問題一覧
1
panels are fitted and all replenishments done
2
wind direction and jet efflux on equipment's & buildings
3
engine start and trim operation
4
requested
5
150 feet
6
temperature stabilized
7
fluid wash and abrasive girt blast
8
same purity standard as drinking water
9
Borescope via an access holes
10
compressors, combustion chamber and turbines
11
fan blade mid-span shroud moves on the other.
12
wind direction 210/wind speed 13knots
13
excessive clearances, imbalance or rubbing contacts
14
vibration level, oil consumption rate and oil analysis results
15
rise in exhaust gas temperature
16
shut down the engine immediately
17
Too little N2 (or N3) margins, too little EGT-margin and too high oil pressure
18
Ferrography
19
may be fitted in the scavenge line used to detects any ferrous partials carried in the oil
20
the principle of not replacing the component at a fixed time
mod5 training
mod5 training
ユーザ名非公開 · 14問 · 1年前mod5 training
mod5 training
14問 • 1年前M6c1
M6c1
ユーザ名非公開 · 22問 · 1年前M6c1
M6c1
22問 • 1年前M6c2
M6c2
ユーザ名非公開 · 20問 · 1年前M6c2
M6c2
20問 • 1年前M6c3
M6c3
ユーザ名非公開 · 52問 · 1年前M6c3
M6c3
52問 • 1年前M6c4
M6c4
ユーザ名非公開 · 26問 · 1年前M6c4
M6c4
26問 • 1年前M6c5
M6c5
ユーザ名非公開 · 48問 · 1年前M6c5
M6c5
48問 • 1年前M6c6
M6c6
ユーザ名非公開 · 27問 · 1年前M6c6
M6c6
27問 • 1年前M6c7
M6c7
ユーザ名非公開 · 15問 · 1年前M6c7
M6c7
15問 • 1年前M6c8
M6c8
ユーザ名非公開 · 15問 · 1年前M6c8
M6c8
15問 • 1年前M6c9
M6c9
ユーザ名非公開 · 17問 · 1年前M6c9
M6c9
17問 • 1年前M6c10
M6c10
ユーザ名非公開 · 18問 · 1年前M6c10
M6c10
18問 • 1年前M6c11
M6c11
ユーザ名非公開 · 44問 · 1年前M6c11
M6c11
44問 • 1年前M7c1
M7c1
ユーザ名非公開 · 18問 · 1年前M7c1
M7c1
18問 • 1年前M7c2
M7c2
ユーザ名非公開 · 11問 · 1年前M7c2
M7c2
11問 • 1年前M7c3
M7c3
ユーザ名非公開 · 39問 · 1年前M7c3
M7c3
39問 • 1年前M7c4
M7c4
ユーザ名非公開 · 21問 · 1年前M7c4
M7c4
21問 • 1年前M10c1
M10c1
ユーザ名非公開 · 15問 · 1年前M10c1
M10c1
15問 • 1年前M7c5
M7c5
ユーザ名非公開 · 11問 · 1年前M7c5
M7c5
11問 • 1年前問題一覧
1
panels are fitted and all replenishments done
2
wind direction and jet efflux on equipment's & buildings
3
engine start and trim operation
4
requested
5
150 feet
6
temperature stabilized
7
fluid wash and abrasive girt blast
8
same purity standard as drinking water
9
Borescope via an access holes
10
compressors, combustion chamber and turbines
11
fan blade mid-span shroud moves on the other.
12
wind direction 210/wind speed 13knots
13
excessive clearances, imbalance or rubbing contacts
14
vibration level, oil consumption rate and oil analysis results
15
rise in exhaust gas temperature
16
shut down the engine immediately
17
Too little N2 (or N3) margins, too little EGT-margin and too high oil pressure
18
Ferrography
19
may be fitted in the scavenge line used to detects any ferrous partials carried in the oil
20
the principle of not replacing the component at a fixed time