week 4 DOTE
問題一覧
1
Driver informs signaller, Signaller informs T.O.C, Contingency plan referenced, Contingency applied as per SMS, Train completes service/removed from service, Maintence depot for repairs, Train enters service, Train develops defect
2
Hot axle box, AWS/TPWS, Bodyside window broken, Brakes dragging, Driving cab window, Driver safety device, deadman switch, Emergency brake supply, Fire detection system, Headlights or taillights, Speedometer
3
Driver safety device, DSD, deadman switch, AWS/TPWS, Bodyside window, Cab controls, Fire detection, EBS, TMS in active cab, Speedometer in active cab, Hot axle box, equipment, dets missing
4
Attach or remove vehicles/unit, Examined by driver, Replacement train, Examined by rolling stock technician, Competent person, Turned or remarshalled, Restricted speed, Out of service, Detrain or next available station
5
DSD fault, Examining line, Broken windscreen
6
Train cannot start with door fault unless authorised by train operator, Must be locked out and labelled
7
Crack over 8cm broken window but still report if under, Single broken pane, move passengers 2 meters, Both panes gone require coach cleared and nobody allowed to enter. Crew each side, 100mph (mk4) unless protective film applied, Door window broken fine for line speed, have someone competent nearby
8
Move to other vehicles with working alarm, Where possible lock end vehicle out, Competent person can inform carriages about missing PAU and use them as a PAU, Whole train then next available station and terminate, Stop all catering and spread crew if needs be
9
1 carriage report it, get staff to shout announcements to them. Use megaphone if needs be, member of staff can use more than one vehicle
10
In darkness or tunnels, glow sticks, phone torches. If emergency lighting on train fine to run, no lighting then terminated
11
IC driver ready to start on azuma, Dispatcher will relay green flag message to driver, dispatch from DVT. Stop train with passcom
12
PA doors are opening and closing every station
13
Class 91 blunt 110mph, Air suspension class 225 100mph, Air suspension class 800/801 75mph, Heavy snow 100mph, Broken outer pane 225 100mph, SLW wrong direction 50mph max, Examining line in tunnel 10mph, Hot axle box 10mph, 5 over points and crossings, Brakes isolated 10mph below line speed, ratio 1 in 5
14
Customers transfers carriage and train terminated at next station, 10mph, 5 over points and crossings, Hot axel box confirmed if any of the following apply. Heat sensing gun above 76c. Tempil stick melts
15
Red accident staff, Purple verbal abuse, Blue accident passenger, Grey witness or continuing, Green incident, environmental
16
Walk up and down train checking doors are locked. kick and push them in if needs be
17
10 car go front 5 of back 5 and look out for accidental division, Make PA if you need to bring train to a stop then contact nearest member of staff, On 10, if possible move everyone to front 5
18
Tell driver, Must tell signaller if starting or continuing journey, Must tell operations control to inform other signallers
19
100mph
20
80mph
21
Attach or remove vehicles/unit, Examined by driver, Replacement train, Examined by rolling stock technician, Competent person, Turned or remarshalled, Restricted speed, Out of service, Detrain or next available station
22
2 on every portion of train, extra 1 outside tm office mark 4 2 azuma 9 2 azuma 5 4 azuma 10 3 mark 4
23
Attach or remove vehicles/unit, Examined by driver, Replacement train, Examined by rolling stock technician, Competent person, Turned or remarshalled, Restricted speed, Out of service, Detrain or next available station
week 2 pts
week 2 pts
Chris C · 70問 · 2年前week 2 pts
week 2 pts
70問 • 2年前week 1 wons sectional appendix
week 1 wons sectional appendix
Chris C · 25問 · 2年前week 1 wons sectional appendix
week 1 wons sectional appendix
25問 • 2年前week 1 signalling
week 1 signalling
Chris C · 59問 · 2年前week 1 signalling
week 1 signalling
59問 • 2年前week 2 Azuma
week 2 Azuma
Chris C · 72問 · 2年前week 2 Azuma
week 2 Azuma
72問 • 2年前week 2 Dispatch theory
week 2 Dispatch theory
Chris C · 10問 · 2年前week 2 Dispatch theory
week 2 Dispatch theory
10問 • 2年前mark 4
mark 4
Chris C · 60問 · 2年前mark 4
mark 4
60問 • 2年前Week 4 Protection
Week 4 Protection
Chris C · 20問 · 2年前Week 4 Protection
Week 4 Protection
20問 • 2年前Week 4 Out of course situations
Week 4 Out of course situations
Chris C · 11問 · 2年前Week 4 Out of course situations
Week 4 Out of course situations
11問 • 2年前Rules element 1 preparation for duty
Rules element 1 preparation for duty
Chris C · 9問 · 1年前Rules element 1 preparation for duty
Rules element 1 preparation for duty
9問 • 1年前Rules element 2 preparing trains for duty
Rules element 2 preparing trains for duty
Chris C · 10問 · 1年前Rules element 2 preparing trains for duty
Rules element 2 preparing trains for duty
10問 • 1年前Rules element 3 safe movement of trains
Rules element 3 safe movement of trains
Chris C · 28問 · 1年前Rules element 3 safe movement of trains
Rules element 3 safe movement of trains
28問 • 1年前Rules element 4 out of course situations
Rules element 4 out of course situations
Chris C · 13問 · 1年前Rules element 4 out of course situations
Rules element 4 out of course situations
13問 • 1年前Element 9 mark 4 traction
Element 9 mark 4 traction
Chris C · 18問 · 1年前Element 9 mark 4 traction
Element 9 mark 4 traction
18問 • 1年前Element 10 Azuma
Element 10 Azuma
Chris C · 71問 · 1年前Element 10 Azuma
Element 10 Azuma
71問 • 1年前fire paper
fire paper
Chris C · 30問 · 1年前fire paper
fire paper
30問 • 1年前問題一覧
1
Driver informs signaller, Signaller informs T.O.C, Contingency plan referenced, Contingency applied as per SMS, Train completes service/removed from service, Maintence depot for repairs, Train enters service, Train develops defect
2
Hot axle box, AWS/TPWS, Bodyside window broken, Brakes dragging, Driving cab window, Driver safety device, deadman switch, Emergency brake supply, Fire detection system, Headlights or taillights, Speedometer
3
Driver safety device, DSD, deadman switch, AWS/TPWS, Bodyside window, Cab controls, Fire detection, EBS, TMS in active cab, Speedometer in active cab, Hot axle box, equipment, dets missing
4
Attach or remove vehicles/unit, Examined by driver, Replacement train, Examined by rolling stock technician, Competent person, Turned or remarshalled, Restricted speed, Out of service, Detrain or next available station
5
DSD fault, Examining line, Broken windscreen
6
Train cannot start with door fault unless authorised by train operator, Must be locked out and labelled
7
Crack over 8cm broken window but still report if under, Single broken pane, move passengers 2 meters, Both panes gone require coach cleared and nobody allowed to enter. Crew each side, 100mph (mk4) unless protective film applied, Door window broken fine for line speed, have someone competent nearby
8
Move to other vehicles with working alarm, Where possible lock end vehicle out, Competent person can inform carriages about missing PAU and use them as a PAU, Whole train then next available station and terminate, Stop all catering and spread crew if needs be
9
1 carriage report it, get staff to shout announcements to them. Use megaphone if needs be, member of staff can use more than one vehicle
10
In darkness or tunnels, glow sticks, phone torches. If emergency lighting on train fine to run, no lighting then terminated
11
IC driver ready to start on azuma, Dispatcher will relay green flag message to driver, dispatch from DVT. Stop train with passcom
12
PA doors are opening and closing every station
13
Class 91 blunt 110mph, Air suspension class 225 100mph, Air suspension class 800/801 75mph, Heavy snow 100mph, Broken outer pane 225 100mph, SLW wrong direction 50mph max, Examining line in tunnel 10mph, Hot axle box 10mph, 5 over points and crossings, Brakes isolated 10mph below line speed, ratio 1 in 5
14
Customers transfers carriage and train terminated at next station, 10mph, 5 over points and crossings, Hot axel box confirmed if any of the following apply. Heat sensing gun above 76c. Tempil stick melts
15
Red accident staff, Purple verbal abuse, Blue accident passenger, Grey witness or continuing, Green incident, environmental
16
Walk up and down train checking doors are locked. kick and push them in if needs be
17
10 car go front 5 of back 5 and look out for accidental division, Make PA if you need to bring train to a stop then contact nearest member of staff, On 10, if possible move everyone to front 5
18
Tell driver, Must tell signaller if starting or continuing journey, Must tell operations control to inform other signallers
19
100mph
20
80mph
21
Attach or remove vehicles/unit, Examined by driver, Replacement train, Examined by rolling stock technician, Competent person, Turned or remarshalled, Restricted speed, Out of service, Detrain or next available station
22
2 on every portion of train, extra 1 outside tm office mark 4 2 azuma 9 2 azuma 5 4 azuma 10 3 mark 4
23
Attach or remove vehicles/unit, Examined by driver, Replacement train, Examined by rolling stock technician, Competent person, Turned or remarshalled, Restricted speed, Out of service, Detrain or next available station