Item 303 Bituminous Seal Coat
20問 • 13日前
  • ユーザ名非公開
  • 通報

    問題一覧

  • 1

    Quantity for bituminous material (L/m2) for seal coat, Type 1

    0.20 to 0.50

  • 2

    Quantity for bituminous material (L/m2) for seal coat, Type 2

    0.51 to 1.00

  • 3

    Quantity for bituminous material (L/m2) for seal coat, Type 3

    1.01 to 1.50

  • 4

    Quantity of cover aggregate (kg/sq.m) for seal coat, Type 1

    None

  • 5

    Quantity of cover aggregate (kg/sq.m) for seal coat, Type 2

    5.00 to 10.00

  • 6

    Quantity of cover aggregate (kg/sq.m) for seal coat, Type 3

    10.01 to 14.00

  • 7

    The cover aggregate for _____ seal coat shall consist of sand and fine screenings, reasonably free from dirt or other organic matter.

    Type 2

  • 8

    Aggregate for ____ seal coat shall be crushed stone, crushed slag, or crushed gravel.

    Type 3

  • 9

    Cover aggregate shall have a mass percent of wear not exceeding _____ according to Los Angeles Abrasion Test.

    40

  • 10

    In cover aggregate, when crushed slag is used, it shall be of uniform density and quality and shall have a density of not less than ____.

    960 kg/cu.m

  • 11

    In no event seal coat shall be placed on a newly constructed or reconditioned surfaces in less than ____ after such surface is laid and opened to traffic, unless ordered in written by the engineer.

    10 days

  • 12

    For asphalt cement, bituminous material shall be applied by means of pressure distributor at the rate of approximately

    0.9 to 1.8 liters

  • 13

    For cutback asphalt, bituminous material shall be applied by means of pressure distributor at the rate of approximately ____ per square meter of surface, in a uniform unbroken spread over the section to be treated.

    1.5 to 3.0 liters

  • 14

    The pressure distributor shall be equipped with a _______ registering the speed and so located as to be visible to the truck driver.

    fifth wheel tacometer

  • 15

    The distributor pump shall be equipped with a gauge registering ______ passing through the nozzles and readily visible to the operator.

    liters per minute

  • 16

    The application of bituminous material at the junction of spreads is not in excess of the specified quantities, any excess shall be removed from the surface by a:

    squeegee

  • 17

    If necessary, to obtain proper junction of spreads, a strip of manila paper approximately ____ wide and at least as long as the spray bar shall be used at the beginning and end of each spread.

    1m

  • 18

    Immediately after the application of asphalt, the cover aggregate shall be evenly spread over the surface at the rate of approximately _________ per sq.m

    0.004 to 0.007 cu.m

  • 19

    As soon as the cover aggregate has been spread, the spread shall be broomed lightly with an approved push or drag broom to insure an even distribution, and shall then be rolled with an approved power roller weighing not less than ____, nor more than ____ to a uniform surface.

    5 tonnes, 6 tonnes

  • 20

    The quantities of bituminous material and cover aggregate shall be measured by _____, calculated by the actual size of application approved by the engineer.

    tonne

  • YT1 Materials Engineer EXAM

    YT1 Materials Engineer EXAM

    ユーザ名非公開 · 100問 · 13日前

    YT1 Materials Engineer EXAM

    YT1 Materials Engineer EXAM

    100問 • 13日前
    ユーザ名非公開

    YT2 Materials Engineer EXAM

    YT2 Materials Engineer EXAM

    ユーザ名非公開 · 100問 · 13日前

    YT2 Materials Engineer EXAM

    YT2 Materials Engineer EXAM

    100問 • 13日前
    ユーザ名非公開

    Project Engineer YT 1

    Project Engineer YT 1

    ユーザ名非公開 · 100問 · 13日前

    Project Engineer YT 1

    Project Engineer YT 1

    100問 • 13日前
    ユーザ名非公開

    Project Engineer EXAM

    Project Engineer EXAM

    ユーザ名非公開 · 62問 · 13日前

    Project Engineer EXAM

    Project Engineer EXAM

    62問 • 13日前
    ユーザ名非公開

    Project Engineer EXAM 68

    Project Engineer EXAM 68

    ユーザ名非公開 · 100問 · 13日前

    Project Engineer EXAM 68

    Project Engineer EXAM 68

    100問 • 13日前
    ユーザ名非公開

    Project Engineer EXAM 82

    Project Engineer EXAM 82

    ユーザ名非公開 · 100問 · 13日前

    Project Engineer EXAM 82

    Project Engineer EXAM 82

    100問 • 13日前
    ユーザ名非公開

    July 2023 PE Refresher

    July 2023 PE Refresher

    ユーザ名非公開 · 70問 · 13日前

    July 2023 PE Refresher

    July 2023 PE Refresher

    70問 • 13日前
    ユーザ名非公開

    August 2019 Special PE Exam

    August 2019 Special PE Exam

    ユーザ名非公開 · 93問 · 13日前

    August 2019 Special PE Exam

    August 2019 Special PE Exam

    93問 • 13日前
    ユーザ名非公開

    RNPCP Chapter 1 to 5

    RNPCP Chapter 1 to 5

    ユーザ名非公開 · 86問 · 13日前

    RNPCP Chapter 1 to 5

    RNPCP Chapter 1 to 5

    86問 • 13日前
    ユーザ名非公開

    Plumbing Code 4

    Plumbing Code 4

    ユーザ名非公開 · 100問 · 13日前

    Plumbing Code 4

    Plumbing Code 4

    100問 • 13日前
    ユーザ名非公開

    Plumbing Code 5

    Plumbing Code 5

    ユーザ名非公開 · 100問 · 13日前

    Plumbing Code 5

    Plumbing Code 5

    100問 • 13日前
    ユーザ名非公開

    Plumbing Code 6

    Plumbing Code 6

    ユーザ名非公開 · 100問 · 13日前

    Plumbing Code 6

    Plumbing Code 6

    100問 • 13日前
    ユーザ名非公開

    Plumbing Code 7

    Plumbing Code 7

    ユーザ名非公開 · 100問 · 13日前

    Plumbing Code 7

    Plumbing Code 7

    100問 • 13日前
    ユーザ名非公開

    Plumbing Code 8

    Plumbing Code 8

    ユーザ名非公開 · 100問 · 13日前

    Plumbing Code 8

    Plumbing Code 8

    100問 • 13日前
    ユーザ名非公開

    Plumbing Code 3

    Plumbing Code 3

    ユーザ名非公開 · 100問 · 13日前

    Plumbing Code 3

    Plumbing Code 3

    100問 • 13日前
    ユーザ名非公開

    Sanitation, Plumbing Design, and Installation 2

    Sanitation, Plumbing Design, and Installation 2

    ユーザ名非公開 · 97問 · 13日前

    Sanitation, Plumbing Design, and Installation 2

    Sanitation, Plumbing Design, and Installation 2

    97問 • 13日前
    ユーザ名非公開

    Sanitation, Plumbing Design, and Installation 1

    Sanitation, Plumbing Design, and Installation 1

    ユーザ名非公開 · 99問 · 13日前

    Sanitation, Plumbing Design, and Installation 1

    Sanitation, Plumbing Design, and Installation 1

    99問 • 13日前
    ユーザ名非公開

    Sanitation, Plumbing Design, and Installation 3

    Sanitation, Plumbing Design, and Installation 3

    ユーザ名非公開 · 96問 · 13日前

    Sanitation, Plumbing Design, and Installation 3

    Sanitation, Plumbing Design, and Installation 3

    96問 • 13日前
    ユーザ名非公開

    Sanitation, Plumbing Design, and Installation 4

    Sanitation, Plumbing Design, and Installation 4

    ユーザ名非公開 · 95問 · 13日前

    Sanitation, Plumbing Design, and Installation 4

    Sanitation, Plumbing Design, and Installation 4

    95問 • 13日前
    ユーザ名非公開

    Sanitation, Plumbing Design, and Installation 5

    Sanitation, Plumbing Design, and Installation 5

    ユーザ名非公開 · 97問 · 13日前

    Sanitation, Plumbing Design, and Installation 5

    Sanitation, Plumbing Design, and Installation 5

    97問 • 13日前
    ユーザ名非公開

    問題一覧

  • 1

    Quantity for bituminous material (L/m2) for seal coat, Type 1

    0.20 to 0.50

  • 2

    Quantity for bituminous material (L/m2) for seal coat, Type 2

    0.51 to 1.00

  • 3

    Quantity for bituminous material (L/m2) for seal coat, Type 3

    1.01 to 1.50

  • 4

    Quantity of cover aggregate (kg/sq.m) for seal coat, Type 1

    None

  • 5

    Quantity of cover aggregate (kg/sq.m) for seal coat, Type 2

    5.00 to 10.00

  • 6

    Quantity of cover aggregate (kg/sq.m) for seal coat, Type 3

    10.01 to 14.00

  • 7

    The cover aggregate for _____ seal coat shall consist of sand and fine screenings, reasonably free from dirt or other organic matter.

    Type 2

  • 8

    Aggregate for ____ seal coat shall be crushed stone, crushed slag, or crushed gravel.

    Type 3

  • 9

    Cover aggregate shall have a mass percent of wear not exceeding _____ according to Los Angeles Abrasion Test.

    40

  • 10

    In cover aggregate, when crushed slag is used, it shall be of uniform density and quality and shall have a density of not less than ____.

    960 kg/cu.m

  • 11

    In no event seal coat shall be placed on a newly constructed or reconditioned surfaces in less than ____ after such surface is laid and opened to traffic, unless ordered in written by the engineer.

    10 days

  • 12

    For asphalt cement, bituminous material shall be applied by means of pressure distributor at the rate of approximately

    0.9 to 1.8 liters

  • 13

    For cutback asphalt, bituminous material shall be applied by means of pressure distributor at the rate of approximately ____ per square meter of surface, in a uniform unbroken spread over the section to be treated.

    1.5 to 3.0 liters

  • 14

    The pressure distributor shall be equipped with a _______ registering the speed and so located as to be visible to the truck driver.

    fifth wheel tacometer

  • 15

    The distributor pump shall be equipped with a gauge registering ______ passing through the nozzles and readily visible to the operator.

    liters per minute

  • 16

    The application of bituminous material at the junction of spreads is not in excess of the specified quantities, any excess shall be removed from the surface by a:

    squeegee

  • 17

    If necessary, to obtain proper junction of spreads, a strip of manila paper approximately ____ wide and at least as long as the spray bar shall be used at the beginning and end of each spread.

    1m

  • 18

    Immediately after the application of asphalt, the cover aggregate shall be evenly spread over the surface at the rate of approximately _________ per sq.m

    0.004 to 0.007 cu.m

  • 19

    As soon as the cover aggregate has been spread, the spread shall be broomed lightly with an approved push or drag broom to insure an even distribution, and shall then be rolled with an approved power roller weighing not less than ____, nor more than ____ to a uniform surface.

    5 tonnes, 6 tonnes

  • 20

    The quantities of bituminous material and cover aggregate shall be measured by _____, calculated by the actual size of application approved by the engineer.

    tonne