Item 407 Concrete Structures

Item 407 Concrete Structures
31問 • 1年前
  • Vaantoote
  • 通報

    問題一覧

  • 1

    Unless otherwise shown on the Plans or specified in Special Provisions, concrete shall be of _______

    Class A

  • 2

    If lean concrete is required in the Plan or as directed by the Engineer prior to placing of reinforcing steel bar, the lean concrete should have a minimum compressive strength of ______

    13.8 MPa

  • 3

    When placing operations would involve dropping the concrete more than _____, concrete shall be conveyed through sheet metal or approved pipes

    1.5m

  • 4

    The discharge end of the line shall not be more than _____ from the point of deposit

    3m

  • 5

    Concrete deposited in water shall be of Class Seal concrete with a minimum cement content of _______ of concrete

    380 kg/m³

  • 6

    The slump of the concrete shall be maintained between ______

    4 to 8 inches

  • 7

    A tremie shall consist of a tube having a diameter of not less than ______ constructed in sections having flanged couplings fitted with gaskets with a hopper at the top

    250mm

  • 8

    The concrete in walls, beams, columns and the like shall be placed in horizontal layers not more than ____ thick except as hereinafter provided

    30cm

  • 9

    The intensity of vibration shall be such as to visibly affect a mass of concrete with a _____ slump over a radius of at least _____

    3 inches, 50cm

  • 10

    An inset formwork shall be used to produce an edge thickness of not less than _____ in the succeeding layer

    15cm

  • 11

    The concrete shall be allowed to set for at least ______ before the caps are placed

    20 hours

  • 12

    The load of the superstructure shall not be allowed to come upon the bents until they have been in place at least _____ unless otherwise permitted by the Engineer

    14 days

  • 13

    The bond between stem and slab shall be secured by means of suitable shear keys which may be formed by the use of timber blocks approximately _____ in cross-section having a length of _____ less than the width of the girder stem

    50mm x 100mm, 100mm

  • 14

    These key blocks shall be placed along the girder stems as required, but the spacing shall not be greater than _______ center to center

    300mm

  • 15

    Ordinary Finish

    Class 1

  • 16

    Rubbed Finish

    Class 2

  • 17

    Floated Finish

    Class 3

  • 18

    The surface finish on piers and abutments shall include all exposed surfaces below the bridge seats to _____ below low water elevation

    20cm

  • 19

    The surface finish on piers and abutments shall include all exposed surfaces below the bridge seats _____ below finished ground level when such ground level is above the water surface

    50cm

  • 20

    Wing walls shall be finished from the top to _____ below the finished slope lines on the outside face and shall be finished on top and for a depth of _____ below the top on the back sides

    50cm, 20cm

  • 21

    On all surfaces the cavities produced by form ties and all other holes, honeycomb spots, broken corners or edges and other defects shall be thoroughly cleaned, and after having been kept saturated with water for a period of not less than ______, shall be carefully pointed and made true with mortar of cement and fine aggregate mixed in the proportions unsed in the grade of the concrete being finished.

    3 hours

  • 22

    Mortar used in pointing shall not be more than _____ old

    1 hour

  • 23

    The rubbing of concrete shall be started as soon as its condition will permit, the concrete shall be kept thoroughly saturated with water for a minimum period of _____

    3 hours

  • 24

    The float shall then be moved forward _____ of each length and the above operation repeated

    1/2

  • 25

    The Contractor shall furnish and use an accurate 3 m straight-edge swing handless _____ longer than ______ the width of the slab

    1m, 1/2

  • 26

    Advancement along the deck shall be in successive stages of not more than ____ of the length of the straight-edge

    1/2

  • 27

    The straight-edge testing and refloating shall continue until the entire surface is found to be free from observable departure from the straight-edge and the slabs has the required grade and contour, until there are no deviations of more than _____ under the 3 m straight-edge

    3mm

  • 28

    The strokes shall be square across the slabs from edge to edge, with adjacent strokes slightly overlapped, and shall be made by drawing the broom without tearing the concrete, but so as to produce regular corrugations not over ____ in depth

    3mm

  • 29

    The surface shall not vary more than ____ under a 3 m straight-edge

    3mm

  • 30

    In Water Method, the concrete shall be kept continuously wet by the application of water for a minimum period of ______ after the concrete has been placed

    7 days

  • 31

    The compound shall be applied with a pressure spray in such a manner as to cover the entire concrete surface with a uniform film and shall be of such character that it will harden within ______ after application

    30 minutes

  • Project Engineer EXAM

    Project Engineer EXAM

    Vaantoote · 62問 · 2年前

    Project Engineer EXAM

    Project Engineer EXAM

    62問 • 2年前
    Vaantoote

    YT1 Materials Engineer EXAM

    YT1 Materials Engineer EXAM

    Vaantoote · 100問 · 2年前

    YT1 Materials Engineer EXAM

    YT1 Materials Engineer EXAM

    100問 • 2年前
    Vaantoote

    YT2 Materials Engineer EXAM

    YT2 Materials Engineer EXAM

    Vaantoote · 100問 · 2年前

    YT2 Materials Engineer EXAM

    YT2 Materials Engineer EXAM

    100問 • 2年前
    Vaantoote

    Project Engineer YT 1

    Project Engineer YT 1

    Vaantoote · 100問 · 1年前

    Project Engineer YT 1

    Project Engineer YT 1

    100問 • 1年前
    Vaantoote

    Project Engineer EXAM 68

    Project Engineer EXAM 68

    Vaantoote · 100問 · 1年前

    Project Engineer EXAM 68

    Project Engineer EXAM 68

    100問 • 1年前
    Vaantoote

    Project Engineer EXAM 82

    Project Engineer EXAM 82

    Vaantoote · 100問 · 1年前

    Project Engineer EXAM 82

    Project Engineer EXAM 82

    100問 • 1年前
    Vaantoote

    July 2023 PE Refresher

    July 2023 PE Refresher

    Vaantoote · 70問 · 1年前

    July 2023 PE Refresher

    July 2023 PE Refresher

    70問 • 1年前
    Vaantoote

    August 2019 Special PE Exam

    August 2019 Special PE Exam

    Vaantoote · 93問 · 1年前

    August 2019 Special PE Exam

    August 2019 Special PE Exam

    93問 • 1年前
    Vaantoote

    RNPCP Chapter 1 to 5

    RNPCP Chapter 1 to 5

    Vaantoote · 86問 · 1年前

    RNPCP Chapter 1 to 5

    RNPCP Chapter 1 to 5

    86問 • 1年前
    Vaantoote

    Plumbing Code 1

    Plumbing Code 1

    Vaantoote · 100問 · 1年前

    Plumbing Code 1

    Plumbing Code 1

    100問 • 1年前
    Vaantoote

    Plumbing Code 2

    Plumbing Code 2

    Vaantoote · 100問 · 1年前

    Plumbing Code 2

    Plumbing Code 2

    100問 • 1年前
    Vaantoote

    Plumbing Code 4

    Plumbing Code 4

    Vaantoote · 100問 · 1年前

    Plumbing Code 4

    Plumbing Code 4

    100問 • 1年前
    Vaantoote

    Plumbing Code 5

    Plumbing Code 5

    Vaantoote · 100問 · 1年前

    Plumbing Code 5

    Plumbing Code 5

    100問 • 1年前
    Vaantoote

    Plumbing Code 6

    Plumbing Code 6

    Vaantoote · 100問 · 1年前

    Plumbing Code 6

    Plumbing Code 6

    100問 • 1年前
    Vaantoote

    Plumbing Code 7

    Plumbing Code 7

    Vaantoote · 100問 · 1年前

    Plumbing Code 7

    Plumbing Code 7

    100問 • 1年前
    Vaantoote

    Plumbing Code 8

    Plumbing Code 8

    Vaantoote · 100問 · 1年前

    Plumbing Code 8

    Plumbing Code 8

    100問 • 1年前
    Vaantoote

    Plumbing Code 3

    Plumbing Code 3

    Vaantoote · 100問 · 1年前

    Plumbing Code 3

    Plumbing Code 3

    100問 • 1年前
    Vaantoote

    Sanitation, Plumbing Design, and Installation 2

    Sanitation, Plumbing Design, and Installation 2

    Vaantoote · 97問 · 1年前

    Sanitation, Plumbing Design, and Installation 2

    Sanitation, Plumbing Design, and Installation 2

    97問 • 1年前
    Vaantoote

    Sanitation, Plumbing Design, and Installation 1

    Sanitation, Plumbing Design, and Installation 1

    Vaantoote · 99問 · 1年前

    Sanitation, Plumbing Design, and Installation 1

    Sanitation, Plumbing Design, and Installation 1

    99問 • 1年前
    Vaantoote

    Sanitation, Plumbing Design, and Installation 3

    Sanitation, Plumbing Design, and Installation 3

    Vaantoote · 96問 · 1年前

    Sanitation, Plumbing Design, and Installation 3

    Sanitation, Plumbing Design, and Installation 3

    96問 • 1年前
    Vaantoote

    Sanitation, Plumbing Design, and Installation 4

    Sanitation, Plumbing Design, and Installation 4

    Vaantoote · 95問 · 1年前

    Sanitation, Plumbing Design, and Installation 4

    Sanitation, Plumbing Design, and Installation 4

    95問 • 1年前
    Vaantoote

    Sanitation, Plumbing Design, and Installation 5

    Sanitation, Plumbing Design, and Installation 5

    Vaantoote · 97問 · 1年前

    Sanitation, Plumbing Design, and Installation 5

    Sanitation, Plumbing Design, and Installation 5

    97問 • 1年前
    Vaantoote

    Sanitation, Plumbing Design, and Installation 7

    Sanitation, Plumbing Design, and Installation 7

    Vaantoote · 100問 · 1年前

    Sanitation, Plumbing Design, and Installation 7

    Sanitation, Plumbing Design, and Installation 7

    100問 • 1年前
    Vaantoote

    Sanitation, Plumbing Design, and Installation 8

    Sanitation, Plumbing Design, and Installation 8

    Vaantoote · 98問 · 1年前

    Sanitation, Plumbing Design, and Installation 8

    Sanitation, Plumbing Design, and Installation 8

    98問 • 1年前
    Vaantoote

    Plumbing Tools 1

    Plumbing Tools 1

    Vaantoote · 87問 · 1年前

    Plumbing Tools 1

    Plumbing Tools 1

    87問 • 1年前
    Vaantoote

    Plumbing Tools 2

    Plumbing Tools 2

    Vaantoote · 53問 · 1年前

    Plumbing Tools 2

    Plumbing Tools 2

    53問 • 1年前
    Vaantoote

    Practical Problems and Experiences 1

    Practical Problems and Experiences 1

    Vaantoote · 100問 · 1年前

    Practical Problems and Experiences 1

    Practical Problems and Experiences 1

    100問 • 1年前
    Vaantoote

    Practical Problems and Experiences 2

    Practical Problems and Experiences 2

    Vaantoote · 100問 · 1年前

    Practical Problems and Experiences 2

    Practical Problems and Experiences 2

    100問 • 1年前
    Vaantoote

    Practical Problems and Experiences 3

    Practical Problems and Experiences 3

    Vaantoote · 99問 · 1年前

    Practical Problems and Experiences 3

    Practical Problems and Experiences 3

    99問 • 1年前
    Vaantoote

    Practical Problems and Experiences 4

    Practical Problems and Experiences 4

    Vaantoote · 100問 · 1年前

    Practical Problems and Experiences 4

    Practical Problems and Experiences 4

    100問 • 1年前
    Vaantoote

    PART A - Facilities for the Engineer

    PART A - Facilities for the Engineer

    Vaantoote · 9問 · 1年前

    PART A - Facilities for the Engineer

    PART A - Facilities for the Engineer

    9問 • 1年前
    Vaantoote

    PART B - Other General Requirements

    PART B - Other General Requirements

    Vaantoote · 13問 · 1年前

    PART B - Other General Requirements

    PART B - Other General Requirements

    13問 • 1年前
    Vaantoote

    Practical Problems and Experiences 5

    Practical Problems and Experiences 5

    Vaantoote · 100問 · 1年前

    Practical Problems and Experiences 5

    Practical Problems and Experiences 5

    100問 • 1年前
    Vaantoote

    Practical Problems and Experiences 6

    Practical Problems and Experiences 6

    Vaantoote · 100問 · 1年前

    Practical Problems and Experiences 6

    Practical Problems and Experiences 6

    100問 • 1年前
    Vaantoote

    Plumbing Arithmetic Terms 1

    Plumbing Arithmetic Terms 1

    Vaantoote · 49問 · 1年前

    Plumbing Arithmetic Terms 1

    Plumbing Arithmetic Terms 1

    49問 • 1年前
    Vaantoote

    Plumbing Arithmetic Terms 2

    Plumbing Arithmetic Terms 2

    Vaantoote · 47問 · 1年前

    Plumbing Arithmetic Terms 2

    Plumbing Arithmetic Terms 2

    47問 • 1年前
    Vaantoote

    Plumbing Arithmetic Terms 3

    Plumbing Arithmetic Terms 3

    Vaantoote · 49問 · 1年前

    Plumbing Arithmetic Terms 3

    Plumbing Arithmetic Terms 3

    49問 • 1年前
    Vaantoote

    Plumbing Arithmetic Terms 4

    Plumbing Arithmetic Terms 4

    Vaantoote · 27問 · 1年前

    Plumbing Arithmetic Terms 4

    Plumbing Arithmetic Terms 4

    27問 • 1年前
    Vaantoote

    Plumbing Code WSFU

    Plumbing Code WSFU

    Vaantoote · 58問 · 1年前

    Plumbing Code WSFU

    Plumbing Code WSFU

    58問 • 1年前
    Vaantoote

    Practical Problems and Experiences REFRESHER 1

    Practical Problems and Experiences REFRESHER 1

    Vaantoote · 100問 · 1年前

    Practical Problems and Experiences REFRESHER 1

    Practical Problems and Experiences REFRESHER 1

    100問 • 1年前
    Vaantoote

    Practical Problems and Experiences REFRESHER 2

    Practical Problems and Experiences REFRESHER 2

    Vaantoote · 70問 · 1年前

    Practical Problems and Experiences REFRESHER 2

    Practical Problems and Experiences REFRESHER 2

    70問 • 1年前
    Vaantoote

    Item # and Descriptions

    Item # and Descriptions

    Vaantoote · 24問 · 1年前

    Item # and Descriptions

    Item # and Descriptions

    24問 • 1年前
    Vaantoote

    Item 200 Aggregate Subbase Course

    Item 200 Aggregate Subbase Course

    Vaantoote · 16問 · 1年前

    Item 200 Aggregate Subbase Course

    Item 200 Aggregate Subbase Course

    16問 • 1年前
    Vaantoote

    Item 201 Aggregate Base Course

    Item 201 Aggregate Base Course

    Vaantoote · 16問 · 1年前

    Item 201 Aggregate Base Course

    Item 201 Aggregate Base Course

    16問 • 1年前
    Vaantoote

    Item 202 Crushed Aggregate Base Course

    Item 202 Crushed Aggregate Base Course

    Vaantoote · 18問 · 1年前

    Item 202 Crushed Aggregate Base Course

    Item 202 Crushed Aggregate Base Course

    18問 • 1年前
    Vaantoote

    Item 203 Lime Stabilized Road Mix Base Course

    Item 203 Lime Stabilized Road Mix Base Course

    Vaantoote · 27問 · 1年前

    Item 203 Lime Stabilized Road Mix Base Course

    Item 203 Lime Stabilized Road Mix Base Course

    27問 • 1年前
    Vaantoote

    Item 204 Portland Cement Stabilized Road Mix Base Course

    Item 204 Portland Cement Stabilized Road Mix Base Course

    Vaantoote · 7問 · 1年前

    Item 204 Portland Cement Stabilized Road Mix Base Course

    Item 204 Portland Cement Stabilized Road Mix Base Course

    7問 • 1年前
    Vaantoote

    Item 205 Asphalt Stabilized Road Mix Base Course

    Item 205 Asphalt Stabilized Road Mix Base Course

    Vaantoote · 7問 · 1年前

    Item 205 Asphalt Stabilized Road Mix Base Course

    Item 205 Asphalt Stabilized Road Mix Base Course

    7問 • 1年前
    Vaantoote

    Item 207 Portland Cement Stabilized Treated Plant Mix Base Course

    Item 207 Portland Cement Stabilized Treated Plant Mix Base Course

    Vaantoote · 13問 · 1年前

    Item 207 Portland Cement Stabilized Treated Plant Mix Base Course

    Item 207 Portland Cement Stabilized Treated Plant Mix Base Course

    13問 • 1年前
    Vaantoote

    Item 206 Chemically Stabilized Road Mix Subbase/Base Course

    Item 206 Chemically Stabilized Road Mix Subbase/Base Course

    Vaantoote · 11問 · 1年前

    Item 206 Chemically Stabilized Road Mix Subbase/Base Course

    Item 206 Chemically Stabilized Road Mix Subbase/Base Course

    11問 • 1年前
    Vaantoote

    Item 300 Aggregate Surface Course

    Item 300 Aggregate Surface Course

    Vaantoote · 11問 · 1年前

    Item 300 Aggregate Surface Course

    Item 300 Aggregate Surface Course

    11問 • 1年前
    Vaantoote

    Item 301 Bituminous Prime Coat

    Item 301 Bituminous Prime Coat

    Vaantoote · 10問 · 1年前

    Item 301 Bituminous Prime Coat

    Item 301 Bituminous Prime Coat

    10問 • 1年前
    Vaantoote

    Item 303 Bituminous Seal Coat

    Item 303 Bituminous Seal Coat

    Vaantoote · 20問 · 1年前

    Item 303 Bituminous Seal Coat

    Item 303 Bituminous Seal Coat

    20問 • 1年前
    Vaantoote

    RNPCP Chapter 6 to 9

    RNPCP Chapter 6 to 9

    Vaantoote · 94問 · 1年前

    RNPCP Chapter 6 to 9

    RNPCP Chapter 6 to 9

    94問 • 1年前
    Vaantoote

    RNPCP Chapter 10 to 13

    RNPCP Chapter 10 to 13

    Vaantoote · 93問 · 1年前

    RNPCP Chapter 10 to 13

    RNPCP Chapter 10 to 13

    93問 • 1年前
    Vaantoote

    RNPCP Appendix A and B

    RNPCP Appendix A and B

    Vaantoote · 79問 · 1年前

    RNPCP Appendix A and B

    RNPCP Appendix A and B

    79問 • 1年前
    Vaantoote

    Item 311 Portland Cement Concrete Pavement (PART 1)

    Item 311 Portland Cement Concrete Pavement (PART 1)

    Vaantoote · 78問 · 1年前

    Item 311 Portland Cement Concrete Pavement (PART 1)

    Item 311 Portland Cement Concrete Pavement (PART 1)

    78問 • 1年前
    Vaantoote

    Item 311 Portland Cement Concrete Pavement (PART 2)

    Item 311 Portland Cement Concrete Pavement (PART 2)

    Vaantoote · 61問 · 1年前

    Item 311 Portland Cement Concrete Pavement (PART 2)

    Item 311 Portland Cement Concrete Pavement (PART 2)

    61問 • 1年前
    Vaantoote

    Republic Acts

    Republic Acts

    Vaantoote · 9問 · 1年前

    Republic Acts

    Republic Acts

    9問 • 1年前
    Vaantoote

    Plumbing Arithmetic Terms 5

    Plumbing Arithmetic Terms 5

    Vaantoote · 68問 · 1年前

    Plumbing Arithmetic Terms 5

    Plumbing Arithmetic Terms 5

    68問 • 1年前
    Vaantoote

    Item 400 Piling

    Item 400 Piling

    Vaantoote · 80問 · 1年前

    Item 400 Piling

    Item 400 Piling

    80問 • 1年前
    Vaantoote

    Item 405 Structural Concrete

    Item 405 Structural Concrete

    Vaantoote · 41問 · 1年前

    Item 405 Structural Concrete

    Item 405 Structural Concrete

    41問 • 1年前
    Vaantoote

    Item 406 Prestressed Concrete Structures

    Item 406 Prestressed Concrete Structures

    Vaantoote · 36問 · 1年前

    Item 406 Prestressed Concrete Structures

    Item 406 Prestressed Concrete Structures

    36問 • 1年前
    Vaantoote

    Plumbing Design and Estimate (by Max Fajardo)

    Plumbing Design and Estimate (by Max Fajardo)

    Vaantoote · 22問 · 1年前

    Plumbing Design and Estimate (by Max Fajardo)

    Plumbing Design and Estimate (by Max Fajardo)

    22問 • 1年前
    Vaantoote

    Principles and Code of Ethics

    Principles and Code of Ethics

    Vaantoote · 29問 · 1年前

    Principles and Code of Ethics

    Principles and Code of Ethics

    29問 • 1年前
    Vaantoote

    Plumbing Arithmetic Problems 1

    Plumbing Arithmetic Problems 1

    Vaantoote · 75問 · 1年前

    Plumbing Arithmetic Problems 1

    Plumbing Arithmetic Problems 1

    75問 • 1年前
    Vaantoote

    問題一覧

  • 1

    Unless otherwise shown on the Plans or specified in Special Provisions, concrete shall be of _______

    Class A

  • 2

    If lean concrete is required in the Plan or as directed by the Engineer prior to placing of reinforcing steel bar, the lean concrete should have a minimum compressive strength of ______

    13.8 MPa

  • 3

    When placing operations would involve dropping the concrete more than _____, concrete shall be conveyed through sheet metal or approved pipes

    1.5m

  • 4

    The discharge end of the line shall not be more than _____ from the point of deposit

    3m

  • 5

    Concrete deposited in water shall be of Class Seal concrete with a minimum cement content of _______ of concrete

    380 kg/m³

  • 6

    The slump of the concrete shall be maintained between ______

    4 to 8 inches

  • 7

    A tremie shall consist of a tube having a diameter of not less than ______ constructed in sections having flanged couplings fitted with gaskets with a hopper at the top

    250mm

  • 8

    The concrete in walls, beams, columns and the like shall be placed in horizontal layers not more than ____ thick except as hereinafter provided

    30cm

  • 9

    The intensity of vibration shall be such as to visibly affect a mass of concrete with a _____ slump over a radius of at least _____

    3 inches, 50cm

  • 10

    An inset formwork shall be used to produce an edge thickness of not less than _____ in the succeeding layer

    15cm

  • 11

    The concrete shall be allowed to set for at least ______ before the caps are placed

    20 hours

  • 12

    The load of the superstructure shall not be allowed to come upon the bents until they have been in place at least _____ unless otherwise permitted by the Engineer

    14 days

  • 13

    The bond between stem and slab shall be secured by means of suitable shear keys which may be formed by the use of timber blocks approximately _____ in cross-section having a length of _____ less than the width of the girder stem

    50mm x 100mm, 100mm

  • 14

    These key blocks shall be placed along the girder stems as required, but the spacing shall not be greater than _______ center to center

    300mm

  • 15

    Ordinary Finish

    Class 1

  • 16

    Rubbed Finish

    Class 2

  • 17

    Floated Finish

    Class 3

  • 18

    The surface finish on piers and abutments shall include all exposed surfaces below the bridge seats to _____ below low water elevation

    20cm

  • 19

    The surface finish on piers and abutments shall include all exposed surfaces below the bridge seats _____ below finished ground level when such ground level is above the water surface

    50cm

  • 20

    Wing walls shall be finished from the top to _____ below the finished slope lines on the outside face and shall be finished on top and for a depth of _____ below the top on the back sides

    50cm, 20cm

  • 21

    On all surfaces the cavities produced by form ties and all other holes, honeycomb spots, broken corners or edges and other defects shall be thoroughly cleaned, and after having been kept saturated with water for a period of not less than ______, shall be carefully pointed and made true with mortar of cement and fine aggregate mixed in the proportions unsed in the grade of the concrete being finished.

    3 hours

  • 22

    Mortar used in pointing shall not be more than _____ old

    1 hour

  • 23

    The rubbing of concrete shall be started as soon as its condition will permit, the concrete shall be kept thoroughly saturated with water for a minimum period of _____

    3 hours

  • 24

    The float shall then be moved forward _____ of each length and the above operation repeated

    1/2

  • 25

    The Contractor shall furnish and use an accurate 3 m straight-edge swing handless _____ longer than ______ the width of the slab

    1m, 1/2

  • 26

    Advancement along the deck shall be in successive stages of not more than ____ of the length of the straight-edge

    1/2

  • 27

    The straight-edge testing and refloating shall continue until the entire surface is found to be free from observable departure from the straight-edge and the slabs has the required grade and contour, until there are no deviations of more than _____ under the 3 m straight-edge

    3mm

  • 28

    The strokes shall be square across the slabs from edge to edge, with adjacent strokes slightly overlapped, and shall be made by drawing the broom without tearing the concrete, but so as to produce regular corrugations not over ____ in depth

    3mm

  • 29

    The surface shall not vary more than ____ under a 3 m straight-edge

    3mm

  • 30

    In Water Method, the concrete shall be kept continuously wet by the application of water for a minimum period of ______ after the concrete has been placed

    7 days

  • 31

    The compound shall be applied with a pressure spray in such a manner as to cover the entire concrete surface with a uniform film and shall be of such character that it will harden within ______ after application

    30 minutes