    Minimum storage tanks size (in cu.m) shall be calculated by dividing the building footprint area by _____.

    75

  • 2

    Flow Rate of Self-metering Lavatory for public use

    0.25 gal

  • 3

    Vertical vent pipes for outdoor installations shall extend to at least _____ distant from any part of the roof that is used for other purposes.

    3.0 m

  • 4

    In the ink test of a water closet, the total length of the remaining ink line must not exceed _____.

    2 inches

  • 5

    Identify the symbol.

    Water Closet Wall Hung

  • 6

    The mounting height of a kitchen sink is _____.

    36"

  • 7

    What is the likely issue if water leaks from the base of the faucet?

    gasket or seal under the faucet

  • 8

    How do you repair a leak on a plastic pipe fitting?

    Cut fitting out and install new fitting

  • 9

    The effective thread length of a 3" screwed steel pipe is _____ long.

    1-1/2"

  • 10

    The maximum flow rate for handheld bidet sprays must be _____ per minute according to PGBC.

    4.8 L

  • 11

    The executive department of the Philippine Government responsible for promoting peace and order, ensuring public safety and strengthening local government capability aimed towards the effective delivery of basic services to the citizenry.

    Department of Interior and Local Government

  • 12

    Water Closet that is simple in construction and yet highly efficient within its limitations

    Washdown

  • 13

    In a dye test, a dilution ratio of _____ must be obtained for each flush.

    100:1

  • 14

    Chemical not found in drain cleaners

    Sodium Hydrochloride

  • 15

    For flush tank supplies, the available pressure may not be less than _____.

    8 psi

  • 16

    A mixing valve that senses outlet temperature and compensates for fluctuations in incoming hot or cold water temperature is called a _____.

    thermostatic valve

  • 17

    The back pressure test determines that the water seal remains in place when exposed to a back pressure of _____.

    2 1/2"

  • 18

    A 1" diameter pipe size has _____ threads per inch.

    8

  • 19

    Maximum Flush rate of water closet as recommended by EPA of 1992

    1.6 gpf

  • 20

    It is used to prevent aggregates, debris, and other unwanted objects from entering the storm drainage systems.

    Catch basin

  • 21

    This is also known as close-coupled toilet.

    two-piece toilet

  • 22

    Where does the soldering of a rigid copper tubing joint require the torch heat to be placed?

    fitting

  • 23

    For use for finish cleaning required of boiler tubes and heat exchangers.

    Flue Brush

  • 24

    On a scale of 1:30 meters, what does it represent?

    10 cm on the plan is 3 m on the field

  • 25

    How should fixtures be located to ensure the most economical installation?

    as close together as possible

  • 26

    A hissing sound from a toilet after it refills usually indicate that _____.

    f ill valve is faulty

  • 27

    A laundry sink faucet with a hose-thread type spout must _____.

    have a backflow prevention device

  • 28

    What is a good practice when designing pipes from a rainwater harvesting tank for recycling?

    pipes are labeled

  • 29

    Increasing vents one pipe size will _____.

    allow vents to be longer

  • 30

    Identify

    Hot water recirculating

  • 31

    Height of juvenile water closet rim height

    13''

  • 32

    What is not a cause of running water?

    Loose Closet bolts

  • 33

    Standard rough-in of bowl outlet from the back wall.

    12''

  • 34

    Identify D

    Packing Nut

  • 35

    In a centerset faucet, the inlet holes are _____ apart.

    4''

  • 36

    A fixture carrier for fixtures is installed _____

    during the rough-in phase of construction

  • 37

    A beginner at the trade who usually serves for to 5 years as a helper to a journeyman

    Apprentice Plumber

  • 38

    What is the name of the special tool designed to reach the hex jam nut beneath a fixture?

    basin wrench

  • 39

    The purpose of "collector" in a solar water heating system

    to absorb solar heat energy to heat water

  • 40

    The extension of a soil or waste stack above the highest horizontal drain connected to the stack.

    Stack Vent

  • 41

    Ladders used to gain access to roof shall extend at least _____ above the roof

    3 feet

  • 42

    Identify # 3

    Waste Stack

  • 43

    In a Ball Removal Test, the water closet must flush at least an average of _____ on the initial flush of three different f lushes.

    75

  • 44

    To fasten or hold a material or device to prevent movement, rotation, or displacement at the point of application

    Anchor

  • 45

    Remove burrs from the inside ends of a galvanized pipe with a _____.

    reamer

  • 46

    What is a "powder room"?

    half bath

  • 47

    Large, deep sinks used in mess-halls type facilities

    Scullery Sink

  • 48

    Bariatric water closets support weights of _____ pounds.

    500 to 1000

  • 49

    Identify No. 2

    Branch Vent

  • 50

    Water closet tank ballcocks shall be installed with the vacuum breaker critical level at least ____.

    1 inch above the full opening of the overflow tube

  • YT1 Materials Engineer EXAM

    YT1 Materials Engineer EXAM

    ユーザ名非公開 · 100問 · 2ヶ月前

    YT1 Materials Engineer EXAM

    YT1 Materials Engineer EXAM

    100問 • 2ヶ月前
    ユーザ名非公開

    YT2 Materials Engineer EXAM

    YT2 Materials Engineer EXAM

    ユーザ名非公開 · 100問 · 2ヶ月前

    YT2 Materials Engineer EXAM

    YT2 Materials Engineer EXAM

    100問 • 2ヶ月前
    ユーザ名非公開

    Project Engineer YT 1

    Project Engineer YT 1

    ユーザ名非公開 · 100問 · 2ヶ月前

    Project Engineer YT 1

    Project Engineer YT 1

    100問 • 2ヶ月前
    ユーザ名非公開

    Project Engineer EXAM

    Project Engineer EXAM

    ユーザ名非公開 · 62問 · 2ヶ月前

    Project Engineer EXAM

    Project Engineer EXAM

    62問 • 2ヶ月前
    ユーザ名非公開

    Project Engineer EXAM 68

    Project Engineer EXAM 68

    ユーザ名非公開 · 100問 · 2ヶ月前

    Project Engineer EXAM 68

    Project Engineer EXAM 68

    100問 • 2ヶ月前
    ユーザ名非公開

    Project Engineer EXAM 82

    Project Engineer EXAM 82

    ユーザ名非公開 · 100問 · 2ヶ月前

    Project Engineer EXAM 82

    Project Engineer EXAM 82

    100問 • 2ヶ月前
    ユーザ名非公開

    July 2023 PE Refresher

    July 2023 PE Refresher

    ユーザ名非公開 · 70問 · 2ヶ月前

    July 2023 PE Refresher

    July 2023 PE Refresher

    70問 • 2ヶ月前
    ユーザ名非公開

    August 2019 Special PE Exam

    August 2019 Special PE Exam

    ユーザ名非公開 · 93問 · 2ヶ月前

    August 2019 Special PE Exam

    August 2019 Special PE Exam

    93問 • 2ヶ月前
    ユーザ名非公開

    RNPCP Chapter 1 to 5

    RNPCP Chapter 1 to 5

    ユーザ名非公開 · 86問 · 2ヶ月前

    RNPCP Chapter 1 to 5

    RNPCP Chapter 1 to 5

    86問 • 2ヶ月前
    ユーザ名非公開

    Plumbing Code 4

    Plumbing Code 4

    ユーザ名非公開 · 100問 · 2ヶ月前

    Plumbing Code 4

    Plumbing Code 4

    100問 • 2ヶ月前
    ユーザ名非公開

    Plumbing Code 5

    Plumbing Code 5

    ユーザ名非公開 · 100問 · 2ヶ月前

    Plumbing Code 5

    Plumbing Code 5

    100問 • 2ヶ月前
    ユーザ名非公開

    Plumbing Code 6

    Plumbing Code 6

    ユーザ名非公開 · 100問 · 2ヶ月前

    Plumbing Code 6

    Plumbing Code 6

    100問 • 2ヶ月前
    ユーザ名非公開

    Plumbing Code 7

    Plumbing Code 7

    ユーザ名非公開 · 100問 · 2ヶ月前

    Plumbing Code 7

    Plumbing Code 7

    100問 • 2ヶ月前
    ユーザ名非公開

    Plumbing Code 8

    Plumbing Code 8

    ユーザ名非公開 · 100問 · 2ヶ月前

    Plumbing Code 8

    Plumbing Code 8

    100問 • 2ヶ月前
    ユーザ名非公開

    Plumbing Code 3

    Plumbing Code 3

    ユーザ名非公開 · 100問 · 2ヶ月前

    Plumbing Code 3

    Plumbing Code 3

    100問 • 2ヶ月前
    ユーザ名非公開

    Sanitation, Plumbing Design, and Installation 2

    Sanitation, Plumbing Design, and Installation 2

    ユーザ名非公開 · 97問 · 2ヶ月前

    Sanitation, Plumbing Design, and Installation 2

    Sanitation, Plumbing Design, and Installation 2

    97問 • 2ヶ月前
    ユーザ名非公開

    Sanitation, Plumbing Design, and Installation 1

    Sanitation, Plumbing Design, and Installation 1

    ユーザ名非公開 · 99問 · 2ヶ月前

    Sanitation, Plumbing Design, and Installation 1

    Sanitation, Plumbing Design, and Installation 1

    99問 • 2ヶ月前
    ユーザ名非公開

    Sanitation, Plumbing Design, and Installation 3

    Sanitation, Plumbing Design, and Installation 3

    ユーザ名非公開 · 96問 · 2ヶ月前

    Sanitation, Plumbing Design, and Installation 3

    Sanitation, Plumbing Design, and Installation 3

    96問 • 2ヶ月前
    ユーザ名非公開

    Sanitation, Plumbing Design, and Installation 4

    Sanitation, Plumbing Design, and Installation 4

    ユーザ名非公開 · 95問 · 2ヶ月前

    Sanitation, Plumbing Design, and Installation 4

    Sanitation, Plumbing Design, and Installation 4

    95問 • 2ヶ月前
    ユーザ名非公開

    Sanitation, Plumbing Design, and Installation 5

    Sanitation, Plumbing Design, and Installation 5

    ユーザ名非公開 · 97問 · 2ヶ月前

    Sanitation, Plumbing Design, and Installation 5

    Sanitation, Plumbing Design, and Installation 5

    97問 • 2ヶ月前
    ユーザ名非公開

    Sanitation, Plumbing Design, and Installation 7

    Sanitation, Plumbing Design, and Installation 7

    ユーザ名非公開 · 100問 · 2ヶ月前

    Sanitation, Plumbing Design, and Installation 7

    Sanitation, Plumbing Design, and Installation 7

    100問 • 2ヶ月前
    ユーザ名非公開

    Sanitation, Plumbing Design, and Installation 8

    Sanitation, Plumbing Design, and Installation 8

    ユーザ名非公開 · 98問 · 2ヶ月前

    Sanitation, Plumbing Design, and Installation 8

    Sanitation, Plumbing Design, and Installation 8

    98問 • 2ヶ月前
    ユーザ名非公開

    Plumbing Tools 1

    Plumbing Tools 1

    ユーザ名非公開 · 87問 · 2ヶ月前

    Plumbing Tools 1

    Plumbing Tools 1

    87問 • 2ヶ月前
    ユーザ名非公開

    Plumbing Tools 2

    Plumbing Tools 2

    ユーザ名非公開 · 53問 · 2ヶ月前

    Plumbing Tools 2

    Plumbing Tools 2

    53問 • 2ヶ月前
    ユーザ名非公開

    Practical Problems and Experiences 1

    Practical Problems and Experiences 1

    ユーザ名非公開 · 100問 · 2ヶ月前

    Practical Problems and Experiences 1

    Practical Problems and Experiences 1

    100問 • 2ヶ月前
    ユーザ名非公開

    Practical Problems and Experiences 2

    Practical Problems and Experiences 2

    ユーザ名非公開 · 100問 · 2ヶ月前

    Practical Problems and Experiences 2

    Practical Problems and Experiences 2

    100問 • 2ヶ月前
    ユーザ名非公開

    Practical Problems and Experiences 3

    Practical Problems and Experiences 3

    ユーザ名非公開 · 99問 · 2ヶ月前

    Practical Problems and Experiences 3

    Practical Problems and Experiences 3

    99問 • 2ヶ月前
    ユーザ名非公開

    Practical Problems and Experiences 4

    Practical Problems and Experiences 4

    ユーザ名非公開 · 100問 · 2ヶ月前

    Practical Problems and Experiences 4

    Practical Problems and Experiences 4

    100問 • 2ヶ月前
    ユーザ名非公開

    Plumbing Arithmetic Terms 1

    Plumbing Arithmetic Terms 1

    ユーザ名非公開 · 49問 · 2ヶ月前

    Plumbing Arithmetic Terms 1

    Plumbing Arithmetic Terms 1

    49問 • 2ヶ月前
    ユーザ名非公開

    Plumbing Arithmetic Terms 2

    Plumbing Arithmetic Terms 2

    ユーザ名非公開 · 47問 · 2ヶ月前

    Plumbing Arithmetic Terms 2

    Plumbing Arithmetic Terms 2

    47問 • 2ヶ月前
    ユーザ名非公開

    Plumbing Arithmetic Terms 3

    Plumbing Arithmetic Terms 3

    ユーザ名非公開 · 49問 · 2ヶ月前

    Plumbing Arithmetic Terms 3

    Plumbing Arithmetic Terms 3

    49問 • 2ヶ月前
    ユーザ名非公開

    Plumbing Arithmetic Terms 4

    Plumbing Arithmetic Terms 4

    ユーザ名非公開 · 27問 · 2ヶ月前

    Plumbing Arithmetic Terms 4

    Plumbing Arithmetic Terms 4

    27問 • 2ヶ月前
    ユーザ名非公開

    Plumbing Code WSFU

    Plumbing Code WSFU

    ユーザ名非公開 · 58問 · 2ヶ月前

    Plumbing Code WSFU

    Plumbing Code WSFU

    58問 • 2ヶ月前
    ユーザ名非公開

    Practical Problems and Experiences REFRESHER 1

    Practical Problems and Experiences REFRESHER 1

    ユーザ名非公開 · 100問 · 2ヶ月前

    Practical Problems and Experiences REFRESHER 1

    Practical Problems and Experiences REFRESHER 1

    100問 • 2ヶ月前
    ユーザ名非公開

    Practical Problems and Experiences REFRESHER 2

    Practical Problems and Experiences REFRESHER 2

    ユーザ名非公開 · 70問 · 2ヶ月前

    Practical Problems and Experiences REFRESHER 2

    Practical Problems and Experiences REFRESHER 2

    70問 • 2ヶ月前
    ユーザ名非公開

    Item # and Descriptions

    Item # and Descriptions

    ユーザ名非公開 · 24問 · 2ヶ月前

    Item # and Descriptions

    Item # and Descriptions

    24問 • 2ヶ月前
    ユーザ名非公開

    Item 200 Aggregate Subbase Course

    Item 200 Aggregate Subbase Course

    ユーザ名非公開 · 16問 · 2ヶ月前

    Item 200 Aggregate Subbase Course

    Item 200 Aggregate Subbase Course

    16問 • 2ヶ月前
    ユーザ名非公開

    Item 201 Aggregate Base Course

    Item 201 Aggregate Base Course

    ユーザ名非公開 · 16問 · 2ヶ月前

    Item 201 Aggregate Base Course

    Item 201 Aggregate Base Course

    16問 • 2ヶ月前
    ユーザ名非公開

    Item 202 Crushed Aggregate Base Course

    Item 202 Crushed Aggregate Base Course

    ユーザ名非公開 · 18問 · 2ヶ月前

    Item 202 Crushed Aggregate Base Course

    Item 202 Crushed Aggregate Base Course

    18問 • 2ヶ月前
    ユーザ名非公開

    Item 203 Lime Stabilized Road Mix Base Course

    Item 203 Lime Stabilized Road Mix Base Course

    ユーザ名非公開 · 27問 · 2ヶ月前

    Item 203 Lime Stabilized Road Mix Base Course

    Item 203 Lime Stabilized Road Mix Base Course

    27問 • 2ヶ月前
    ユーザ名非公開

    Item 204 Portland Cement Stabilized Road Mix Base Course

    Item 204 Portland Cement Stabilized Road Mix Base Course

    ユーザ名非公開 · 7問 · 2ヶ月前

    Item 204 Portland Cement Stabilized Road Mix Base Course

    Item 204 Portland Cement Stabilized Road Mix Base Course

    7問 • 2ヶ月前
    ユーザ名非公開

    Item 207 Portland Cement Stabilized Treated Plant Mix Base Course

    Item 207 Portland Cement Stabilized Treated Plant Mix Base Course

    ユーザ名非公開 · 13問 · 2ヶ月前

    Item 207 Portland Cement Stabilized Treated Plant Mix Base Course

    Item 207 Portland Cement Stabilized Treated Plant Mix Base Course

    13問 • 2ヶ月前
    ユーザ名非公開

    Item 205 Asphalt Stabilized Road Mix Base Course

    Item 205 Asphalt Stabilized Road Mix Base Course

    ユーザ名非公開 · 7問 · 2ヶ月前

    Item 205 Asphalt Stabilized Road Mix Base Course

    Item 205 Asphalt Stabilized Road Mix Base Course

    7問 • 2ヶ月前
    ユーザ名非公開

    Item 206 Chemically Stabilized Road Mix Subbase/Base Course

    Item 206 Chemically Stabilized Road Mix Subbase/Base Course

    ユーザ名非公開 · 11問 · 2ヶ月前

    Item 206 Chemically Stabilized Road Mix Subbase/Base Course

    Item 206 Chemically Stabilized Road Mix Subbase/Base Course

    11問 • 2ヶ月前
    ユーザ名非公開

    Item 300 Aggregate Surface Course

    Item 300 Aggregate Surface Course

    ユーザ名非公開 · 11問 · 2ヶ月前

    Item 300 Aggregate Surface Course

    Item 300 Aggregate Surface Course

    11問 • 2ヶ月前
    ユーザ名非公開

    Item 301 Bituminous Prime Coat

    Item 301 Bituminous Prime Coat

    ユーザ名非公開 · 10問 · 2ヶ月前

    Item 301 Bituminous Prime Coat

    Item 301 Bituminous Prime Coat

    10問 • 2ヶ月前
    ユーザ名非公開

    Item 303 Bituminous Seal Coat

    Item 303 Bituminous Seal Coat

    ユーザ名非公開 · 20問 · 2ヶ月前

    Item 303 Bituminous Seal Coat

    Item 303 Bituminous Seal Coat

    20問 • 2ヶ月前
    ユーザ名非公開

    RNPCP Chapter 6 to 9

    RNPCP Chapter 6 to 9

    ユーザ名非公開 · 94問 · 2ヶ月前

    RNPCP Chapter 6 to 9

    RNPCP Chapter 6 to 9

    94問 • 2ヶ月前
    ユーザ名非公開

    RNPCP Chapter 10 to 13

    RNPCP Chapter 10 to 13

    ユーザ名非公開 · 93問 · 2ヶ月前

    RNPCP Chapter 10 to 13

    RNPCP Chapter 10 to 13

    93問 • 2ヶ月前
    ユーザ名非公開

    RNPCP Appendix A and B

    RNPCP Appendix A and B

    ユーザ名非公開 · 79問 · 2ヶ月前

    RNPCP Appendix A and B

    RNPCP Appendix A and B

    79問 • 2ヶ月前
    ユーザ名非公開

    Republic Acts

    Republic Acts

    ユーザ名非公開 · 9問 · 2ヶ月前

    Republic Acts

    Republic Acts

    9問 • 2ヶ月前
    ユーザ名非公開

    Plumbing Arithmetic Terms 5

    Plumbing Arithmetic Terms 5

    ユーザ名非公開 · 68問 · 2ヶ月前

    Plumbing Arithmetic Terms 5

    Plumbing Arithmetic Terms 5

    68問 • 2ヶ月前
    ユーザ名非公開

    Principles and Code of Ethics

    Principles and Code of Ethics

    ユーザ名非公開 · 29問 · 2ヶ月前

    Principles and Code of Ethics

    Principles and Code of Ethics

    29問 • 2ヶ月前
    ユーザ名非公開

    Plumbing Arithmetic Problems 1

    Plumbing Arithmetic Problems 1

    ユーザ名非公開 · 75問 · 2ヶ月前

    Plumbing Arithmetic Problems 1

    Plumbing Arithmetic Problems 1

    75問 • 2ヶ月前
    ユーザ名非公開

    Item 406 Prestressed Concrete Structures

    Item 406 Prestressed Concrete Structures

    ユーザ名非公開 · 36問 · 2ヶ月前

    Item 406 Prestressed Concrete Structures

    Item 406 Prestressed Concrete Structures

    36問 • 2ヶ月前
    ユーザ名非公開

    Item 405 Structural Concrete

    Item 405 Structural Concrete

    ユーザ名非公開 · 41問 · 2ヶ月前

    Item 405 Structural Concrete

    Item 405 Structural Concrete

    41問 • 2ヶ月前
    ユーザ名非公開

    Item 400 Piling

    Item 400 Piling

    ユーザ名非公開 · 80問 · 2ヶ月前

    Item 400 Piling

    Item 400 Piling

    80問 • 2ヶ月前
    ユーザ名非公開

    Item 311 Portland Cement Concrete Pavement (PART 2)

    Item 311 Portland Cement Concrete Pavement (PART 2)

    ユーザ名非公開 · 61問 · 2ヶ月前

    Item 311 Portland Cement Concrete Pavement (PART 2)

    Item 311 Portland Cement Concrete Pavement (PART 2)

    61問 • 2ヶ月前
    ユーザ名非公開

    Item 311 Portland Cement Concrete Pavement (PART 1)

    Item 311 Portland Cement Concrete Pavement (PART 1)

    ユーザ名非公開 · 78問 · 2ヶ月前

    Item 311 Portland Cement Concrete Pavement (PART 1)

    Item 311 Portland Cement Concrete Pavement (PART 1)

    78問 • 2ヶ月前
    ユーザ名非公開

    Standpipe Requirements

    Standpipe Requirements

    ユーザ名非公開 · 29問 · 2ヶ月前

    Standpipe Requirements

    Standpipe Requirements

    29問 • 2ヶ月前
    ユーザ名非公開

    Spdi 1

    Spdi 1

    ユーザ名非公開 · 100問 · 2ヶ月前

    Spdi 1

    Spdi 1

    100問 • 2ヶ月前
    ユーザ名非公開

    Spdi 2

    Spdi 2

    ユーザ名非公開 · 98問 · 2ヶ月前

    Spdi 2

    Spdi 2

    98問 • 2ヶ月前
    ユーザ名非公開

    SPI version D pt 2

    SPI version D pt 2

    ユーザ名非公開 · 61問 · 2ヶ月前

    SPI version D pt 2

    SPI version D pt 2

    61問 • 2ヶ月前
    ユーザ名非公開

    plumbing code

    plumbing code

    ユーザ名非公開 · 100問 · 2ヶ月前

    plumbing code

    plumbing code

    100問 • 2ヶ月前
    ユーザ名非公開

    plumbing code 2

    plumbing code 2

    ユーザ名非公開 · 100問 · 2ヶ月前

    plumbing code 2

    plumbing code 2

    100問 • 2ヶ月前
    ユーザ名非公開

    plumbing code 3

    plumbing code 3

    ユーザ名非公開 · 56問 · 2ヶ月前

    plumbing code 3

    plumbing code 3

    56問 • 2ヶ月前
    ユーザ名非公開

    Practice Problem

    Practice Problem

    ユーザ名非公開 · 70問 · 2ヶ月前

    Practice Problem

    Practice Problem

    70問 • 2ヶ月前
    ユーザ名非公開

    PP pre

    PP pre

    ユーザ名非公開 · 100問 · 2ヶ月前

    PP pre

    PP pre

    100問 • 2ヶ月前
    ユーザ名非公開

    PP Pre 2

    PP Pre 2

    ユーザ名非公開 · 100問 · 2ヶ月前

    PP Pre 2

    PP Pre 2

    100問 • 2ヶ月前
    ユーザ名非公開

    PP pre 3

    PP pre 3

    ユーザ名非公開 · 44問 · 2ヶ月前

    PP pre 3

    PP pre 3

    44問 • 2ヶ月前
    ユーザ名非公開

    WT 1

    WT 1

    ユーザ名非公開 · 50問 · 2ヶ月前

    WT 1

    WT 1

    50問 • 2ヶ月前
    ユーザ名非公開

    WT 2

    WT 2

    ユーザ名非公開 · 48問 · 2ヶ月前

    WT 2

    WT 2

    48問 • 2ヶ月前
    ユーザ名非公開

    WT 3

    WT 3

    ユーザ名非公開 · 50問 · 2ヶ月前

    WT 3

    WT 3

    50問 • 2ヶ月前
    ユーザ名非公開

    WT 6

    WT 6

    ユーザ名非公開 · 50問 · 2ヶ月前

    WT 6

    WT 6

    50問 • 2ヶ月前
    ユーザ名非公開

    Definition of Terms 1

    Definition of Terms 1

    ユーザ名非公開 · 90問 · 2ヶ月前

    Definition of Terms 1

    Definition of Terms 1

    90問 • 2ヶ月前
    ユーザ名非公開

    Definition of Terms 2

    Definition of Terms 2

    ユーザ名非公開 · 90問 · 2ヶ月前

    Definition of Terms 2

    Definition of Terms 2

    90問 • 2ヶ月前
    ユーザ名非公開

    Definition of Terms 3

    Definition of Terms 3

    ユーザ名非公開 · 90問 · 2ヶ月前

    Definition of Terms 3

    Definition of Terms 3

    90問 • 2ヶ月前
    ユーザ名非公開

    Refresher SPDI 1

    Refresher SPDI 1

    ユーザ名非公開 · 100問 · 2ヶ月前

    Refresher SPDI 1

    Refresher SPDI 1

    100問 • 2ヶ月前
    ユーザ名非公開

    Refresher SPDI 1

    Refresher SPDI 1

    ユーザ名非公開 · 9問 · 2ヶ月前

    Refresher SPDI 1

    Refresher SPDI 1

    9問 • 2ヶ月前
    ユーザ名非公開

    Weekly Test 1

    Weekly Test 1

    ユーザ名非公開 · 50問 · 2ヶ月前

    Weekly Test 1

    Weekly Test 1

    50問 • 2ヶ月前
    ユーザ名非公開

    Weekly Test 2

    Weekly Test 2

    ユーザ名非公開 · 50問 · 2ヶ月前

    Weekly Test 2

    Weekly Test 2

    50問 • 2ヶ月前
    ユーザ名非公開

    Weekly Test 3

    Weekly Test 3

    ユーザ名非公開 · 50問 · 2ヶ月前

    Weekly Test 3

    Weekly Test 3

    50問 • 2ヶ月前
    ユーザ名非公開

    MPLE

    MPLE

    ユーザ名非公開 · 41問 · 2ヶ月前

    MPLE

    MPLE

    41問 • 2ヶ月前
    ユーザ名非公開

    CDG- Plumbing Code 1

    CDG- Plumbing Code 1

    ユーザ名非公開 · 48問 · 2ヶ月前

    CDG- Plumbing Code 1

    CDG- Plumbing Code 1

    48問 • 2ヶ月前
    ユーザ名非公開

    CDG- Plumbing Code 1.1

    CDG- Plumbing Code 1.1

    ユーザ名非公開 · 50問 · 2ヶ月前

    CDG- Plumbing Code 1.1

    CDG- Plumbing Code 1.1

    50問 • 2ヶ月前
    ユーザ名非公開

    CDG- Plumbing Code 1.4

    CDG- Plumbing Code 1.4

    ユーザ名非公開 · 23問 · 2ヶ月前

    CDG- Plumbing Code 1.4

    CDG- Plumbing Code 1.4

    23問 • 2ヶ月前
    ユーザ名非公開

    CDG- Plumbing Code 1.2

    CDG- Plumbing Code 1.2

    ユーザ名非公開 · 50問 · 2ヶ月前

    CDG- Plumbing Code 1.2

    CDG- Plumbing Code 1.2

    50問 • 2ヶ月前
    ユーザ名非公開

    CGD- Plumbing Code 1.3

    CGD- Plumbing Code 1.3

    ユーザ名非公開 · 50問 · 2ヶ月前

    CGD- Plumbing Code 1.3

    CGD- Plumbing Code 1.3

    50問 • 2ヶ月前
    ユーザ名非公開

    Plumbing Code 1

    Plumbing Code 1

    ユーザ名非公開 · 50問 · 2ヶ月前

    Plumbing Code 1

    Plumbing Code 1

    50問 • 2ヶ月前
    ユーザ名非公開

    Plumbing Code 1.1

    Plumbing Code 1.1

    ユーザ名非公開 · 22問 · 2ヶ月前

    Plumbing Code 1.1

    Plumbing Code 1.1

    22問 • 2ヶ月前
    ユーザ名非公開

    CGD - Sanitary Design

    CGD - Sanitary Design

    ユーザ名非公開 · 19問 · 2ヶ月前

    CGD - Sanitary Design

    CGD - Sanitary Design

    19問 • 2ヶ月前
    ユーザ名非公開

    Practical Problems 1

    Practical Problems 1

    ユーザ名非公開 · 50問 · 2ヶ月前

    Practical Problems 1

    Practical Problems 1

    50問 • 2ヶ月前
    ユーザ名非公開

    Practical Problems 1.1

    Practical Problems 1.1

    ユーザ名非公開 · 47問 · 2ヶ月前

    Practical Problems 1.1

    Practical Problems 1.1

    47問 • 2ヶ月前
    ユーザ名非公開

    Practical Problems 2

    Practical Problems 2

    ユーザ名非公開 · 50問 · 2ヶ月前

    Practical Problems 2

    Practical Problems 2

    50問 • 2ヶ月前
    ユーザ名非公開

    Practical Problems 2.1

    Practical Problems 2.1

    ユーザ名非公開 · 50問 · 2ヶ月前

    Practical Problems 2.1

    Practical Problems 2.1

    50問 • 2ヶ月前
    ユーザ名非公開

    Plumbing Arithmetic 1

    Plumbing Arithmetic 1

    ユーザ名非公開 · 50問 · 2ヶ月前

    Plumbing Arithmetic 1

    Plumbing Arithmetic 1

    50問 • 2ヶ月前
    ユーザ名非公開

    Plumbing Arithmetic 1.1

    Plumbing Arithmetic 1.1

    ユーザ名非公開 · 50問 · 2ヶ月前

    Plumbing Arithmetic 1.1

    Plumbing Arithmetic 1.1

    50問 • 2ヶ月前
    ユーザ名非公開

    Plumbing Arithmetic 2

    Plumbing Arithmetic 2

    ユーザ名非公開 · 50問 · 2ヶ月前

    Plumbing Arithmetic 2

    Plumbing Arithmetic 2

    50問 • 2ヶ月前
    ユーザ名非公開

    Plumbing Arithmetic 2.1

    Plumbing Arithmetic 2.1

    ユーザ名非公開 · 50問 · 2ヶ月前

    Plumbing Arithmetic 2.1

    Plumbing Arithmetic 2.1

    50問 • 2ヶ月前
    ユーザ名非公開

    問題一覧

  • 1

    Minimum storage tanks size (in cu.m) shall be calculated by dividing the building footprint area by _____.

    75

  • 2

    Flow Rate of Self-metering Lavatory for public use

    0.25 gal

  • 3

    Vertical vent pipes for outdoor installations shall extend to at least _____ distant from any part of the roof that is used for other purposes.

    3.0 m

  • 4

    In the ink test of a water closet, the total length of the remaining ink line must not exceed _____.

    2 inches

  • 5

    Identify the symbol.

    Water Closet Wall Hung

  • 6

    The mounting height of a kitchen sink is _____.

    36"

  • 7

    What is the likely issue if water leaks from the base of the faucet?

    gasket or seal under the faucet

  • 8

    How do you repair a leak on a plastic pipe fitting?

    Cut fitting out and install new fitting

  • 9

    The effective thread length of a 3" screwed steel pipe is _____ long.

    1-1/2"

  • 10

    The maximum flow rate for handheld bidet sprays must be _____ per minute according to PGBC.

    4.8 L

  • 11

    The executive department of the Philippine Government responsible for promoting peace and order, ensuring public safety and strengthening local government capability aimed towards the effective delivery of basic services to the citizenry.

    Department of Interior and Local Government

  • 12

    Water Closet that is simple in construction and yet highly efficient within its limitations

    Washdown

  • 13

    In a dye test, a dilution ratio of _____ must be obtained for each flush.

    100:1

  • 14

    Chemical not found in drain cleaners

    Sodium Hydrochloride

  • 15

    For flush tank supplies, the available pressure may not be less than _____.

    8 psi

  • 16

    A mixing valve that senses outlet temperature and compensates for fluctuations in incoming hot or cold water temperature is called a _____.

    thermostatic valve

  • 17

    The back pressure test determines that the water seal remains in place when exposed to a back pressure of _____.

    2 1/2"

  • 18

    A 1" diameter pipe size has _____ threads per inch.

    8

  • 19

    Maximum Flush rate of water closet as recommended by EPA of 1992

    1.6 gpf

  • 20

    It is used to prevent aggregates, debris, and other unwanted objects from entering the storm drainage systems.

    Catch basin

  • 21

    This is also known as close-coupled toilet.

    two-piece toilet

  • 22

    Where does the soldering of a rigid copper tubing joint require the torch heat to be placed?

    fitting

  • 23

    For use for finish cleaning required of boiler tubes and heat exchangers.

    Flue Brush

  • 24

    On a scale of 1:30 meters, what does it represent?

    10 cm on the plan is 3 m on the field

  • 25

    How should fixtures be located to ensure the most economical installation?

    as close together as possible

  • 26

    A hissing sound from a toilet after it refills usually indicate that _____.

    f ill valve is faulty

  • 27

    A laundry sink faucet with a hose-thread type spout must _____.

    have a backflow prevention device

  • 28

    What is a good practice when designing pipes from a rainwater harvesting tank for recycling?

    pipes are labeled

  • 29

    Increasing vents one pipe size will _____.

    allow vents to be longer

  • 30

    Identify

    Hot water recirculating

  • 31

    Height of juvenile water closet rim height

    13''

  • 32

    What is not a cause of running water?

    Loose Closet bolts

  • 33

    Standard rough-in of bowl outlet from the back wall.

    12''

  • 34

    Identify D

    Packing Nut

  • 35

    In a centerset faucet, the inlet holes are _____ apart.

    4''

  • 36

    A fixture carrier for fixtures is installed _____

    during the rough-in phase of construction

  • 37

    A beginner at the trade who usually serves for to 5 years as a helper to a journeyman

    Apprentice Plumber

  • 38

    What is the name of the special tool designed to reach the hex jam nut beneath a fixture?

    basin wrench

  • 39

    The purpose of "collector" in a solar water heating system

    to absorb solar heat energy to heat water

  • 40

    The extension of a soil or waste stack above the highest horizontal drain connected to the stack.

    Stack Vent

  • 41

    Ladders used to gain access to roof shall extend at least _____ above the roof

    3 feet

  • 42

    Identify # 3

    Waste Stack

  • 43

    In a Ball Removal Test, the water closet must flush at least an average of _____ on the initial flush of three different f lushes.

    75

  • 44

    To fasten or hold a material or device to prevent movement, rotation, or displacement at the point of application

    Anchor

  • 45

    Remove burrs from the inside ends of a galvanized pipe with a _____.

    reamer

  • 46

    What is a "powder room"?

    half bath

  • 47

    Large, deep sinks used in mess-halls type facilities

    Scullery Sink

  • 48

    Bariatric water closets support weights of _____ pounds.

    500 to 1000

  • 49

    Identify No. 2

    Branch Vent

  • 50

    Water closet tank ballcocks shall be installed with the vacuum breaker critical level at least ____.