1
Department Order _____S.___________provides the Guidelines and Procedures in Terminating Contracts due to Fault of the Contractor.
90 Séries of 2020
2
All Biacklisting Order shal be approved by the Secretary.
True
3
What is the official reporting tool for projects funded under FY 2016 and onwards?
Project and Contract Management Application
4
Which of the following can update accomplishment of projects/contracts in PCMA?
Project Engineer
5
On which module can the implementing office generate various reports in the PCMA?
Civil Works Monitoring
6
Which of the foliowing field engineer can access "E-Log" only in PCMA?
Project Inspector
7
On which application does PCMA pulls its data regarding project component to be implemented by the Implementing ofices?
Multi-Year Planning and Scheduling Applcatlon
8
Which of the following is a system that interconnects roadways in conjunction with one or more highway separations providing for the movement of traffic between two or more intersecting highways?
Interchanges
9
Which of the following is an intervention implemented to increase or improve the capacity of the existing road network with the aim of reducing travel time?
Road Widening
10
Which of the following factors is NOT Considered in cutting segments in the Road Condition (RoCond) segmenting procedures?
Change in Carriageway Width
11
In accordance with D.O 197, s. of 2016, what should be the basis of the mark-up percentages to be utlized for the Overhead, Contingencies Miscellaneous (0CM) expenses and Contractor's Profit?
Estimated Direct Cost
12
The following are NOT Considered as assessable road segment EXCEPT:
Gravel/Earth Road
13
Which of the following is NOT part of the Road Network Entities?
Chainage
14
The Road and Bridge Information Application (RBIA) was institutionalized thru what department issuance?
Department Order No, 124, serles of 2016
15
Which of the following refers to the systematic approach used to identify the best alignment for the road project during the conduct of feasibility study?
Multi-Criterla Analysis
16
Which of the following document refers to the standard documentation of the description necessary to confirm non-coverage of Category D and Category C Projects as well as projects operating prior to 1982?
Project Description (PD)
17
The following are the usage of Annual Average Dally Traffic EXCEPT:
Intersection design
18
The following are the responsibilities of the District Engineering Offices in the implementation of National Road Traffic Survey Program (NRTSP) and Road Traffic Information Application (RTIA) EXCEPT:
Assist the Regional Office in the conduct of automated classİfied traffic counts.
19
The following are documentary requirements for funding consideration of a flood control project, EXCEPT:
Calamity Damage Assessment Report
20
Among the river basins in the Philippines, how many are considered as major river basins according to the National Water Regulatory Board (NWRB)?
18
21
Which of the following department issuances states that the Department shall not be responsible for the payment of right-of-way acquisition for Convergence Program Projects?
DO 229, series of 2022
22
Which of the following is NOT a subprogram under Asset Preservation Program?
Off-Carriageway Improvement
23
Which of the following statements is FALSE?
The Convergence Program between DPWH and DOTis the "TIKAS"
24
It is the modification of existing bridge structures to make It more resistant to seismic activity. ground motion, or soil failure due to earthquakes.
Retrofitting/Strengthening of Permanent Bridges
25
How much is the allowed minimum proposed allocation/cost for completion of projects under Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) and Basic Infrastructure Program (BIP)?
2 million pesos
26
Who among the following should undertake the acquiring of land/resettlement activities for Sustainabie Infrastructure Projects Alleviating Gaps (SIPAG) and Basic Infrastructure Program (BIP) projects?
Local Government Units (LGUs)
27
Which of the following is NOT a project component in Multi-Year Planning and Scheduling (MYPS)?
Roads
28
Who among the following DPWH Personnel is the Multi-Year Planning and Scheduling (MYPS) Application User Coordinator (AUC)?
Nenita R. Jimenez, Chief, Development Planning Division, Planning Service
29
What excel macro program was developed by the Development Planning Division (DPD) staff for the submission of Supporting Documents (SDs) and has the capability to monitor the completeness of submission in terms of the required SDs per Sub-Program (PAP)?
Registry of Information and Foldering (RIF)
30
Which of the following is NOT part of the Seamless and Inclusive Connectivity via National and Local Linkages?
High Standard Highways and Expressways
31
Which of the following surveying equipment measures only the horizontal distance and vertical elevation?
Digital Level
32
Which of the following is FALSE regarding DPWH Preliminary Geohazard Assessment?
It is different frorm the Engineering Geology and Geohazard Assessment (EGGAR), in a Sense that EGGAR is required for projects which are exempted fróm an Environmental Compliarnce Certificate (ECC), while PGAR is required for projects with a need for an ECC as stipulated in the Department of Environment and Nátural Resources Administrative Örder 2000-28 (DENR-AO 2000-28).
33
What is the component of an engineered structure that transmits the structure's forces into the soil rock that supports it?
Foundation
34
In the pile foundation, what is the minimum requirement for penetration depth if the soil classification is soft cohesive or loose granular material?
6.0 m
35
Which occupancy category does a public school building belong to?
Category I Essential Facilities
36
What is the design Iife of Portiand Cement Concrete Pavement (PCCP)?
20 years
37
When should the Contractor submit the Construction Safety and Health Program to the Department of Labor and Employment?
Prior to the start date (NTP) of the project
38
Mobilization and Demobilization shall be treated as a separate pay item. It shall be computed based on the equipment requirements of the project stipulated in the proposal and contract booklet. However, the estimated cost of the Mobilization/Demobilization should not exceed to __________ without requesting for clearance to the authorized official as per D.0 NO. 197, SERIES OF 2016?
1% of the Estimated Direct Cost of the civil works items
39
Which set of tools or methods assists decision makers in finding optimum strategies for providing and maintaining pavements in a serviceable condition over a specified period of time?
Pavement Management System (PMS)
40
In DEO Classification, a DEO must have an equivalent road length of__________km to be considered a 2nd class.
100 km to less than 250 km
41
This refers to the strategy for making women's as well as men's concerns and experiences an integral dimension of the design, implementation, monitoring, and evaluation of policies and programs in all political, economic, and societal spheres so that women and men benefit equally, and inequality is not perpetuated.
Gender Mainstreaming
42
Which of the following design guidelines provide basic requiremernts and essential tools in the design preparation of water engineering projects, specifically flood control, water supply, coastal facilities and urban drainage infrastructure?
DPWH DGCS 2015: Volume 3: Water Engineering Projects
43
Which of the following suggested design approaches incorporates climate changes for extreme rainfall?
Incorporate a 10% increased in rainfall intensity
44
Which of the following department issuances CANNOT be used as a reference for the Design Revision of a Flood Control Structure?
D.0. No. 47, Series of 2022, Re: Gưdelines on the Conuct of Feasibilty Studies for Roads, Bridge, Flood Control, Drainage and Other Water-Related Projects
45
In earthquake resistant design, it is a kind of vertical irreqularity which is reciprocal to a signifcant difference between the stiffness and the resistance of one of the floors of a building and the rest of them.
Soft Storey
46
The National Structural Code of the Philippines is based on what performance level in terms of Performance Based Design?
LIfe Safety
47
What is the maximum superelevation rate adopted along national roads?
8%
48
Which of the foliowing is a support found at the ends of a bridge or extreme end of multi-span superstructures and which usually retains or supports the road approach embankments?
Abutment
49
The following pay items shall NOT be subjected to Overhead, Contingencies and Miscellaneous (0CM) and profit mark-up, EXCEPT:
Construction of Field Office for the Engineer
50
As of 2023, which milestone listed in the DPWH Value Engineering Institutionalization Roadmap has NOT yet been achieved?
Creation of Value Engineering Unlts In the ROs/DEOS
51
Which of the following statements about Value Methodology is TRUE?
It is a process that alms to improve the overall value of a project by optimizing the cost, qualíty and perfornmance.
52
What systematic process used by a multidisciplinary team to improve the value of a project, product, or process through the analysis of functions and resources?
Value Methodology
53
Which of the following issuances requires all concerned offices involved in the preparation of plans "to include the details of Road Safety and Traffic Management Plans in all Detailed Engineering Design (DED) for Road and Bridge Plans"?
DO 224, s. 2022
54
Which of the following refers to a complete set of analyses carried out to determine if the project can be implemented, can achieve the desired goals, and more importantly, will result in net benefits?
Feasibility Study
55
What is the primary measure of traffic congestion as stated in Department Order 22, series of 2013?
Volume-Capacity Ratio
56
What should be the value of the Economic Internal Rate of Return (EIRR) to consider the project as feasible?
Equal or greater than the Social Discount Rate
57
Which among the following is a document that recommends the funding of pre-investment studies prior to the implementation/ construction of road and bridge projects?
Rapid Assessment Report
58
Which of the following is NOT a factor of Traffic Growth Rate (TGR)?
Social Discount Rate
59
The folowing DPWH offices are mandated to conduct Feasibility Studies in accordance with D.O. 47, s. 2022 and D.0. 4, s. 2017, EXCEPT:
Bureaus
60
What are the primary components of a Project Concept Paper?
Strategic Fit, Technical Complexity, Environmental and Social Impacts
61
Which among the following flood-control projects require the conduct of a feasibility study?
Principal and major river basins
62
The DPWH quarantees early stakeholder involvement in the Environmental Impact Assessment (EIA) in compliance with the DENR Administrative Order No. 2017-15: Guidelines on Public Participation under the Philippine Environmental Impact Statement (EIS) System. At what stage of the EIA WOuld the proponent conduct Stakeholder Consultations where information and assessment needs are established to give the proponent the scope of work for the EIA report?
Scoping
63
This refers to an integrated collection of computer software and data used to view and manage information about geographic places, analyze spatial relationships, and model spatial processes.
Geographic Information System (GIS)
64
The purpose of the conduct of EIA Monitoring is to adhere the DPWH Quality Policy which is to provide quality, safe, and environment-friendly public infrastructure facilities that will improve the lives of the Flipino people and to ensure that the Implementing Office is compliant to the conditions set in the Environmental Compliance Certificate (ECC), Environmental Management Plan (EMP), effectiveness of Environmental Measures and continual Updating of EMP. Who among the following is responsible for preparing the Compliance Monitoring Report (CMR) and Self-monitoring Report (SMR)?
Pollution Control Officer (PCO)
65
The DENR Environmental Management Bureau (EMB) undertook a procedural assessment of the EIA report as part of the submission and review of EIA reports process to ensure compliance with the minimum requirements outlined during scoping. This was followed by a substantive review by outside experts who were hired by the agency. In order to share the EIA 's findings with the community, the proponent must also engage stakeholders during this process. What kind of stakeholder activity does the proponent need to conduct when the EIA reports are being submitted and reviewed?
Public Hearing (PH)
66
Which of the following computer-based system stores the inventory information, monitors bridge condition and prioritizes bridges for work based on needs for major maintenance and replacement/construction?
Bidge Management System (BMS)
67
The following statements are true about National Road Trafic Survey Program (NRTSP) and Road Traffic Information Application (RTIA) EXCEPT:
The NRTSP is limited project-level anaysis considering locations within metropolitan areas and major urban centers
68
Which department issuance pertains to the "Procedures for Assignment and Use of Project iDs and Project Component IDs?
DO 61, Series of 2018
69
As per GAA, the total budget for the Construction of Bridge in Barangay Dagupan, Vintar, Ilocos Norte is Php 100,000,000.00. Further, the result of the evaluation in the Harmonized Gender and Deveiopment Guidelines Box 10 Checklist for the said project got a score of 6.18. What is the total attributed GAD Budget for the construction of the Bridge?
Php 30,900,000.00
70
Which of the following is the critical exercise of the allocation of revenues and borrowed funds to attain the economic and social goals of the country?
Government Budgeting
71
Which of the following is an authorization made by law or other legislative enactment, directing the payment of goods and services out of government funds?
Appropriation
72
Which of the following contains the proposed appropriations of different government agencies?
National Expenditure Program
73
Which of the following refers to any changes to a project involving the movement of funds between components without any changes to the targets?
Data Change
74
Which set of procedures records slope stability risks and hazards on the road network and identifles designs and programs countermeasures to protect the road and road users?
Road Slope Management (RSM)
75
What computer application stores project data including location, scope, major items of work and targets, and provides a single record source for all projects in all of the Department's infrastructure programs?
Multi-Year Planning and Scheduling (MYPS)
76
Which of the following is a simple and easy to use application developed by the Information Management Service (IMS) designed to improve transparency and accountability in the monitoring of civil works projects implemented by the Department?
Infratrack App
77
The following are traffic engineering surveys under tne National Traffc Survey Proqram EXCEPT:
Origin-destination survey
78
Which of the following approaches has a main line of action to transform unequal power relations between men and women in all spheres of society. It İs also a development perspective and process that are participatory and empowering, equitable, sustainable, free from violence, respectful of human rights, supportive of self-determination and actualization of human potentials.
Gender and Development
79
As per Republic Act 9710, what is the minimum percentage of the agency's or local government unit's total budget appropriations that should be allocated to implement GAD programs?
Five percent (5%)
80
Which of the following tools is used for transport planning, starting from the analysis of present situations to model building for demand forecast, identification of developrnent projects, demand forecast, and project evaluation?
JICA Strada
81
Which of the following is NOT under the Traffic Decongestion Program of the Strategic Infrastructure Programs aligned with Philippine Development Plan (PDP) 2023-2028?
Gaps and Missing Links along National Roads
82
This refers to the priority programs and projects included in the Public Investment Program (PIP), with a total project cost of at least Php 2.5 billion, and which have met the criteria to be considered under the PIP Guidelines of NEDA.
Core Investment Programs and Projects (CIPs)
83
Which of the following is NOT pat of the National Level Medium-Term Plans?
Regional-National Investment Program (RNIP)
84
What online database svstem contains the rolling list of priority Programs and Projects (PAPS) to be implemented by the DpWH within the medium term, whlch responds to the outcomes in the Philippine Development Plan (PDP) and its Results Matrices (RM)?
Publlc Investment Program Online (PIPOL)
85
Which of the folowing is a modification of the Comprehensive and Integrated Infrastructure Program (CIIP), which is a consolidated list of all infrastructure programs and projects, and puts more emphasis on immediate priorities to be undertaken in three-year periods?
Three-Year Rolling Ihfrastructure Proaram (TRIP)
86
Which of the following issuances directs all accounts payable outstanding for two (2) years or more be reverted to the accumulated surplus or deficit of the general fund?
Executive Order No. 87
87
Which of the followng best describes the expenditures for the acquisition of fixed assets and other goods and services where productive benefits of which extend beyond the fiscal year?
Capital Outlays
88
When is the deadline of payment of all FY 2022 General Appropriations Act (GAA), Republic Act No.11639 (ContinuingAppropriations) obligations per National Budget Circular No. 590 s. 2023?
December 31, 2023
89
Which of the following is a Valid and legal obligation of NGAS/GOCCs for which goods/services/projects have been delivered/rendered/completed regardless of the year when these obligations were incurred?
Accounts Payables
90
Which of the following process determines the bidder with the Lowest Calculated Bid (LCB) or Highest Rated Bid (HRB)?
Bid Evaluation
91
Which of the following corresponds to the documents prepared by the Bids and Awards Committee (BAC) after all bids have been received, opened, examined, evaluated and ranked?
Bid Evaluation Report
92
The following are the requirements prior to commencement of procurement, EXCEPT:
Abstract of Bids
93
Which of the following procurement activities is done to assess the readiness of the procurement in terms of confirming the certification of availability of funds, as well as reviewing all relevant documents of the project?
Pre-Procurement Conference
94
What is the latest Department Order for the Implementation of Document Tracking System (DoTS) for Civil Works?
Departrnent Order No. 11, series of 2021
95
Which of the following department issuances provides the acquisition process of Right-of-Way (ROW)?
Department Order No. 152, series of 2017
96
In accordance with Department Order No. 11, series of 2021, the following documents are needed to prove ownership, EXCEPT:
Land Rights
97
Which of the following department issuances policy which prescribes the Standard Forms used for Varigtion Orders?
Department Order No. 46, series of 2022
98
It is a method of procurement of goods from the previous winning bidder, whenever there is a need to replenish goods provided that the goods were procured under a contract previously awarded through competitive bidding.
Repeat Order
99
The cumulative amount of positive or additive Variation Order shall not exceed ten percent (10%) of which quantity?
Original Contract Price
100
Based on the Standard Form for Variation Order, who shall prepare the proposed Variation Order?
DPWH Project Engineer