3 Promotional Exam
問題一覧
1
90 Séries of 2020
2
True
3
Project and Contract Management Application
4
Project Engineer
5
Civil Works Monitoring
6
Project Inspector
7
Multi-Year Planning and Scheduling Applcatlon
8
Interchanges
9
Road Widening
10
Change in Carriageway Width
11
Estimated Direct Cost
12
Gravel/Earth Road
13
Chainage
14
Department Order No, 124, serles of 2016
15
Multi-Criterla Analysis
16
Project Description (PD)
17
Intersection design
18
Assist the Regional Office in the conduct of automated classİfied traffic counts.
19
Calamity Damage Assessment Report
20
18
21
DO 229, series of 2022
22
Off-Carriageway Improvement
23
The Convergence Program between DPWH and DOTis the "TIKAS"
24
Retrofitting/Strengthening of Permanent Bridges
25
2 million pesos
26
Local Government Units (LGUs)
27
Roads
28
Nenita R. Jimenez, Chief, Development Planning Division, Planning Service
29
Registry of Information and Foldering (RIF)
30
High Standard Highways and Expressways
31
Digital Level
32
It is different frorm the Engineering Geology and Geohazard Assessment (EGGAR), in a Sense that EGGAR is required for projects which are exempted fróm an Environmental Compliarnce Certificate (ECC), while PGAR is required for projects with a need for an ECC as stipulated in the Department of Environment and Nátural Resources Administrative Örder 2000-28 (DENR-AO 2000-28).
33
Foundation
34
6.0 m
35
Category I Essential Facilities
36
20 years
37
Prior to the start date (NTP) of the project
38
1% of the Estimated Direct Cost of the civil works items
39
Pavement Management System (PMS)
40
100 km to less than 250 km
41
Gender Mainstreaming
42
DPWH DGCS 2015: Volume 3: Water Engineering Projects
43
Incorporate a 10% increased in rainfall intensity
44
D.0. No. 47, Series of 2022, Re: Gưdelines on the Conuct of Feasibilty Studies for Roads, Bridge, Flood Control, Drainage and Other Water-Related Projects
45
Soft Storey
46
LIfe Safety
47
8%
48
Abutment
49
Construction of Field Office for the Engineer
50
Creation of Value Engineering Unlts In the ROs/DEOS
51
It is a process that alms to improve the overall value of a project by optimizing the cost, qualíty and perfornmance.
52
Value Methodology
53
DO 224, s. 2022
54
Feasibility Study
55
Volume-Capacity Ratio
56
Equal or greater than the Social Discount Rate
57
Rapid Assessment Report
58
Social Discount Rate
59
Bureaus
60
Strategic Fit, Technical Complexity, Environmental and Social Impacts
61
Principal and major river basins
62
Scoping
63
Geographic Information System (GIS)
64
Pollution Control Officer (PCO)
65
Public Hearing (PH)
66
Bidge Management System (BMS)
67
The NRTSP is limited project-level anaysis considering locations within metropolitan areas and major urban centers
68
DO 61, Series of 2018
69
Php 30,900,000.00
70
Government Budgeting
71
Appropriation
72
National Expenditure Program
73
Data Change
74
Road Slope Management (RSM)
75
Multi-Year Planning and Scheduling (MYPS)
76
Infratrack App
77
Origin-destination survey
78
Gender and Development
79
Five percent (5%)
80
JICA Strada
81
Gaps and Missing Links along National Roads
82
Core Investment Programs and Projects (CIPs)
83
Regional-National Investment Program (RNIP)
84
Publlc Investment Program Online (PIPOL)
85
Three-Year Rolling Ihfrastructure Proaram (TRIP)
86
Executive Order No. 87
87
Capital Outlays
88
December 31, 2023
89
Accounts Payables
90
Bid Evaluation
91
Bid Evaluation Report
92
Abstract of Bids
93
Pre-Procurement Conference
94
Departrnent Order No. 11, series of 2021
95
Department Order No. 152, series of 2017
96
Land Rights
97
Department Order No. 46, series of 2022
98
Repeat Order
99
Original Contract Price
100
DPWH Project Engineer
PE/PI/ME Exam
PE/PI/ME Exam
denis cagomoc · 106問 · 2年前PE/PI/ME Exam
PE/PI/ME Exam
106問 • 2年前Latest Promotional Exam
Latest Promotional Exam
denis cagomoc · 109問 · 2年前Latest Promotional Exam
Latest Promotional Exam
109問 • 2年前2 Latest Promotional Exam
2 Latest Promotional Exam
denis cagomoc · 100問 · 2年前2 Latest Promotional Exam
2 Latest Promotional Exam
100問 • 2年前Department Orders
Department Orders
denis cagomoc · 34問 · 2年前Department Orders
Department Orders
34問 • 2年前4 DE promotional Exam
4 DE promotional Exam
denis cagomoc · 86問 · 2年前4 DE promotional Exam
4 DE promotional Exam
86問 • 2年前PE / PI / ME Exam 2
PE / PI / ME Exam 2
denis cagomoc · 101問 · 2年前PE / PI / ME Exam 2
PE / PI / ME Exam 2
101問 • 2年前Marichu
Marichu
denis cagomoc · 126問 · 2年前Marichu
Marichu
126問 • 2年前PE / PI / ME EXAM 3
PE / PI / ME EXAM 3
denis cagomoc · 221問 · 2年前PE / PI / ME EXAM 3
PE / PI / ME EXAM 3
221問 • 2年前Eduarte
Eduarte
denis cagomoc · 53問 · 2年前Eduarte
Eduarte
53問 • 2年前PE/ME Exam 4
PE/ME Exam 4
denis cagomoc · 69問 · 2年前PE/ME Exam 4
PE/ME Exam 4
69問 • 2年前DO 189 s 2022
DO 189 s 2022
denis cagomoc · 35問 · 2年前DO 189 s 2022
DO 189 s 2022
35問 • 2年前PE/ME 5
PE/ME 5
denis cagomoc · 60問 · 2年前PE/ME 5
PE/ME 5
60問 • 2年前New
New
denis cagomoc · 23問 · 1年前New
New
23問 • 1年前Gilbert
Gilbert
denis cagomoc · 20問 · 1年前Gilbert
Gilbert
20問 • 1年前Arra 2
Arra 2
denis cagomoc · 50問 · 1年前Arra 2
Arra 2
50問 • 1年前Arra 3
Arra 3
denis cagomoc · 50問 · 1年前Arra 3
Arra 3
50問 • 1年前Arra 4
Arra 4
denis cagomoc · 67問 · 1年前Arra 4
Arra 4
67問 • 1年前問題一覧
1
90 Séries of 2020
2
True
3
Project and Contract Management Application
4
Project Engineer
5
Civil Works Monitoring
6
Project Inspector
7
Multi-Year Planning and Scheduling Applcatlon
8
Interchanges
9
Road Widening
10
Change in Carriageway Width
11
Estimated Direct Cost
12
Gravel/Earth Road
13
Chainage
14
Department Order No, 124, serles of 2016
15
Multi-Criterla Analysis
16
Project Description (PD)
17
Intersection design
18
Assist the Regional Office in the conduct of automated classİfied traffic counts.
19
Calamity Damage Assessment Report
20
18
21
DO 229, series of 2022
22
Off-Carriageway Improvement
23
The Convergence Program between DPWH and DOTis the "TIKAS"
24
Retrofitting/Strengthening of Permanent Bridges
25
2 million pesos
26
Local Government Units (LGUs)
27
Roads
28
Nenita R. Jimenez, Chief, Development Planning Division, Planning Service
29
Registry of Information and Foldering (RIF)
30
High Standard Highways and Expressways
31
Digital Level
32
It is different frorm the Engineering Geology and Geohazard Assessment (EGGAR), in a Sense that EGGAR is required for projects which are exempted fróm an Environmental Compliarnce Certificate (ECC), while PGAR is required for projects with a need for an ECC as stipulated in the Department of Environment and Nátural Resources Administrative Örder 2000-28 (DENR-AO 2000-28).
33
Foundation
34
6.0 m
35
Category I Essential Facilities
36
20 years
37
Prior to the start date (NTP) of the project
38
1% of the Estimated Direct Cost of the civil works items
39
Pavement Management System (PMS)
40
100 km to less than 250 km
41
Gender Mainstreaming
42
DPWH DGCS 2015: Volume 3: Water Engineering Projects
43
Incorporate a 10% increased in rainfall intensity
44
D.0. No. 47, Series of 2022, Re: Gưdelines on the Conuct of Feasibilty Studies for Roads, Bridge, Flood Control, Drainage and Other Water-Related Projects
45
Soft Storey
46
LIfe Safety
47
8%
48
Abutment
49
Construction of Field Office for the Engineer
50
Creation of Value Engineering Unlts In the ROs/DEOS
51
It is a process that alms to improve the overall value of a project by optimizing the cost, qualíty and perfornmance.
52
Value Methodology
53
DO 224, s. 2022
54
Feasibility Study
55
Volume-Capacity Ratio
56
Equal or greater than the Social Discount Rate
57
Rapid Assessment Report
58
Social Discount Rate
59
Bureaus
60
Strategic Fit, Technical Complexity, Environmental and Social Impacts
61
Principal and major river basins
62
Scoping
63
Geographic Information System (GIS)
64
Pollution Control Officer (PCO)
65
Public Hearing (PH)
66
Bidge Management System (BMS)
67
The NRTSP is limited project-level anaysis considering locations within metropolitan areas and major urban centers
68
DO 61, Series of 2018
69
Php 30,900,000.00
70
Government Budgeting
71
Appropriation
72
National Expenditure Program
73
Data Change
74
Road Slope Management (RSM)
75
Multi-Year Planning and Scheduling (MYPS)
76
Infratrack App
77
Origin-destination survey
78
Gender and Development
79
Five percent (5%)
80
JICA Strada
81
Gaps and Missing Links along National Roads
82
Core Investment Programs and Projects (CIPs)
83
Regional-National Investment Program (RNIP)
84
Publlc Investment Program Online (PIPOL)
85
Three-Year Rolling Ihfrastructure Proaram (TRIP)
86
Executive Order No. 87
87
Capital Outlays
88
December 31, 2023
89
Accounts Payables
90
Bid Evaluation
91
Bid Evaluation Report
92
Abstract of Bids
93
Pre-Procurement Conference
94
Departrnent Order No. 11, series of 2021
95
Department Order No. 152, series of 2017
96
Land Rights
97
Department Order No. 46, series of 2022
98
Repeat Order
99
Original Contract Price
100
DPWH Project Engineer