Item 406 Prestressed Concrete Structures

Item 406 Prestressed Concrete Structures
36問 • 1年前
  • Vaantoote
  • 通報

    問題一覧

  • 1

    For pre-tensioning work-samples, at least a ____ long shall be furnished of each size of wire or strand proposed

    2m

  • 2

    For post-tensioning work-samples, a ____ long shall be furnished for wire requiring heading

    2m

  • 3

    For wires not requiring heading, sufficient length to make up one parallel-lay cable of ____ long consisting of the same number of wires as the cable to be furnished

    1.5m

  • 4

    For strand to be furnished with fittings, _____ long shall be between near ends of fittings

    1.5m

  • 5

    If anchorage assemblies are not attached to reinforcement samples, _____ anchorage assemblies shall be furnished, completed with distribution plates of each size and type to be used

    2

  • 6

    The pressure gauge, if used, shall have an accurate reading dial at least _____ in diameter

    154mm

  • 7

    The range of the load cell shall be such that the lower ____ of the manufacturer's rated capacity will not be used in determining the jacking stress

    10%

  • 8

    Vents shall be _____ minimum diameter standard pipe

    12.7mm

  • 9

    Ends of vents shall be removed _____ below the roadway surface after grouting has been completed

    25.4mm

  • 10

    When acceptable prestressing steel for post-tensioning is installed in ducts after completion of concrete curing, and if stressing and grouting are completed within ___ calendar days after the installation of the prestressing steel

    10

  • 11

    Prestressing steel, installed, tensioned and grouted in this manner, all within ___ calendar days shall be subject to all the requirements in this Item pertaining to corrosion protection and rejection because of rust

    10

  • 12

    No bond stress shall be transferred to the concrete, nor end anchorages released until the concrete has attained a compressive strength, as shown by cylinder tests, of at least _____ unless otherwise specified

    28 MPa

  • 13

    _______ after placing concrete and after the concrete has undergone initial set, the first application of steam or radiant heat shall be made unless retarders are used

    2-4 hours

  • 14

    The waiting period before application of steam or radiant heat shall be increased to between ________

    4-6 hours

  • 15

    During the waiting period, the temperature within the curing chamber shall not be less than _____ and live steam or radiant heat may be used to maintain the curing chamber at the proper minimum temperature

    10°C

  • 16

    The steam shall be at ____ relative humidity to prevent loss of moisture and to provide moisture for proper hydration of the cement

    100%

  • 17

    During application of the steam, or of radiant heat, the ambient air temperature shall increase at a rate not to exceed _____ per hour until the curing temperature is reached

    4.41°C

  • 18

    The maximum curing temperature within the enclosure shall not exceed _____

    71.1°C

  • 19

    Tensioning of the prestressing reinforcement shall not be commenced until tests on concrete cylinders, manufactured of the same concrete and cured under the same conditions, indicate that the concrete of the particular member to be prestressed has attained compressive strength of at least ______ unless otherwise specified

    28 MPa

  • 20

    Cast-in-place concrete shall not be post-tensioned until at least _____ after the last concrete has been placed in the member to be post-tensioned and until the compressive strength of said placed concrete has reached the strength specified for the concrete at the time of stressing

    10 days

  • 21

    The falsework under the bottom slab supporting the superstructure shall not be released until a minimum of _____ have elapsed after grouting of the post-tension tendons nor until all other conditions of the Specifications have been met

    48 hours

  • 22

    The water content shall be not more than _____ per sack of cement

    19L

  • 23

    Grouting equipment shall be capable of grouting at a pressure of at least _______

    0.6894 MPa

  • 24

    Grouting equipment shall be furnished with a pressure gauge having a full-scale reading of not more than _______

    2.07 MPa

  • 25

    Standby flushing equipment capable of developing a pumping pressure of ______ and of sufficient capacity to flush out any partially grouted ducts shall be provided

    1.72 MPa

  • 26

    All grout shall pass through a screen with a ______ maximum clear opening prior to being introduced into the grout pump

    2mm

  • 27

    Approximately _______ after the concrete pour, the metal conduits shall be flushed out with water and then blown out with compressed oil free air

    24 hours

  • 28

    Grout shall be pumped through the duct and continuously wasted at the outlet until no visible slugs of water or air are ejected and the efflux time of ejected grout is not less than _______

    11 seconds

  • 29

    After all vents and openings shall then be closed and the grouting pressure at the injection end shall be raised to a minimum of _______ and held for a minimum of ______

    0.6894 MPa, 10 seconds

  • 30

    From 2 to 4 grams of the unpolished variety, about __________ of each sack of cement used in the grout

    1 to 2 teaspoons

  • 31

    The aluminum powder shall be blended with pumicite or other inert powder in the proportion of _____ powder to _______ pumicite (or other inert powder) by weight

    1 part, 50 parts

  • 32

    After all ingredients are added, the batch shall be mixed for ________

    3 minutes

  • 33

    Batches of grout shall be placed within _______ after mixing

    45 minutes

  • 34

    Prestressed concrete girders shall not be shipped until indicate that the concrete of the particular girder has attained a compressive strength equal to the specified design compressive strength of the concrete in the girder and has attained a minimum age of ______

    14 days

  • 35

    The width of the deci soffit shall be within _____

    ± 25mm

  • 36

    The width of gap between individual beams shall not exceed ______ the nominal gap

    twice

  • Project Engineer EXAM

    Project Engineer EXAM

    Vaantoote · 62問 · 2年前

    Project Engineer EXAM

    Project Engineer EXAM

    62問 • 2年前
    Vaantoote

    YT1 Materials Engineer EXAM

    YT1 Materials Engineer EXAM

    Vaantoote · 100問 · 2年前

    YT1 Materials Engineer EXAM

    YT1 Materials Engineer EXAM

    100問 • 2年前
    Vaantoote

    YT2 Materials Engineer EXAM

    YT2 Materials Engineer EXAM

    Vaantoote · 100問 · 2年前

    YT2 Materials Engineer EXAM

    YT2 Materials Engineer EXAM

    100問 • 2年前
    Vaantoote

    Project Engineer YT 1

    Project Engineer YT 1

    Vaantoote · 100問 · 1年前

    Project Engineer YT 1

    Project Engineer YT 1

    100問 • 1年前
    Vaantoote

    Project Engineer EXAM 68

    Project Engineer EXAM 68

    Vaantoote · 100問 · 1年前

    Project Engineer EXAM 68

    Project Engineer EXAM 68

    100問 • 1年前
    Vaantoote

    Project Engineer EXAM 82

    Project Engineer EXAM 82

    Vaantoote · 100問 · 1年前

    Project Engineer EXAM 82

    Project Engineer EXAM 82

    100問 • 1年前
    Vaantoote

    July 2023 PE Refresher

    July 2023 PE Refresher

    Vaantoote · 70問 · 1年前

    July 2023 PE Refresher

    July 2023 PE Refresher

    70問 • 1年前
    Vaantoote

    August 2019 Special PE Exam

    August 2019 Special PE Exam

    Vaantoote · 93問 · 1年前

    August 2019 Special PE Exam

    August 2019 Special PE Exam

    93問 • 1年前
    Vaantoote

    RNPCP Chapter 1 to 5

    RNPCP Chapter 1 to 5

    Vaantoote · 86問 · 1年前

    RNPCP Chapter 1 to 5

    RNPCP Chapter 1 to 5

    86問 • 1年前
    Vaantoote

    Plumbing Code 1

    Plumbing Code 1

    Vaantoote · 100問 · 1年前

    Plumbing Code 1

    Plumbing Code 1

    100問 • 1年前
    Vaantoote

    Plumbing Code 2

    Plumbing Code 2

    Vaantoote · 100問 · 1年前

    Plumbing Code 2

    Plumbing Code 2

    100問 • 1年前
    Vaantoote

    Plumbing Code 4

    Plumbing Code 4

    Vaantoote · 100問 · 1年前

    Plumbing Code 4

    Plumbing Code 4

    100問 • 1年前
    Vaantoote

    Plumbing Code 5

    Plumbing Code 5

    Vaantoote · 100問 · 1年前

    Plumbing Code 5

    Plumbing Code 5

    100問 • 1年前
    Vaantoote

    Plumbing Code 6

    Plumbing Code 6

    Vaantoote · 100問 · 1年前

    Plumbing Code 6

    Plumbing Code 6

    100問 • 1年前
    Vaantoote

    Plumbing Code 7

    Plumbing Code 7

    Vaantoote · 100問 · 1年前

    Plumbing Code 7

    Plumbing Code 7

    100問 • 1年前
    Vaantoote

    Plumbing Code 8

    Plumbing Code 8

    Vaantoote · 100問 · 1年前

    Plumbing Code 8

    Plumbing Code 8

    100問 • 1年前
    Vaantoote

    Plumbing Code 3

    Plumbing Code 3

    Vaantoote · 100問 · 1年前

    Plumbing Code 3

    Plumbing Code 3

    100問 • 1年前
    Vaantoote

    Sanitation, Plumbing Design, and Installation 2

    Sanitation, Plumbing Design, and Installation 2

    Vaantoote · 97問 · 1年前

    Sanitation, Plumbing Design, and Installation 2

    Sanitation, Plumbing Design, and Installation 2

    97問 • 1年前
    Vaantoote

    Sanitation, Plumbing Design, and Installation 1

    Sanitation, Plumbing Design, and Installation 1

    Vaantoote · 99問 · 1年前

    Sanitation, Plumbing Design, and Installation 1

    Sanitation, Plumbing Design, and Installation 1

    99問 • 1年前
    Vaantoote

    Sanitation, Plumbing Design, and Installation 3

    Sanitation, Plumbing Design, and Installation 3

    Vaantoote · 96問 · 1年前

    Sanitation, Plumbing Design, and Installation 3

    Sanitation, Plumbing Design, and Installation 3

    96問 • 1年前
    Vaantoote

    Sanitation, Plumbing Design, and Installation 4

    Sanitation, Plumbing Design, and Installation 4

    Vaantoote · 95問 · 1年前

    Sanitation, Plumbing Design, and Installation 4

    Sanitation, Plumbing Design, and Installation 4

    95問 • 1年前
    Vaantoote

    Sanitation, Plumbing Design, and Installation 5

    Sanitation, Plumbing Design, and Installation 5

    Vaantoote · 97問 · 1年前

    Sanitation, Plumbing Design, and Installation 5

    Sanitation, Plumbing Design, and Installation 5

    97問 • 1年前
    Vaantoote

    Sanitation, Plumbing Design, and Installation 7

    Sanitation, Plumbing Design, and Installation 7

    Vaantoote · 100問 · 1年前

    Sanitation, Plumbing Design, and Installation 7

    Sanitation, Plumbing Design, and Installation 7

    100問 • 1年前
    Vaantoote

    Sanitation, Plumbing Design, and Installation 8

    Sanitation, Plumbing Design, and Installation 8

    Vaantoote · 98問 · 1年前

    Sanitation, Plumbing Design, and Installation 8

    Sanitation, Plumbing Design, and Installation 8

    98問 • 1年前
    Vaantoote

    Plumbing Tools 1

    Plumbing Tools 1

    Vaantoote · 87問 · 1年前

    Plumbing Tools 1

    Plumbing Tools 1

    87問 • 1年前
    Vaantoote

    Plumbing Tools 2

    Plumbing Tools 2

    Vaantoote · 53問 · 1年前

    Plumbing Tools 2

    Plumbing Tools 2

    53問 • 1年前
    Vaantoote

    Practical Problems and Experiences 1

    Practical Problems and Experiences 1

    Vaantoote · 100問 · 1年前

    Practical Problems and Experiences 1

    Practical Problems and Experiences 1

    100問 • 1年前
    Vaantoote

    Practical Problems and Experiences 2

    Practical Problems and Experiences 2

    Vaantoote · 100問 · 1年前

    Practical Problems and Experiences 2

    Practical Problems and Experiences 2

    100問 • 1年前
    Vaantoote

    Practical Problems and Experiences 3

    Practical Problems and Experiences 3

    Vaantoote · 99問 · 1年前

    Practical Problems and Experiences 3

    Practical Problems and Experiences 3

    99問 • 1年前
    Vaantoote

    Practical Problems and Experiences 4

    Practical Problems and Experiences 4

    Vaantoote · 100問 · 1年前

    Practical Problems and Experiences 4

    Practical Problems and Experiences 4

    100問 • 1年前
    Vaantoote

    PART A - Facilities for the Engineer

    PART A - Facilities for the Engineer

    Vaantoote · 9問 · 1年前

    PART A - Facilities for the Engineer

    PART A - Facilities for the Engineer

    9問 • 1年前
    Vaantoote

    PART B - Other General Requirements

    PART B - Other General Requirements

    Vaantoote · 13問 · 1年前

    PART B - Other General Requirements

    PART B - Other General Requirements

    13問 • 1年前
    Vaantoote

    Practical Problems and Experiences 5

    Practical Problems and Experiences 5

    Vaantoote · 100問 · 1年前

    Practical Problems and Experiences 5

    Practical Problems and Experiences 5

    100問 • 1年前
    Vaantoote

    Practical Problems and Experiences 6

    Practical Problems and Experiences 6

    Vaantoote · 100問 · 1年前

    Practical Problems and Experiences 6

    Practical Problems and Experiences 6

    100問 • 1年前
    Vaantoote

    Plumbing Arithmetic Terms 1

    Plumbing Arithmetic Terms 1

    Vaantoote · 49問 · 1年前

    Plumbing Arithmetic Terms 1

    Plumbing Arithmetic Terms 1

    49問 • 1年前
    Vaantoote

    Plumbing Arithmetic Terms 2

    Plumbing Arithmetic Terms 2

    Vaantoote · 47問 · 1年前

    Plumbing Arithmetic Terms 2

    Plumbing Arithmetic Terms 2

    47問 • 1年前
    Vaantoote

    Plumbing Arithmetic Terms 3

    Plumbing Arithmetic Terms 3

    Vaantoote · 49問 · 1年前

    Plumbing Arithmetic Terms 3

    Plumbing Arithmetic Terms 3

    49問 • 1年前
    Vaantoote

    Plumbing Arithmetic Terms 4

    Plumbing Arithmetic Terms 4

    Vaantoote · 27問 · 1年前

    Plumbing Arithmetic Terms 4

    Plumbing Arithmetic Terms 4

    27問 • 1年前
    Vaantoote

    Plumbing Code WSFU

    Plumbing Code WSFU

    Vaantoote · 58問 · 1年前

    Plumbing Code WSFU

    Plumbing Code WSFU

    58問 • 1年前
    Vaantoote

    Practical Problems and Experiences REFRESHER 1

    Practical Problems and Experiences REFRESHER 1

    Vaantoote · 100問 · 1年前

    Practical Problems and Experiences REFRESHER 1

    Practical Problems and Experiences REFRESHER 1

    100問 • 1年前
    Vaantoote

    Practical Problems and Experiences REFRESHER 2

    Practical Problems and Experiences REFRESHER 2

    Vaantoote · 70問 · 1年前

    Practical Problems and Experiences REFRESHER 2

    Practical Problems and Experiences REFRESHER 2

    70問 • 1年前
    Vaantoote

    Item # and Descriptions

    Item # and Descriptions

    Vaantoote · 24問 · 1年前

    Item # and Descriptions

    Item # and Descriptions

    24問 • 1年前
    Vaantoote

    Item 200 Aggregate Subbase Course

    Item 200 Aggregate Subbase Course

    Vaantoote · 16問 · 1年前

    Item 200 Aggregate Subbase Course

    Item 200 Aggregate Subbase Course

    16問 • 1年前
    Vaantoote

    Item 201 Aggregate Base Course

    Item 201 Aggregate Base Course

    Vaantoote · 16問 · 1年前

    Item 201 Aggregate Base Course

    Item 201 Aggregate Base Course

    16問 • 1年前
    Vaantoote

    Item 202 Crushed Aggregate Base Course

    Item 202 Crushed Aggregate Base Course

    Vaantoote · 18問 · 1年前

    Item 202 Crushed Aggregate Base Course

    Item 202 Crushed Aggregate Base Course

    18問 • 1年前
    Vaantoote

    Item 203 Lime Stabilized Road Mix Base Course

    Item 203 Lime Stabilized Road Mix Base Course

    Vaantoote · 27問 · 1年前

    Item 203 Lime Stabilized Road Mix Base Course

    Item 203 Lime Stabilized Road Mix Base Course

    27問 • 1年前
    Vaantoote

    Item 204 Portland Cement Stabilized Road Mix Base Course

    Item 204 Portland Cement Stabilized Road Mix Base Course

    Vaantoote · 7問 · 1年前

    Item 204 Portland Cement Stabilized Road Mix Base Course

    Item 204 Portland Cement Stabilized Road Mix Base Course

    7問 • 1年前
    Vaantoote

    Item 205 Asphalt Stabilized Road Mix Base Course

    Item 205 Asphalt Stabilized Road Mix Base Course

    Vaantoote · 7問 · 1年前

    Item 205 Asphalt Stabilized Road Mix Base Course

    Item 205 Asphalt Stabilized Road Mix Base Course

    7問 • 1年前
    Vaantoote

    Item 207 Portland Cement Stabilized Treated Plant Mix Base Course

    Item 207 Portland Cement Stabilized Treated Plant Mix Base Course

    Vaantoote · 13問 · 1年前

    Item 207 Portland Cement Stabilized Treated Plant Mix Base Course

    Item 207 Portland Cement Stabilized Treated Plant Mix Base Course

    13問 • 1年前
    Vaantoote

    Item 206 Chemically Stabilized Road Mix Subbase/Base Course

    Item 206 Chemically Stabilized Road Mix Subbase/Base Course

    Vaantoote · 11問 · 1年前

    Item 206 Chemically Stabilized Road Mix Subbase/Base Course

    Item 206 Chemically Stabilized Road Mix Subbase/Base Course

    11問 • 1年前
    Vaantoote

    Item 300 Aggregate Surface Course

    Item 300 Aggregate Surface Course

    Vaantoote · 11問 · 1年前

    Item 300 Aggregate Surface Course

    Item 300 Aggregate Surface Course

    11問 • 1年前
    Vaantoote

    Item 301 Bituminous Prime Coat

    Item 301 Bituminous Prime Coat

    Vaantoote · 10問 · 1年前

    Item 301 Bituminous Prime Coat

    Item 301 Bituminous Prime Coat

    10問 • 1年前
    Vaantoote

    Item 303 Bituminous Seal Coat

    Item 303 Bituminous Seal Coat

    Vaantoote · 20問 · 1年前

    Item 303 Bituminous Seal Coat

    Item 303 Bituminous Seal Coat

    20問 • 1年前
    Vaantoote

    RNPCP Chapter 6 to 9

    RNPCP Chapter 6 to 9

    Vaantoote · 94問 · 1年前

    RNPCP Chapter 6 to 9

    RNPCP Chapter 6 to 9

    94問 • 1年前
    Vaantoote

    RNPCP Chapter 10 to 13

    RNPCP Chapter 10 to 13

    Vaantoote · 93問 · 1年前

    RNPCP Chapter 10 to 13

    RNPCP Chapter 10 to 13

    93問 • 1年前
    Vaantoote

    RNPCP Appendix A and B

    RNPCP Appendix A and B

    Vaantoote · 79問 · 1年前

    RNPCP Appendix A and B

    RNPCP Appendix A and B

    79問 • 1年前
    Vaantoote

    Item 311 Portland Cement Concrete Pavement (PART 1)

    Item 311 Portland Cement Concrete Pavement (PART 1)

    Vaantoote · 78問 · 1年前

    Item 311 Portland Cement Concrete Pavement (PART 1)

    Item 311 Portland Cement Concrete Pavement (PART 1)

    78問 • 1年前
    Vaantoote

    Item 311 Portland Cement Concrete Pavement (PART 2)

    Item 311 Portland Cement Concrete Pavement (PART 2)

    Vaantoote · 61問 · 1年前

    Item 311 Portland Cement Concrete Pavement (PART 2)

    Item 311 Portland Cement Concrete Pavement (PART 2)

    61問 • 1年前
    Vaantoote

    Republic Acts

    Republic Acts

    Vaantoote · 9問 · 1年前

    Republic Acts

    Republic Acts

    9問 • 1年前
    Vaantoote

    Plumbing Arithmetic Terms 5

    Plumbing Arithmetic Terms 5

    Vaantoote · 68問 · 1年前

    Plumbing Arithmetic Terms 5

    Plumbing Arithmetic Terms 5

    68問 • 1年前
    Vaantoote

    Item 400 Piling

    Item 400 Piling

    Vaantoote · 80問 · 1年前

    Item 400 Piling

    Item 400 Piling

    80問 • 1年前
    Vaantoote

    Item 405 Structural Concrete

    Item 405 Structural Concrete

    Vaantoote · 41問 · 1年前

    Item 405 Structural Concrete

    Item 405 Structural Concrete

    41問 • 1年前
    Vaantoote

    Item 407 Concrete Structures

    Item 407 Concrete Structures

    Vaantoote · 31問 · 1年前

    Item 407 Concrete Structures

    Item 407 Concrete Structures

    31問 • 1年前
    Vaantoote

    Plumbing Design and Estimate (by Max Fajardo)

    Plumbing Design and Estimate (by Max Fajardo)

    Vaantoote · 22問 · 1年前

    Plumbing Design and Estimate (by Max Fajardo)

    Plumbing Design and Estimate (by Max Fajardo)

    22問 • 1年前
    Vaantoote

    Principles and Code of Ethics

    Principles and Code of Ethics

    Vaantoote · 29問 · 1年前

    Principles and Code of Ethics

    Principles and Code of Ethics

    29問 • 1年前
    Vaantoote

    Plumbing Arithmetic Problems 1

    Plumbing Arithmetic Problems 1

    Vaantoote · 75問 · 1年前

    Plumbing Arithmetic Problems 1

    Plumbing Arithmetic Problems 1

    75問 • 1年前
    Vaantoote

    問題一覧

  • 1

    For pre-tensioning work-samples, at least a ____ long shall be furnished of each size of wire or strand proposed

    2m

  • 2

    For post-tensioning work-samples, a ____ long shall be furnished for wire requiring heading

    2m

  • 3

    For wires not requiring heading, sufficient length to make up one parallel-lay cable of ____ long consisting of the same number of wires as the cable to be furnished

    1.5m

  • 4

    For strand to be furnished with fittings, _____ long shall be between near ends of fittings

    1.5m

  • 5

    If anchorage assemblies are not attached to reinforcement samples, _____ anchorage assemblies shall be furnished, completed with distribution plates of each size and type to be used

    2

  • 6

    The pressure gauge, if used, shall have an accurate reading dial at least _____ in diameter

    154mm

  • 7

    The range of the load cell shall be such that the lower ____ of the manufacturer's rated capacity will not be used in determining the jacking stress

    10%

  • 8

    Vents shall be _____ minimum diameter standard pipe

    12.7mm

  • 9

    Ends of vents shall be removed _____ below the roadway surface after grouting has been completed

    25.4mm

  • 10

    When acceptable prestressing steel for post-tensioning is installed in ducts after completion of concrete curing, and if stressing and grouting are completed within ___ calendar days after the installation of the prestressing steel

    10

  • 11

    Prestressing steel, installed, tensioned and grouted in this manner, all within ___ calendar days shall be subject to all the requirements in this Item pertaining to corrosion protection and rejection because of rust

    10

  • 12

    No bond stress shall be transferred to the concrete, nor end anchorages released until the concrete has attained a compressive strength, as shown by cylinder tests, of at least _____ unless otherwise specified

    28 MPa

  • 13

    _______ after placing concrete and after the concrete has undergone initial set, the first application of steam or radiant heat shall be made unless retarders are used

    2-4 hours

  • 14

    The waiting period before application of steam or radiant heat shall be increased to between ________

    4-6 hours

  • 15

    During the waiting period, the temperature within the curing chamber shall not be less than _____ and live steam or radiant heat may be used to maintain the curing chamber at the proper minimum temperature

    10°C

  • 16

    The steam shall be at ____ relative humidity to prevent loss of moisture and to provide moisture for proper hydration of the cement

    100%

  • 17

    During application of the steam, or of radiant heat, the ambient air temperature shall increase at a rate not to exceed _____ per hour until the curing temperature is reached

    4.41°C

  • 18

    The maximum curing temperature within the enclosure shall not exceed _____

    71.1°C

  • 19

    Tensioning of the prestressing reinforcement shall not be commenced until tests on concrete cylinders, manufactured of the same concrete and cured under the same conditions, indicate that the concrete of the particular member to be prestressed has attained compressive strength of at least ______ unless otherwise specified

    28 MPa

  • 20

    Cast-in-place concrete shall not be post-tensioned until at least _____ after the last concrete has been placed in the member to be post-tensioned and until the compressive strength of said placed concrete has reached the strength specified for the concrete at the time of stressing

    10 days

  • 21

    The falsework under the bottom slab supporting the superstructure shall not be released until a minimum of _____ have elapsed after grouting of the post-tension tendons nor until all other conditions of the Specifications have been met

    48 hours

  • 22

    The water content shall be not more than _____ per sack of cement

    19L

  • 23

    Grouting equipment shall be capable of grouting at a pressure of at least _______

    0.6894 MPa

  • 24

    Grouting equipment shall be furnished with a pressure gauge having a full-scale reading of not more than _______

    2.07 MPa

  • 25

    Standby flushing equipment capable of developing a pumping pressure of ______ and of sufficient capacity to flush out any partially grouted ducts shall be provided

    1.72 MPa

  • 26

    All grout shall pass through a screen with a ______ maximum clear opening prior to being introduced into the grout pump

    2mm

  • 27

    Approximately _______ after the concrete pour, the metal conduits shall be flushed out with water and then blown out with compressed oil free air

    24 hours

  • 28

    Grout shall be pumped through the duct and continuously wasted at the outlet until no visible slugs of water or air are ejected and the efflux time of ejected grout is not less than _______

    11 seconds

  • 29

    After all vents and openings shall then be closed and the grouting pressure at the injection end shall be raised to a minimum of _______ and held for a minimum of ______

    0.6894 MPa, 10 seconds

  • 30

    From 2 to 4 grams of the unpolished variety, about __________ of each sack of cement used in the grout

    1 to 2 teaspoons

  • 31

    The aluminum powder shall be blended with pumicite or other inert powder in the proportion of _____ powder to _______ pumicite (or other inert powder) by weight

    1 part, 50 parts

  • 32

    After all ingredients are added, the batch shall be mixed for ________

    3 minutes

  • 33

    Batches of grout shall be placed within _______ after mixing

    45 minutes

  • 34

    Prestressed concrete girders shall not be shipped until indicate that the concrete of the particular girder has attained a compressive strength equal to the specified design compressive strength of the concrete in the girder and has attained a minimum age of ______

    14 days

  • 35

    The width of the deci soffit shall be within _____

    ± 25mm

  • 36

    The width of gap between individual beams shall not exceed ______ the nominal gap

    twice