    In most cases, the person is referring to a technique for increasing the production per unit of time decreasing the cost per unit output-in other words, productivity improvement.

    Methods engineering

  • 2

    It entails analyses at two different times during the history of a product.

    Methods engineering

  • 3

    Two Responsible of Methods engineering

    The methods engineer is first responsible for designing and developing the various work centers where the product will be produced, Second, that engineer must continually restudy the work centers to find a better way to produce the product and/or improve it's quality

  • 4

    Eight Systematic Procedure to Develop a Work Center

    Select the project, Get and present the data, Analyze the data, Develop the ideal method, Present and install the method, Develop a job analysis, Establish time standards, Follow up the method

  • 5

    As part of developing or maintaining the new method, the principles of _______ must be used to fit the task and workstation ergonomically to the human operator.

    Work design

  • 6

    This technique establishes a time standard allowed to perform a given task, based on measurements of the work content of the prescribe method, with sue consideration for fatigue and for personal and unavoidable delays.

    Standards

  • 7

    The principal objectives of methods, standards, and work design are:

    To increase productivity and product reliability safely, To lower unit cost, thus allowing more quality goods and services to be produced for more people

  • 8

    This are the end result of time study or work measurement.

    Standards

  • 9

    Corollaries to the principal objectives are:

    Minimize the time required to perform tasks, Continually improve the quality and reliability of products and services, Conserve resources and minimize cost by specifying the most appropriate direct and indirect materials for the production of goods and service, Take the availability of power into careful consideration, Maximize the safety, health, and well-being of all employees, Procedure with an increasing concern for protecting the environment, Follow a humane program of management the result in job interest and satisfaction for each employee

  • 10

    He is generally conceded to be founder of modern time study in the country

    Frederick W. Taylor

  • 11

    Taylor carried out the _____ that came to be one of the most celebrated demonstration of his principle

    Pig-iron experiment

  • 12

    Another of Taylor's Bethlehem Steel Studies that gained fame was the _____.

    Shoveling experiment

  • 13

    They are the founders of the modern study technique.

    Frank and Lillian Gilbreth

  • 14

    An associateof Frederick W. Taylor, developed a production slide rule for determining the most efficient combinations of speeds and feeds for cutting metals of various hardnesses. considering the depth of a cut, size of tool, and life of the tool.

    Carl G. Barth

  • 15

    He applied scientific methods to work on the Santa Fe Railroad and wrote a book.

    Harrington Emerson

  • 16

    Twelve Principles of Efficiency, in which he made an effort to inform management of procedures, installed standards cost and a bonus plan, and transferred its accounting work to Hollerith tabulating machines.

    Harrington Emerson

  • 17

    He developed simple graphs that would measure performance while visually showing projected schedules.

    Henry Laurence Gantt

  • 18

    it is relatively new science that deals with designing the task, work-station, and working environment to fit the human operator better.

    Work design

  • 19

    In the United States, it is more typically known as human factors.

    Work design

  • 20

    In internationally it is better known as ergonomics, which is derived from the Greekwords for ____ and ______.

    Work (erg), Laws (nomos)

  • 21

    They developed the technique of filming motions to study them. In a technique known as ________.

    Micromotion study

  • 22

    Frank Gilbreth originally Introduced his ideas and philosophies into the ________ in which he was employed

    Bricklayer's trade

  • 23

    It involves attaching a small electric light bulb to the finger or hand or part of the body being studied and then photographing the motion while the operator is performing the operation.

    Cyclegraphic method

  • 24

    It is similar to the cyclegraph, but its electic circuit is interrupted regularly, causing the light to flash.

    Chronocyclegraphic

  • 25

    it is defined as the study of the body motions used in performing an operation, to improve the operation by eliminating unnecessary motions, simplifying necessary motions, and the establishing the most favorable motion sequence for maximu efficiency.

    Motion study

  • 26

    This are used to implement a wage payment scheme

    Resulting standards

  • RIZAL QUIZ 1

    RIZAL QUIZ 1

    Alyssa Laciste · 14問 · 1年前

    RIZAL QUIZ 1

    RIZAL QUIZ 1

    14問 • 1年前
    Alyssa Laciste

    ADVMATH

    ADVMATH

    Alyssa Laciste · 26問 · 1年前

    ADVMATH

    ADVMATH

    26問 • 1年前
    Alyssa Laciste

    WSM Quiz 1

    WSM Quiz 1

    Alyssa Laciste · 28問 · 1年前

    WSM Quiz 1

    WSM Quiz 1

    28問 • 1年前
    Alyssa Laciste

    ENGECON QUIZ 1

    ENGECON QUIZ 1

    Alyssa Laciste · 43問 · 1年前

    ENGECON QUIZ 1

    ENGECON QUIZ 1

    43問 • 1年前
    Alyssa Laciste

    RIZAL QUIZ 2

    RIZAL QUIZ 2

    Alyssa Laciste · 18問 · 1年前

    RIZAL QUIZ 2

    RIZAL QUIZ 2

    18問 • 1年前
    Alyssa Laciste

    KOMFIL Quiz 1

    KOMFIL Quiz 1

    Alyssa Laciste · 22問 · 1年前

    KOMFIL Quiz 1

    KOMFIL Quiz 1

    22問 • 1年前
    Alyssa Laciste

    KOMFIL QUIZ 2

    KOMFIL QUIZ 2

    Alyssa Laciste · 78問 · 1年前

    KOMFIL QUIZ 2

    KOMFIL QUIZ 2

    78問 • 1年前
    Alyssa Laciste

    nnn

    nnn

    Alyssa Laciste · 59問 · 1年前

    nnn

    nnn

    59問 • 1年前
    Alyssa Laciste

    yty

    yty

    Alyssa Laciste · 19問 · 1年前

    yty

    yty

    19問 • 1年前
    Alyssa Laciste

    QUIZ 2

    QUIZ 2

    Alyssa Laciste · 40問 · 1年前

    QUIZ 2

    QUIZ 2

    40問 • 1年前
    Alyssa Laciste

    WSM QUIZ 3

    WSM QUIZ 3

    Alyssa Laciste · 42問 · 1年前

    WSM QUIZ 3

    WSM QUIZ 3

    42問 • 1年前
    Alyssa Laciste

    Quiz 2

    Quiz 2

    Alyssa Laciste · 91問 · 1年前

    Quiz 2

    Quiz 2

    91問 • 1年前
    Alyssa Laciste

    Chapter 1

    Chapter 1

    Alyssa Laciste · 29問 · 1年前

    Chapter 1

    Chapter 1

    29問 • 1年前
    Alyssa Laciste

    Rizal siblings

    Rizal siblings

    Alyssa Laciste · 17問 · 1年前

    Rizal siblings

    Rizal siblings

    17問 • 1年前
    Alyssa Laciste

    tt

    tt

    Alyssa Laciste · 7問 · 1年前

    tt

    tt

    7問 • 1年前
    Alyssa Laciste

    Chapter 2

    Chapter 2

    Alyssa Laciste · 15問 · 1年前

    Chapter 2

    Chapter 2

    15問 • 1年前
    Alyssa Laciste

    Chapter 3

    Chapter 3

    Alyssa Laciste · 40問 · 1年前

    Chapter 3

    Chapter 3

    40問 • 1年前
    Alyssa Laciste

    ik

    ik

    Alyssa Laciste · 22問 · 1年前

    ik

    ik

    22問 • 1年前
    Alyssa Laciste

    aa

    aa

    Alyssa Laciste · 18問 · 1年前

    aa

    aa

    18問 • 1年前
    Alyssa Laciste

    Chapter 7

    Chapter 7

    Alyssa Laciste · 19問 · 1年前

    Chapter 7

    Chapter 7

    19問 • 1年前
    Alyssa Laciste

    問題一覧

  • 1

    In most cases, the person is referring to a technique for increasing the production per unit of time decreasing the cost per unit output-in other words, productivity improvement.

    Methods engineering

  • 2

    It entails analyses at two different times during the history of a product.

    Methods engineering

  • 3

    Two Responsible of Methods engineering

    The methods engineer is first responsible for designing and developing the various work centers where the product will be produced, Second, that engineer must continually restudy the work centers to find a better way to produce the product and/or improve it's quality

  • 4

    Eight Systematic Procedure to Develop a Work Center

    Select the project, Get and present the data, Analyze the data, Develop the ideal method, Present and install the method, Develop a job analysis, Establish time standards, Follow up the method

  • 5

    As part of developing or maintaining the new method, the principles of _______ must be used to fit the task and workstation ergonomically to the human operator.

    Work design

  • 6

    This technique establishes a time standard allowed to perform a given task, based on measurements of the work content of the prescribe method, with sue consideration for fatigue and for personal and unavoidable delays.

    Standards

  • 7

    The principal objectives of methods, standards, and work design are:

    To increase productivity and product reliability safely, To lower unit cost, thus allowing more quality goods and services to be produced for more people

  • 8

    This are the end result of time study or work measurement.

    Standards

  • 9

    Corollaries to the principal objectives are:

    Minimize the time required to perform tasks, Continually improve the quality and reliability of products and services, Conserve resources and minimize cost by specifying the most appropriate direct and indirect materials for the production of goods and service, Take the availability of power into careful consideration, Maximize the safety, health, and well-being of all employees, Procedure with an increasing concern for protecting the environment, Follow a humane program of management the result in job interest and satisfaction for each employee

  • 10

    He is generally conceded to be founder of modern time study in the country

    Frederick W. Taylor

  • 11

    Taylor carried out the _____ that came to be one of the most celebrated demonstration of his principle

    Pig-iron experiment

  • 12

    Another of Taylor's Bethlehem Steel Studies that gained fame was the _____.

    Shoveling experiment

  • 13

    They are the founders of the modern study technique.

    Frank and Lillian Gilbreth

  • 14

    An associateof Frederick W. Taylor, developed a production slide rule for determining the most efficient combinations of speeds and feeds for cutting metals of various hardnesses. considering the depth of a cut, size of tool, and life of the tool.

    Carl G. Barth

  • 15

    He applied scientific methods to work on the Santa Fe Railroad and wrote a book.

    Harrington Emerson

  • 16

    Twelve Principles of Efficiency, in which he made an effort to inform management of procedures, installed standards cost and a bonus plan, and transferred its accounting work to Hollerith tabulating machines.

    Harrington Emerson

  • 17

    He developed simple graphs that would measure performance while visually showing projected schedules.

    Henry Laurence Gantt

  • 18

    it is relatively new science that deals with designing the task, work-station, and working environment to fit the human operator better.

    Work design

  • 19

    In the United States, it is more typically known as human factors.

    Work design

  • 20

    In internationally it is better known as ergonomics, which is derived from the Greekwords for ____ and ______.

    Work (erg), Laws (nomos)

  • 21

    They developed the technique of filming motions to study them. In a technique known as ________.

    Micromotion study

  • 22

    Frank Gilbreth originally Introduced his ideas and philosophies into the ________ in which he was employed

    Bricklayer's trade

  • 23

    It involves attaching a small electric light bulb to the finger or hand or part of the body being studied and then photographing the motion while the operator is performing the operation.

    Cyclegraphic method

  • 24

    It is similar to the cyclegraph, but its electic circuit is interrupted regularly, causing the light to flash.

    Chronocyclegraphic

  • 25

    it is defined as the study of the body motions used in performing an operation, to improve the operation by eliminating unnecessary motions, simplifying necessary motions, and the establishing the most favorable motion sequence for maximu efficiency.

    Motion study

  • 26

    This are used to implement a wage payment scheme

    Resulting standards