    1 Quality Test for every ____ or ____.

    40T, 200 drums

  • 2

    Shall be only applied to surfaces which are dry or slightly moist

    prime coat

  • 3

    The liquid bituminous material shall be sprayed by means of a pressure distributor of not less than ____ capacity.

    1000L

  • 4

    Pressure distributor mounted on pneumatic tires of such width and number that the load produced on the road surface will not ____ per cm width of tire.

    1kN

  • 5

    The tank shall have a heating device able to heat a complete change of bituminous liquid to ____.

    180°C

  • 6

    The drop on temperature when the tank is filled with bituminous liquid and not heated will be less than:

    2°C per hour

  • 7

    The distributor shall be designed so that the deviation from the prescribed rate of application does not exceed ___ and shall be equipped with a device for hand spraying of the bituminous liquid.

    10%

  • 8

    The rate of application of the bituminous material shall be within the range of ____.

    1 to 2 L/sq.m

  • 9

    The prime coat shall be left undisturbed for a period of at least ___ or until such time it has sufficiently cured as determined by the engineer and shall not be opened to traffic.

    24 hrs

  • 10

    Bituminous Prime Coat shall be measured by:

    square meter

  • YT1 Materials Engineer EXAM

    YT1 Materials Engineer EXAM

    ユーザ名非公開 · 100問 · 13日前

    YT1 Materials Engineer EXAM

    YT1 Materials Engineer EXAM

    100問 • 13日前
    ユーザ名非公開

    YT2 Materials Engineer EXAM

    YT2 Materials Engineer EXAM

    ユーザ名非公開 · 100問 · 13日前

    YT2 Materials Engineer EXAM

    YT2 Materials Engineer EXAM

    100問 • 13日前
    ユーザ名非公開

    Project Engineer YT 1

    Project Engineer YT 1

    ユーザ名非公開 · 100問 · 13日前

    Project Engineer YT 1

    Project Engineer YT 1

    100問 • 13日前
    ユーザ名非公開

    Project Engineer EXAM

    Project Engineer EXAM

    ユーザ名非公開 · 62問 · 13日前

    Project Engineer EXAM

    Project Engineer EXAM

    62問 • 13日前
    ユーザ名非公開

    Project Engineer EXAM 68

    Project Engineer EXAM 68

    ユーザ名非公開 · 100問 · 13日前

    Project Engineer EXAM 68

    Project Engineer EXAM 68

    100問 • 13日前
    ユーザ名非公開

    Project Engineer EXAM 82

    Project Engineer EXAM 82

    ユーザ名非公開 · 100問 · 13日前

    Project Engineer EXAM 82

    Project Engineer EXAM 82

    100問 • 13日前
    ユーザ名非公開

    July 2023 PE Refresher

    July 2023 PE Refresher

    ユーザ名非公開 · 70問 · 13日前

    July 2023 PE Refresher

    July 2023 PE Refresher

    70問 • 13日前
    ユーザ名非公開

    August 2019 Special PE Exam

    August 2019 Special PE Exam

    ユーザ名非公開 · 93問 · 13日前

    August 2019 Special PE Exam

    August 2019 Special PE Exam

    93問 • 13日前
    ユーザ名非公開

    RNPCP Chapter 1 to 5

    RNPCP Chapter 1 to 5

    ユーザ名非公開 · 86問 · 13日前

    RNPCP Chapter 1 to 5

    RNPCP Chapter 1 to 5

    86問 • 13日前
    ユーザ名非公開

    Plumbing Code 4

    Plumbing Code 4

    ユーザ名非公開 · 100問 · 13日前

    Plumbing Code 4

    Plumbing Code 4

    100問 • 13日前
    ユーザ名非公開

    Plumbing Code 5

    Plumbing Code 5

    ユーザ名非公開 · 100問 · 13日前

    Plumbing Code 5

    Plumbing Code 5

    100問 • 13日前
    ユーザ名非公開

    Plumbing Code 6

    Plumbing Code 6

    ユーザ名非公開 · 100問 · 13日前

    Plumbing Code 6

    Plumbing Code 6

    100問 • 13日前
    ユーザ名非公開

    Plumbing Code 7

    Plumbing Code 7

    ユーザ名非公開 · 100問 · 13日前

    Plumbing Code 7

    Plumbing Code 7

    100問 • 13日前
    ユーザ名非公開

    Plumbing Code 8

    Plumbing Code 8

    ユーザ名非公開 · 100問 · 13日前

    Plumbing Code 8

    Plumbing Code 8

    100問 • 13日前
    ユーザ名非公開

    Plumbing Code 3

    Plumbing Code 3

    ユーザ名非公開 · 100問 · 13日前

    Plumbing Code 3

    Plumbing Code 3

    100問 • 13日前
    ユーザ名非公開

    Sanitation, Plumbing Design, and Installation 2

    Sanitation, Plumbing Design, and Installation 2

    ユーザ名非公開 · 97問 · 13日前

    Sanitation, Plumbing Design, and Installation 2

    Sanitation, Plumbing Design, and Installation 2

    97問 • 13日前
    ユーザ名非公開

    Sanitation, Plumbing Design, and Installation 1

    Sanitation, Plumbing Design, and Installation 1

    ユーザ名非公開 · 99問 · 13日前

    Sanitation, Plumbing Design, and Installation 1

    Sanitation, Plumbing Design, and Installation 1

    99問 • 13日前
    ユーザ名非公開

    Sanitation, Plumbing Design, and Installation 3

    Sanitation, Plumbing Design, and Installation 3

    ユーザ名非公開 · 96問 · 13日前

    Sanitation, Plumbing Design, and Installation 3

    Sanitation, Plumbing Design, and Installation 3

    96問 • 13日前
    ユーザ名非公開

    Sanitation, Plumbing Design, and Installation 4

    Sanitation, Plumbing Design, and Installation 4

    ユーザ名非公開 · 95問 · 13日前

    Sanitation, Plumbing Design, and Installation 4

    Sanitation, Plumbing Design, and Installation 4

    95問 • 13日前
    ユーザ名非公開

    Sanitation, Plumbing Design, and Installation 5

    Sanitation, Plumbing Design, and Installation 5

    ユーザ名非公開 · 97問 · 13日前

    Sanitation, Plumbing Design, and Installation 5

    Sanitation, Plumbing Design, and Installation 5

    97問 • 13日前
    ユーザ名非公開

    問題一覧

  • 1

    1 Quality Test for every ____ or ____.

    40T, 200 drums

  • 2

    Shall be only applied to surfaces which are dry or slightly moist

    prime coat

  • 3

    The liquid bituminous material shall be sprayed by means of a pressure distributor of not less than ____ capacity.

    1000L

  • 4

    Pressure distributor mounted on pneumatic tires of such width and number that the load produced on the road surface will not ____ per cm width of tire.

    1kN

  • 5

    The tank shall have a heating device able to heat a complete change of bituminous liquid to ____.

    180°C

  • 6

    The drop on temperature when the tank is filled with bituminous liquid and not heated will be less than:

    2°C per hour

  • 7

    The distributor shall be designed so that the deviation from the prescribed rate of application does not exceed ___ and shall be equipped with a device for hand spraying of the bituminous liquid.

    10%

  • 8

    The rate of application of the bituminous material shall be within the range of ____.

    1 to 2 L/sq.m

  • 9

    The prime coat shall be left undisturbed for a period of at least ___ or until such time it has sufficiently cured as determined by the engineer and shall not be opened to traffic.

    24 hrs

  • 10

    Bituminous Prime Coat shall be measured by:

    square meter