Item 200 Aggregate Subbase Course
16問 • 13日前
  • ユーザ名非公開
  • 通報

    問題一覧

  • 1

    According to AASHTO T89, the fraction passing the No. 40 sieve (0.425mm) shall have a LL of:

    not greater than 35

  • 2

    According to AASHTO T90, the fraction passing the No. 40 sieve (0.425mm) shall have a PI of:

    not greater than 12

  • 3

    When the required thickness is more than ______, the aggregate subbase shall be spread and compacted into ______ or more layers of approximately equal thickness, and the minimum compacted thickness of any layer shall not exceed ______.

    150mm, two, 150mm

  • 4

    Compaction on each layer shall continue until a the FDT result is _____.

    100%

  • 5

    At least _____ in situ FDT should be conducted in trial section of _____ or fraction thereof per material or procedure and per layer

    three, 500sq.m

  • 6

    Permitted variation from design thickness of layer

    +/- 20mm

  • 7

    Permissible variation in design level of surface

    +10mm/-20mm

  • 8

    Permitted surface irregularity measured by 3m straight edge

    20mm

  • 9

    Permitted variation from design crossfall or camber

    +/- 0.3%

  • 10

    Permitted variation from design longitudinal grade over 25m in length

    +/- 0.1%

  • 11

    Basis of payment is in _____.

    cubic meter

  • 12

    The course portion, retained on a No. 40 sieve (2mm) shall have a mass percent of wear ___ max by the Los Angeles Abrasion Test

    50%

  • 13

    The material shall have a soaked CBR value of ___ max as determined by AASHTO T193

    30%

  • 14

    Laboratory Compaction Test and Quality Test for every:

    1500cu.m

  • 15

    Grading Test and Plasticity Test (LL, PL, PI) for every:

    300cu.m

  • 16

    California Bearing Ratio (CBR) Test for every:

    2500cu.m

  • YT1 Materials Engineer EXAM

    YT1 Materials Engineer EXAM

    ユーザ名非公開 · 100問 · 13日前

    YT1 Materials Engineer EXAM

    YT1 Materials Engineer EXAM

    100問 • 13日前
    ユーザ名非公開

    YT2 Materials Engineer EXAM

    YT2 Materials Engineer EXAM

    ユーザ名非公開 · 100問 · 13日前

    YT2 Materials Engineer EXAM

    YT2 Materials Engineer EXAM

    100問 • 13日前
    ユーザ名非公開

    Project Engineer YT 1

    Project Engineer YT 1

    ユーザ名非公開 · 100問 · 13日前

    Project Engineer YT 1

    Project Engineer YT 1

    100問 • 13日前
    ユーザ名非公開

    Project Engineer EXAM

    Project Engineer EXAM

    ユーザ名非公開 · 62問 · 13日前

    Project Engineer EXAM

    Project Engineer EXAM

    62問 • 13日前
    ユーザ名非公開

    Project Engineer EXAM 68

    Project Engineer EXAM 68

    ユーザ名非公開 · 100問 · 13日前

    Project Engineer EXAM 68

    Project Engineer EXAM 68

    100問 • 13日前
    ユーザ名非公開

    Project Engineer EXAM 82

    Project Engineer EXAM 82

    ユーザ名非公開 · 100問 · 13日前

    Project Engineer EXAM 82

    Project Engineer EXAM 82

    100問 • 13日前
    ユーザ名非公開

    July 2023 PE Refresher

    July 2023 PE Refresher

    ユーザ名非公開 · 70問 · 13日前

    July 2023 PE Refresher

    July 2023 PE Refresher

    70問 • 13日前
    ユーザ名非公開

    August 2019 Special PE Exam

    August 2019 Special PE Exam

    ユーザ名非公開 · 93問 · 13日前

    August 2019 Special PE Exam

    August 2019 Special PE Exam

    93問 • 13日前
    ユーザ名非公開

    RNPCP Chapter 1 to 5

    RNPCP Chapter 1 to 5

    ユーザ名非公開 · 86問 · 13日前

    RNPCP Chapter 1 to 5

    RNPCP Chapter 1 to 5

    86問 • 13日前
    ユーザ名非公開

    Plumbing Code 4

    Plumbing Code 4

    ユーザ名非公開 · 100問 · 13日前

    Plumbing Code 4

    Plumbing Code 4

    100問 • 13日前
    ユーザ名非公開

    Plumbing Code 5

    Plumbing Code 5

    ユーザ名非公開 · 100問 · 13日前

    Plumbing Code 5

    Plumbing Code 5

    100問 • 13日前
    ユーザ名非公開

    Plumbing Code 6

    Plumbing Code 6

    ユーザ名非公開 · 100問 · 13日前

    Plumbing Code 6

    Plumbing Code 6

    100問 • 13日前
    ユーザ名非公開

    Plumbing Code 7

    Plumbing Code 7

    ユーザ名非公開 · 100問 · 13日前

    Plumbing Code 7

    Plumbing Code 7

    100問 • 13日前
    ユーザ名非公開

    Plumbing Code 8

    Plumbing Code 8

    ユーザ名非公開 · 100問 · 13日前

    Plumbing Code 8

    Plumbing Code 8

    100問 • 13日前
    ユーザ名非公開

    Plumbing Code 3

    Plumbing Code 3

    ユーザ名非公開 · 100問 · 13日前

    Plumbing Code 3

    Plumbing Code 3

    100問 • 13日前
    ユーザ名非公開

    Sanitation, Plumbing Design, and Installation 2

    Sanitation, Plumbing Design, and Installation 2

    ユーザ名非公開 · 97問 · 13日前

    Sanitation, Plumbing Design, and Installation 2

    Sanitation, Plumbing Design, and Installation 2

    97問 • 13日前
    ユーザ名非公開

    Sanitation, Plumbing Design, and Installation 1

    Sanitation, Plumbing Design, and Installation 1

    ユーザ名非公開 · 99問 · 13日前

    Sanitation, Plumbing Design, and Installation 1

    Sanitation, Plumbing Design, and Installation 1

    99問 • 13日前
    ユーザ名非公開

    Sanitation, Plumbing Design, and Installation 3

    Sanitation, Plumbing Design, and Installation 3

    ユーザ名非公開 · 96問 · 13日前

    Sanitation, Plumbing Design, and Installation 3

    Sanitation, Plumbing Design, and Installation 3

    96問 • 13日前
    ユーザ名非公開

    Sanitation, Plumbing Design, and Installation 4

    Sanitation, Plumbing Design, and Installation 4

    ユーザ名非公開 · 95問 · 13日前

    Sanitation, Plumbing Design, and Installation 4

    Sanitation, Plumbing Design, and Installation 4

    95問 • 13日前
    ユーザ名非公開

    Sanitation, Plumbing Design, and Installation 5

    Sanitation, Plumbing Design, and Installation 5

    ユーザ名非公開 · 97問 · 13日前

    Sanitation, Plumbing Design, and Installation 5

    Sanitation, Plumbing Design, and Installation 5

    97問 • 13日前
    ユーザ名非公開

    問題一覧

  • 1

    According to AASHTO T89, the fraction passing the No. 40 sieve (0.425mm) shall have a LL of:

    not greater than 35

  • 2

    According to AASHTO T90, the fraction passing the No. 40 sieve (0.425mm) shall have a PI of:

    not greater than 12

  • 3

    When the required thickness is more than ______, the aggregate subbase shall be spread and compacted into ______ or more layers of approximately equal thickness, and the minimum compacted thickness of any layer shall not exceed ______.

    150mm, two, 150mm

  • 4

    Compaction on each layer shall continue until a the FDT result is _____.

    100%

  • 5

    At least _____ in situ FDT should be conducted in trial section of _____ or fraction thereof per material or procedure and per layer

    three, 500sq.m

  • 6

    Permitted variation from design thickness of layer

    +/- 20mm

  • 7

    Permissible variation in design level of surface

    +10mm/-20mm

  • 8

    Permitted surface irregularity measured by 3m straight edge

    20mm

  • 9

    Permitted variation from design crossfall or camber

    +/- 0.3%

  • 10

    Permitted variation from design longitudinal grade over 25m in length

    +/- 0.1%

  • 11

    Basis of payment is in _____.

    cubic meter

  • 12

    The course portion, retained on a No. 40 sieve (2mm) shall have a mass percent of wear ___ max by the Los Angeles Abrasion Test

    50%

  • 13

    The material shall have a soaked CBR value of ___ max as determined by AASHTO T193

    30%

  • 14

    Laboratory Compaction Test and Quality Test for every:

    1500cu.m

  • 15

    Grading Test and Plasticity Test (LL, PL, PI) for every:

    300cu.m

  • 16

    California Bearing Ratio (CBR) Test for every:

    2500cu.m