PE/ME 5
問題一覧
1
Road-right-of-waylimit
2
windrow
3
camber or cross slope
4
50 m
5
Rational Formula
6
both the top and bottom
7
38 mm
8
ruling gradient
9
Total depth of water from surface to a scoured bed level
10
5.5 m
11
95 %
12
the cost of labor, equipment, materials and supplies increased, due to acts of the government
13
Where the additional works necessary for the completion of the project is beyond the limits and the general scope of the project
14
The aggregate cost is limited to 25% of original contract cost
15
There are additional works which were not included as items of work in the original contract
16
There are additional works necessary but were not included as items of works in the original contract
17
Termination of Contract
18
One bulldozer, one payloader, one grader, one compactor and three dump trucks
19
delayed preparation of contract documents
20
redesign/reconstruction of the spillway structure
21
15 to 20 percent
22
Critical Path
23
Exception Report
24
12 to 18%
25
50 %
26
1 day
27
14 days
28
45
29
rolling the mixture below the temperature requirements
30
Job-Mix formula
31
Determine the maximum size of aggregates in-place
32
3
33
All of the above
34
Straight line
35
delete the mini-hydro power component
36
Pilot channel
37
Introduce dredging works
38
Cut-off channels
39
periodic maintenance
40
Landslide
41
Surplus materials
42
Conduct Pre-construction Survey
43
0.4 for Zone 4
44
c. Load factor (ultimate strength) design
45
Bank protection
46
Two deep borings per abutment and an additional one per pier
47
No, it should be 100 m both sides
48
Velocity-Area Method
49
1 day
50
5 or 25
51
before the construction work
52
Certificate of Availability of Funds
53
30%
54
Project Inspector
55
coastal protection works
56
retaining wall
57
culvert (pipe or box)
58
it stabilizes the mountain grade
59
reclamation
60
sounding
PE/PI/ME Exam
PE/PI/ME Exam
denis cagomoc · 106問 · 2年前PE/PI/ME Exam
PE/PI/ME Exam
106問 • 2年前Latest Promotional Exam
Latest Promotional Exam
denis cagomoc · 109問 · 2年前Latest Promotional Exam
Latest Promotional Exam
109問 • 2年前2 Latest Promotional Exam
2 Latest Promotional Exam
denis cagomoc · 100問 · 2年前2 Latest Promotional Exam
2 Latest Promotional Exam
100問 • 2年前3 Promotional Exam
3 Promotional Exam
denis cagomoc · 100問 · 2年前3 Promotional Exam
3 Promotional Exam
100問 • 2年前Department Orders
Department Orders
denis cagomoc · 34問 · 2年前Department Orders
Department Orders
34問 • 2年前4 DE promotional Exam
4 DE promotional Exam
denis cagomoc · 86問 · 2年前4 DE promotional Exam
4 DE promotional Exam
86問 • 2年前PE / PI / ME Exam 2
PE / PI / ME Exam 2
denis cagomoc · 101問 · 2年前PE / PI / ME Exam 2
PE / PI / ME Exam 2
101問 • 2年前Marichu
Marichu
denis cagomoc · 126問 · 2年前Marichu
Marichu
126問 • 2年前PE / PI / ME EXAM 3
PE / PI / ME EXAM 3
denis cagomoc · 221問 · 2年前PE / PI / ME EXAM 3
PE / PI / ME EXAM 3
221問 • 2年前Eduarte
Eduarte
denis cagomoc · 53問 · 2年前Eduarte
Eduarte
53問 • 2年前PE/ME Exam 4
PE/ME Exam 4
denis cagomoc · 69問 · 2年前PE/ME Exam 4
PE/ME Exam 4
69問 • 2年前DO 189 s 2022
DO 189 s 2022
denis cagomoc · 35問 · 2年前DO 189 s 2022
DO 189 s 2022
35問 • 2年前New
New
denis cagomoc · 23問 · 1年前New
New
23問 • 1年前Gilbert
Gilbert
denis cagomoc · 20問 · 1年前Gilbert
Gilbert
20問 • 1年前Arra 2
Arra 2
denis cagomoc · 50問 · 1年前Arra 2
Arra 2
50問 • 1年前Arra 3
Arra 3
denis cagomoc · 50問 · 1年前Arra 3
Arra 3
50問 • 1年前Arra 4
Arra 4
denis cagomoc · 67問 · 1年前Arra 4
Arra 4
67問 • 1年前問題一覧
1
Road-right-of-waylimit
2
windrow
3
camber or cross slope
4
50 m
5
Rational Formula
6
both the top and bottom
7
38 mm
8
ruling gradient
9
Total depth of water from surface to a scoured bed level
10
5.5 m
11
95 %
12
the cost of labor, equipment, materials and supplies increased, due to acts of the government
13
Where the additional works necessary for the completion of the project is beyond the limits and the general scope of the project
14
The aggregate cost is limited to 25% of original contract cost
15
There are additional works which were not included as items of work in the original contract
16
There are additional works necessary but were not included as items of works in the original contract
17
Termination of Contract
18
One bulldozer, one payloader, one grader, one compactor and three dump trucks
19
delayed preparation of contract documents
20
redesign/reconstruction of the spillway structure
21
15 to 20 percent
22
Critical Path
23
Exception Report
24
12 to 18%
25
50 %
26
1 day
27
14 days
28
45
29
rolling the mixture below the temperature requirements
30
Job-Mix formula
31
Determine the maximum size of aggregates in-place
32
3
33
All of the above
34
Straight line
35
delete the mini-hydro power component
36
Pilot channel
37
Introduce dredging works
38
Cut-off channels
39
periodic maintenance
40
Landslide
41
Surplus materials
42
Conduct Pre-construction Survey
43
0.4 for Zone 4
44
c. Load factor (ultimate strength) design
45
Bank protection
46
Two deep borings per abutment and an additional one per pier
47
No, it should be 100 m both sides
48
Velocity-Area Method
49
1 day
50
5 or 25
51
before the construction work
52
Certificate of Availability of Funds
53
30%
54
Project Inspector
55
coastal protection works
56
retaining wall
57
culvert (pipe or box)
58
it stabilizes the mountain grade
59
reclamation
60
sounding