記憶度
4問
11問
0問
0問
0問
アカウント登録して、解答結果を保存しよう
問題一覧
1
Amount of lime to be added
3-12%
2
Grading Test and Plasticity Test (LL, PL, PI) on soil aggregates for every:
300cu.m
3
Quality Test (Grading, Plasticity, and Abrasion) on soil aggregate for every:
1500cu.m
4
Laboratory Compaction Test and Unconfined Compaction Test on mix for every:
300cu.m
5
FDT for every ____ or fraction thereof on base course of 150mm compacted depth
150m
6
Thickness determination for every ____ or fraction thereof on base course for every layer of 150mm compacted depth
150m
7
Quality Test for every ____ or fraction thereof of Hydrated Lime
100T
8
Plasticity Index shall be from ____.
4-10
9
The aggregate shall have a mass percent wear not exceeding ____ as determined by AASHTO T96.
50%
10
In the CBR Test for Gravelly Soils, the mixture passing ____ shall have a minimum soaked CBR value of ____.
19mm, 100%
11
Unconfined Compression Test for Finer Testured Soils Method B shall not be less than ____ when tested in accordance with ASTM D1633.
2.1 MPa
12
In Nes Soil-Aggregate, at least ____ shall be allowed for measuring, sampling, and testing for approval of quantity and gradation before windrow is spread for application of hydrated lime.
1 day
13
If the surface moisture of the soil aggregate is ____ of the dry aggregate, the soil aggregate shall be turned by blades or disc harrows or otherwise aerated until the moisture content is reduced to ____.
more than 2%, less than 2%
14
The soil aggregate shall be spread smoothly and uniformly over ___ of the road or other convinient width of the surface ready for the application of hydrated lime
1/2
15
A typical slurry ratio is _____ lime to _____ of water
1 tonne, 2cu.m
16
The slurry is distributed by ______ passes over a measured area until the specified percentage (based on lime solids content) is obtained.
1 or more
17
Rolling of the surface shall be parallel to the road center line and shall commence at the outer edges of the road, overlapping the shoulders and progress toward the center, overlapping on sucessive passes by ____ of the width of the roller.
1/2
18
In rolling, each pass shall terminate at least ____ in advance or to the rear of the end of the preceeding pass
910mm
19
The compacted thickness of the road mix lime stabilized base course is:
150mm
20
Compaction shall continue until field density of ____ of compacted maximum dry density
100%
21
After the lime-stabilized base course has been finished as specified, the surface shall be protected against rapid drying for a period of:
5 days
22
Surface shall be protected by covering the completed surface with a _____ layer of earth or sand and maintained in moist condition.
50mm
23
Trial section of the stabilized base shall be constructed at least _____ before the actual base construction.
2 weeks
24
The contractor will not be permitted to drive heavy equipment over completed portions prior to the end of ____ curing period exceptbpneumatic tired equipment required for constructing adjoining sections.
5 days
25
Turning areas on completed portions of the base shall be protected by a layer of stable granular materials of not less than ___ of compacted depth
50mm
26
Lime Stablized Road Mix Base Course will be measured by:
cubic meter
27
Grading Test and Plasticity Test (LL, PL, PI) on soil aggregates for every:
300cu.m