暗記メーカー
ログイン
Sanitation, Plumbing Design, and Installation 5
  • Vaantoote

  • 問題数 97 • 12/9/2024

    記憶度

    完璧

    14

    覚えた

    36

    うろ覚え

    0

    苦手

    0

    未解答

    0

    アカウント登録して、解答結果を保存しよう

    問題一覧

  • 1

    18

    B

  • 2

    55

    D

  • 3

    1

    A

  • 4

    74 In this leeching bed, minimum required dimension (mm) of B

    304.8

  • 5

    23

    C

  • 6

    29

    A

  • 7

    3

    B

  • 8

    96 Identify C

    Main Vent

  • 9

    52

    D

  • 10

    44 Identify E

    sludge pit

  • 11

    99 Identify E

    Soil Branch

  • 12

    75 What is A?

    Bottom width of trench

  • 13

    42 Identify D

    airspace

  • 14

    37 Identify J

    curb stop

  • 15

    63

    C

  • 16

    21

    C

  • 17

    85 Size of stack between 1st and 2nd floor?

    D

  • 18

    24

    B

  • 19

    53

    A

  • 20

    10

    C

  • 21

    11

    B

  • 22

    30

    C

  • 23

    51

    C

  • 24

    68

    C

  • 25

    70

    C

  • 26

    33 Identify I

    service pipe

  • 27

    83

    B

  • 28

    39 Identify H

    curb box

  • 29

    100 Identify F

    Building Drain

  • 30

    27

    B

  • 31

    20

    D

  • 32

    98 Identify B

    Branch Vent

  • 33

    81

    B

  • 34

    76 What is F?

    Backfill

  • 35

    59

    A

  • 36

    91

    A

  • 37

    34 Identify E

    gooseneck

  • 38

    28

    B

  • 39

    80

    A

  • 40

    72 In this leeching bed, maximum required dimension (mm) of A

    914.4

  • 41

    58

    A

  • 42

    97 Identify D

    Main Soil and Waste Stack

  • 43

    84 Size of stack between 3rd and 4th floor?

    D

  • 44

    78 Identify G

    All of these

  • 45

    32 Identify B

    saddle clamp

  • 46

    77 What is H?

    Filler Material

  • 47

    54

    B

  • 48

    41 Identify F

    outlet

  • 49

    9

    C

  • 50

    45 Identify C

    liquid level

  • 51

    43 Identify B

    manhole

  • 52

    73 In this leeching bed, minimum required dimension (mm) of E

    304.8

  • 53

    49

    D

  • 54

    22

    B

  • 55

    62

    A

  • 56

    36 Identify D

    straight coupling

  • 57

    25

    D

  • 58

    65

    D

  • 59

    8

    C

  • 60

    60

    C

  • 61

    31 Identify A

    water main

  • 62

    13

    A

  • 63

    56

    C

  • 64

    35 Identify C

    corporation stop

  • 65

    26

    C

  • 66

    19

    B

  • 67

    57

    C

  • 68

    4

    A

  • 69

    67

    A

  • 70

    38 Identify F

    adapter

  • 71

    50

    C

  • 72

    94

    Floor Trap

  • 73

    47

    B

  • 74

    64

    C

  • 75

    48

    B

  • 76

    71 In this leeching bed, minimum required dimension (mm) of A

    457.2

  • 77

    61

    D

  • 78

    79

    C

  • 79

    66

    B

  • 80

    17

    B

  • 81

    93

    D

  • 82

    90

    C

  • 83

    89

    B

  • 84

    40 Identify A

    inlet

  • 85

    69

    A

  • 86

    C

  • 87

    16

    D

  • 88

    15

    C

  • 89

    87

    A

  • 90

    7

    B

  • 91

    14

    C

  • 92

    95 Identify A

    Main Soil and Waste Vent

  • 93

    12

    C

  • 94

    5

    C

  • 95

    2

    D

  • 96

    88

    A

  • 97

    6

    A