  • 1

    1068. For testing reinforcing steel bars, the sample for every 10 tons should be:

    1.0 meter

  • 2

    1067. In the Memorandum Circular No. 38 dated 12 November 1981,. a certificate of Quality Control Assurance ( COCA ) should be accomplished.

    Weekiy

  • 3

    1066. The moisture density relation test determines the.

    Maximum dry density

  • 4

    1065. Which of the following items is not a structured of dam?

    Distribution canal

  • 5

    1064. When concrete piles are lifted or moved, they should be supported at what point?

    Quarter point

  • 6

    1063. Which of the following is not considered as slope protection work?

    Cofferdams

  • 7

    1057. What is the usual measure undertaken to stop a river for charging its path?

    River training works

  • 8

    1056. What is the technical term for a bridge abutment that sits high up on the river bank?

    Wing wall

  • 9

    1055. Which of the following is not included in the exploration of foundation strata?

    Nuclear Density Test

  • 10

    1054. What is the technical term for the slight convexity required in the construction of bridges and is provide to compensate for dead load deflection?

    Camber

  • 11

    1053. Immediately after removal of forms on concrete pavement the side are saturated with water then rubbed and finished with mortar primarily to:

    Fill all voids and eliminate honeycombs

  • 12

    1052. What do you call the process of cutting the branches around a tree on the roadside to make then denser and grow straight?

    Pruning

  • 13

    1051.To attain a uniform consistency of concrete during the pouring operation of a concrete pavement, the slump should not be more than

    40mm

  • 14

    1050. Concrete should be kept continuously wet by the application of water for a minimum period after it has been placed?

    7 Days

  • 15

    1048. The minimum distance of extended compaction of road embankment material from the edge of the designed width should be?

    1m

  • 16

    1047. Testing conducted for CHB, except

    Air content

  • 17

    1043. Responsible for logbooks, S -Curves'

    Project Engineer

  • 18

    1042. If the surface is sloping, where should the asphalt application start?

    Low

  • 19

    1040. Preventive maintenance works shall include all following activities, except:

    slope protection works

  • 20

    1039. The maintenance work for a newly completely concrete road project shall commence on the:

    date of project acceptance

  • 21

    1034. In dredging works, what is the preferred side slope (vertical to horizontal ) between original bottom and the indicated dredging level of a clay materials.

    1 to 4

  • 22

    1033. Termination area is the area where traffic resumes normal operations after the worksite. The following are the signs that would be located in this area, as applicable, except:

    Prepare to stop (T1-18 )

  • 23

    1032. The _______________ lateral safety buffer beside the work area that increase protection and safety for workers

    Adjacent Clearance Area

  • 24

    1031. The Approach Clearance Area is a longitudinal safety buffer immediately in advance of the work area that increases the protection and safety for workers. Generally, this clearance area should have distance of:

    20-30 meters

  • 25

    1000. Concrete shall be applied within____________of adding cement to the mixtures.

    45 minutes

  • 26

    999. In Item 311, the diving line between coarse and fine aggregates is__________mm sieve.

    4.75 mm sieve

  • 27

    998. The sand use in field density test in determining the hole using sand cone method must be clean, dry and passing sieve number:

    10

  • 28

    997. In conducting Slump Test, how many stroke per layer?

    25

  • 29

    995. It is used as to check the pavement surface at sites selected by the Engineer.

    3-m Straight Edge

  • 30

    994. In Item 310, after final rolling, the degree of compaction should be checked. The compacted pavement shall have a density equal to, or greater than________of the laboratory composed density.

    97

  • 31

    993. Is the most commonly used method in the design and evaluation of bituminous mixture.

    Marshall Stability Method

  • 32

    992. In Item 310, the minimum dry compressive strength of mixture is ?

    200 psi

  • 33

    991. In Item 310, the minimum IRS of mixture is ?

    70

  • 34

    990. It is the arrangement of construction work activities required by construction logic and sequence.

    Construction Schedule

  • 35

    989. Advantage of having Construction Schedule, except?

    Basis of Payment

  • 36

    988. Tool also used to plan the timing of projects involving sequential activities but unlike PERT/CPM, it can depict more than one interdependencies of each activity providing lag times and lead times in betvween them.

    PDM Network Diagram

  • 37

    987. It is predicted/projected/correlated from cumulative monthly target accomplishment in percent along the duration of the project.

    Cash Flow

  • 38

    985. It is established by jointing the cumulative monthly accomplishment derived from the Bar Chart.

    S-Curve

  • 39

    984.Use time lines and other symbols to illustrate scheduled completion of aproject.、

    Bar Chart

  • 40

    983. This will show work activities in accomplishing a project or a project component.

    Pert/CPM and PDM Network

  • 41

    982. Also known as the shortest time possible to complete the project.

    Critical Path

  • 42

    981. How much is the maximum Advance Payment?

    15%

  • 43

    980. Progress payments are subjected to retention of_______referred to as"retention money".

    10%

  • 44

    979. It is a kind of bridge was adopted as standard Military Bridge in 1941?

    Bailey Bridge

  • 45

    978. What are true about Construction Joint/Cold Joint, except?

    Use dowel bars (Deformed Bars)

  • 46

    977.What are true about Contraction Joint/Weakened Plane Joint, except?

    Relieve Compression Stresses

  • 47

    976. In PCCP tie bar use in longitudinal joint is__________.

    Deformed Bar

  • 48

    975. The services of a certified first-aider when total number of workers is________or less.

    50

  • 49

    974. As work progresses, at least one(1) set consisting of three(3) concrete beam test specimens, or fraction thereof placed each day. 150mm. x 150mm. x 525mm. Shall be taken every________.

    75 cu.m

  • 50

    972. For a construction of 50 workers, how many part-time/full-time safety man?

    1 Part-time safety man

  • 51

    971. Is a method of making a part of a structure impervious to water to protect the structure's integrity.

    Waterproofing

  • 52

    970. In CHB Filing, Lintel Beam to be provided at every

    3 m

  • 53

    969. Is best described as the deployment of resources at the project site. This also involves any work that is necessary to provide access to the site including, but not limited to grading, clearing and grubbing.

    Mobilization

  • 54

    968. Time allocation for Mobilization and Demobilization for 100 M to 150M estimated direct cost of project.

    30 C.D

  • 55

    967. For DPWH projects Mobilization and Demobilization shall not exceed of the Estimated Direct Cost (EDC) of civil works items (as per D.0. 197, S. of 2016) with time duration as prescribed in D.0. 44, Series of 2012.

    1%

  • 56

    966. Time allocation for Mobilization and Demobilization for up to 5M estimated direct cost of project.

    10 C.D

  • 57

    965. What is the advisable maximum drop height of concrete?

    1.5 m

  • 58

    964. A type of pier used to avoid skewed piers or where there are space limitations as in highway.

    Single Column or T- Belt

  • 59

    963. The set of logic requirements which are intended to assure public safety?

    National Building Code

  • 60

    962. What are the types of pier, except?

    Spread Column

  • 61

    961. Tiles shall have been laid in place for at least

    24 hrs.

  • 62

    960. Serves to estimate the annual work quantities, resource requirements and standard costs needed to meet Department's objectives for roadway maintenance.

    Planning

  • 63

    959.______________prior to production, the contractor shall submit in writing a "job-mix formula".

    3 weeks

  • 64

    958. The precast curb and gutter shall be________ in length and shall be put side by side consecutively with joint in between.

    1.0 m

  • 65

    957. Posts shall be set vertically and where embedded in a concrete foundation block, shall remain undisturbed for a minimum of

    48 hrs.

  • 66

    956. Traffic paint shall be applied to the pavement at the rate of_________per square meter.

    0.33 liter

  • 67

    955. The length of the weep-hole shall not be less than the thickness of the walls of the grouted riprap structure and shall be at least__________diameter PVC.

    50 mm

  • 68

    954. In Item 500, Mortar proportion for collaring is______with enough water to obtain the desired consistency. The collar shall form a continuous bead around the outside of the pipe and finished smooth on the inside (flushed).

    1:2

  • 69

    923. Under the Accessibility Code, what is the maximum height of handrail?

    0.90 m

  • 70

    953. Effective July 1, 2013, the use of slip-form paver with built-in or separate mechanical surface texture finisher (broom finisher) shall b required for projects whose cost of Item 311-Portland Cement Concrete Pavement is

    50 M and Above

  • 71

    922. A circle of_________in diameter is a suitable guide in the planning of wheelchair turning spaces?

    1.50 m

  • 72

    952. During the progress of rolling, a minimum overlapped width of Shall be observed for each succeeding parallel pass to ensure level compacted surface.

    300 mm

  • 73

    951. In Clearing and Grubbing, Clearing shall extend beyond the toe of the fill slopes or beyond rounding of cut slopes for the entire length and provided it is within the right of way limits of the project.

    1.0 m

  • 74

    921. Minimum bedroom door opening?

    0.80 m

  • 75

    950. In Removal of Structures and Obstructions - Pavement, Sidewalks, Curbs, etc. Shall be broken into pieces, the size of which shall not exceed_______in any dimension.

    300 mm

  • 76

    920. Minimum entrance door opening?

    0.80 m

  • 77

    949. Trees that are selected for presevation must be protected, while trees that are needed to be cut/ball shall be identified by the

    Project Engineer

  • 78

    919. For parking areas of PWD, a walkway between the front ends of parked cars shall have a minimum clear width of

    1.20 m

  • 79

    918. What is the minimum width for parking slots of PWD?

    3.70 m

  • 80

    948. It diverts traffic from any existing roadway whenever the construction operations block the flow

    Detour Road

  • 81

    917. Distance of parking for the disabled from building entrance?

    60 m

  • 82

    947. It is a road by which a job is connected to the highway system and is generally used in connection with borrow pits.

    Access Road

  • 83

    916. Under BP 344, walks should have_________turn/groove in order to guide the blind?

    90 m

  • 84

    946. Plans that govern an infrastructure project, except?

    Revised Plans

  • 85

    915. What is the minimum Doorway width under BP 344?

    0.80 m

  • 86

    945. Determines the actual position of the road structure based on the plans.

    As-Stake Survey

  • 87

    944. Discussion on specifications, unusual conditions, contractor's plans and schedule of operation and other pertinent items to be better familiarized with the project.

    Pre-Construction Conference

  • 88

    914. What is the minimum size of Elevator Doors for the handicapped?

    0.80 m

  • 89

    943. It is constructed along the side of the roadway to stabilize the slopes either above or below the elevation of the roadway.

    Slope Protection Structures

  • 90

    913. Minimum door opening for elevators for a single door?

    0.80 m

  • 91

    912. What is the minimum size of an elevator shaft?

    1.50 mx 1.80 m

  • 92

    942. Simplest form of road?

    Earth and Gravel Road

  • 93

    911. What is the minimum size of an elevator car?

    1.10 mx1.40 m

  • 94

    941. Refer to roads linking the agriculture and fisheries production sites, coastal landing points and post-harvest facilities to the market and arterial roads and highways.

    Farm to Market Road

  • 95

    910. What is the minimum dimension of an elevator door width?

    0.80 m

  • 96

    940. What is the minimum RROW and Width of travel way (2 Lane) in Municipality/Clty Road?

    15 m & 6.10 m

  • 97

    909. What is the maximum distance of the building main entrance to the elevator?

    30 m

  • 98

    939. What is the minimum RROW and Width of travel way (2 Lane) in Provincial Road?

    15 m & 6.10 m

  • 99

    908. What is the minimum width for a hallway?

    1.20 m

  • 100

    938. What is the minimum RROW and Width of travel way (2 Lane) in National Highway?

    20 m & 6.70 m