    Amount of lime to be added

    3-12%

  • 2

    Grading Test and Plasticity Test (LL, PL, PI) on soil aggregates for every:

    300cu.m

  • 3

    Quality Test (Grading, Plasticity, and Abrasion) on soil aggregate for every:

    1500cu.m

  • 4

    Laboratory Compaction Test and Unconfined Compaction Test on mix for every:

    300cu.m

  • 5

    FDT for every ____ or fraction thereof on base course of 150mm compacted depth

    150m

  • 6

    Thickness determination for every ____ or fraction thereof on base course for every layer of 150mm compacted depth

    150m

  • 7

    Quality Test for every ____ or fraction thereof of Hydrated Lime

    100T

  • 8

    Plasticity Index shall be from ____.

    4-10

  • 9

    The aggregate shall have a mass percent wear not exceeding ____ as determined by AASHTO T96.

    50%

  • 10

    In the CBR Test for Gravelly Soils, the mixture passing ____ shall have a minimum soaked CBR value of ____.

    19mm, 100%

  • 11

    Unconfined Compression Test for Finer Testured Soils Method B shall not be less than ____ when tested in accordance with ASTM D1633.

    2.1 MPa

  • 12

    In Nes Soil-Aggregate, at least ____ shall be allowed for measuring, sampling, and testing for approval of quantity and gradation before windrow is spread for application of hydrated lime.

    1 day

  • 13

    If the surface moisture of the soil aggregate is ____ of the dry aggregate, the soil aggregate shall be turned by blades or disc harrows or otherwise aerated until the moisture content is reduced to ____.

    more than 2%, less than 2%

  • 14

    The soil aggregate shall be spread smoothly and uniformly over ___ of the road or other convinient width of the surface ready for the application of hydrated lime

    1/2

  • 15

    A typical slurry ratio is _____ lime to _____ of water

    1 tonne, 2cu.m

  • 16

    The slurry is distributed by ______ passes over a measured area until the specified percentage (based on lime solids content) is obtained.

    1 or more

  • 17

    Rolling of the surface shall be parallel to the road center line and shall commence at the outer edges of the road, overlapping the shoulders and progress toward the center, overlapping on sucessive passes by ____ of the width of the roller.

    1/2

  • 18

    In rolling, each pass shall terminate at least ____ in advance or to the rear of the end of the preceeding pass

    910mm

  • 19

    The compacted thickness of the road mix lime stabilized base course is:

    150mm

  • 20

    Compaction shall continue until field density of ____ of compacted maximum dry density

    100%

  • 21

    After the lime-stabilized base course has been finished as specified, the surface shall be protected against rapid drying for a period of:

    5 days

  • 22

    Surface shall be protected by covering the completed surface with a _____ layer of earth or sand and maintained in moist condition.

    50mm

  • 23

    Trial section of the stabilized base shall be constructed at least _____ before the actual base construction.

    2 weeks

  • 24

    The contractor will not be permitted to drive heavy equipment over completed portions prior to the end of ____ curing period exceptbpneumatic tired equipment required for constructing adjoining sections.

    5 days

  • 25

    Turning areas on completed portions of the base shall be protected by a layer of stable granular materials of not less than ___ of compacted depth

    50mm

  • 26

    Lime Stablized Road Mix Base Course will be measured by:

    cubic meter

  • 27

    Grading Test and Plasticity Test (LL, PL, PI) on soil aggregates for every:

    300cu.m

  • Project Engineer EXAM

    Project Engineer EXAM

    Vaantoote · 62問 · 2年前

    Project Engineer EXAM

    Project Engineer EXAM

    62問 • 2年前
    Vaantoote

    YT1 Materials Engineer EXAM

    YT1 Materials Engineer EXAM

    Vaantoote · 100問 · 2年前

    YT1 Materials Engineer EXAM

    YT1 Materials Engineer EXAM

    100問 • 2年前
    Vaantoote

    YT2 Materials Engineer EXAM

    YT2 Materials Engineer EXAM

    Vaantoote · 100問 · 2年前

    YT2 Materials Engineer EXAM

    YT2 Materials Engineer EXAM

    100問 • 2年前
    Vaantoote

    Project Engineer YT 1

    Project Engineer YT 1

    Vaantoote · 100問 · 1年前

    Project Engineer YT 1

    Project Engineer YT 1

    100問 • 1年前
    Vaantoote

    Project Engineer EXAM 68

    Project Engineer EXAM 68

    Vaantoote · 100問 · 1年前

    Project Engineer EXAM 68

    Project Engineer EXAM 68

    100問 • 1年前
    Vaantoote

    Project Engineer EXAM 82

    Project Engineer EXAM 82

    Vaantoote · 100問 · 1年前

    Project Engineer EXAM 82

    Project Engineer EXAM 82

    100問 • 1年前
    Vaantoote

    July 2023 PE Refresher

    July 2023 PE Refresher

    Vaantoote · 70問 · 1年前

    July 2023 PE Refresher

    July 2023 PE Refresher

    70問 • 1年前
    Vaantoote

    August 2019 Special PE Exam

    August 2019 Special PE Exam

    Vaantoote · 93問 · 1年前

    August 2019 Special PE Exam

    August 2019 Special PE Exam

    93問 • 1年前
    Vaantoote

    RNPCP Chapter 1 to 5

    RNPCP Chapter 1 to 5

    Vaantoote · 86問 · 1年前

    RNPCP Chapter 1 to 5

    RNPCP Chapter 1 to 5

    86問 • 1年前
    Vaantoote

    Plumbing Code 1

    Plumbing Code 1

    Vaantoote · 100問 · 1年前

    Plumbing Code 1

    Plumbing Code 1

    100問 • 1年前
    Vaantoote

    Plumbing Code 2

    Plumbing Code 2

    Vaantoote · 100問 · 1年前

    Plumbing Code 2

    Plumbing Code 2

    100問 • 1年前
    Vaantoote

    Plumbing Code 4

    Plumbing Code 4

    Vaantoote · 100問 · 1年前

    Plumbing Code 4

    Plumbing Code 4

    100問 • 1年前
    Vaantoote

    Plumbing Code 5

    Plumbing Code 5

    Vaantoote · 100問 · 1年前

    Plumbing Code 5

    Plumbing Code 5

    100問 • 1年前
    Vaantoote

    Plumbing Code 6

    Plumbing Code 6

    Vaantoote · 100問 · 1年前

    Plumbing Code 6

    Plumbing Code 6

    100問 • 1年前
    Vaantoote

    Plumbing Code 7

    Plumbing Code 7

    Vaantoote · 100問 · 1年前

    Plumbing Code 7

    Plumbing Code 7

    100問 • 1年前
    Vaantoote

    Plumbing Code 8

    Plumbing Code 8

    Vaantoote · 100問 · 1年前

    Plumbing Code 8

    Plumbing Code 8

    100問 • 1年前
    Vaantoote

    Plumbing Code 3

    Plumbing Code 3

    Vaantoote · 100問 · 1年前

    Plumbing Code 3

    Plumbing Code 3

    100問 • 1年前
    Vaantoote

    Sanitation, Plumbing Design, and Installation 2

    Sanitation, Plumbing Design, and Installation 2

    Vaantoote · 97問 · 1年前

    Sanitation, Plumbing Design, and Installation 2

    Sanitation, Plumbing Design, and Installation 2

    97問 • 1年前
    Vaantoote

    Sanitation, Plumbing Design, and Installation 1

    Sanitation, Plumbing Design, and Installation 1

    Vaantoote · 99問 · 1年前

    Sanitation, Plumbing Design, and Installation 1

    Sanitation, Plumbing Design, and Installation 1

    99問 • 1年前
    Vaantoote

    Sanitation, Plumbing Design, and Installation 3

    Sanitation, Plumbing Design, and Installation 3

    Vaantoote · 96問 · 1年前

    Sanitation, Plumbing Design, and Installation 3

    Sanitation, Plumbing Design, and Installation 3

    96問 • 1年前
    Vaantoote

    Sanitation, Plumbing Design, and Installation 4

    Sanitation, Plumbing Design, and Installation 4

    Vaantoote · 95問 · 1年前

    Sanitation, Plumbing Design, and Installation 4

    Sanitation, Plumbing Design, and Installation 4

    95問 • 1年前
    Vaantoote

    Sanitation, Plumbing Design, and Installation 5

    Sanitation, Plumbing Design, and Installation 5

    Vaantoote · 97問 · 1年前

    Sanitation, Plumbing Design, and Installation 5

    Sanitation, Plumbing Design, and Installation 5

    97問 • 1年前
    Vaantoote

    Sanitation, Plumbing Design, and Installation 7

    Sanitation, Plumbing Design, and Installation 7

    Vaantoote · 100問 · 1年前

    Sanitation, Plumbing Design, and Installation 7

    Sanitation, Plumbing Design, and Installation 7

    100問 • 1年前
    Vaantoote

    Sanitation, Plumbing Design, and Installation 8

    Sanitation, Plumbing Design, and Installation 8

    Vaantoote · 98問 · 1年前

    Sanitation, Plumbing Design, and Installation 8

    Sanitation, Plumbing Design, and Installation 8

    98問 • 1年前
    Vaantoote

    Plumbing Tools 1

    Plumbing Tools 1

    Vaantoote · 87問 · 1年前

    Plumbing Tools 1

    Plumbing Tools 1

    87問 • 1年前
    Vaantoote

    Plumbing Tools 2

    Plumbing Tools 2

    Vaantoote · 53問 · 1年前

    Plumbing Tools 2

    Plumbing Tools 2

    53問 • 1年前
    Vaantoote

    Practical Problems and Experiences 1

    Practical Problems and Experiences 1

    Vaantoote · 100問 · 1年前

    Practical Problems and Experiences 1

    Practical Problems and Experiences 1

    100問 • 1年前
    Vaantoote

    Practical Problems and Experiences 2

    Practical Problems and Experiences 2

    Vaantoote · 100問 · 1年前

    Practical Problems and Experiences 2

    Practical Problems and Experiences 2

    100問 • 1年前
    Vaantoote

    Practical Problems and Experiences 3

    Practical Problems and Experiences 3

    Vaantoote · 99問 · 1年前

    Practical Problems and Experiences 3

    Practical Problems and Experiences 3

    99問 • 1年前
    Vaantoote

    Practical Problems and Experiences 4

    Practical Problems and Experiences 4

    Vaantoote · 100問 · 1年前

    Practical Problems and Experiences 4

    Practical Problems and Experiences 4

    100問 • 1年前
    Vaantoote

    PART A - Facilities for the Engineer

    PART A - Facilities for the Engineer

    Vaantoote · 9問 · 1年前

    PART A - Facilities for the Engineer

    PART A - Facilities for the Engineer

    9問 • 1年前
    Vaantoote

    PART B - Other General Requirements

    PART B - Other General Requirements

    Vaantoote · 13問 · 1年前

    PART B - Other General Requirements

    PART B - Other General Requirements

    13問 • 1年前
    Vaantoote

    Practical Problems and Experiences 5

    Practical Problems and Experiences 5

    Vaantoote · 100問 · 1年前

    Practical Problems and Experiences 5

    Practical Problems and Experiences 5

    100問 • 1年前
    Vaantoote

    Practical Problems and Experiences 6

    Practical Problems and Experiences 6

    Vaantoote · 100問 · 1年前

    Practical Problems and Experiences 6

    Practical Problems and Experiences 6

    100問 • 1年前
    Vaantoote

    Plumbing Arithmetic Terms 1

    Plumbing Arithmetic Terms 1

    Vaantoote · 49問 · 1年前

    Plumbing Arithmetic Terms 1

    Plumbing Arithmetic Terms 1

    49問 • 1年前
    Vaantoote

    Plumbing Arithmetic Terms 2

    Plumbing Arithmetic Terms 2

    Vaantoote · 47問 · 1年前

    Plumbing Arithmetic Terms 2

    Plumbing Arithmetic Terms 2

    47問 • 1年前
    Vaantoote

    Plumbing Arithmetic Terms 3

    Plumbing Arithmetic Terms 3

    Vaantoote · 49問 · 1年前

    Plumbing Arithmetic Terms 3

    Plumbing Arithmetic Terms 3

    49問 • 1年前
    Vaantoote

    Plumbing Arithmetic Terms 4

    Plumbing Arithmetic Terms 4

    Vaantoote · 27問 · 1年前

    Plumbing Arithmetic Terms 4

    Plumbing Arithmetic Terms 4

    27問 • 1年前
    Vaantoote

    Plumbing Code WSFU

    Plumbing Code WSFU

    Vaantoote · 58問 · 1年前

    Plumbing Code WSFU

    Plumbing Code WSFU

    58問 • 1年前
    Vaantoote

    Practical Problems and Experiences REFRESHER 1

    Practical Problems and Experiences REFRESHER 1

    Vaantoote · 100問 · 1年前

    Practical Problems and Experiences REFRESHER 1

    Practical Problems and Experiences REFRESHER 1

    100問 • 1年前
    Vaantoote

    Practical Problems and Experiences REFRESHER 2

    Practical Problems and Experiences REFRESHER 2

    Vaantoote · 70問 · 1年前

    Practical Problems and Experiences REFRESHER 2

    Practical Problems and Experiences REFRESHER 2

    70問 • 1年前
    Vaantoote

    Item # and Descriptions

    Item # and Descriptions

    Vaantoote · 24問 · 1年前

    Item # and Descriptions

    Item # and Descriptions

    24問 • 1年前
    Vaantoote

    Item 200 Aggregate Subbase Course

    Item 200 Aggregate Subbase Course

    Vaantoote · 16問 · 1年前

    Item 200 Aggregate Subbase Course

    Item 200 Aggregate Subbase Course

    16問 • 1年前
    Vaantoote

    Item 201 Aggregate Base Course

    Item 201 Aggregate Base Course

    Vaantoote · 16問 · 1年前

    Item 201 Aggregate Base Course

    Item 201 Aggregate Base Course

    16問 • 1年前
    Vaantoote

    Item 202 Crushed Aggregate Base Course

    Item 202 Crushed Aggregate Base Course

    Vaantoote · 18問 · 1年前

    Item 202 Crushed Aggregate Base Course

    Item 202 Crushed Aggregate Base Course

    18問 • 1年前
    Vaantoote

    Item 204 Portland Cement Stabilized Road Mix Base Course

    Item 204 Portland Cement Stabilized Road Mix Base Course

    Vaantoote · 7問 · 1年前

    Item 204 Portland Cement Stabilized Road Mix Base Course

    Item 204 Portland Cement Stabilized Road Mix Base Course

    7問 • 1年前
    Vaantoote

    Item 205 Asphalt Stabilized Road Mix Base Course

    Item 205 Asphalt Stabilized Road Mix Base Course

    Vaantoote · 7問 · 1年前

    Item 205 Asphalt Stabilized Road Mix Base Course

    Item 205 Asphalt Stabilized Road Mix Base Course

    7問 • 1年前
    Vaantoote

    Item 207 Portland Cement Stabilized Treated Plant Mix Base Course

    Item 207 Portland Cement Stabilized Treated Plant Mix Base Course

    Vaantoote · 13問 · 1年前

    Item 207 Portland Cement Stabilized Treated Plant Mix Base Course

    Item 207 Portland Cement Stabilized Treated Plant Mix Base Course

    13問 • 1年前
    Vaantoote

    Item 206 Chemically Stabilized Road Mix Subbase/Base Course

    Item 206 Chemically Stabilized Road Mix Subbase/Base Course

    Vaantoote · 11問 · 1年前

    Item 206 Chemically Stabilized Road Mix Subbase/Base Course

    Item 206 Chemically Stabilized Road Mix Subbase/Base Course

    11問 • 1年前
    Vaantoote

    Item 300 Aggregate Surface Course

    Item 300 Aggregate Surface Course

    Vaantoote · 11問 · 1年前

    Item 300 Aggregate Surface Course

    Item 300 Aggregate Surface Course

    11問 • 1年前
    Vaantoote

    Item 301 Bituminous Prime Coat

    Item 301 Bituminous Prime Coat

    Vaantoote · 10問 · 1年前

    Item 301 Bituminous Prime Coat

    Item 301 Bituminous Prime Coat

    10問 • 1年前
    Vaantoote

    Item 303 Bituminous Seal Coat

    Item 303 Bituminous Seal Coat

    Vaantoote · 20問 · 1年前

    Item 303 Bituminous Seal Coat

    Item 303 Bituminous Seal Coat

    20問 • 1年前
    Vaantoote

    RNPCP Chapter 6 to 9

    RNPCP Chapter 6 to 9

    Vaantoote · 94問 · 1年前

    RNPCP Chapter 6 to 9

    RNPCP Chapter 6 to 9

    94問 • 1年前
    Vaantoote

    RNPCP Chapter 10 to 13

    RNPCP Chapter 10 to 13

    Vaantoote · 93問 · 1年前

    RNPCP Chapter 10 to 13

    RNPCP Chapter 10 to 13

    93問 • 1年前
    Vaantoote

    RNPCP Appendix A and B

    RNPCP Appendix A and B

    Vaantoote · 79問 · 1年前

    RNPCP Appendix A and B

    RNPCP Appendix A and B

    79問 • 1年前
    Vaantoote

    Item 311 Portland Cement Concrete Pavement (PART 1)

    Item 311 Portland Cement Concrete Pavement (PART 1)

    Vaantoote · 78問 · 1年前

    Item 311 Portland Cement Concrete Pavement (PART 1)

    Item 311 Portland Cement Concrete Pavement (PART 1)

    78問 • 1年前
    Vaantoote

    Item 311 Portland Cement Concrete Pavement (PART 2)

    Item 311 Portland Cement Concrete Pavement (PART 2)

    Vaantoote · 61問 · 1年前

    Item 311 Portland Cement Concrete Pavement (PART 2)

    Item 311 Portland Cement Concrete Pavement (PART 2)

    61問 • 1年前
    Vaantoote

    Republic Acts

    Republic Acts

    Vaantoote · 9問 · 1年前

    Republic Acts

    Republic Acts

    9問 • 1年前
    Vaantoote

    Plumbing Arithmetic Terms 5

    Plumbing Arithmetic Terms 5

    Vaantoote · 68問 · 1年前

    Plumbing Arithmetic Terms 5

    Plumbing Arithmetic Terms 5

    68問 • 1年前
    Vaantoote

    Item 400 Piling

    Item 400 Piling

    Vaantoote · 80問 · 1年前

    Item 400 Piling

    Item 400 Piling

    80問 • 1年前
    Vaantoote

    Item 405 Structural Concrete

    Item 405 Structural Concrete

    Vaantoote · 41問 · 1年前

    Item 405 Structural Concrete

    Item 405 Structural Concrete

    41問 • 1年前
    Vaantoote

    Item 406 Prestressed Concrete Structures

    Item 406 Prestressed Concrete Structures

    Vaantoote · 36問 · 1年前

    Item 406 Prestressed Concrete Structures

    Item 406 Prestressed Concrete Structures

    36問 • 1年前
    Vaantoote

    Item 407 Concrete Structures

    Item 407 Concrete Structures

    Vaantoote · 31問 · 1年前

    Item 407 Concrete Structures

    Item 407 Concrete Structures

    31問 • 1年前
    Vaantoote

    Plumbing Design and Estimate (by Max Fajardo)

    Plumbing Design and Estimate (by Max Fajardo)

    Vaantoote · 22問 · 1年前

    Plumbing Design and Estimate (by Max Fajardo)

    Plumbing Design and Estimate (by Max Fajardo)

    22問 • 1年前
    Vaantoote

    Principles and Code of Ethics

    Principles and Code of Ethics

    Vaantoote · 29問 · 1年前

    Principles and Code of Ethics

    Principles and Code of Ethics

    29問 • 1年前
    Vaantoote

    Plumbing Arithmetic Problems 1

    Plumbing Arithmetic Problems 1

    Vaantoote · 75問 · 1年前

    Plumbing Arithmetic Problems 1

    Plumbing Arithmetic Problems 1

    75問 • 1年前
    Vaantoote

    問題一覧

  • 1

    Amount of lime to be added

    3-12%

  • 2

    Grading Test and Plasticity Test (LL, PL, PI) on soil aggregates for every:

    300cu.m

  • 3

    Quality Test (Grading, Plasticity, and Abrasion) on soil aggregate for every:

    1500cu.m

  • 4

    Laboratory Compaction Test and Unconfined Compaction Test on mix for every:

    300cu.m

  • 5

    FDT for every ____ or fraction thereof on base course of 150mm compacted depth

    150m

  • 6

    Thickness determination for every ____ or fraction thereof on base course for every layer of 150mm compacted depth

    150m

  • 7

    Quality Test for every ____ or fraction thereof of Hydrated Lime

    100T

  • 8

    Plasticity Index shall be from ____.

    4-10

  • 9

    The aggregate shall have a mass percent wear not exceeding ____ as determined by AASHTO T96.

    50%

  • 10

    In the CBR Test for Gravelly Soils, the mixture passing ____ shall have a minimum soaked CBR value of ____.

    19mm, 100%

  • 11

    Unconfined Compression Test for Finer Testured Soils Method B shall not be less than ____ when tested in accordance with ASTM D1633.

    2.1 MPa

  • 12

    In Nes Soil-Aggregate, at least ____ shall be allowed for measuring, sampling, and testing for approval of quantity and gradation before windrow is spread for application of hydrated lime.

    1 day

  • 13

    If the surface moisture of the soil aggregate is ____ of the dry aggregate, the soil aggregate shall be turned by blades or disc harrows or otherwise aerated until the moisture content is reduced to ____.

    more than 2%, less than 2%

  • 14

    The soil aggregate shall be spread smoothly and uniformly over ___ of the road or other convinient width of the surface ready for the application of hydrated lime

    1/2

  • 15

    A typical slurry ratio is _____ lime to _____ of water

    1 tonne, 2cu.m

  • 16

    The slurry is distributed by ______ passes over a measured area until the specified percentage (based on lime solids content) is obtained.

    1 or more

  • 17

    Rolling of the surface shall be parallel to the road center line and shall commence at the outer edges of the road, overlapping the shoulders and progress toward the center, overlapping on sucessive passes by ____ of the width of the roller.

    1/2

  • 18

    In rolling, each pass shall terminate at least ____ in advance or to the rear of the end of the preceeding pass

    910mm

  • 19

    The compacted thickness of the road mix lime stabilized base course is:

    150mm

  • 20

    Compaction shall continue until field density of ____ of compacted maximum dry density

    100%

  • 21

    After the lime-stabilized base course has been finished as specified, the surface shall be protected against rapid drying for a period of:

    5 days

  • 22

    Surface shall be protected by covering the completed surface with a _____ layer of earth or sand and maintained in moist condition.

    50mm

  • 23

    Trial section of the stabilized base shall be constructed at least _____ before the actual base construction.

    2 weeks

  • 24

    The contractor will not be permitted to drive heavy equipment over completed portions prior to the end of ____ curing period exceptbpneumatic tired equipment required for constructing adjoining sections.

    5 days

  • 25

    Turning areas on completed portions of the base shall be protected by a layer of stable granular materials of not less than ___ of compacted depth

    50mm

  • 26

    Lime Stablized Road Mix Base Course will be measured by:

    cubic meter

  • 27

    Grading Test and Plasticity Test (LL, PL, PI) on soil aggregates for every: