問題一覧
1
valve
2
3"
3
reinforced concrete
4
white
5
gas pipe
6
copper sulphate
7
establishing a grade line then digging the trench exactly this line
8
combined drain
9
Vertical pipe of a system of soil, waste or vent piping that extends through one or more stories
10
As close to the fixture as possible, preferably inside the building
11
It should be underneath the driveway
12
tensile stress
13
blue
14
25mm
15
No
16
Volume of liquid and solid waste
17
service sinks
18
stack table
19
milligrams per kg
20
15.2m
21
large trees
22
soil pipe
23
The pressure inside the pipe equates to the pressure outside the pipe causing the water to stop at that point where it appears
24
50-100 liters
25
glycol
26
yards catch basin
27
flushometer valve
28
booster pump
29
2
30
1 1/2"
31
ceramic component
32
2"
33
threaded
34
pipe chase
35
water pipe
36
20-25" above the finished floor line
37
riser run-out
38
require smaller size supply
39
National Standards for Drinking Water
40
To use up the difference in pressure from the service to the supply fixtures
41
one part cement, one part sand and water
42
Cut fitting out and install new fitting
43
Close the main shutoff valve
44
aerobic treatment system
45
riser run-out
46
UPVC
47
2.4m
48
basin wrench
49
Waste water runs away from solids, eventually causing stoppages
50
countertop
51
asbestos
52
capillarity action
53
To allow easier installation
54
DTI
55
plastic pipe
56
flushometer
57
waste
58
2
59
traps
60
flowing sluggishly
61
Working from the center out
62
RA 9514
63
1.2m
64
Ventilate it or use self contained breathing appratus
65
Backfill in layers or not more than 4" and tamp with mechanical tamper
66
30min/2.5fps
67
after you inspect the pipe
68
reverse trap
69
2.3m
70
de-chlorination
71
2
72
19mm
73
catch basin
74
easier operation and tighter seal
75
38mm or 1 1/2"
76
76mm or 3"
77
curb cock/stop
78
standpipe
79
inside columns
80
drywall
81
water main to the water meter
82
flushing, dosing, flushing, testing
83
air gap
84
51mm or 2"
85
plug valves
86
waterproof all surfaces
87
5
88
RA 9275
89
near the curb
90
scoop
91
government
92
removal of temporary hardness
93
liquid line
94
compression coupling
95
51mm or 2"
96
RA 8749
97
provide the end of roof leader with flexible material
98
25mm or 1"
99
D20
100
PD 198
YT1 Materials Engineer EXAM
YT1 Materials Engineer EXAM
ユーザ名非公開 · 100問 · 13日前YT1 Materials Engineer EXAM
YT1 Materials Engineer EXAM
100問 • 13日前YT2 Materials Engineer EXAM
YT2 Materials Engineer EXAM
ユーザ名非公開 · 100問 · 13日前YT2 Materials Engineer EXAM
YT2 Materials Engineer EXAM
100問 • 13日前Project Engineer YT 1
Project Engineer YT 1
ユーザ名非公開 · 100問 · 13日前Project Engineer YT 1
Project Engineer YT 1
100問 • 13日前Project Engineer EXAM
Project Engineer EXAM
ユーザ名非公開 · 62問 · 13日前Project Engineer EXAM
Project Engineer EXAM
62問 • 13日前Project Engineer EXAM 68
Project Engineer EXAM 68
ユーザ名非公開 · 100問 · 13日前Project Engineer EXAM 68
Project Engineer EXAM 68
100問 • 13日前Project Engineer EXAM 82
Project Engineer EXAM 82
ユーザ名非公開 · 100問 · 13日前Project Engineer EXAM 82
Project Engineer EXAM 82
100問 • 13日前July 2023 PE Refresher
July 2023 PE Refresher
ユーザ名非公開 · 70問 · 13日前July 2023 PE Refresher
July 2023 PE Refresher
70問 • 13日前August 2019 Special PE Exam
August 2019 Special PE Exam
ユーザ名非公開 · 93問 · 13日前August 2019 Special PE Exam
August 2019 Special PE Exam
93問 • 13日前RNPCP Chapter 1 to 5
RNPCP Chapter 1 to 5
ユーザ名非公開 · 86問 · 13日前RNPCP Chapter 1 to 5
RNPCP Chapter 1 to 5
86問 • 13日前Plumbing Code 4
Plumbing Code 4
ユーザ名非公開 · 100問 · 13日前Plumbing Code 4
Plumbing Code 4
100問 • 13日前Plumbing Code 5
Plumbing Code 5
ユーザ名非公開 · 100問 · 13日前Plumbing Code 5
Plumbing Code 5
100問 • 13日前Plumbing Code 6
Plumbing Code 6
ユーザ名非公開 · 100問 · 13日前Plumbing Code 6
Plumbing Code 6
100問 • 13日前Plumbing Code 7
Plumbing Code 7
ユーザ名非公開 · 100問 · 13日前Plumbing Code 7
Plumbing Code 7
100問 • 13日前Plumbing Code 8
Plumbing Code 8
ユーザ名非公開 · 100問 · 13日前Plumbing Code 8
Plumbing Code 8
100問 • 13日前Plumbing Code 3
Plumbing Code 3
ユーザ名非公開 · 100問 · 13日前Plumbing Code 3
Plumbing Code 3
100問 • 13日前Sanitation, Plumbing Design, and Installation 2
Sanitation, Plumbing Design, and Installation 2
ユーザ名非公開 · 97問 · 13日前Sanitation, Plumbing Design, and Installation 2
Sanitation, Plumbing Design, and Installation 2
97問 • 13日前Sanitation, Plumbing Design, and Installation 1
Sanitation, Plumbing Design, and Installation 1
ユーザ名非公開 · 99問 · 13日前Sanitation, Plumbing Design, and Installation 1
Sanitation, Plumbing Design, and Installation 1
99問 • 13日前Sanitation, Plumbing Design, and Installation 3
Sanitation, Plumbing Design, and Installation 3
ユーザ名非公開 · 96問 · 13日前Sanitation, Plumbing Design, and Installation 3
Sanitation, Plumbing Design, and Installation 3
96問 • 13日前Sanitation, Plumbing Design, and Installation 4
Sanitation, Plumbing Design, and Installation 4
ユーザ名非公開 · 95問 · 13日前Sanitation, Plumbing Design, and Installation 4
Sanitation, Plumbing Design, and Installation 4
95問 • 13日前Sanitation, Plumbing Design, and Installation 5
Sanitation, Plumbing Design, and Installation 5
ユーザ名非公開 · 97問 · 13日前Sanitation, Plumbing Design, and Installation 5
Sanitation, Plumbing Design, and Installation 5
97問 • 13日前問題一覧
1
valve
2
3"
3
reinforced concrete
4
white
5
gas pipe
6
copper sulphate
7
establishing a grade line then digging the trench exactly this line
8
combined drain
9
Vertical pipe of a system of soil, waste or vent piping that extends through one or more stories
10
As close to the fixture as possible, preferably inside the building
11
It should be underneath the driveway
12
tensile stress
13
blue
14
25mm
15
No
16
Volume of liquid and solid waste
17
service sinks
18
stack table
19
milligrams per kg
20
15.2m
21
large trees
22
soil pipe
23
The pressure inside the pipe equates to the pressure outside the pipe causing the water to stop at that point where it appears
24
50-100 liters
25
glycol
26
yards catch basin
27
flushometer valve
28
booster pump
29
2
30
1 1/2"
31
ceramic component
32
2"
33
threaded
34
pipe chase
35
water pipe
36
20-25" above the finished floor line
37
riser run-out
38
require smaller size supply
39
National Standards for Drinking Water
40
To use up the difference in pressure from the service to the supply fixtures
41
one part cement, one part sand and water
42
Cut fitting out and install new fitting
43
Close the main shutoff valve
44
aerobic treatment system
45
riser run-out
46
UPVC
47
2.4m
48
basin wrench
49
Waste water runs away from solids, eventually causing stoppages
50
countertop
51
asbestos
52
capillarity action
53
To allow easier installation
54
DTI
55
plastic pipe
56
flushometer
57
waste
58
2
59
traps
60
flowing sluggishly
61
Working from the center out
62
RA 9514
63
1.2m
64
Ventilate it or use self contained breathing appratus
65
Backfill in layers or not more than 4" and tamp with mechanical tamper
66
30min/2.5fps
67
after you inspect the pipe
68
reverse trap
69
2.3m
70
de-chlorination
71
2
72
19mm
73
catch basin
74
easier operation and tighter seal
75
38mm or 1 1/2"
76
76mm or 3"
77
curb cock/stop
78
standpipe
79
inside columns
80
drywall
81
water main to the water meter
82
flushing, dosing, flushing, testing
83
air gap
84
51mm or 2"
85
plug valves
86
waterproof all surfaces
87
5
88
RA 9275
89
near the curb
90
scoop
91
government
92
removal of temporary hardness
93
liquid line
94
compression coupling
95
51mm or 2"
96
RA 8749
97
provide the end of roof leader with flexible material
98
25mm or 1"
99
D20
100
PD 198