ログイン

Weekly Test 3

Weekly Test 3
50問 • 2ヶ月前
  • ユーザ名非公開
  • 通報

    問題一覧

  • 1

    What is the estimated sewage flow rate of bowling alleys with snack bar only?

    283.9 LpD per lane

  • 2

    What is the storage factor for self-service auto washers?

    1.5

  • 3

    Minimum dimension of a sand interceptor's inlet opening

    0.2 sq.m.

  • 4

    A group vent pipe that connects to the vent stack

    Circuit Vent

  • 5

    Prohibited vent pipe material below ground

    Galvanized Wrought Iron

  • 6

    Minimum spacing between trenches or leaching beds

    1.20 m

  • 7

    Which among the choices is a prohibited trap?

    Crown trap

  • 8

    Normally in Manila, the rainfall intensity used is _____.

    102 mm

  • 9

    Maximum number of slip joint fitting that may be used on the outlet side of a trap

    1

  • 10

    Wet venting is limited to ______ fixtures

    4

  • 11

    Maximum length of a tailpiece

    0.6 m

  • 12

    What is an underground drain pipe that receives only sub-surface or seepage water and convey it to a sump for disposal by gravity flow or by lift pump?

    subsoil drain

  • 13

    Connects directly with an individual trap underneath or behind the fixture

    Backvent Pipe

  • 14

    What can be drained through an airbreak?

    air washer

  • 15

    The size of a vent pipe is determined by __________.

    FU and length

  • 16

    In getting the roof area for the computation of rainwater piping size, for two walls opposite of differing heights, add _______ of wall area above top of lower wall to the roof area.

    50%

  • 17

    Elastomeric gasketed and rubber-ring joints shall comply with _________ installation standard

    IAPMO

  • 18

    The minimum inlet and outlet size for sand interceptor

    76 mm

  • 19

    What is the maximum length allowed for a vent stack serving 48 DFU?

    55

  • 20

    For accessible toilets, signs on walls and doors should be located at a maximum height of _______.

    1.60 m

  • 21

    What is the horizontal distance required of a vent pipe from any openable window, door opening, air intake, or vent shaft?

    3 m

  • 22

    The maximum trap loading of a pipe size 76 mm

    6

  • 23

    Vertical vent pipes installed in a roof used for other purposes shall extend a minimum of ________ above such roof.

    2.1 m

  • 24

    If a septic tank can have an effective capacity of 4000 L, how much does the secondary compartment hold?

    1,333 L

  • 25

    The principal artery of the venting system to which vent branches are connected.

    Main Vent

  • 26

    The bottom of the water pipe, at all points shall be at least _________ above the top of the sewer or drain line.

    0.3 m

  • 27

    What is the minimum distance from disposal field to another disposal field?

    1.2 m

  • 28

    What is the sewage that turns dark and smell unpleasantly due to anaerobic decomposition?

    septic

  • 29

    Determine the size of horizontal rainwater piping with a slope of 2% for a 350 sqm roof in an area where the the rainfall is 102 mm/hr.

    127 mm

  • 30

    When the first compartment exceeds 3.7 m in length, an additional ________ shall be provided.

    manhole

  • 31

    Rainwater piping located within a medium height building basement area shall be of Galvanized Iron _______.

    Schedule 30

  • 32

    What will be the size of 0.5% sloped circular bottom gutter serving a roof area of 180 sqm, and the rainfall intensity around the area is 76 mm/hr?

    178 mm

  • 33

    What downspout size would you specify for an 800 sqm roof with a rainfall intensity around the area of 152.4 mm/hr?

    152 mm

  • 34

    Minimum distance of a 32 mm trap arm diameter to a vent

    64 mm

  • 35

    The minimum depth of the sand interceptor under the invert of the outlet pipe is ________.

    610 mm

  • 36

    The side walls of a Septic Tank shall be at least __________ above the liquid depth.

    9”

  • 37

    All condensers and sumps shall be properly trapped at the outlet with a deep seal trap extending to within _________ of the bottom of the tank.

    6”

  • 38

    A 203 mm diameter and larger sewer may have a slope of _________.

    0.5%

  • 39

    In a granule test of a water closet, the initial flush of three different flushes must result in no more than ___________ on average remaining in the bowl.

    125

  • 40

    What is the minimum condensate pipe diameter of a cooling equipment with capacity through 125 ToR?

    38 mm

  • 41

    A water that stands in or passes through the ground

    Ground Water

  • 42

    Jointing method for soft copper water tubing

    Flared Joint

  • 43

    What is required when a soil or waste stack extends 10 or more stories?

    Parallel Vent Stack

  • 44

    Minimum water seal of a grease trap

    51 mm

  • 45

    Septic tanks should be cleaned when scum or sludge occupies ________ of the tank volume.

    1/3

  • 46

    Every abandoned building sewer shall be plugged or capped within __________ of the property line.

    1.5 m

  • 47

    Water closets that are made to accommodate overweight and obese people

    Bariatic Water Closet

  • 48

    _________ are recommended for oil handling piping works.

    Neoprene Gaskets

  • 49

    Horizontal distance of the trap arm with a diameter of 38 mm

    1.07 m

  • 50

    What is the gauge pressure to be maintained for air tests as substitute for water test in water pipings?

    344.5 kPa

  • YT1 Materials Engineer EXAM

    YT1 Materials Engineer EXAM

    ユーザ名非公開 · 100問 · 2ヶ月前

    YT1 Materials Engineer EXAM

    YT1 Materials Engineer EXAM

    100問 • 2ヶ月前
    ユーザ名非公開

    YT2 Materials Engineer EXAM

    YT2 Materials Engineer EXAM

    ユーザ名非公開 · 100問 · 2ヶ月前

    YT2 Materials Engineer EXAM

    YT2 Materials Engineer EXAM

    100問 • 2ヶ月前
    ユーザ名非公開

    Project Engineer YT 1

    Project Engineer YT 1

    ユーザ名非公開 · 100問 · 2ヶ月前

    Project Engineer YT 1

    Project Engineer YT 1

    100問 • 2ヶ月前
    ユーザ名非公開

    Project Engineer EXAM

    Project Engineer EXAM

    ユーザ名非公開 · 62問 · 2ヶ月前

    Project Engineer EXAM

    Project Engineer EXAM

    62問 • 2ヶ月前
    ユーザ名非公開

    Project Engineer EXAM 68

    Project Engineer EXAM 68

    ユーザ名非公開 · 100問 · 2ヶ月前

    Project Engineer EXAM 68

    Project Engineer EXAM 68

    100問 • 2ヶ月前
    ユーザ名非公開

    Project Engineer EXAM 82

    Project Engineer EXAM 82

    ユーザ名非公開 · 100問 · 2ヶ月前

    Project Engineer EXAM 82

    Project Engineer EXAM 82

    100問 • 2ヶ月前
    ユーザ名非公開

    July 2023 PE Refresher

    July 2023 PE Refresher

    ユーザ名非公開 · 70問 · 2ヶ月前

    July 2023 PE Refresher

    July 2023 PE Refresher

    70問 • 2ヶ月前
    ユーザ名非公開

    August 2019 Special PE Exam

    August 2019 Special PE Exam

    ユーザ名非公開 · 93問 · 2ヶ月前

    August 2019 Special PE Exam

    August 2019 Special PE Exam

    93問 • 2ヶ月前
    ユーザ名非公開

    RNPCP Chapter 1 to 5

    RNPCP Chapter 1 to 5

    ユーザ名非公開 · 86問 · 2ヶ月前

    RNPCP Chapter 1 to 5

    RNPCP Chapter 1 to 5

    86問 • 2ヶ月前
    ユーザ名非公開

    Plumbing Code 4

    Plumbing Code 4

    ユーザ名非公開 · 100問 · 2ヶ月前

    Plumbing Code 4

    Plumbing Code 4

    100問 • 2ヶ月前
    ユーザ名非公開

    Plumbing Code 5

    Plumbing Code 5

    ユーザ名非公開 · 100問 · 2ヶ月前

    Plumbing Code 5

    Plumbing Code 5

    100問 • 2ヶ月前
    ユーザ名非公開

    Plumbing Code 6

    Plumbing Code 6

    ユーザ名非公開 · 100問 · 2ヶ月前

    Plumbing Code 6

    Plumbing Code 6

    100問 • 2ヶ月前
    ユーザ名非公開

    Plumbing Code 7

    Plumbing Code 7

    ユーザ名非公開 · 100問 · 2ヶ月前

    Plumbing Code 7

    Plumbing Code 7

    100問 • 2ヶ月前
    ユーザ名非公開

    Plumbing Code 8

    Plumbing Code 8

    ユーザ名非公開 · 100問 · 2ヶ月前

    Plumbing Code 8

    Plumbing Code 8

    100問 • 2ヶ月前
    ユーザ名非公開

    Plumbing Code 3

    Plumbing Code 3

    ユーザ名非公開 · 100問 · 2ヶ月前

    Plumbing Code 3

    Plumbing Code 3

    100問 • 2ヶ月前
    ユーザ名非公開

    Sanitation, Plumbing Design, and Installation 2

    Sanitation, Plumbing Design, and Installation 2

    ユーザ名非公開 · 97問 · 2ヶ月前

    Sanitation, Plumbing Design, and Installation 2

    Sanitation, Plumbing Design, and Installation 2

    97問 • 2ヶ月前
    ユーザ名非公開

    Sanitation, Plumbing Design, and Installation 1

    Sanitation, Plumbing Design, and Installation 1

    ユーザ名非公開 · 99問 · 2ヶ月前

    Sanitation, Plumbing Design, and Installation 1

    Sanitation, Plumbing Design, and Installation 1

    99問 • 2ヶ月前
    ユーザ名非公開

    Sanitation, Plumbing Design, and Installation 3

    Sanitation, Plumbing Design, and Installation 3

    ユーザ名非公開 · 96問 · 2ヶ月前

    Sanitation, Plumbing Design, and Installation 3

    Sanitation, Plumbing Design, and Installation 3

    96問 • 2ヶ月前
    ユーザ名非公開

    Sanitation, Plumbing Design, and Installation 4

    Sanitation, Plumbing Design, and Installation 4

    ユーザ名非公開 · 95問 · 2ヶ月前

    Sanitation, Plumbing Design, and Installation 4

    Sanitation, Plumbing Design, and Installation 4

    95問 • 2ヶ月前
    ユーザ名非公開

    Sanitation, Plumbing Design, and Installation 5

    Sanitation, Plumbing Design, and Installation 5

    ユーザ名非公開 · 97問 · 2ヶ月前

    Sanitation, Plumbing Design, and Installation 5

    Sanitation, Plumbing Design, and Installation 5

    97問 • 2ヶ月前
    ユーザ名非公開

    Sanitation, Plumbing Design, and Installation 7

    Sanitation, Plumbing Design, and Installation 7

    ユーザ名非公開 · 100問 · 2ヶ月前

    Sanitation, Plumbing Design, and Installation 7

    Sanitation, Plumbing Design, and Installation 7

    100問 • 2ヶ月前
    ユーザ名非公開

    Sanitation, Plumbing Design, and Installation 8

    Sanitation, Plumbing Design, and Installation 8

    ユーザ名非公開 · 98問 · 2ヶ月前

    Sanitation, Plumbing Design, and Installation 8

    Sanitation, Plumbing Design, and Installation 8

    98問 • 2ヶ月前
    ユーザ名非公開

    Plumbing Tools 1

    Plumbing Tools 1

    ユーザ名非公開 · 87問 · 2ヶ月前

    Plumbing Tools 1

    Plumbing Tools 1

    87問 • 2ヶ月前
    ユーザ名非公開

    Plumbing Tools 2

    Plumbing Tools 2

    ユーザ名非公開 · 53問 · 2ヶ月前

    Plumbing Tools 2

    Plumbing Tools 2

    53問 • 2ヶ月前
    ユーザ名非公開

    Practical Problems and Experiences 1

    Practical Problems and Experiences 1

    ユーザ名非公開 · 100問 · 2ヶ月前

    Practical Problems and Experiences 1

    Practical Problems and Experiences 1

    100問 • 2ヶ月前
    ユーザ名非公開

    Practical Problems and Experiences 2

    Practical Problems and Experiences 2

    ユーザ名非公開 · 100問 · 2ヶ月前

    Practical Problems and Experiences 2

    Practical Problems and Experiences 2

    100問 • 2ヶ月前
    ユーザ名非公開

    Practical Problems and Experiences 3

    Practical Problems and Experiences 3

    ユーザ名非公開 · 99問 · 2ヶ月前

    Practical Problems and Experiences 3

    Practical Problems and Experiences 3

    99問 • 2ヶ月前
    ユーザ名非公開

    Practical Problems and Experiences 4

    Practical Problems and Experiences 4

    ユーザ名非公開 · 100問 · 2ヶ月前

    Practical Problems and Experiences 4

    Practical Problems and Experiences 4

    100問 • 2ヶ月前
    ユーザ名非公開

    Plumbing Arithmetic Terms 1

    Plumbing Arithmetic Terms 1

    ユーザ名非公開 · 49問 · 2ヶ月前

    Plumbing Arithmetic Terms 1

    Plumbing Arithmetic Terms 1

    49問 • 2ヶ月前
    ユーザ名非公開

    Plumbing Arithmetic Terms 2

    Plumbing Arithmetic Terms 2

    ユーザ名非公開 · 47問 · 2ヶ月前

    Plumbing Arithmetic Terms 2

    Plumbing Arithmetic Terms 2

    47問 • 2ヶ月前
    ユーザ名非公開

    Plumbing Arithmetic Terms 3

    Plumbing Arithmetic Terms 3

    ユーザ名非公開 · 49問 · 2ヶ月前

    Plumbing Arithmetic Terms 3

    Plumbing Arithmetic Terms 3

    49問 • 2ヶ月前
    ユーザ名非公開

    Plumbing Arithmetic Terms 4

    Plumbing Arithmetic Terms 4

    ユーザ名非公開 · 27問 · 2ヶ月前

    Plumbing Arithmetic Terms 4

    Plumbing Arithmetic Terms 4

    27問 • 2ヶ月前
    ユーザ名非公開

    Plumbing Code WSFU

    Plumbing Code WSFU

    ユーザ名非公開 · 58問 · 2ヶ月前

    Plumbing Code WSFU

    Plumbing Code WSFU

    58問 • 2ヶ月前
    ユーザ名非公開

    Practical Problems and Experiences REFRESHER 1

    Practical Problems and Experiences REFRESHER 1

    ユーザ名非公開 · 100問 · 2ヶ月前

    Practical Problems and Experiences REFRESHER 1

    Practical Problems and Experiences REFRESHER 1

    100問 • 2ヶ月前
    ユーザ名非公開

    Practical Problems and Experiences REFRESHER 2

    Practical Problems and Experiences REFRESHER 2

    ユーザ名非公開 · 70問 · 2ヶ月前

    Practical Problems and Experiences REFRESHER 2

    Practical Problems and Experiences REFRESHER 2

    70問 • 2ヶ月前
    ユーザ名非公開

    Item # and Descriptions

    Item # and Descriptions

    ユーザ名非公開 · 24問 · 2ヶ月前

    Item # and Descriptions

    Item # and Descriptions

    24問 • 2ヶ月前
    ユーザ名非公開

    Item 200 Aggregate Subbase Course

    Item 200 Aggregate Subbase Course

    ユーザ名非公開 · 16問 · 2ヶ月前

    Item 200 Aggregate Subbase Course

    Item 200 Aggregate Subbase Course

    16問 • 2ヶ月前
    ユーザ名非公開

    Item 201 Aggregate Base Course

    Item 201 Aggregate Base Course

    ユーザ名非公開 · 16問 · 2ヶ月前

    Item 201 Aggregate Base Course

    Item 201 Aggregate Base Course

    16問 • 2ヶ月前
    ユーザ名非公開

    Item 202 Crushed Aggregate Base Course

    Item 202 Crushed Aggregate Base Course

    ユーザ名非公開 · 18問 · 2ヶ月前

    Item 202 Crushed Aggregate Base Course

    Item 202 Crushed Aggregate Base Course

    18問 • 2ヶ月前
    ユーザ名非公開

    Item 203 Lime Stabilized Road Mix Base Course

    Item 203 Lime Stabilized Road Mix Base Course

    ユーザ名非公開 · 27問 · 2ヶ月前

    Item 203 Lime Stabilized Road Mix Base Course

    Item 203 Lime Stabilized Road Mix Base Course

    27問 • 2ヶ月前
    ユーザ名非公開

    Item 204 Portland Cement Stabilized Road Mix Base Course

    Item 204 Portland Cement Stabilized Road Mix Base Course

    ユーザ名非公開 · 7問 · 2ヶ月前

    Item 204 Portland Cement Stabilized Road Mix Base Course

    Item 204 Portland Cement Stabilized Road Mix Base Course

    7問 • 2ヶ月前
    ユーザ名非公開

    Item 207 Portland Cement Stabilized Treated Plant Mix Base Course

    Item 207 Portland Cement Stabilized Treated Plant Mix Base Course

    ユーザ名非公開 · 13問 · 2ヶ月前

    Item 207 Portland Cement Stabilized Treated Plant Mix Base Course

    Item 207 Portland Cement Stabilized Treated Plant Mix Base Course

    13問 • 2ヶ月前
    ユーザ名非公開

    Item 205 Asphalt Stabilized Road Mix Base Course

    Item 205 Asphalt Stabilized Road Mix Base Course

    ユーザ名非公開 · 7問 · 2ヶ月前

    Item 205 Asphalt Stabilized Road Mix Base Course

    Item 205 Asphalt Stabilized Road Mix Base Course

    7問 • 2ヶ月前
    ユーザ名非公開

    Item 206 Chemically Stabilized Road Mix Subbase/Base Course

    Item 206 Chemically Stabilized Road Mix Subbase/Base Course

    ユーザ名非公開 · 11問 · 2ヶ月前

    Item 206 Chemically Stabilized Road Mix Subbase/Base Course

    Item 206 Chemically Stabilized Road Mix Subbase/Base Course

    11問 • 2ヶ月前
    ユーザ名非公開

    Item 300 Aggregate Surface Course

    Item 300 Aggregate Surface Course

    ユーザ名非公開 · 11問 · 2ヶ月前

    Item 300 Aggregate Surface Course

    Item 300 Aggregate Surface Course

    11問 • 2ヶ月前
    ユーザ名非公開

    Item 301 Bituminous Prime Coat

    Item 301 Bituminous Prime Coat

    ユーザ名非公開 · 10問 · 2ヶ月前

    Item 301 Bituminous Prime Coat

    Item 301 Bituminous Prime Coat

    10問 • 2ヶ月前
    ユーザ名非公開

    Item 303 Bituminous Seal Coat

    Item 303 Bituminous Seal Coat

    ユーザ名非公開 · 20問 · 2ヶ月前

    Item 303 Bituminous Seal Coat

    Item 303 Bituminous Seal Coat

    20問 • 2ヶ月前
    ユーザ名非公開

    RNPCP Chapter 6 to 9

    RNPCP Chapter 6 to 9

    ユーザ名非公開 · 94問 · 2ヶ月前

    RNPCP Chapter 6 to 9

    RNPCP Chapter 6 to 9

    94問 • 2ヶ月前
    ユーザ名非公開

    RNPCP Chapter 10 to 13

    RNPCP Chapter 10 to 13

    ユーザ名非公開 · 93問 · 2ヶ月前

    RNPCP Chapter 10 to 13

    RNPCP Chapter 10 to 13

    93問 • 2ヶ月前
    ユーザ名非公開

    RNPCP Appendix A and B

    RNPCP Appendix A and B

    ユーザ名非公開 · 79問 · 2ヶ月前

    RNPCP Appendix A and B

    RNPCP Appendix A and B

    79問 • 2ヶ月前
    ユーザ名非公開

    Republic Acts

    Republic Acts

    ユーザ名非公開 · 9問 · 2ヶ月前

    Republic Acts

    Republic Acts

    9問 • 2ヶ月前
    ユーザ名非公開

    Plumbing Arithmetic Terms 5

    Plumbing Arithmetic Terms 5

    ユーザ名非公開 · 68問 · 2ヶ月前

    Plumbing Arithmetic Terms 5

    Plumbing Arithmetic Terms 5

    68問 • 2ヶ月前
    ユーザ名非公開

    Principles and Code of Ethics

    Principles and Code of Ethics

    ユーザ名非公開 · 29問 · 2ヶ月前

    Principles and Code of Ethics

    Principles and Code of Ethics

    29問 • 2ヶ月前
    ユーザ名非公開

    Plumbing Arithmetic Problems 1

    Plumbing Arithmetic Problems 1

    ユーザ名非公開 · 75問 · 2ヶ月前

    Plumbing Arithmetic Problems 1

    Plumbing Arithmetic Problems 1

    75問 • 2ヶ月前
    ユーザ名非公開

    Item 406 Prestressed Concrete Structures

    Item 406 Prestressed Concrete Structures

    ユーザ名非公開 · 36問 · 2ヶ月前

    Item 406 Prestressed Concrete Structures

    Item 406 Prestressed Concrete Structures

    36問 • 2ヶ月前
    ユーザ名非公開

    Item 405 Structural Concrete

    Item 405 Structural Concrete

    ユーザ名非公開 · 41問 · 2ヶ月前

    Item 405 Structural Concrete

    Item 405 Structural Concrete

    41問 • 2ヶ月前
    ユーザ名非公開

    Item 400 Piling

    Item 400 Piling

    ユーザ名非公開 · 80問 · 2ヶ月前

    Item 400 Piling

    Item 400 Piling

    80問 • 2ヶ月前
    ユーザ名非公開

    Item 311 Portland Cement Concrete Pavement (PART 2)

    Item 311 Portland Cement Concrete Pavement (PART 2)

    ユーザ名非公開 · 61問 · 2ヶ月前

    Item 311 Portland Cement Concrete Pavement (PART 2)

    Item 311 Portland Cement Concrete Pavement (PART 2)

    61問 • 2ヶ月前
    ユーザ名非公開

    Item 311 Portland Cement Concrete Pavement (PART 1)

    Item 311 Portland Cement Concrete Pavement (PART 1)

    ユーザ名非公開 · 78問 · 2ヶ月前

    Item 311 Portland Cement Concrete Pavement (PART 1)

    Item 311 Portland Cement Concrete Pavement (PART 1)

    78問 • 2ヶ月前
    ユーザ名非公開

    Standpipe Requirements

    Standpipe Requirements

    ユーザ名非公開 · 29問 · 2ヶ月前

    Standpipe Requirements

    Standpipe Requirements

    29問 • 2ヶ月前
    ユーザ名非公開

    Spdi 1

    Spdi 1

    ユーザ名非公開 · 100問 · 2ヶ月前

    Spdi 1

    Spdi 1

    100問 • 2ヶ月前
    ユーザ名非公開

    Spdi 2

    Spdi 2

    ユーザ名非公開 · 98問 · 2ヶ月前

    Spdi 2

    Spdi 2

    98問 • 2ヶ月前
    ユーザ名非公開

    SPI version D pt 2

    SPI version D pt 2

    ユーザ名非公開 · 61問 · 2ヶ月前

    SPI version D pt 2

    SPI version D pt 2

    61問 • 2ヶ月前
    ユーザ名非公開

    plumbing code

    plumbing code

    ユーザ名非公開 · 100問 · 2ヶ月前

    plumbing code

    plumbing code

    100問 • 2ヶ月前
    ユーザ名非公開

    plumbing code 2

    plumbing code 2

    ユーザ名非公開 · 100問 · 2ヶ月前

    plumbing code 2

    plumbing code 2

    100問 • 2ヶ月前
    ユーザ名非公開

    plumbing code 3

    plumbing code 3

    ユーザ名非公開 · 56問 · 2ヶ月前

    plumbing code 3

    plumbing code 3

    56問 • 2ヶ月前
    ユーザ名非公開

    Practice Problem

    Practice Problem

    ユーザ名非公開 · 70問 · 2ヶ月前

    Practice Problem

    Practice Problem

    70問 • 2ヶ月前
    ユーザ名非公開

    PP pre

    PP pre

    ユーザ名非公開 · 100問 · 2ヶ月前

    PP pre

    PP pre

    100問 • 2ヶ月前
    ユーザ名非公開

    PP Pre 2

    PP Pre 2

    ユーザ名非公開 · 100問 · 2ヶ月前

    PP Pre 2

    PP Pre 2

    100問 • 2ヶ月前
    ユーザ名非公開

    PP pre 3

    PP pre 3

    ユーザ名非公開 · 44問 · 2ヶ月前

    PP pre 3

    PP pre 3

    44問 • 2ヶ月前
    ユーザ名非公開

    WT 1

    WT 1

    ユーザ名非公開 · 50問 · 2ヶ月前

    WT 1

    WT 1

    50問 • 2ヶ月前
    ユーザ名非公開

    WT 2

    WT 2

    ユーザ名非公開 · 48問 · 2ヶ月前

    WT 2

    WT 2

    48問 • 2ヶ月前
    ユーザ名非公開

    WT 3

    WT 3

    ユーザ名非公開 · 50問 · 2ヶ月前

    WT 3

    WT 3

    50問 • 2ヶ月前
    ユーザ名非公開

    WT 6

    WT 6

    ユーザ名非公開 · 50問 · 2ヶ月前

    WT 6

    WT 6

    50問 • 2ヶ月前
    ユーザ名非公開

    Definition of Terms 1

    Definition of Terms 1

    ユーザ名非公開 · 90問 · 2ヶ月前

    Definition of Terms 1

    Definition of Terms 1

    90問 • 2ヶ月前
    ユーザ名非公開

    Definition of Terms 2

    Definition of Terms 2

    ユーザ名非公開 · 90問 · 2ヶ月前

    Definition of Terms 2

    Definition of Terms 2

    90問 • 2ヶ月前
    ユーザ名非公開

    Definition of Terms 3

    Definition of Terms 3

    ユーザ名非公開 · 90問 · 2ヶ月前

    Definition of Terms 3

    Definition of Terms 3

    90問 • 2ヶ月前
    ユーザ名非公開

    Refresher SPDI 1

    Refresher SPDI 1

    ユーザ名非公開 · 100問 · 2ヶ月前

    Refresher SPDI 1

    Refresher SPDI 1

    100問 • 2ヶ月前
    ユーザ名非公開

    Refresher SPDI 1

    Refresher SPDI 1

    ユーザ名非公開 · 9問 · 2ヶ月前

    Refresher SPDI 1

    Refresher SPDI 1

    9問 • 2ヶ月前
    ユーザ名非公開

    Weekly Test 1

    Weekly Test 1

    ユーザ名非公開 · 50問 · 2ヶ月前

    Weekly Test 1

    Weekly Test 1

    50問 • 2ヶ月前
    ユーザ名非公開

    Weekly Test 2

    Weekly Test 2

    ユーザ名非公開 · 50問 · 2ヶ月前

    Weekly Test 2

    Weekly Test 2

    50問 • 2ヶ月前
    ユーザ名非公開

    MPLE

    MPLE

    ユーザ名非公開 · 41問 · 2ヶ月前

    MPLE

    MPLE

    41問 • 2ヶ月前
    ユーザ名非公開

    CDG- Plumbing Code 1

    CDG- Plumbing Code 1

    ユーザ名非公開 · 48問 · 2ヶ月前

    CDG- Plumbing Code 1

    CDG- Plumbing Code 1

    48問 • 2ヶ月前
    ユーザ名非公開

    CDG- Plumbing Code 1.1

    CDG- Plumbing Code 1.1

    ユーザ名非公開 · 50問 · 2ヶ月前

    CDG- Plumbing Code 1.1

    CDG- Plumbing Code 1.1

    50問 • 2ヶ月前
    ユーザ名非公開

    CDG- Plumbing Code 1.4

    CDG- Plumbing Code 1.4

    ユーザ名非公開 · 23問 · 2ヶ月前

    CDG- Plumbing Code 1.4

    CDG- Plumbing Code 1.4

    23問 • 2ヶ月前
    ユーザ名非公開

    CDG- Plumbing Code 1.2

    CDG- Plumbing Code 1.2

    ユーザ名非公開 · 50問 · 2ヶ月前

    CDG- Plumbing Code 1.2

    CDG- Plumbing Code 1.2

    50問 • 2ヶ月前
    ユーザ名非公開

    CGD- Plumbing Code 1.3

    CGD- Plumbing Code 1.3

    ユーザ名非公開 · 50問 · 2ヶ月前

    CGD- Plumbing Code 1.3

    CGD- Plumbing Code 1.3

    50問 • 2ヶ月前
    ユーザ名非公開

    Plumbing Code 1

    Plumbing Code 1

    ユーザ名非公開 · 50問 · 2ヶ月前

    Plumbing Code 1

    Plumbing Code 1

    50問 • 2ヶ月前
    ユーザ名非公開

    Plumbing Code 1.1

    Plumbing Code 1.1

    ユーザ名非公開 · 22問 · 2ヶ月前

    Plumbing Code 1.1

    Plumbing Code 1.1

    22問 • 2ヶ月前
    ユーザ名非公開

    CGD - Sanitary Design

    CGD - Sanitary Design

    ユーザ名非公開 · 19問 · 2ヶ月前

    CGD - Sanitary Design

    CGD - Sanitary Design

    19問 • 2ヶ月前
    ユーザ名非公開

    Practical Problems 1

    Practical Problems 1

    ユーザ名非公開 · 50問 · 2ヶ月前

    Practical Problems 1

    Practical Problems 1

    50問 • 2ヶ月前
    ユーザ名非公開

    Practical Problems 1.1

    Practical Problems 1.1

    ユーザ名非公開 · 47問 · 2ヶ月前

    Practical Problems 1.1

    Practical Problems 1.1

    47問 • 2ヶ月前
    ユーザ名非公開

    Practical Problems 2

    Practical Problems 2

    ユーザ名非公開 · 50問 · 2ヶ月前

    Practical Problems 2

    Practical Problems 2

    50問 • 2ヶ月前
    ユーザ名非公開

    Practical Problems 2.1

    Practical Problems 2.1

    ユーザ名非公開 · 50問 · 2ヶ月前

    Practical Problems 2.1

    Practical Problems 2.1

    50問 • 2ヶ月前
    ユーザ名非公開

    Plumbing Arithmetic 1

    Plumbing Arithmetic 1

    ユーザ名非公開 · 50問 · 2ヶ月前

    Plumbing Arithmetic 1

    Plumbing Arithmetic 1

    50問 • 2ヶ月前
    ユーザ名非公開

    Plumbing Arithmetic 1.1

    Plumbing Arithmetic 1.1

    ユーザ名非公開 · 50問 · 2ヶ月前

    Plumbing Arithmetic 1.1

    Plumbing Arithmetic 1.1

    50問 • 2ヶ月前
    ユーザ名非公開

    Plumbing Arithmetic 2

    Plumbing Arithmetic 2

    ユーザ名非公開 · 50問 · 2ヶ月前

    Plumbing Arithmetic 2

    Plumbing Arithmetic 2

    50問 • 2ヶ月前
    ユーザ名非公開

    Plumbing Arithmetic 2.1

    Plumbing Arithmetic 2.1

    ユーザ名非公開 · 50問 · 2ヶ月前

    Plumbing Arithmetic 2.1

    Plumbing Arithmetic 2.1

    50問 • 2ヶ月前
    ユーザ名非公開

    問題一覧

  • 1

    What is the estimated sewage flow rate of bowling alleys with snack bar only?

    283.9 LpD per lane

  • 2

    What is the storage factor for self-service auto washers?

    1.5

  • 3

    Minimum dimension of a sand interceptor's inlet opening

    0.2 sq.m.

  • 4

    A group vent pipe that connects to the vent stack

    Circuit Vent

  • 5

    Prohibited vent pipe material below ground

    Galvanized Wrought Iron

  • 6

    Minimum spacing between trenches or leaching beds

    1.20 m

  • 7

    Which among the choices is a prohibited trap?

    Crown trap

  • 8

    Normally in Manila, the rainfall intensity used is _____.

    102 mm

  • 9

    Maximum number of slip joint fitting that may be used on the outlet side of a trap

    1

  • 10

    Wet venting is limited to ______ fixtures

    4

  • 11

    Maximum length of a tailpiece

    0.6 m

  • 12

    What is an underground drain pipe that receives only sub-surface or seepage water and convey it to a sump for disposal by gravity flow or by lift pump?

    subsoil drain

  • 13

    Connects directly with an individual trap underneath or behind the fixture

    Backvent Pipe

  • 14

    What can be drained through an airbreak?

    air washer

  • 15

    The size of a vent pipe is determined by __________.

    FU and length

  • 16

    In getting the roof area for the computation of rainwater piping size, for two walls opposite of differing heights, add _______ of wall area above top of lower wall to the roof area.

    50%

  • 17

    Elastomeric gasketed and rubber-ring joints shall comply with _________ installation standard

    IAPMO

  • 18

    The minimum inlet and outlet size for sand interceptor

    76 mm

  • 19

    What is the maximum length allowed for a vent stack serving 48 DFU?

    55

  • 20

    For accessible toilets, signs on walls and doors should be located at a maximum height of _______.

    1.60 m

  • 21

    What is the horizontal distance required of a vent pipe from any openable window, door opening, air intake, or vent shaft?

    3 m

  • 22

    The maximum trap loading of a pipe size 76 mm

    6

  • 23

    Vertical vent pipes installed in a roof used for other purposes shall extend a minimum of ________ above such roof.

    2.1 m

  • 24

    If a septic tank can have an effective capacity of 4000 L, how much does the secondary compartment hold?

    1,333 L

  • 25

    The principal artery of the venting system to which vent branches are connected.

    Main Vent

  • 26

    The bottom of the water pipe, at all points shall be at least _________ above the top of the sewer or drain line.

    0.3 m

  • 27

    What is the minimum distance from disposal field to another disposal field?

    1.2 m

  • 28

    What is the sewage that turns dark and smell unpleasantly due to anaerobic decomposition?

    septic

  • 29

    Determine the size of horizontal rainwater piping with a slope of 2% for a 350 sqm roof in an area where the the rainfall is 102 mm/hr.

    127 mm

  • 30

    When the first compartment exceeds 3.7 m in length, an additional ________ shall be provided.

    manhole

  • 31

    Rainwater piping located within a medium height building basement area shall be of Galvanized Iron _______.

    Schedule 30

  • 32

    What will be the size of 0.5% sloped circular bottom gutter serving a roof area of 180 sqm, and the rainfall intensity around the area is 76 mm/hr?

    178 mm

  • 33

    What downspout size would you specify for an 800 sqm roof with a rainfall intensity around the area of 152.4 mm/hr?

    152 mm

  • 34

    Minimum distance of a 32 mm trap arm diameter to a vent

    64 mm

  • 35

    The minimum depth of the sand interceptor under the invert of the outlet pipe is ________.

    610 mm

  • 36

    The side walls of a Septic Tank shall be at least __________ above the liquid depth.

    9”

  • 37

    All condensers and sumps shall be properly trapped at the outlet with a deep seal trap extending to within _________ of the bottom of the tank.

    6”

  • 38

    A 203 mm diameter and larger sewer may have a slope of _________.

    0.5%

  • 39

    In a granule test of a water closet, the initial flush of three different flushes must result in no more than ___________ on average remaining in the bowl.

    125

  • 40

    What is the minimum condensate pipe diameter of a cooling equipment with capacity through 125 ToR?

    38 mm

  • 41

    A water that stands in or passes through the ground

    Ground Water

  • 42

    Jointing method for soft copper water tubing

    Flared Joint

  • 43

    What is required when a soil or waste stack extends 10 or more stories?

    Parallel Vent Stack

  • 44

    Minimum water seal of a grease trap

    51 mm

  • 45

    Septic tanks should be cleaned when scum or sludge occupies ________ of the tank volume.

    1/3

  • 46

    Every abandoned building sewer shall be plugged or capped within __________ of the property line.

    1.5 m

  • 47

    Water closets that are made to accommodate overweight and obese people

    Bariatic Water Closet

  • 48

    _________ are recommended for oil handling piping works.

    Neoprene Gaskets

  • 49

    Horizontal distance of the trap arm with a diameter of 38 mm

    1.07 m

  • 50

    What is the gauge pressure to be maintained for air tests as substitute for water test in water pipings?

    344.5 kPa