問題一覧
1
712. Vegetation control along highways should be undertaken from the outer edge of the shoulder to:
Road-right-of-waylimit
2
711. What do you call the portion of earth or base course materials left unleveled by a road grader during longitudinal grading operation?
windrow
3
709. The water from the pavement surface is removed by providing which of the following to the pavement?
camber or cross slope
4
708. The maximum spacing of manholeş for circular conduits should be:
50 m
5
707. For drainage mains and outfalls, the discharge should be computed by the use of:
Rational Formula
6
706. A given reinforced concrete girder may be subject at one time to positive span moments and at another to negative span moments. To withstand both types of moments, the girder must be designed such that tensile steel must be furnished at:
both the top and bottom
7
705. In general, the minimum concrete cover for primary reinforcement of concrete not exposed to weather or in contact with the ground should be:
38 mm
8
704. Gradients are categorized into four as listed below. Which of the following is also known as design gradient?
ruling gradient
9
703. What does scoured depth refer to?
Total depth of water from surface to a scoured bed level
10
702. Rivers, esteros and navigating canals, not subject to overbank flows should have a minimum easement measured from the edge of the existing bank or the improved bank of:
5.5 m
11
701. The contract time may be suspended once the project reaches an accomplishment of:
95 %
12
699. Adjustment of contract price of a project may be authorized if:
the cost of labor, equipment, materials and supplies increased, due to acts of the government
13
697. Select one not covered by conditions where an extra work order may be issued:
Where the additional works necessary for the completion of the project is beyond the limits and the general scope of the project
14
696. A change order may be issued when:
The aggregate cost is limited to 25% of original contract cost
15
695. Which does not fall, under the condition when a change order can be issued?
There are additional works which were not included as items of work in the original contract
16
694. An Extra Work Order may be issued if:
There are additional works necessary but were not included as items of works in the original contract
17
693. If a project is abandoned by the contractor due to peace and order problems, what recommendation should immediately be submítted?
Termination of Contract
18
692. In embankment works involving a 300-meter hauling distance, what is the most efficient equipment mix?
One bulldozer, one payloader, one grader, one compactor and three dump trucks
19
690. Concerning delayed project implementation, which of the following is not the fault of the contractor?
delayed preparation of contract documents
20
689. During the test run, a mini dam was observed to have a high probability of overtopping due to increase in river discharge capacity brought about by massive deforestation. Which of the following is the most logical recommendation?
redesign/reconstruction of the spillway structure
21
688. In terms of percentage, how much higher in strength is a well-consolidated concrete compared to a concrete not thoroughly consolidated?
15 to 20 percent
22
687. In a PERT/CPM diagram, the contract time duration of the project is represented by:
Critical Path
23
684. In case of emergency, e.g. earthquake, typhoons, or volcanic eruption, what report should a Project Engineer submit?
Exception Report
24
683. Lumber is considered well-seasoned when its moisture content is between:
12 to 18%
25
682. Which Index of Retained Strength (|RS) is not preferable for bituminous mixture in accordance with the Immersion-Compression Stability Test?
50 %
26
681. In order to attain the minimum percentage design strength of concrete for concrete walls, the minimum time before forms and supports are removed should be:
1 day
27
680. In order to attain the minimum percentage design strength of concrete for floor slabs, the minimum time before forms and supports are removed should be:
14 days
28
678. If permitted by the Engineer, additional water may be added to the batch concrete materials in truck mixers for portland cement concrete pavements. Additional mixing may be performed to increase the slump to meet the specified requirement provided that the water-cement ratio is not exceeded and that the said operations are performed within minutes after the initial mixing operation.
45
29
677. When a completed asphalt pavement exhibits too much voids, it is usually caused by the following with the exception of:
rolling the mixture below the temperature requirements
30
676. The primary quality control mechanism for the production of asphalt mixtures which will have a high degree of uniformity that will satisfy job requirements is called:
Job-Mix formula
31
674. Verification of in-placed Items 200 and 201 materials were conducted thru test pitting, As Project Inspector, what would you do to best determine whether ltem 201 was incorporated in the project?
Determine the maximum size of aggregates in-place
32
672. How many set/s of in-situ density tests is required in a 1500 square meter compacted aggregate subbase course?
3
33
670. A series of almost paralel cracks running longitudinally along bituminous pavement surfaces is caused by:
All of the above
34
669. The flow curve obtained when the liquid test results are plotted on a semi-log scale is in the form of a/an:
Straight line
35
668. A proposed flood control project has a mini-hydro electric power component. However, the area is already being serviced by the National Power Corporation. Which of the following will be the best action to take?
delete the mini-hydro power component
36
667. What kind of cut-off channel is being constructed to carry 10% of a river discharge, and which subsequently develops capacity of up to 40%?
Pilot channel
37
665. You are to recommend measures to minimize inundation on the landside of an overflowing river. Which of the following is not acceptable?
Introduce dredging works
38
664. Which of the following is not a measure against mudflow?
Cut-off channels
39
662. Resurfacing of unpaved shoulder that has settled or been eroded by traffic and water is an activity under:
periodic maintenance
40
660. What do you call the collapse of earth and side slope due to slope failure and natural calamity like earthquake?
Landslide
41
659. What is the difference between the Net Volume Suitable Materials Embankment and Net Volume of Suitable Materials from Excavation?
Surplus materials
42
658. What will you do if there is evidence of discrepancies on the actual elevation from those shown in the Plans?
Conduct Pre-construction Survey
43
653. Every building will be designed for lateral seismic forces. As a minimum, the design base shear (V=ZICW/Rw) will be applied to the structure as a whole and be distributed to the various levels of the structure. The factor Z (seismicity of the site) as used in the Philippines is:
0.4 for Zone 4
44
652. Per bridge design procedures, the design method to be used for columns should preferably be:
c. Load factor (ultimate strength) design
45
651. The general principles of design of bridges depend on many factors. These may be broadly unified under the following with the exception of:
Bank protection
46
650. For a bridge project, spacing of borings should be made at a minimum of:
Two deep borings per abutment and an additional one per pier
47
648. A set of revised drawings shows a grade separation structure at railroad crossing with cross sections of the railroad taken at 20 m interval and extended at least 5Om from both sides of the centerline. Does the 50m extension conform with survey/design requirements?
No, it should be 100 m both sides
48
647. What do you call the method of determining stream discharge by measuring the cross-sectional area of the stream and its velocity with a current meter?
Velocity-Area Method
49
646. In order to attain the minimum percentage design strength of concrete for sides of concrete beams and girders, the minimum time before forms and supports are removed should be:
1 day
50
643. Per program of work, the estimated volume of ltem 201 materials is 7,500 cu.m. How many Grading and Plasticity tests are required based on the DPWH minimum testing requirement?
5 or 25
51
640. Settlement of right-of-way problems should be done
before the construction work
52
639. The following are basic documents needed as reference in an assessment of a project with the exception of:
Certificate of Availability of Funds
53
637. How much percentage is withheld on the general items until the final acceptance of the project?
30%
54
632. Who prepares daily reports on work accomplishment for review of the resident engineer?
Project Inspector
55
590. The system of protecting land area from ocean waves is called:
coastal protection works
56
589. Which of the following is a bank protection structure?
retaining wall
57
588. What do you call the structure, typically less than 5.0 m., that is built across or spanning a river or waterway?
culvert (pipe or box)
58
587. Which of the following is not a function of a groin?
it stabilizes the mountain grade
59
586. Which of the following is not a flood prevention/mitigation measure?
reclamation
60
585. What is the method of measurement for determining the depth of a river channel?
sounding