問題一覧
1
heat shield
2
rim
3
molds
4
bad washer
5
electric thawers
6
physical and chemical
7
bichlor
8
32mm or 1 1/4"
9
non sparking tools
10
2
11
color
12
32mm or 1 1/4"
13
utility
14
inside the tank
15
biannually
16
PD 1067
17
Circuit Vent
18
outlet side
19
34"
20
50ppm/24hrs
21
series
22
central sewage booster
23
dry well
24
1/4 of ladder's length
25
storm sewer
26
6"
27
turnbuckle
28
linseed oil
29
thermostatic mixing valve
30
industrial drain
31
32mm or 1 1/4"
32
8
33
1.8m
34
The bigger the pipes diameter, the lesser the pressure; the smaller the diameter, the greater the pressure
35
siphonage
36
4 or more
37
Store waste in a tank and dispose in sanitary landfill
38
Simply ask to relocate
39
A soil stack carries human fecal discharge from water closets, urinals or other similar fixtures, whereas waste stack does not
40
PVC
41
soil and waste pipe
42
house sewer
43
tub at the time the tub is set
44
They have pH between 0 to 7
45
flush sediments out of the heater
46
cleanouts
47
SVTR
48
300ft to 500ft
49
51mm or 2"
50
replace flapper
51
shielded coupling
52
flow limiting feature
53
calcium hypochlorite tablets
54
6" CHB
55
remove deformation which will cause reduction of pipe diameter
56
51mm or 2"
57
snap cutter
58
right after main distribution line connection
59
thimble
60
Cut the sewer to the length and insert the wye and cement joint end
61
150psi
62
A properly installed trap will prevent stoppages caused by grease solidification
63
plastic
64
Throw away into a garbage
65
The size of the columns will be larger
66
300mm
67
30-40 gpd
68
1/4 in/foot (2%)
69
plumbing blueprints and floor plans
70
3
YT1 Materials Engineer EXAM
YT1 Materials Engineer EXAM
ユーザ名非公開 · 100問 · 13日前YT1 Materials Engineer EXAM
YT1 Materials Engineer EXAM
100問 • 13日前YT2 Materials Engineer EXAM
YT2 Materials Engineer EXAM
ユーザ名非公開 · 100問 · 13日前YT2 Materials Engineer EXAM
YT2 Materials Engineer EXAM
100問 • 13日前Project Engineer YT 1
Project Engineer YT 1
ユーザ名非公開 · 100問 · 13日前Project Engineer YT 1
Project Engineer YT 1
100問 • 13日前Project Engineer EXAM
Project Engineer EXAM
ユーザ名非公開 · 62問 · 13日前Project Engineer EXAM
Project Engineer EXAM
62問 • 13日前Project Engineer EXAM 68
Project Engineer EXAM 68
ユーザ名非公開 · 100問 · 13日前Project Engineer EXAM 68
Project Engineer EXAM 68
100問 • 13日前Project Engineer EXAM 82
Project Engineer EXAM 82
ユーザ名非公開 · 100問 · 13日前Project Engineer EXAM 82
Project Engineer EXAM 82
100問 • 13日前July 2023 PE Refresher
July 2023 PE Refresher
ユーザ名非公開 · 70問 · 13日前July 2023 PE Refresher
July 2023 PE Refresher
70問 • 13日前August 2019 Special PE Exam
August 2019 Special PE Exam
ユーザ名非公開 · 93問 · 13日前August 2019 Special PE Exam
August 2019 Special PE Exam
93問 • 13日前RNPCP Chapter 1 to 5
RNPCP Chapter 1 to 5
ユーザ名非公開 · 86問 · 13日前RNPCP Chapter 1 to 5
RNPCP Chapter 1 to 5
86問 • 13日前Plumbing Code 4
Plumbing Code 4
ユーザ名非公開 · 100問 · 13日前Plumbing Code 4
Plumbing Code 4
100問 • 13日前Plumbing Code 5
Plumbing Code 5
ユーザ名非公開 · 100問 · 13日前Plumbing Code 5
Plumbing Code 5
100問 • 13日前Plumbing Code 6
Plumbing Code 6
ユーザ名非公開 · 100問 · 13日前Plumbing Code 6
Plumbing Code 6
100問 • 13日前Plumbing Code 7
Plumbing Code 7
ユーザ名非公開 · 100問 · 13日前Plumbing Code 7
Plumbing Code 7
100問 • 13日前Plumbing Code 8
Plumbing Code 8
ユーザ名非公開 · 100問 · 13日前Plumbing Code 8
Plumbing Code 8
100問 • 13日前Plumbing Code 3
Plumbing Code 3
ユーザ名非公開 · 100問 · 13日前Plumbing Code 3
Plumbing Code 3
100問 • 13日前Sanitation, Plumbing Design, and Installation 2
Sanitation, Plumbing Design, and Installation 2
ユーザ名非公開 · 97問 · 13日前Sanitation, Plumbing Design, and Installation 2
Sanitation, Plumbing Design, and Installation 2
97問 • 13日前Sanitation, Plumbing Design, and Installation 1
Sanitation, Plumbing Design, and Installation 1
ユーザ名非公開 · 99問 · 13日前Sanitation, Plumbing Design, and Installation 1
Sanitation, Plumbing Design, and Installation 1
99問 • 13日前Sanitation, Plumbing Design, and Installation 3
Sanitation, Plumbing Design, and Installation 3
ユーザ名非公開 · 96問 · 13日前Sanitation, Plumbing Design, and Installation 3
Sanitation, Plumbing Design, and Installation 3
96問 • 13日前Sanitation, Plumbing Design, and Installation 4
Sanitation, Plumbing Design, and Installation 4
ユーザ名非公開 · 95問 · 13日前Sanitation, Plumbing Design, and Installation 4
Sanitation, Plumbing Design, and Installation 4
95問 • 13日前Sanitation, Plumbing Design, and Installation 5
Sanitation, Plumbing Design, and Installation 5
ユーザ名非公開 · 97問 · 13日前Sanitation, Plumbing Design, and Installation 5
Sanitation, Plumbing Design, and Installation 5
97問 • 13日前問題一覧
1
heat shield
2
rim
3
molds
4
bad washer
5
electric thawers
6
physical and chemical
7
bichlor
8
32mm or 1 1/4"
9
non sparking tools
10
2
11
color
12
32mm or 1 1/4"
13
utility
14
inside the tank
15
biannually
16
PD 1067
17
Circuit Vent
18
outlet side
19
34"
20
50ppm/24hrs
21
series
22
central sewage booster
23
dry well
24
1/4 of ladder's length
25
storm sewer
26
6"
27
turnbuckle
28
linseed oil
29
thermostatic mixing valve
30
industrial drain
31
32mm or 1 1/4"
32
8
33
1.8m
34
The bigger the pipes diameter, the lesser the pressure; the smaller the diameter, the greater the pressure
35
siphonage
36
4 or more
37
Store waste in a tank and dispose in sanitary landfill
38
Simply ask to relocate
39
A soil stack carries human fecal discharge from water closets, urinals or other similar fixtures, whereas waste stack does not
40
PVC
41
soil and waste pipe
42
house sewer
43
tub at the time the tub is set
44
They have pH between 0 to 7
45
flush sediments out of the heater
46
cleanouts
47
SVTR
48
300ft to 500ft
49
51mm or 2"
50
replace flapper
51
shielded coupling
52
flow limiting feature
53
calcium hypochlorite tablets
54
6" CHB
55
remove deformation which will cause reduction of pipe diameter
56
51mm or 2"
57
snap cutter
58
right after main distribution line connection
59
thimble
60
Cut the sewer to the length and insert the wye and cement joint end
61
150psi
62
A properly installed trap will prevent stoppages caused by grease solidification
63
plastic
64
Throw away into a garbage
65
The size of the columns will be larger
66
300mm
67
30-40 gpd
68
1/4 in/foot (2%)
69
plumbing blueprints and floor plans
70
3