PE / PI / ME Exam 2
問題一覧
1
preventive maintenance
2
300mm greater than the diameter of the pipe
3
bottom of slope
4
1.5m below the proposed subgrade
5
3.00 m/ Km
6
Laid with its longest axis perpendicular to the slope
7
1.5mm
8
Liquidated damages
9
About 500 sq.m.
10
20
11
Armor the breached section with gabions mattress and spur dike to utilize gap as diversion channel
12
5.34
13
Lag time
14
0.3mm
15
5
16
1.20m
17
Entry
18
1:4
19
10 YRS
20
20X4Ocm
21
50% of total # of bored pile
22
100mm
23
Head Wall
24
Critical path
25
Axial failure
26
50
27
1 layer
28
1.5m& 1:12
29
2%
30
CBR
31
Parcellary survey
32
Termination of default
33
10
34
1.5 m
35
30 minutes
36
4/24
37
Ill only
38
Ill only
39
lI ONLY
40
24
41
28 mpa
42
Check the actual bearing capacity
43
base preparation
44
After 20% of contract works, excluding the provisional sum is completed
45
Pouring permit
46
Approved "as stated plans"
47
50mm
48
15 to 24
49
3
50
60 cm
51
30
52
October 2017
53
6mm
54
Tack coating
55
Prime coating
56
Rice hull
57
25MM
58
Highway drainage
59
20KG
60
CBR
61
Where there is increase in cost in construction material
62
transverse construction joint
63
at least 85% and no single core is less than 75% of fc
64
28 MPA 4000 Lbs/sa.in.
65
5
66
150MM
67
15 YRS
68
Once a month
69
300MM
70
Approved quality control program
71
flat slab
72
300mm
73
Spur dike
74
2%
75
1000 In.m
76
3 layer
77
1 layer
78
150mm
79
20.7 MPA
80
80% completed
81
after the inter-bureau committee has conducted inspection
82
Shop drawing
83
Inflation
84
Catch ーup schedule
85
102
86
Transition area
87
Concise
88
Remove tree
89
All through traffic eliminated
90
expressway
91
Merge Taper
92
Advance Warning, Other Warning Signs, Driver Instruction Signs
93
D. O. 56 series of 2005
94
Construction Safety and Health Program
95
Chemical Resistant Gloves
96
Bureau of Quality and Safety
97
5% to 8%
98
A and B.
99
6%
100
Require additional rolling until the minimum density requirement is attained
PE/PI/ME Exam
PE/PI/ME Exam
denis cagomoc · 106問 · 2年前PE/PI/ME Exam
PE/PI/ME Exam
106問 • 2年前Latest Promotional Exam
Latest Promotional Exam
denis cagomoc · 109問 · 2年前Latest Promotional Exam
Latest Promotional Exam
109問 • 2年前2 Latest Promotional Exam
2 Latest Promotional Exam
denis cagomoc · 100問 · 2年前2 Latest Promotional Exam
2 Latest Promotional Exam
100問 • 2年前3 Promotional Exam
3 Promotional Exam
denis cagomoc · 100問 · 2年前3 Promotional Exam
3 Promotional Exam
100問 • 2年前Department Orders
Department Orders
denis cagomoc · 34問 · 2年前Department Orders
Department Orders
34問 • 2年前4 DE promotional Exam
4 DE promotional Exam
denis cagomoc · 86問 · 2年前4 DE promotional Exam
4 DE promotional Exam
86問 • 2年前Marichu
Marichu
denis cagomoc · 126問 · 2年前Marichu
Marichu
126問 • 2年前PE / PI / ME EXAM 3
PE / PI / ME EXAM 3
denis cagomoc · 221問 · 2年前PE / PI / ME EXAM 3
PE / PI / ME EXAM 3
221問 • 2年前Eduarte
Eduarte
denis cagomoc · 53問 · 2年前Eduarte
Eduarte
53問 • 2年前PE/ME Exam 4
PE/ME Exam 4
denis cagomoc · 69問 · 2年前PE/ME Exam 4
PE/ME Exam 4
69問 • 2年前DO 189 s 2022
DO 189 s 2022
denis cagomoc · 35問 · 2年前DO 189 s 2022
DO 189 s 2022
35問 • 2年前PE/ME 5
PE/ME 5
denis cagomoc · 60問 · 2年前PE/ME 5
PE/ME 5
60問 • 2年前New
New
denis cagomoc · 23問 · 1年前New
New
23問 • 1年前Gilbert
Gilbert
denis cagomoc · 20問 · 1年前Gilbert
Gilbert
20問 • 1年前Arra 2
Arra 2
denis cagomoc · 50問 · 1年前Arra 2
Arra 2
50問 • 1年前Arra 3
Arra 3
denis cagomoc · 50問 · 1年前Arra 3
Arra 3
50問 • 1年前Arra 4
Arra 4
denis cagomoc · 67問 · 1年前Arra 4
Arra 4
67問 • 1年前問題一覧
1
preventive maintenance
2
300mm greater than the diameter of the pipe
3
bottom of slope
4
1.5m below the proposed subgrade
5
3.00 m/ Km
6
Laid with its longest axis perpendicular to the slope
7
1.5mm
8
Liquidated damages
9
About 500 sq.m.
10
20
11
Armor the breached section with gabions mattress and spur dike to utilize gap as diversion channel
12
5.34
13
Lag time
14
0.3mm
15
5
16
1.20m
17
Entry
18
1:4
19
10 YRS
20
20X4Ocm
21
50% of total # of bored pile
22
100mm
23
Head Wall
24
Critical path
25
Axial failure
26
50
27
1 layer
28
1.5m& 1:12
29
2%
30
CBR
31
Parcellary survey
32
Termination of default
33
10
34
1.5 m
35
30 minutes
36
4/24
37
Ill only
38
Ill only
39
lI ONLY
40
24
41
28 mpa
42
Check the actual bearing capacity
43
base preparation
44
After 20% of contract works, excluding the provisional sum is completed
45
Pouring permit
46
Approved "as stated plans"
47
50mm
48
15 to 24
49
3
50
60 cm
51
30
52
October 2017
53
6mm
54
Tack coating
55
Prime coating
56
Rice hull
57
25MM
58
Highway drainage
59
20KG
60
CBR
61
Where there is increase in cost in construction material
62
transverse construction joint
63
at least 85% and no single core is less than 75% of fc
64
28 MPA 4000 Lbs/sa.in.
65
5
66
150MM
67
15 YRS
68
Once a month
69
300MM
70
Approved quality control program
71
flat slab
72
300mm
73
Spur dike
74
2%
75
1000 In.m
76
3 layer
77
1 layer
78
150mm
79
20.7 MPA
80
80% completed
81
after the inter-bureau committee has conducted inspection
82
Shop drawing
83
Inflation
84
Catch ーup schedule
85
102
86
Transition area
87
Concise
88
Remove tree
89
All through traffic eliminated
90
expressway
91
Merge Taper
92
Advance Warning, Other Warning Signs, Driver Instruction Signs
93
D. O. 56 series of 2005
94
Construction Safety and Health Program
95
Chemical Resistant Gloves
96
Bureau of Quality and Safety
97
5% to 8%
98
A and B.
99
6%
100
Require additional rolling until the minimum density requirement is attained