAM
YT2 Materials Engineer EXAM
100問 • 13日前Project Engineer YT 1
Project Engineer YT 1
ユーザ名非公開 · 100問 · 13日前Project Engineer YT 1
Project Engineer YT 1
100問 • 13日前Project Engineer EXAM
Project Engineer EXAM
ユーザ名非公開 · 62問 · 13日前Project Engineer EXAM
Project Engineer EXAM
62問 • 13日前Project Engineer EXAM 68
Project Engineer EXAM 68
ユーザ名非公開 · 100問 · 13日前Project Engineer EXAM 68
Project Engineer EXAM 68
100問 • 13日前Project Engineer EXAM 82
Project Engineer EXAM 82
ユーザ名非公開 · 100問 · 13日前Project Engineer EXAM 82
Project Engineer EXAM 82
100問 • 13日前July 2023 PE Refresher
July 2023 PE Refresher
ユーザ名非公開 · 70問 · 13日前July 2023 PE Refresher
July 2023 PE Refresher
70問 • 13日前August 2019 Special PE Exam
August 2019 Special PE Exam
ユーザ名非公開 · 93問 · 13日前August 2019 Special PE Exam
August 2019 Special PE Exam
93問 • 13日前RNPCP Chapter 1 to 5
RNPCP Chapter 1 to 5
ユーザ名非公開 · 86問 · 13日前RNPCP Chapter 1 to 5
RNPCP Chapter 1 to 5
86問 • 13日前Plumbing Code 4
Plumbing Code 4
ユーザ名非公開 · 100問 · 13日前Plumbing Code 4
Plumbing Code 4
100問 • 13日前Plumbing Code 5
Plumbing Code 5
ユーザ名非公開 · 100問 · 13日前Plumbing Code 5
Plumbing Code 5
100問 • 13日前Plumbing Code 6
Plumbing Code 6
ユーザ名非公開 · 100問 · 13日前Plumbing Code 6
Plumbing Code 6
100問 • 13日前Plumbing Code 7
Plumbing Code 7
ユーザ名非公開 · 100問 · 13日前Plumbing Code 7
Plumbing Code 7
100問 • 13日前Plumbing Code 8
Plumbing Code 8
ユーザ名非公開 · 100問 · 13日前Plumbing Code 8
Plumbing Code 8
100問 • 13日前Plumbing Code 3
Plumbing Code 3
ユーザ名非公開 · 100問 · 13日前Plumbing Code 3
Plumbing Code 3
100問 • 13日前Sanitation, Plumbing Design, and Installation 2
Sanitation, Plumbing Design, and Installation 2
ユーザ名非公開 · 97問 · 13日前Sanitation, Plumbing Design, and Installation 2
Sanitation, Plumbing Design, and Installation 2
97問 • 13日前Sanitation, Plumbing Design, and Installation 1
Sanitation, Plumbing Design, and Installation 1
ユーザ名非公開 · 99問 · 13日前Sanitation, Plumbing Design, and Installation 1
Sanitation, Plumbing Design, and Installation 1
99問 • 13日前Sanitation, Plumbing Design, and Installation 3
Sanitation, Plumbing Design, and Installation 3
ユーザ名非公開 · 96問 · 13日前Sanitation, Plumbing Design, and Installation 3
Sanitation, Plumbing Design, and Installation 3
96問 • 13日前Sanitation, Plumbing Design, and Installation 4
Sanitation, Plumbing Design, and Installation 4
ユーザ名非公開 · 95問 · 13日前Sanitation, Plumbing Design, and Installation 4
Sanitation, Plumbing Design, and Installation 4
95問 • 13日前Sanitation, Plumbing Design, and Installation 5
Sanitation, Plumbing Design, and Installation 5
ユーザ名非公開 · 97問 · 13日前Sanitation, Plumbing Design, and Installation 5
Sanitation, Plumbing Design, and Installation 5
97問 • 13日前問題一覧
1
100mm
2
32
3
Fast removal of the waste with a minimum probability of leakage and stoppage of drain
4
8 gpm
5
4 gpm
6
4 gpm
7
3 gpm
8
3/4
9
Nipple
10
Close nipple
11
Short pipe
12
3/4 inch
13
5%
14
5%
15
85%
16
4
17
1/8 in per foot
18
1/4 in per foot
19
3’-0”
20
2’-1”
21
3 gpm
22
Dry standpipe
23
4 in.
24
6 in.
25
It is being served by the domestic water supply under constant pressure.
26
The danger of contamination of the building water supply from the unknown source.
27
Cut and insert coupling
28
Short offset and unnecessary fittings
29
Poor workmanship
30
Iron inserted on the tough floor sheating and slushed into the concrete slab
31
It will fail to close tightly.
32
It is convenient to provide a drum valve to make it possible to drain the entire water system.
33
In between the main supply line and pump line.
34
6 in.
35
Drainage cannot be affected by gravity.
36
Wrought iron pipe.
37
Cast iropn pipe
38
Adequate cleanouts
39
Excessive rainwater hinders the treatment of the sewage.
40
Smoke tight
41
200,000m^3
42
Circle
43
29.4
44
Indicating
45
Parallel
46
30 psi
47
None of the above
48
1.78m
49
Low pressure
50
5%