ログイン

MT 5

MT 5
80問 • 2ヶ月前
  • ユーザ名非公開
  • 通報

    問題一覧

  • 1

    The developed length between the trap of a water closet or similar fixture measured from the top of closet ring (closet flange) to inner edge of vent shall not exceed _____ m.

    1.8

  • 2

    Interceptors for sand and similar heavy solids shall have a water seal of not less than _____ mm deep.

    152

  • 3

    The sand interceptor shall have a minimum dimension of _____ m^2 for the net free opening of the inlet section.

    0.2

  • 4

    No standpipe receptor for any clotheswasher shall extend more than _____ m nor less than 0.45 m above its trap.

    0.8

  • 5

    Estimated sewage flow rate for Day Camps (no meals served)

    56.8 LpD

  • 6

    Interceptors shall be of approved design and be of not less than _____ compartments

    2

  • 7

    Lead pipe shall be supported at intervals not exceeding _____ m at centers with a rigid vertical back-up.

    1.2

  • 8

    A _____ kpa air pressure may be substituted for the water test.

    344.5

  • 9

    No part of the perimeter of the leaching bed shall be more than ____ from a distribution drain line.

    0.9 m

  • 10

    When disposal fields are installed, a minimum of _____ of trench bottom shall be provided for each system exclusive of any hard pan, rock, clay, or other impervious formations.

    14 sqm

  • 11

    Minimum thickness of lead safe pan in mm

    1.6

  • 12

    The corresponding maximum trap loading pipe size for fixture unit 6 (answer in mm)

    76

  • 13

    The arch or dome of seepage pit shall be an approved type one or two piece reinforced concrete slab of ____ minimum compressive strength.

    2500 psi

  • 14

    The width of a continuous and indelibly colored stripe in copper tubing.

    6.4 mm

  • 15

    Closet rings shall be tightly fastened with corrosive resistant fasteners up to the floor with top surface _____ mm above finish floor.

    6.4

  • 16

    Estimated sewage flow rate for airports per employee

    56.8 LpD

  • 17

    Cleanouts may be omitted on a horizontal drain line less than _____ m in length unless such line is serving sinks or urinals

    1.5

  • 18

    The public sewer may be considered as not being available when such public sewer or any exterior drainage facility connected thereto is located more than _____ m from any proposed building or exterior drainage facility on any lot or premises thereat.

    61

  • 19

    The diameter of an individual vent shall not be less than _____ mm nor less than 1/2 the diameter of the drain to which it is connected.

    32

  • 20

    Each pressure relief valve shall be an approved automatic type with drain and each such relief valve shall be set at a pressure of not more than _____ kpa

    1033

  • 21

    Tunnels shall have a clear height of _____ m above the pipe and shall be limited in length to 1/2 the depth of trench, with a maximum length of 2.4 meters.

    0.6 m

  • 22

    Trenches shall be back-filled in thin layers of _____ m.

    0.3

  • 23

    Each run of pipe which is more than _____ m in total developed length shall be provided with a cleanout.

    15

  • 24

    Every abandoned building (house) sewer, or part thereof, shall be plugged or capped in an approved manner within _____ m of the property line.

    1.5

  • 25

    Lead bends and lead traps shall not be less than ____ mm in wall thickness.

    3.2

  • 26

    Limit stops shall be provided on such valves and shall be adjusted to deliver hot water with a maximum temperature of _____ deg. C

    48.8

  • 27

    (Vertical wall areas for rainwater piping size) For two adjacent walls, add _____ percent of the total wall areas to the roof area.

    35

  • 28

    If the highest group of the fixtures contains flushometer valves , the pressure for the group should not be less than _____.

    103.42 kpa

  • 29

    Each seepage pit shall have a minimum sidewall of _____ below the inlet.

    3 m

  • 30

    Each vent pipe or stack through roof shall extend its flashing all around and the stack vent shall terminate vertically not less than _____ m above the roof.

    0.15

  • 31

    The yoke vent connection with the vent stack shall be placed not less than _____ m above the floor level.

    1

  • 32

    An additional cleanout shall be provided on a horizontal line with an aggregate offset angle of direction exceeding _____ degrees.

    135

  • 33

    (Septic Tank) The liquid depth shall be not less than ______ nor more than _____.

    0.6 m to 1.8 m

  • 34

    Distance of Building or structures to Building Sewer (answer in meters)

    0.60 m

  • 35

    Storage factor for fully equipped commercial kitchen- 16 hours operation

    2

  • 36

    Backflow prevention for hot water over ____ deg. C shall be a listed type assembly.

    43.3

  • 37

    Water pipes crossing sewer or drainage piping constructed of clay or materials, not approved for use within a building, shall be laid a minimum of _____ m above the sewer or drainpipe.

    0.3

  • 38

    No galvanized wrought iron or galvanized steel pipe shall be used underground and shall be kept at least _____ mm above ground.

    152

  • 39

    When the quantity of sewage exceeds the amount that can be disposed in a _____ meter of each line, a dosing tank shall be used.

    152.4 m

  • 40

    457.2 m

    34.5

  • 41

    The water shall be kept in the pipe system or in the portion under test for at least _____ minutes before inspection starts.

    15

  • 42

    Allowable slope of a pipe having a diameter 203 mm or larger is _____%.

    0.5

  • 43

    Fixture outlets shall not be connected to the horizontal excreta drainage piping system within _____ m of any vertical to horizontal change of direction of a stack containing suds-producing fixtures.

    2.4

  • 44

    No underfloor cleanout in any residential occupancy shall be located more than _____ m from an access door, trap door or crawl hole.

    6.1

  • 45

    For flush tank supplies, the available pressure may not be less than _____.

    55.16 kpa

  • 46

    Depth of equivalent area of rectangular gutter = ____ x diameter.

    0.392

  • 47

    Retention time of commercial kitchen waste

    2.5 hours

  • 48

    Fixtures that also serves as a vent for not to exceed _____ fixtures.

    4

  • 49

    The distance to vent of a trap arm 51 mm in diameter. (answer in meters)

    1.52

  • 50

    Where the local water pressure is in excess of _____ kpa, an approved-type pressure regulator preceded by an adequately sized strainer shall be installed to reduce the pressure on the building side of the regulator to the required supply pressure.

    551

  • 51

    The corresponding maximum trap loading pipe size for fixture unit 3 (answer in mm)

    38

  • 52

    An exposed and readily accessible drawn brass tubing trap, not less than Gauge ___ may be used on fixtures discharging domestic sewage but shall exclude urine.

    17

  • 53

    Distribution drain lines in leaching beds shall be more than ____ apart on centers.

    1.8 m

  • 54

    Each grease trap shall have an approved water seal of not less than _____ mm.

    51

  • 55

    Cleanout size of 64 mm pipe. (answer in mm)

    64

  • 56

    Each vent opening shall terminate not less than _____ m above any openable window, door opening, air intake or vent shaft.

    0.9

  • 57

    Wiped lead joints shall have an exposed surface on each side of a joint not less than _____ mm.

    19

  • 58

    Cast iron fittings up to and including _____ mm in size when used in connection with potable water piping shall be galvanized.

    51

  • 59

    In a water test, each section shall be filled with water, but no section shall be tested with less than _____ m head of water.

    3

  • 60

    The minimum size of any pump discharge or any discharge pipe from a sump having a water closet connected thereto shall not be less than _____ mm diameter.

    50.8

  • 61

    Distance of Septic Tank to to Water Supply wells.

    15.2 m

  • 62

    The inlet compartment of any septic tank shall be not less than _____ of the total capacity of the tank.

    2/3

  • 63

    When disposal fields and/or seepage pits are installed in sloping ground, the minimum horizontal distance between any part of the leaching system and ground surface shall be _____.

    4.6 m

  • 64

    The minimum wall thickness of any steel tank shall be _____ mm.

    2.8 mm

  • 65

    How many tests cocks does a Double Check Valve Backflow Prevention Assembly have?

    4

  • 66

    Vertical vent pipes for outdoor installations shall extend to at least _____ m distant from any part of the roof that is used for other purposes.

    3

  • 67

    Water closets shall be computed as _____ fixture units when determining septic tank size.

    6

  • 68

    Access to each septic tank shall be provided by at least two manholes _____ in minimum dimension.

    508 mm

  • 69

    Side walls of the septic tank shall exceed at least _____ above the liquid depth.

    228.6 mm

  • 70

    Support trap arms in excess of _____ feet in length as close as possible to the trap.

    3

  • 71

    Restaurant kitchen and other special-use sinks may be made of approved-type bonderized and galvanized sheet steel of not less than Gauge No. _____.

    16

  • 72

    Water pipes and fittings with a lead content that exceed ___% shall be prohibited and not used in potable piping systems.

    8

  • 73

    Water pipe joints shall be installed not less than _____ m away from sewer line in both directions.

    3

  • 74

    Such tailpiece or connections shall be as short as possible and in no case shall exceed _____ m long.

    0.6

  • 75

    Before placing filter material or drain lines in a prepared excavation, all smeared or compacted surfaces shall be removed from trenches by raking to a depth of _____ mm.

    25.4 mm

  • 76

    All septic tank covers shall be capable of supporting an earth load of not less than _____ when the maximum coverage does not exceed 9m.

    14.4 kpa

  • 77

    Where there is exposure to skin contamination with poisonous, infectious, or irritating materials, provide 1 lavatory for each _____ persons.

    5

  • 78

    Minimum depth of filter materials under drain lines

    304.8 mm

  • 79

    When seepage pits are used in combination with disposal fields, the filter material in the trenches shall terminate at least _____ from the pit excavation.

    1.5 m

  • 80

    The vacuum breaker shall be installed at the discharge side of the flushometer valve with the critical level at least _____ mm.

    152

  • YT1 Materials Engineer EXAM

    YT1 Materials Engineer EXAM

    ユーザ名非公開 · 100問 · 2ヶ月前

    YT1 Materials Engineer EXAM

    YT1 Materials Engineer EXAM

    100問 • 2ヶ月前
    ユーザ名非公開

    YT2 Materials Engineer EXAM

    YT2 Materials Engineer EXAM

    ユーザ名非公開 · 100問 · 2ヶ月前

    YT2 Materials Engineer EXAM

    YT2 Materials Engineer EXAM

    100問 • 2ヶ月前
    ユーザ名非公開

    Project Engineer YT 1

    Project Engineer YT 1

    ユーザ名非公開 · 100問 · 2ヶ月前

    Project Engineer YT 1

    Project Engineer YT 1

    100問 • 2ヶ月前
    ユーザ名非公開

    Project Engineer EXAM

    Project Engineer EXAM

    ユーザ名非公開 · 62問 · 2ヶ月前

    Project Engineer EXAM

    Project Engineer EXAM

    62問 • 2ヶ月前
    ユーザ名非公開

    Project Engineer EXAM 68

    Project Engineer EXAM 68

    ユーザ名非公開 · 100問 · 2ヶ月前

    Project Engineer EXAM 68

    Project Engineer EXAM 68

    100問 • 2ヶ月前
    ユーザ名非公開

    Project Engineer EXAM 82

    Project Engineer EXAM 82

    ユーザ名非公開 · 100問 · 2ヶ月前

    Project Engineer EXAM 82

    Project Engineer EXAM 82

    100問 • 2ヶ月前
    ユーザ名非公開

    July 2023 PE Refresher

    July 2023 PE Refresher

    ユーザ名非公開 · 70問 · 2ヶ月前

    July 2023 PE Refresher

    July 2023 PE Refresher

    70問 • 2ヶ月前
    ユーザ名非公開

    August 2019 Special PE Exam

    August 2019 Special PE Exam

    ユーザ名非公開 · 93問 · 2ヶ月前

    August 2019 Special PE Exam

    August 2019 Special PE Exam

    93問 • 2ヶ月前
    ユーザ名非公開

    RNPCP Chapter 1 to 5

    RNPCP Chapter 1 to 5

    ユーザ名非公開 · 86問 · 2ヶ月前

    RNPCP Chapter 1 to 5

    RNPCP Chapter 1 to 5

    86問 • 2ヶ月前
    ユーザ名非公開

    Plumbing Code 4

    Plumbing Code 4

    ユーザ名非公開 · 100問 · 2ヶ月前

    Plumbing Code 4

    Plumbing Code 4

    100問 • 2ヶ月前
    ユーザ名非公開

    Plumbing Code 5

    Plumbing Code 5

    ユーザ名非公開 · 100問 · 2ヶ月前

    Plumbing Code 5

    Plumbing Code 5

    100問 • 2ヶ月前
    ユーザ名非公開

    Plumbing Code 6

    Plumbing Code 6

    ユーザ名非公開 · 100問 · 2ヶ月前

    Plumbing Code 6

    Plumbing Code 6

    100問 • 2ヶ月前
    ユーザ名非公開

    Plumbing Code 7

    Plumbing Code 7

    ユーザ名非公開 · 100問 · 2ヶ月前

    Plumbing Code 7

    Plumbing Code 7

    100問 • 2ヶ月前
    ユーザ名非公開

    Plumbing Code 8

    Plumbing Code 8

    ユーザ名非公開 · 100問 · 2ヶ月前

    Plumbing Code 8

    Plumbing Code 8

    100問 • 2ヶ月前
    ユーザ名非公開

    Plumbing Code 3

    Plumbing Code 3

    ユーザ名非公開 · 100問 · 2ヶ月前

    Plumbing Code 3

    Plumbing Code 3

    100問 • 2ヶ月前
    ユーザ名非公開

    Sanitation, Plumbing Design, and Installation 2

    Sanitation, Plumbing Design, and Installation 2

    ユーザ名非公開 · 97問 · 2ヶ月前

    Sanitation, Plumbing Design, and Installation 2

    Sanitation, Plumbing Design, and Installation 2

    97問 • 2ヶ月前
    ユーザ名非公開

    Sanitation, Plumbing Design, and Installation 1

    Sanitation, Plumbing Design, and Installation 1

    ユーザ名非公開 · 99問 · 2ヶ月前

    Sanitation, Plumbing Design, and Installation 1

    Sanitation, Plumbing Design, and Installation 1

    99問 • 2ヶ月前
    ユーザ名非公開

    Sanitation, Plumbing Design, and Installation 3

    Sanitation, Plumbing Design, and Installation 3

    ユーザ名非公開 · 96問 · 2ヶ月前

    Sanitation, Plumbing Design, and Installation 3

    Sanitation, Plumbing Design, and Installation 3

    96問 • 2ヶ月前
    ユーザ名非公開

    Sanitation, Plumbing Design, and Installation 4

    Sanitation, Plumbing Design, and Installation 4

    ユーザ名非公開 · 95問 · 2ヶ月前

    Sanitation, Plumbing Design, and Installation 4

    Sanitation, Plumbing Design, and Installation 4

    95問 • 2ヶ月前
    ユーザ名非公開

    Sanitation, Plumbing Design, and Installation 5

    Sanitation, Plumbing Design, and Installation 5

    ユーザ名非公開 · 97問 · 2ヶ月前

    Sanitation, Plumbing Design, and Installation 5

    Sanitation, Plumbing Design, and Installation 5

    97問 • 2ヶ月前
    ユーザ名非公開

    Sanitation, Plumbing Design, and Installation 7

    Sanitation, Plumbing Design, and Installation 7

    ユーザ名非公開 · 100問 · 2ヶ月前

    Sanitation, Plumbing Design, and Installation 7

    Sanitation, Plumbing Design, and Installation 7

    100問 • 2ヶ月前
    ユーザ名非公開

    Sanitation, Plumbing Design, and Installation 8

    Sanitation, Plumbing Design, and Installation 8

    ユーザ名非公開 · 98問 · 2ヶ月前

    Sanitation, Plumbing Design, and Installation 8

    Sanitation, Plumbing Design, and Installation 8

    98問 • 2ヶ月前
    ユーザ名非公開

    Plumbing Tools 1

    Plumbing Tools 1

    ユーザ名非公開 · 87問 · 2ヶ月前

    Plumbing Tools 1

    Plumbing Tools 1

    87問 • 2ヶ月前
    ユーザ名非公開

    Plumbing Tools 2

    Plumbing Tools 2

    ユーザ名非公開 · 53問 · 2ヶ月前

    Plumbing Tools 2

    Plumbing Tools 2

    53問 • 2ヶ月前
    ユーザ名非公開

    Practical Problems and Experiences 1

    Practical Problems and Experiences 1

    ユーザ名非公開 · 100問 · 2ヶ月前

    Practical Problems and Experiences 1

    Practical Problems and Experiences 1

    100問 • 2ヶ月前
    ユーザ名非公開

    Practical Problems and Experiences 2

    Practical Problems and Experiences 2

    ユーザ名非公開 · 100問 · 2ヶ月前

    Practical Problems and Experiences 2

    Practical Problems and Experiences 2

    100問 • 2ヶ月前
    ユーザ名非公開

    Practical Problems and Experiences 3

    Practical Problems and Experiences 3

    ユーザ名非公開 · 99問 · 2ヶ月前

    Practical Problems and Experiences 3

    Practical Problems and Experiences 3

    99問 • 2ヶ月前
    ユーザ名非公開

    Practical Problems and Experiences 4

    Practical Problems and Experiences 4

    ユーザ名非公開 · 100問 · 2ヶ月前

    Practical Problems and Experiences 4

    Practical Problems and Experiences 4

    100問 • 2ヶ月前
    ユーザ名非公開

    Plumbing Arithmetic Terms 1

    Plumbing Arithmetic Terms 1

    ユーザ名非公開 · 49問 · 2ヶ月前

    Plumbing Arithmetic Terms 1

    Plumbing Arithmetic Terms 1

    49問 • 2ヶ月前
    ユーザ名非公開

    Plumbing Arithmetic Terms 2

    Plumbing Arithmetic Terms 2

    ユーザ名非公開 · 47問 · 2ヶ月前

    Plumbing Arithmetic Terms 2

    Plumbing Arithmetic Terms 2

    47問 • 2ヶ月前
    ユーザ名非公開

    Plumbing Arithmetic Terms 3

    Plumbing Arithmetic Terms 3

    ユーザ名非公開 · 49問 · 2ヶ月前

    Plumbing Arithmetic Terms 3

    Plumbing Arithmetic Terms 3

    49問 • 2ヶ月前
    ユーザ名非公開

    Plumbing Arithmetic Terms 4

    Plumbing Arithmetic Terms 4

    ユーザ名非公開 · 27問 · 2ヶ月前

    Plumbing Arithmetic Terms 4

    Plumbing Arithmetic Terms 4

    27問 • 2ヶ月前
    ユーザ名非公開

    Plumbing Code WSFU

    Plumbing Code WSFU

    ユーザ名非公開 · 58問 · 2ヶ月前

    Plumbing Code WSFU

    Plumbing Code WSFU

    58問 • 2ヶ月前
    ユーザ名非公開

    Practical Problems and Experiences REFRESHER 1

    Practical Problems and Experiences REFRESHER 1

    ユーザ名非公開 · 100問 · 2ヶ月前

    Practical Problems and Experiences REFRESHER 1

    Practical Problems and Experiences REFRESHER 1

    100問 • 2ヶ月前
    ユーザ名非公開

    Practical Problems and Experiences REFRESHER 2

    Practical Problems and Experiences REFRESHER 2

    ユーザ名非公開 · 70問 · 2ヶ月前

    Practical Problems and Experiences REFRESHER 2

    Practical Problems and Experiences REFRESHER 2

    70問 • 2ヶ月前
    ユーザ名非公開

    Item # and Descriptions

    Item # and Descriptions

    ユーザ名非公開 · 24問 · 2ヶ月前

    Item # and Descriptions

    Item # and Descriptions

    24問 • 2ヶ月前
    ユーザ名非公開

    Item 200 Aggregate Subbase Course

    Item 200 Aggregate Subbase Course

    ユーザ名非公開 · 16問 · 2ヶ月前

    Item 200 Aggregate Subbase Course

    Item 200 Aggregate Subbase Course

    16問 • 2ヶ月前
    ユーザ名非公開

    Item 201 Aggregate Base Course

    Item 201 Aggregate Base Course

    ユーザ名非公開 · 16問 · 2ヶ月前

    Item 201 Aggregate Base Course

    Item 201 Aggregate Base Course

    16問 • 2ヶ月前
    ユーザ名非公開

    Item 202 Crushed Aggregate Base Course

    Item 202 Crushed Aggregate Base Course

    ユーザ名非公開 · 18問 · 2ヶ月前

    Item 202 Crushed Aggregate Base Course

    Item 202 Crushed Aggregate Base Course

    18問 • 2ヶ月前
    ユーザ名非公開

    Item 203 Lime Stabilized Road Mix Base Course

    Item 203 Lime Stabilized Road Mix Base Course

    ユーザ名非公開 · 27問 · 2ヶ月前

    Item 203 Lime Stabilized Road Mix Base Course

    Item 203 Lime Stabilized Road Mix Base Course

    27問 • 2ヶ月前
    ユーザ名非公開

    Item 204 Portland Cement Stabilized Road Mix Base Course

    Item 204 Portland Cement Stabilized Road Mix Base Course

    ユーザ名非公開 · 7問 · 2ヶ月前

    Item 204 Portland Cement Stabilized Road Mix Base Course

    Item 204 Portland Cement Stabilized Road Mix Base Course

    7問 • 2ヶ月前
    ユーザ名非公開

    Item 207 Portland Cement Stabilized Treated Plant Mix Base Course

    Item 207 Portland Cement Stabilized Treated Plant Mix Base Course

    ユーザ名非公開 · 13問 · 2ヶ月前

    Item 207 Portland Cement Stabilized Treated Plant Mix Base Course

    Item 207 Portland Cement Stabilized Treated Plant Mix Base Course

    13問 • 2ヶ月前
    ユーザ名非公開

    Item 205 Asphalt Stabilized Road Mix Base Course

    Item 205 Asphalt Stabilized Road Mix Base Course

    ユーザ名非公開 · 7問 · 2ヶ月前

    Item 205 Asphalt Stabilized Road Mix Base Course

    Item 205 Asphalt Stabilized Road Mix Base Course

    7問 • 2ヶ月前
    ユーザ名非公開

    Item 206 Chemically Stabilized Road Mix Subbase/Base Course

    Item 206 Chemically Stabilized Road Mix Subbase/Base Course

    ユーザ名非公開 · 11問 · 2ヶ月前

    Item 206 Chemically Stabilized Road Mix Subbase/Base Course

    Item 206 Chemically Stabilized Road Mix Subbase/Base Course

    11問 • 2ヶ月前
    ユーザ名非公開

    Item 300 Aggregate Surface Course

    Item 300 Aggregate Surface Course

    ユーザ名非公開 · 11問 · 2ヶ月前

    Item 300 Aggregate Surface Course

    Item 300 Aggregate Surface Course

    11問 • 2ヶ月前
    ユーザ名非公開

    Item 301 Bituminous Prime Coat

    Item 301 Bituminous Prime Coat

    ユーザ名非公開 · 10問 · 2ヶ月前

    Item 301 Bituminous Prime Coat

    Item 301 Bituminous Prime Coat

    10問 • 2ヶ月前
    ユーザ名非公開

    Item 303 Bituminous Seal Coat

    Item 303 Bituminous Seal Coat

    ユーザ名非公開 · 20問 · 2ヶ月前

    Item 303 Bituminous Seal Coat

    Item 303 Bituminous Seal Coat

    20問 • 2ヶ月前
    ユーザ名非公開

    RNPCP Chapter 6 to 9

    RNPCP Chapter 6 to 9

    ユーザ名非公開 · 94問 · 2ヶ月前

    RNPCP Chapter 6 to 9

    RNPCP Chapter 6 to 9

    94問 • 2ヶ月前
    ユーザ名非公開

    RNPCP Chapter 10 to 13

    RNPCP Chapter 10 to 13

    ユーザ名非公開 · 93問 · 2ヶ月前

    RNPCP Chapter 10 to 13

    RNPCP Chapter 10 to 13

    93問 • 2ヶ月前
    ユーザ名非公開

    RNPCP Appendix A and B

    RNPCP Appendix A and B

    ユーザ名非公開 · 79問 · 2ヶ月前

    RNPCP Appendix A and B

    RNPCP Appendix A and B

    79問 • 2ヶ月前
    ユーザ名非公開

    Republic Acts

    Republic Acts

    ユーザ名非公開 · 9問 · 2ヶ月前

    Republic Acts

    Republic Acts

    9問 • 2ヶ月前
    ユーザ名非公開

    Plumbing Arithmetic Terms 5

    Plumbing Arithmetic Terms 5

    ユーザ名非公開 · 68問 · 2ヶ月前

    Plumbing Arithmetic Terms 5

    Plumbing Arithmetic Terms 5

    68問 • 2ヶ月前
    ユーザ名非公開

    Principles and Code of Ethics

    Principles and Code of Ethics

    ユーザ名非公開 · 29問 · 2ヶ月前

    Principles and Code of Ethics

    Principles and Code of Ethics

    29問 • 2ヶ月前
    ユーザ名非公開

    Plumbing Arithmetic Problems 1

    Plumbing Arithmetic Problems 1

    ユーザ名非公開 · 75問 · 2ヶ月前

    Plumbing Arithmetic Problems 1

    Plumbing Arithmetic Problems 1

    75問 • 2ヶ月前
    ユーザ名非公開

    Item 406 Prestressed Concrete Structures

    Item 406 Prestressed Concrete Structures

    ユーザ名非公開 · 36問 · 2ヶ月前

    Item 406 Prestressed Concrete Structures

    Item 406 Prestressed Concrete Structures

    36問 • 2ヶ月前
    ユーザ名非公開

    Item 405 Structural Concrete

    Item 405 Structural Concrete

    ユーザ名非公開 · 41問 · 2ヶ月前

    Item 405 Structural Concrete

    Item 405 Structural Concrete

    41問 • 2ヶ月前
    ユーザ名非公開

    Item 400 Piling

    Item 400 Piling

    ユーザ名非公開 · 80問 · 2ヶ月前

    Item 400 Piling

    Item 400 Piling

    80問 • 2ヶ月前
    ユーザ名非公開

    Item 311 Portland Cement Concrete Pavement (PART 2)

    Item 311 Portland Cement Concrete Pavement (PART 2)

    ユーザ名非公開 · 61問 · 2ヶ月前

    Item 311 Portland Cement Concrete Pavement (PART 2)

    Item 311 Portland Cement Concrete Pavement (PART 2)

    61問 • 2ヶ月前
    ユーザ名非公開

    Item 311 Portland Cement Concrete Pavement (PART 1)

    Item 311 Portland Cement Concrete Pavement (PART 1)

    ユーザ名非公開 · 78問 · 2ヶ月前

    Item 311 Portland Cement Concrete Pavement (PART 1)

    Item 311 Portland Cement Concrete Pavement (PART 1)

    78問 • 2ヶ月前
    ユーザ名非公開

    Standpipe Requirements

    Standpipe Requirements

    ユーザ名非公開 · 29問 · 2ヶ月前

    Standpipe Requirements

    Standpipe Requirements

    29問 • 2ヶ月前
    ユーザ名非公開

    Spdi 1

    Spdi 1

    ユーザ名非公開 · 100問 · 2ヶ月前

    Spdi 1

    Spdi 1

    100問 • 2ヶ月前
    ユーザ名非公開

    Spdi 2

    Spdi 2

    ユーザ名非公開 · 98問 · 2ヶ月前

    Spdi 2

    Spdi 2

    98問 • 2ヶ月前
    ユーザ名非公開

    SPI version D pt 2

    SPI version D pt 2

    ユーザ名非公開 · 61問 · 2ヶ月前

    SPI version D pt 2

    SPI version D pt 2

    61問 • 2ヶ月前
    ユーザ名非公開

    plumbing code

    plumbing code

    ユーザ名非公開 · 100問 · 2ヶ月前

    plumbing code

    plumbing code

    100問 • 2ヶ月前
    ユーザ名非公開

    plumbing code 2

    plumbing code 2

    ユーザ名非公開 · 100問 · 2ヶ月前

    plumbing code 2

    plumbing code 2

    100問 • 2ヶ月前
    ユーザ名非公開

    plumbing code 3

    plumbing code 3

    ユーザ名非公開 · 56問 · 2ヶ月前

    plumbing code 3

    plumbing code 3

    56問 • 2ヶ月前
    ユーザ名非公開

    Practice Problem

    Practice Problem

    ユーザ名非公開 · 70問 · 2ヶ月前

    Practice Problem

    Practice Problem

    70問 • 2ヶ月前
    ユーザ名非公開

    PP pre

    PP pre

    ユーザ名非公開 · 100問 · 2ヶ月前

    PP pre

    PP pre

    100問 • 2ヶ月前
    ユーザ名非公開

    PP Pre 2

    PP Pre 2

    ユーザ名非公開 · 100問 · 2ヶ月前

    PP Pre 2

    PP Pre 2

    100問 • 2ヶ月前
    ユーザ名非公開

    PP pre 3

    PP pre 3

    ユーザ名非公開 · 44問 · 2ヶ月前

    PP pre 3

    PP pre 3

    44問 • 2ヶ月前
    ユーザ名非公開

    WT 1

    WT 1

    ユーザ名非公開 · 50問 · 2ヶ月前

    WT 1

    WT 1

    50問 • 2ヶ月前
    ユーザ名非公開

    WT 2

    WT 2

    ユーザ名非公開 · 48問 · 2ヶ月前

    WT 2

    WT 2

    48問 • 2ヶ月前
    ユーザ名非公開

    WT 3

    WT 3

    ユーザ名非公開 · 50問 · 2ヶ月前

    WT 3

    WT 3

    50問 • 2ヶ月前
    ユーザ名非公開

    WT 6

    WT 6

    ユーザ名非公開 · 50問 · 2ヶ月前

    WT 6

    WT 6

    50問 • 2ヶ月前
    ユーザ名非公開

    Definition of Terms 1

    Definition of Terms 1

    ユーザ名非公開 · 90問 · 2ヶ月前

    Definition of Terms 1

    Definition of Terms 1

    90問 • 2ヶ月前
    ユーザ名非公開

    Definition of Terms 2

    Definition of Terms 2

    ユーザ名非公開 · 90問 · 2ヶ月前

    Definition of Terms 2

    Definition of Terms 2

    90問 • 2ヶ月前
    ユーザ名非公開

    Definition of Terms 3

    Definition of Terms 3

    ユーザ名非公開 · 90問 · 2ヶ月前

    Definition of Terms 3

    Definition of Terms 3

    90問 • 2ヶ月前
    ユーザ名非公開

    Refresher SPDI 1

    Refresher SPDI 1

    ユーザ名非公開 · 100問 · 2ヶ月前

    Refresher SPDI 1

    Refresher SPDI 1

    100問 • 2ヶ月前
    ユーザ名非公開

    Refresher SPDI 1

    Refresher SPDI 1

    ユーザ名非公開 · 9問 · 2ヶ月前

    Refresher SPDI 1

    Refresher SPDI 1

    9問 • 2ヶ月前
    ユーザ名非公開

    Weekly Test 1

    Weekly Test 1

    ユーザ名非公開 · 50問 · 2ヶ月前

    Weekly Test 1

    Weekly Test 1

    50問 • 2ヶ月前
    ユーザ名非公開

    Weekly Test 2

    Weekly Test 2

    ユーザ名非公開 · 50問 · 2ヶ月前

    Weekly Test 2

    Weekly Test 2

    50問 • 2ヶ月前
    ユーザ名非公開

    Weekly Test 3

    Weekly Test 3

    ユーザ名非公開 · 50問 · 2ヶ月前

    Weekly Test 3

    Weekly Test 3

    50問 • 2ヶ月前
    ユーザ名非公開

    MPLE

    MPLE

    ユーザ名非公開 · 41問 · 2ヶ月前

    MPLE

    MPLE

    41問 • 2ヶ月前
    ユーザ名非公開

    CDG- Plumbing Code 1

    CDG- Plumbing Code 1

    ユーザ名非公開 · 48問 · 2ヶ月前

    CDG- Plumbing Code 1

    CDG- Plumbing Code 1

    48問 • 2ヶ月前
    ユーザ名非公開

    CDG- Plumbing Code 1.1

    CDG- Plumbing Code 1.1

    ユーザ名非公開 · 50問 · 2ヶ月前

    CDG- Plumbing Code 1.1

    CDG- Plumbing Code 1.1

    50問 • 2ヶ月前
    ユーザ名非公開

    CDG- Plumbing Code 1.4

    CDG- Plumbing Code 1.4

    ユーザ名非公開 · 23問 · 2ヶ月前

    CDG- Plumbing Code 1.4

    CDG- Plumbing Code 1.4

    23問 • 2ヶ月前
    ユーザ名非公開

    CDG- Plumbing Code 1.2

    CDG- Plumbing Code 1.2

    ユーザ名非公開 · 50問 · 2ヶ月前

    CDG- Plumbing Code 1.2

    CDG- Plumbing Code 1.2

    50問 • 2ヶ月前
    ユーザ名非公開

    CGD- Plumbing Code 1.3

    CGD- Plumbing Code 1.3

    ユーザ名非公開 · 50問 · 2ヶ月前

    CGD- Plumbing Code 1.3

    CGD- Plumbing Code 1.3

    50問 • 2ヶ月前
    ユーザ名非公開

    Plumbing Code 1

    Plumbing Code 1

    ユーザ名非公開 · 50問 · 2ヶ月前

    Plumbing Code 1

    Plumbing Code 1

    50問 • 2ヶ月前
    ユーザ名非公開

    Plumbing Code 1.1

    Plumbing Code 1.1

    ユーザ名非公開 · 22問 · 2ヶ月前

    Plumbing Code 1.1

    Plumbing Code 1.1

    22問 • 2ヶ月前
    ユーザ名非公開

    CGD - Sanitary Design

    CGD - Sanitary Design

    ユーザ名非公開 · 19問 · 2ヶ月前

    CGD - Sanitary Design

    CGD - Sanitary Design

    19問 • 2ヶ月前
    ユーザ名非公開

    Practical Problems 1

    Practical Problems 1

    ユーザ名非公開 · 50問 · 2ヶ月前

    Practical Problems 1

    Practical Problems 1

    50問 • 2ヶ月前
    ユーザ名非公開

    Practical Problems 1.1

    Practical Problems 1.1

    ユーザ名非公開 · 47問 · 2ヶ月前

    Practical Problems 1.1

    Practical Problems 1.1

    47問 • 2ヶ月前
    ユーザ名非公開

    Practical Problems 2

    Practical Problems 2

    ユーザ名非公開 · 50問 · 2ヶ月前

    Practical Problems 2

    Practical Problems 2

    50問 • 2ヶ月前
    ユーザ名非公開

    Practical Problems 2.1

    Practical Problems 2.1

    ユーザ名非公開 · 50問 · 2ヶ月前

    Practical Problems 2.1

    Practical Problems 2.1

    50問 • 2ヶ月前
    ユーザ名非公開

    Plumbing Arithmetic 1

    Plumbing Arithmetic 1

    ユーザ名非公開 · 50問 · 2ヶ月前

    Plumbing Arithmetic 1

    Plumbing Arithmetic 1

    50問 • 2ヶ月前
    ユーザ名非公開

    Plumbing Arithmetic 1.1

    Plumbing Arithmetic 1.1

    ユーザ名非公開 · 50問 · 2ヶ月前

    Plumbing Arithmetic 1.1

    Plumbing Arithmetic 1.1

    50問 • 2ヶ月前
    ユーザ名非公開

    Plumbing Arithmetic 2

    Plumbing Arithmetic 2

    ユーザ名非公開 · 50問 · 2ヶ月前

    Plumbing Arithmetic 2

    Plumbing Arithmetic 2

    50問 • 2ヶ月前
    ユーザ名非公開

    Plumbing Arithmetic 2.1

    Plumbing Arithmetic 2.1

    ユーザ名非公開 · 50問 · 2ヶ月前

    Plumbing Arithmetic 2.1

    Plumbing Arithmetic 2.1

    50問 • 2ヶ月前
    ユーザ名非公開

    問題一覧

  • 1

    The developed length between the trap of a water closet or similar fixture measured from the top of closet ring (closet flange) to inner edge of vent shall not exceed _____ m.

    1.8

  • 2

    Interceptors for sand and similar heavy solids shall have a water seal of not less than _____ mm deep.

    152

  • 3

    The sand interceptor shall have a minimum dimension of _____ m^2 for the net free opening of the inlet section.

    0.2

  • 4

    No standpipe receptor for any clotheswasher shall extend more than _____ m nor less than 0.45 m above its trap.

    0.8

  • 5

    Estimated sewage flow rate for Day Camps (no meals served)

    56.8 LpD

  • 6

    Interceptors shall be of approved design and be of not less than _____ compartments

    2

  • 7

    Lead pipe shall be supported at intervals not exceeding _____ m at centers with a rigid vertical back-up.

    1.2

  • 8

    A _____ kpa air pressure may be substituted for the water test.

    344.5

  • 9

    No part of the perimeter of the leaching bed shall be more than ____ from a distribution drain line.

    0.9 m

  • 10

    When disposal fields are installed, a minimum of _____ of trench bottom shall be provided for each system exclusive of any hard pan, rock, clay, or other impervious formations.

    14 sqm

  • 11

    Minimum thickness of lead safe pan in mm

    1.6

  • 12

    The corresponding maximum trap loading pipe size for fixture unit 6 (answer in mm)

    76

  • 13

    The arch or dome of seepage pit shall be an approved type one or two piece reinforced concrete slab of ____ minimum compressive strength.

    2500 psi

  • 14

    The width of a continuous and indelibly colored stripe in copper tubing.

    6.4 mm

  • 15

    Closet rings shall be tightly fastened with corrosive resistant fasteners up to the floor with top surface _____ mm above finish floor.

    6.4

  • 16

    Estimated sewage flow rate for airports per employee

    56.8 LpD

  • 17

    Cleanouts may be omitted on a horizontal drain line less than _____ m in length unless such line is serving sinks or urinals

    1.5

  • 18

    The public sewer may be considered as not being available when such public sewer or any exterior drainage facility connected thereto is located more than _____ m from any proposed building or exterior drainage facility on any lot or premises thereat.

    61

  • 19

    The diameter of an individual vent shall not be less than _____ mm nor less than 1/2 the diameter of the drain to which it is connected.

    32

  • 20

    Each pressure relief valve shall be an approved automatic type with drain and each such relief valve shall be set at a pressure of not more than _____ kpa

    1033

  • 21

    Tunnels shall have a clear height of _____ m above the pipe and shall be limited in length to 1/2 the depth of trench, with a maximum length of 2.4 meters.

    0.6 m

  • 22

    Trenches shall be back-filled in thin layers of _____ m.

    0.3

  • 23

    Each run of pipe which is more than _____ m in total developed length shall be provided with a cleanout.

    15

  • 24

    Every abandoned building (house) sewer, or part thereof, shall be plugged or capped in an approved manner within _____ m of the property line.

    1.5

  • 25

    Lead bends and lead traps shall not be less than ____ mm in wall thickness.

    3.2

  • 26

    Limit stops shall be provided on such valves and shall be adjusted to deliver hot water with a maximum temperature of _____ deg. C

    48.8

  • 27

    (Vertical wall areas for rainwater piping size) For two adjacent walls, add _____ percent of the total wall areas to the roof area.

    35

  • 28

    If the highest group of the fixtures contains flushometer valves , the pressure for the group should not be less than _____.

    103.42 kpa

  • 29

    Each seepage pit shall have a minimum sidewall of _____ below the inlet.

    3 m

  • 30

    Each vent pipe or stack through roof shall extend its flashing all around and the stack vent shall terminate vertically not less than _____ m above the roof.

    0.15

  • 31

    The yoke vent connection with the vent stack shall be placed not less than _____ m above the floor level.

    1

  • 32

    An additional cleanout shall be provided on a horizontal line with an aggregate offset angle of direction exceeding _____ degrees.

    135

  • 33

    (Septic Tank) The liquid depth shall be not less than ______ nor more than _____.

    0.6 m to 1.8 m

  • 34

    Distance of Building or structures to Building Sewer (answer in meters)

    0.60 m

  • 35

    Storage factor for fully equipped commercial kitchen- 16 hours operation

    2

  • 36

    Backflow prevention for hot water over ____ deg. C shall be a listed type assembly.

    43.3

  • 37

    Water pipes crossing sewer or drainage piping constructed of clay or materials, not approved for use within a building, shall be laid a minimum of _____ m above the sewer or drainpipe.

    0.3

  • 38

    No galvanized wrought iron or galvanized steel pipe shall be used underground and shall be kept at least _____ mm above ground.

    152

  • 39

    When the quantity of sewage exceeds the amount that can be disposed in a _____ meter of each line, a dosing tank shall be used.

    152.4 m

  • 40

    457.2 m

    34.5

  • 41

    The water shall be kept in the pipe system or in the portion under test for at least _____ minutes before inspection starts.

    15

  • 42

    Allowable slope of a pipe having a diameter 203 mm or larger is _____%.

    0.5

  • 43

    Fixture outlets shall not be connected to the horizontal excreta drainage piping system within _____ m of any vertical to horizontal change of direction of a stack containing suds-producing fixtures.

    2.4

  • 44

    No underfloor cleanout in any residential occupancy shall be located more than _____ m from an access door, trap door or crawl hole.

    6.1

  • 45

    For flush tank supplies, the available pressure may not be less than _____.

    55.16 kpa

  • 46

    Depth of equivalent area of rectangular gutter = ____ x diameter.

    0.392

  • 47

    Retention time of commercial kitchen waste

    2.5 hours

  • 48

    Fixtures that also serves as a vent for not to exceed _____ fixtures.

    4

  • 49

    The distance to vent of a trap arm 51 mm in diameter. (answer in meters)

    1.52

  • 50

    Where the local water pressure is in excess of _____ kpa, an approved-type pressure regulator preceded by an adequately sized strainer shall be installed to reduce the pressure on the building side of the regulator to the required supply pressure.

    551

  • 51

    The corresponding maximum trap loading pipe size for fixture unit 3 (answer in mm)

    38

  • 52

    An exposed and readily accessible drawn brass tubing trap, not less than Gauge ___ may be used on fixtures discharging domestic sewage but shall exclude urine.

    17

  • 53

    Distribution drain lines in leaching beds shall be more than ____ apart on centers.

    1.8 m

  • 54

    Each grease trap shall have an approved water seal of not less than _____ mm.

    51

  • 55

    Cleanout size of 64 mm pipe. (answer in mm)

    64

  • 56

    Each vent opening shall terminate not less than _____ m above any openable window, door opening, air intake or vent shaft.

    0.9

  • 57

    Wiped lead joints shall have an exposed surface on each side of a joint not less than _____ mm.

    19

  • 58

    Cast iron fittings up to and including _____ mm in size when used in connection with potable water piping shall be galvanized.

    51

  • 59

    In a water test, each section shall be filled with water, but no section shall be tested with less than _____ m head of water.

    3

  • 60

    The minimum size of any pump discharge or any discharge pipe from a sump having a water closet connected thereto shall not be less than _____ mm diameter.

    50.8

  • 61

    Distance of Septic Tank to to Water Supply wells.

    15.2 m

  • 62

    The inlet compartment of any septic tank shall be not less than _____ of the total capacity of the tank.

    2/3

  • 63

    When disposal fields and/or seepage pits are installed in sloping ground, the minimum horizontal distance between any part of the leaching system and ground surface shall be _____.

    4.6 m

  • 64

    The minimum wall thickness of any steel tank shall be _____ mm.

    2.8 mm

  • 65

    How many tests cocks does a Double Check Valve Backflow Prevention Assembly have?

    4

  • 66

    Vertical vent pipes for outdoor installations shall extend to at least _____ m distant from any part of the roof that is used for other purposes.

    3

  • 67

    Water closets shall be computed as _____ fixture units when determining septic tank size.

    6

  • 68

    Access to each septic tank shall be provided by at least two manholes _____ in minimum dimension.

    508 mm

  • 69

    Side walls of the septic tank shall exceed at least _____ above the liquid depth.

    228.6 mm

  • 70

    Support trap arms in excess of _____ feet in length as close as possible to the trap.

    3

  • 71

    Restaurant kitchen and other special-use sinks may be made of approved-type bonderized and galvanized sheet steel of not less than Gauge No. _____.

    16

  • 72

    Water pipes and fittings with a lead content that exceed ___% shall be prohibited and not used in potable piping systems.

    8

  • 73

    Water pipe joints shall be installed not less than _____ m away from sewer line in both directions.

    3

  • 74

    Such tailpiece or connections shall be as short as possible and in no case shall exceed _____ m long.

    0.6

  • 75

    Before placing filter material or drain lines in a prepared excavation, all smeared or compacted surfaces shall be removed from trenches by raking to a depth of _____ mm.

    25.4 mm

  • 76

    All septic tank covers shall be capable of supporting an earth load of not less than _____ when the maximum coverage does not exceed 9m.

    14.4 kpa

  • 77

    Where there is exposure to skin contamination with poisonous, infectious, or irritating materials, provide 1 lavatory for each _____ persons.

    5

  • 78

    Minimum depth of filter materials under drain lines

    304.8 mm

  • 79

    When seepage pits are used in combination with disposal fields, the filter material in the trenches shall terminate at least _____ from the pit excavation.

    1.5 m

  • 80

    The vacuum breaker shall be installed at the discharge side of the flushometer valve with the critical level at least _____ mm.

    152