Composites and material test 1
問題一覧
1
Prevents cross contamination between the clean and dirty room. Ensures quality of composite while curing. Safety shoes and glasses, respiratory protection, lab coat, face shied.
2
Just as the name implies, this room is where the dirty part of composite manufacturing takes place. Tyvek suit respirator and face shield or eye protection required
3
Keeps the area organized, ensure quality of material and prevents injury
4
Contains 2 or more physically distinct and mechanically separable materials. Created by binding two materials together to achieve positive quality’s from both materials
5
Reinforcement (fibres) aramid, fibreglass, carbon fibre etc. Matrix (resin) epoxy
6
Strong, lightweight, thermal and corrosion resistance, bullet proof
7
Expensive, difficult to detect interior damage, exposed fibres wick up moisture.
8
Raydome, flight control surfaces, vertical and horizontal stabilizer
9
Thermoplastic; formed using heat, will change shape if significantly “reheated” Thermosetting; formed using heat or room temperature. Will not change shape if significantly heated
10
Most structural applications on an aircraft
11
Part A “Base” Part B “catalyst” / hardener
12
It needs to be measure in precise ratio in weight and volume as per manufactures instructions
13
Mix part A first then part B
14
White in colour, less weight and strength, low cost compared to aramid and carbon fibre. E-glass resistant to current flow S-glass for structural applications, high temperature and tensile strength
15
Thin string crystalline filament of black carbon, used as a strengthening material in with the matrix system. Known as carbon fibre composite. Promotes galvanic corrosion when bonded to other metals.
16
Yellow in colour, known also as Kevlar or NOMEX. High tensile strength and bullet proof, used on rotor blades and hub assembly’s.
17
Fire hazard, splash hazard, absorption hazard, inhalation hazard
18
Tyvek suit ,safety shoes and glasses, respirator, gloves and hearing protection
19
Uncontrolled exotherm, the release of excess heat, smoking and bubbling in matrix causing combustion. Also called “run away” or “hot batch” Sensitization, allergic reaction following contact with matrix resin system. Develops upon repeated exposure.
20
Exothermic, reaction followed by release of heat
21
Sensitization, can be cause by contact with matrix resin systems or other materials that follows by an allergic reaction, that develops upon repeated exposure to a chemical or material
22
MSDS (material safety data sheet)
23
Methyl ethyl ketone (MEK) Acetone Goggles, Tyvek suit, gloves, respirator
24
Isopropyl alcohol, used to clean bonding surfaces and clean tools or working surfaces
25
1. Room temperature, epoxy and art resins 2. Heat cure, pre pregs
26
The “pot life” dictates the time limit when working with the materials
27
Avoided using filler or tropic agent. Too hot = sagging Too cold = becomes thick and difficult to use
28
Small hallow phelonic resin plastic microspheres that are light weight “thickener/ additive”. They don’t add structural strength
29
Very fine microscopic droplets of fumes silica powder (dust) not for structural accommodations
30
A fuzzy material from fabric strands, used to thicken matrix and increase strength
31
Fibre glass, carbon fibre, aramid
32
Filament / thread
33
Kevlar
34
Stored in flat, warm, dry climate controlled, contaminate free area
35
A fabric previously impregnated with a mixed resin and then “B-staged” or partially cross-linked until it no longer flows at room temperature. Stored frozen and must be thawed. Requires heat and pressure to fully cure. Requires out time log
36
-Proper ratio of fibre to mixture -resin system already worked into fibres -less mess and eliminates need for weighing and mixing resins
37
Two or more layers of different reinforcing fibres bonded together. Used to create composite with the characteristics of both fibres.
38
Vacuum bagging
39
Removes excess resin, removes air between laminates, maintains contours and shape and compacts fibres
40
1. Peel ply 2. Perforated release film 3. Bleeder 4. Solid release film 5. Breather 6. Vacuum bag
41
Respirator, face shield with charcoal filter
Composites test 2
Composites test 2
Zachary Halycz · 54問 · 2年前Composites test 2
Composites test 2
54問 • 2年前Systems test 2, 2023
Systems test 2, 2023
Zachary Halycz · 49問 · 2年前Systems test 2, 2023
Systems test 2, 2023
49問 • 2年前History test 1
History test 1
Zachary Halycz · 52問 · 3年前History test 1
History test 1
52問 • 3年前Composites and material test 1
Composites and material test 1
Zachary Halycz · 41問 · 3年前Composites and material test 1
Composites and material test 1
41問 • 3年前Systems test 2, 2023
Systems test 2, 2023
Zachary Halycz · 49問 · 2年前Systems test 2, 2023
Systems test 2, 2023
49問 • 2年前Electricity test 2
Electricity test 2
Zachary Halycz · 35問 · 2年前Electricity test 2
Electricity test 2
35問 • 2年前Engines test 1 good copy
Engines test 1 good copy
Zachary Halycz · 45問 · 3年前Engines test 1 good copy
Engines test 1 good copy
45問 • 3年前Composites test 2
Composites test 2
Zachary Halycz · 63問 · 2年前Composites test 2
Composites test 2
63問 • 2年前Engines test 2
Engines test 2
Zachary Halycz · 56問 · 2年前Engines test 2
Engines test 2
56問 • 2年前Basic systems, sem 2, test 1
Basic systems, sem 2, test 1
Zachary Halycz · 61問 · 3年前Basic systems, sem 2, test 1
Basic systems, sem 2, test 1
61問 • 3年前History test 1
History test 1
Zachary Halycz · 52問 · 3年前History test 1
History test 1
52問 • 3年前Electricity test 2
Electricity test 2
Zachary Halycz · 35問 · 2年前Electricity test 2
Electricity test 2
35問 • 2年前Composites test 2
Composites test 2
Zachary Halycz · 54問 · 2年前Composites test 2
Composites test 2
54問 • 2年前Engines test 2
Engines test 2
Zachary Halycz · 60問 · 2年前Engines test 2
Engines test 2
60問 • 2年前Engines test 1 good copy
Engines test 1 good copy
Zachary Halycz · 41問 · 3年前Engines test 1 good copy
Engines test 1 good copy
41問 • 3年前Structures sem 2, test 1
Structures sem 2, test 1
Zachary Halycz · 50問 · 3年前Structures sem 2, test 1
Structures sem 2, test 1
50問 • 3年前Basic systems test 4 final
Basic systems test 4 final
Zachary Halycz · 17問 · 3年前Basic systems test 4 final
Basic systems test 4 final
17問 • 3年前Basic systems, sem 2, test 1
Basic systems, sem 2, test 1
Zachary Halycz · 67問 · 3年前Basic systems, sem 2, test 1
Basic systems, sem 2, test 1
67問 • 3年前Electricity sem 2, test 1
Electricity sem 2, test 1
Zachary Halycz · 31問 · 3年前Electricity sem 2, test 1
Electricity sem 2, test 1
31問 • 3年前Structures test 2, memorization
Structures test 2, memorization
Zachary Halycz · 11問 · 2年前Structures test 2, memorization
Structures test 2, memorization
11問 • 2年前Electricity sem 2, test 1
Electricity sem 2, test 1
Zachary Halycz · 31問 · 3年前Electricity sem 2, test 1
Electricity sem 2, test 1
31問 • 3年前Structures sem 2, test 1
Structures sem 2, test 1
Zachary Halycz · 50問 · 3年前Structures sem 2, test 1
Structures sem 2, test 1
50問 • 3年前Structures test 4 final
Structures test 4 final
Zachary Halycz · 45問 · 3年前Structures test 4 final
Structures test 4 final
45問 • 3年前NDT test 2
NDT test 2
Zachary Halycz · 16問 · 3年前NDT test 2
NDT test 2
16問 • 3年前Engines test 1 good copy
Engines test 1 good copy
Zachary Halycz · 45問 · 3年前Engines test 1 good copy
Engines test 1 good copy
45問 • 3年前History test 1
History test 1
Zachary Halycz · 52問 · 3年前History test 1
History test 1
52問 • 3年前Electricity test 2
Electricity test 2
Zachary Halycz · 35問 · 2年前Electricity test 2
Electricity test 2
35問 • 2年前Electricity
Electricity
Zachary Halycz · 23問 · 3年前Electricity
Electricity
23問 • 3年前Composites test 2
Composites test 2
Zachary Halycz · 63問 · 2年前Composites test 2
Composites test 2
63問 • 2年前Engines test 2
Engines test 2
Zachary Halycz · 60問 · 2年前Engines test 2
Engines test 2
60問 • 2年前Structures sem 2, test 1
Structures sem 2, test 1
Zachary Halycz · 50問 · 3年前Structures sem 2, test 1
Structures sem 2, test 1
50問 • 3年前Electricity
Electricity
Zachary Halycz · 37問 · 3年前Electricity
Electricity
37問 • 3年前Structures test 4 final
Structures test 4 final
Zachary Halycz · 45問 · 3年前Structures test 4 final
Structures test 4 final
45問 • 3年前History test 1
History test 1
Zachary Halycz · 52問 · 3年前History test 1
History test 1
52問 • 3年前Basic systems, sem 2, test 1
Basic systems, sem 2, test 1
Zachary Halycz · 67問 · 3年前Basic systems, sem 2, test 1
Basic systems, sem 2, test 1
67問 • 3年前Composites test 2
Composites test 2
Zachary Halycz · 54問 · 2年前Composites test 2
Composites test 2
54問 • 2年前Engines test 2
Engines test 2
Zachary Halycz · 56問 · 2年前Engines test 2
Engines test 2
56問 • 2年前Structures test 2, sem 2
Structures test 2, sem 2
Zachary Halycz · 61問 · 2年前Structures test 2, sem 2
Structures test 2, sem 2
61問 • 2年前Engines test 2
Engines test 2
Zachary Halycz · 62問 · 2年前Engines test 2
Engines test 2
62問 • 2年前Composites test 2
Composites test 2
Zachary Halycz · 63問 · 2年前Composites test 2
Composites test 2
63問 • 2年前NDT test 2
NDT test 2
Zachary Halycz · 16問 · 3年前NDT test 2
NDT test 2
16問 • 3年前Composites test 2
Composites test 2
Zachary Halycz · 54問 · 2年前Composites test 2
Composites test 2
54問 • 2年前Electricity test 2, part 2
Electricity test 2, part 2
Zachary Halycz · 44問 · 2年前Electricity test 2, part 2
Electricity test 2, part 2
44問 • 2年前Electricity sem 2, test 1
Electricity sem 2, test 1
Zachary Halycz · 31問 · 3年前Electricity sem 2, test 1
Electricity sem 2, test 1
31問 • 3年前Basic systems, sem 2, test 1
Basic systems, sem 2, test 1
Zachary Halycz · 67問 · 3年前Basic systems, sem 2, test 1
Basic systems, sem 2, test 1
67問 • 3年前Engines test 2
Engines test 2
Zachary Halycz · 56問 · 2年前Engines test 2
Engines test 2
56問 • 2年前Engines test 1 good copy
Engines test 1 good copy
Zachary Halycz · 45問 · 3年前Engines test 1 good copy
Engines test 1 good copy
45問 • 3年前History test 1
History test 1
Zachary Halycz · 52問 · 3年前History test 1
History test 1
52問 • 3年前Electricity test 2
Electricity test 2
Zachary Halycz · 35問 · 2年前Electricity test 2
Electricity test 2
35問 • 2年前Electricity
Electricity
Zachary Halycz · 37問 · 3年前Electricity
Electricity
37問 • 3年前Electricity test 2, part 2
Electricity test 2, part 2
Zachary Halycz · 44問 · 2年前Electricity test 2, part 2
Electricity test 2, part 2
44問 • 2年前Engines test 2
Engines test 2
Zachary Halycz · 60問 · 2年前Engines test 2
Engines test 2
60問 • 2年前Electricity test 2, part 2
Electricity test 2, part 2
Zachary Halycz · 44問 · 2年前Electricity test 2, part 2
Electricity test 2, part 2
44問 • 2年前Engines test 2
Engines test 2
Zachary Halycz · 62問 · 2年前Engines test 2
Engines test 2
62問 • 2年前Engines test 2
Engines test 2
Zachary Halycz · 58問 · 2年前Engines test 2
Engines test 2
58問 • 2年前Engines test 2
Engines test 2
Zachary Halycz · 56問 · 2年前Engines test 2
Engines test 2
56問 • 2年前Structures test 2, memorization
Structures test 2, memorization
Zachary Halycz · 22問 · 2年前Structures test 2, memorization
Structures test 2, memorization
22問 • 2年前Health and safety test 4 final
Health and safety test 4 final
Zachary Halycz · 9問 · 3年前Health and safety test 4 final
Health and safety test 4 final
9問 • 3年前Engines test 2
Engines test 2
Zachary Halycz · 62問 · 2年前Engines test 2
Engines test 2
62問 • 2年前History test 1
History test 1
Zachary Halycz · 52問 · 3年前History test 1
History test 1
52問 • 3年前NDT test 3
NDT test 3
Zachary Halycz · 20問 · 2年前NDT test 3
NDT test 3
20問 • 2年前systems test 3, sem 2
systems test 3, sem 2
Zachary Halycz · 78問 · 2年前systems test 3, sem 2
systems test 3, sem 2
78問 • 2年前engines test 3, sem 2
engines test 3, sem 2
Zachary Halycz · 25問 · 2年前engines test 3, sem 2
engines test 3, sem 2
25問 • 2年前composites test 3
composites test 3
Zachary Halycz · 47問 · 2年前composites test 3
composites test 3
47問 • 2年前structure test 3, sem 2
structure test 3, sem 2
Zachary Halycz · 37問 · 2年前structure test 3, sem 2
structure test 3, sem 2
37問 • 2年前electricity test 3, sem 2
electricity test 3, sem 2
Zachary Halycz · 38問 · 2年前electricity test 3, sem 2
electricity test 3, sem 2
38問 • 2年前NDT test 4
NDT test 4
Zachary Halycz · 17問 · 2年前NDT test 4
NDT test 4
17問 • 2年前Systems Test 4, Sem 2
Systems Test 4, Sem 2
Zachary Halycz · 74問 · 2年前Systems Test 4, Sem 2
Systems Test 4, Sem 2
74問 • 2年前composites test 4 , 2023
composites test 4 , 2023
Zachary Halycz · 16問 · 2年前composites test 4 , 2023
composites test 4 , 2023
16問 • 2年前engines test 4, sem 2
engines test 4, sem 2
Zachary Halycz · 44問 · 2年前engines test 4, sem 2
engines test 4, sem 2
44問 • 2年前electricity final test 4, semester 2
electricity final test 4, semester 2
Zachary Halycz · 66問 · 2年前electricity final test 4, semester 2
electricity final test 4, semester 2
66問 • 2年前NDT year 2, test 1
NDT year 2, test 1
Zachary Halycz · 16問 · 2年前NDT year 2, test 1
NDT year 2, test 1
16問 • 2年前airframes test 1, year 2
airframes test 1, year 2
Zachary Halycz · 62問 · 2年前airframes test 1, year 2
airframes test 1, year 2
62問 • 2年前sealant test 1, 10025
sealant test 1, 10025
Zachary Halycz · 41問 · 2年前sealant test 1, 10025
sealant test 1, 10025
41問 • 2年前sealant test 1, review 2
sealant test 1, review 2
Zachary Halycz · 23問 · 2年前sealant test 1, review 2
sealant test 1, review 2
23問 • 2年前NDT year 2, Test 2
NDT year 2, Test 2
Zachary Halycz · 15問 · 2年前NDT year 2, Test 2
NDT year 2, Test 2
15問 • 2年前cars test 1
cars test 1
Zachary Halycz · 26問 · 2年前cars test 1
cars test 1
26問 • 2年前10026 test 1 corrosion prevention
10026 test 1 corrosion prevention
Zachary Halycz · 47問 · 2年前10026 test 1 corrosion prevention
10026 test 1 corrosion prevention
47問 • 2年前10025 fluid lines test 33 questions
10025 fluid lines test 33 questions
Zachary Halycz · 51問 · 2年前10025 fluid lines test 33 questions
10025 fluid lines test 33 questions
51問 • 2年前NDT test 3, year 2
NDT test 3, year 2
Zachary Halycz · 10問 · 2年前NDT test 3, year 2
NDT test 3, year 2
10問 • 2年前airframes test 2
airframes test 2
Zachary Halycz · 97問 · 2年前airframes test 2
airframes test 2
97問 • 2年前composites test 1, year 2
composites test 1, year 2
Zachary Halycz · 100問 · 2年前composites test 1, year 2
composites test 1, year 2
100問 • 2年前composites test 1, year 2, weave pictures
composites test 1, year 2, weave pictures
Zachary Halycz · 6問 · 2年前composites test 1, year 2, weave pictures
composites test 1, year 2, weave pictures
6問 • 2年前damage assess & repair Test 1
damage assess & repair Test 1
Zachary Halycz · 59問 · 2年前damage assess & repair Test 1
damage assess & repair Test 1
59問 • 2年前cars test 2
cars test 2
Zachary Halycz · 30問 · 2年前cars test 2
cars test 2
30問 • 2年前tubular structure test 1 100%
tubular structure test 1 100%
Zachary Halycz · 59問 · 2年前tubular structure test 1 100%
tubular structure test 1 100%
59問 • 2年前NDT test 4
NDT test 4
Zachary Halycz · 11問 · 2年前NDT test 4
NDT test 4
11問 • 2年前airframes test 3
airframes test 3
Zachary Halycz · 73問 · 2年前airframes test 3
airframes test 3
73問 • 2年前NDT prac
NDT prac
Zachary Halycz · 7問 · 2年前NDT prac
NDT prac
7問 • 2年前10026 final test, 20 Q, 17%
10026 final test, 20 Q, 17%
Zachary Halycz · 20問 · 2年前10026 final test, 20 Q, 17%
10026 final test, 20 Q, 17%
20問 • 2年前10022 final test, 50q, 66%
10022 final test, 50q, 66%
Zachary Halycz · 77問 · 2年前10022 final test, 50q, 66%
10022 final test, 50q, 66%
77問 • 2年前composites 10043 final test
composites 10043 final test
Zachary Halycz · 38問 · 2年前composites 10043 final test
composites 10043 final test
38問 • 2年前airframes final test!!
airframes final test!!
Zachary Halycz · 58問 · 2年前airframes final test!!
airframes final test!!
58問 • 2年前cars final test, first sem
cars final test, first sem
Zachary Halycz · 14問 · 2年前cars final test, first sem
cars final test, first sem
14問 • 2年前structures job questions
structures job questions
Zachary Halycz · 19問 · 2年前structures job questions
structures job questions
19問 • 2年前問題一覧
1
Prevents cross contamination between the clean and dirty room. Ensures quality of composite while curing. Safety shoes and glasses, respiratory protection, lab coat, face shied.
2
Just as the name implies, this room is where the dirty part of composite manufacturing takes place. Tyvek suit respirator and face shield or eye protection required
3
Keeps the area organized, ensure quality of material and prevents injury
4
Contains 2 or more physically distinct and mechanically separable materials. Created by binding two materials together to achieve positive quality’s from both materials
5
Reinforcement (fibres) aramid, fibreglass, carbon fibre etc. Matrix (resin) epoxy
6
Strong, lightweight, thermal and corrosion resistance, bullet proof
7
Expensive, difficult to detect interior damage, exposed fibres wick up moisture.
8
Raydome, flight control surfaces, vertical and horizontal stabilizer
9
Thermoplastic; formed using heat, will change shape if significantly “reheated” Thermosetting; formed using heat or room temperature. Will not change shape if significantly heated
10
Most structural applications on an aircraft
11
Part A “Base” Part B “catalyst” / hardener
12
It needs to be measure in precise ratio in weight and volume as per manufactures instructions
13
Mix part A first then part B
14
White in colour, less weight and strength, low cost compared to aramid and carbon fibre. E-glass resistant to current flow S-glass for structural applications, high temperature and tensile strength
15
Thin string crystalline filament of black carbon, used as a strengthening material in with the matrix system. Known as carbon fibre composite. Promotes galvanic corrosion when bonded to other metals.
16
Yellow in colour, known also as Kevlar or NOMEX. High tensile strength and bullet proof, used on rotor blades and hub assembly’s.
17
Fire hazard, splash hazard, absorption hazard, inhalation hazard
18
Tyvek suit ,safety shoes and glasses, respirator, gloves and hearing protection
19
Uncontrolled exotherm, the release of excess heat, smoking and bubbling in matrix causing combustion. Also called “run away” or “hot batch” Sensitization, allergic reaction following contact with matrix resin system. Develops upon repeated exposure.
20
Exothermic, reaction followed by release of heat
21
Sensitization, can be cause by contact with matrix resin systems or other materials that follows by an allergic reaction, that develops upon repeated exposure to a chemical or material
22
MSDS (material safety data sheet)
23
Methyl ethyl ketone (MEK) Acetone Goggles, Tyvek suit, gloves, respirator
24
Isopropyl alcohol, used to clean bonding surfaces and clean tools or working surfaces
25
1. Room temperature, epoxy and art resins 2. Heat cure, pre pregs
26
The “pot life” dictates the time limit when working with the materials
27
Avoided using filler or tropic agent. Too hot = sagging Too cold = becomes thick and difficult to use
28
Small hallow phelonic resin plastic microspheres that are light weight “thickener/ additive”. They don’t add structural strength
29
Very fine microscopic droplets of fumes silica powder (dust) not for structural accommodations
30
A fuzzy material from fabric strands, used to thicken matrix and increase strength
31
Fibre glass, carbon fibre, aramid
32
Filament / thread
33
Kevlar
34
Stored in flat, warm, dry climate controlled, contaminate free area
35
A fabric previously impregnated with a mixed resin and then “B-staged” or partially cross-linked until it no longer flows at room temperature. Stored frozen and must be thawed. Requires heat and pressure to fully cure. Requires out time log
36
-Proper ratio of fibre to mixture -resin system already worked into fibres -less mess and eliminates need for weighing and mixing resins
37
Two or more layers of different reinforcing fibres bonded together. Used to create composite with the characteristics of both fibres.
38
Vacuum bagging
39
Removes excess resin, removes air between laminates, maintains contours and shape and compacts fibres
40
1. Peel ply 2. Perforated release film 3. Bleeder 4. Solid release film 5. Breather 6. Vacuum bag
41
Respirator, face shield with charcoal filter