    As per existing Department Order regarding MPP walk-the-line inspection, how many times per year shall inspector/validation be done by the Bureau of Maintenance other than NCR.

    2 times

  • 2

    The following are the types of monitoring of the condition of the flood control structures, except?

    Monitoring during Disaster

  • 3

    This refers to the level of status/condition of the flood control structure, wherein the damage is serious, and huge flood damages to human lives and properties have occurred or are expected to occur in the next flood event.

    Urgency A

  • 4

    Responsible for preparing and keeping the inventory of Flood Control and Drainage Structures under each DEOs.

    Maintenance Section

  • 5

    The DEOs prepares and submits inventory of Flood Control and Drainage Structures to the Bureau of Maintenance every year, by the end of what month?

    June

  • 6

    It is a mode or system of Budget Allocation, designed to address the road maintenance requirements.

    Equivalent Maintenance Kilometrage

  • 7

    What is code 01?

    Pathole

  • 8

    Material that is being put on a square cut hole on the pavement before the application of Asphalt Mix?

    Tack Coat

  • 9

    How many response time is allotted for the repair of Code 05 (Pumping and Depression)?

    30 days

  • 10

    Major Scaling is the deterioration of the upper concrete slab surface of more than______mm affecting the whole slab.

    10mm

  • 11

    As per Do41, s2016, what is the weighted grade/percentage for code 09 Clogged Drains?

    5%

  • 12

    Which bureau maintains the pool of Project Engineers and Project Inspectors included in PCMA?

    Bureau of Quality and Safety

  • 13

    Which work control category has the second highest priority in PHMMS?

    Limited

  • 14

    What does 'P' stand for in AMWP?

    Program

  • 15

    It is a distinct part of the roadway system that requires one or more activities to be performed on it.

    Maintenance Feature

  • 16

    Which of the following has the highest EMK Factor?

    Temporary Bridges (Bailey and Timber)

  • 17

    What type of maintenance corresponds to Work Category No. 12?

    Bridge and Structure Máintenance

  • 18

    It is a numerical input to either a work program or performance budget.

    Planning Value

  • 19

    The D.0. 125, Series of 2015 sets the limitation of the total payment for progress billing of all locally funded projects to 95% and 90% of their respective total contract cost. The remaining balance/uńcollected of the progress billing, except the retention money will be paid to the contractor upon issuance of the Certificate of Acceptance for the project by the Head of the Implementing Office.

    False

  • 20

    Payment for first progress billing can be granted to the contractor even if partial as-staked plan is submitted.

    True with certain conditions

  • 21

    After the Head of Implementing Office approves the Contract Termination, the _______________ shall be forwarded to the contractor.

    Notice of Decision toTerminate Contract

  • 22

    If through no faut of the contractor, Road right of way problem is a ground for termination by contractor:

    True

  • 23

    The Notice to Termirate Contract shall always be accompanied by the Verified Report of the Inspectorate Team or the Implementing Unit.

    True

  • 24

    Upon reaching 15% negative slippage, the Project Engineer shall immediately issue the Noticé to Terminate Contract even without the Verified Report.

    False

  • 25

    After the effectivity of contract termination for default, the Head of the Agency shall issue the Blacklisting Order of the contractor within_______calendar days.

    7

  • 26

    Which of the following statement is correct?

    The retention money shall be due for release upon substitution with irrevocable standby letters of credit from a commercial bank, bank guarantees or surety bonds callable on demand, of amounts equivalent to the retention money substituted

  • 27

    Choose the correct statement among the choices below.

    The advance payment shall be made only upon the submission to and acceptance by the procuring entity of the performance security.

  • 28

    Official receipt and approved voucher of the previous payment, if not yet submitted to the accounting Division or copy of duly received OR by the Accounting Division is required in thé Release of Retention.

    True

  • 29

    Considering the discussion from presentation for the computation of the Construction Durations as stipulated in Department Orders No. 141, Series of 2014, and No. 44, Series of 2012, and No. 71, Series of 2013, how many year(s) should the Pre-determined Unworkable Day for Rainy Days be based on?

    Three (3) years historical rainfall records

  • 30

    Based on the table below, compute for the total Project Duration of the project amounting to Php 14,700,000.00, for Paved (Concrete) to Paved (Concrete)

    137 working days

  • 31

    It is the budget for the contract duly approved by the Head of the Procuring Entity, as provided for in the General Appropriations Act (GAA), continuing, and automatic appropriations, in the case of national government agencies (NGAs).

    Approved Budget for the Contract

  • 32

    For mobilization/demobilization exceeding allotted % as per DO 197, series of 2016, approval shalł be secured from the concerned____________.

    Undersecretary for Operations

  • 33

    It is a type of Control Curve where the slope starts out Steep and hen fatens out towards the end.

    Front-Loaded

  • 34

    It is the stage where the contraçtor shall be issued a final warning and required to come-up with a more detailed program of activities with weekty physical targets, together with the required additional input resources.

    ICU Stage

  • 35

    It is the first step in furnishing the Catch-Up schedule.

    Update the construction schedules

  • 36

    __________________is the rough calculation of the value, number, quantity, or extent of something.

    Estimation

  • 37

    _______________is an approximation of the project cost at completion.

    Cost estimate

  • 38

    AS per D.O. No. 197, Series of 2016, the percentages to be utilized for the OCM and Profit Mark-up should be based on_____________?

    Estimated Total Direct Cost

  • 39

    What is the percent weight distributiòn in a Normal S-Curve?

    25-50-25

  • 40

    Who will prepare the complete set of the Construction Schedules prior to the signing of the Contract?

    Contractor

  • 41

    It is the Department Order instructing the adoption of the PDM as the project scheduling technique to be utilized in DPWH infrastructure projects.

    D.O. no. 133, series of 2015

  • 42

    It is the amount of time whereby a successor activity can be advanced with respect to the predecessor activity.

    Lead

  • 43

    This is a tool to assist employees in career and personal development.It helps employees reach short or long-term career goals, as well as improve current job performance.

    Individual Development Plan

  • 44

    This involves consistently observing the achievement of outouts for the purpose of measuring performance, keeping track of and documenting outputs and behaviour and checking progress of committed plans and actions.

    Performance Monitoring and Coaching

  • 45

    An approved IPCR can be modified.

    False

  • 46

    Which of the following is not true.

    The minimum appraisal period is at least sixty (60) calendar days or two (2) months

  • 47

    For the Desigň Measure, if VS is at least 90.00%, how many Implementing Offices achieved the target?

    7

  • 48

    For the Quality Méasure, what percent of the Implementing Offices met the target?

    100

  • 49

    If VS is at least 85.00% in the Maintenance Measure, which offices met all three (3) targets?

    Las Malabon South

  • 50

    This is done at the start of the performance period where supervisors and subordinates agree on Outputs and targets to be accomplished and success indicators.

    Performance Planning and Commitment

  • 51

    The Certificate of Acceptance shall be issued by the Head of the Implementing Office after the one-year defects liability period, after all defects/deficiencies, f any. shall have been repaired by the Contractor to the Satsfaction of the same Inspectorate Team as mentioned above and upon extension of the Performance Securiy up to one year by the Contractor.

    False

  • 52

    Which project ID has the highest accomplishment?

    1210

  • 53

    What implementing office has the highest accomplishyênt rate?

    2504

  • 54

    What is the length that needs to be completed to at least achieve a 90% overall accomplishment?

    10.21

  • 55

    Upon issuance by the DPWH of the NTP the IO chall provide the contractor withn an editable file of the approved original plan of the proiect in order to facilitate the as staked plan.

    True

  • 56

    If the contractor fails to submit the as-staked plan on time for processing, the Contractor shall submit to the IO a request for one (1) time extension of at least fifteen (15) days depending on the project cost.

    False

  • 57

    Submission of "As-Staked" plan is not required if there are no changes in the original plan. The Project Engineer/Manager shall issue a certification to this effect to be approved by the Head of Implementing Office within the prescribed time duration after the issuance of NTP.

    False

  • 58

    The contractor shall take the reasonable precautions to maintain the health and safety of his personnel based on the Construction Safety and Health Program (CSHP) duly concurred bythe DPWH.

    False

  • 59

    Upon issuanceof Notice of Proceed, the approve CSHP is among the list of required documents to be submitted for the perfection of the contract.

    False

  • 60

    When the contractor incurred a negative 10% slippage, the contractor shall be issued a final warning and required to come-up with a more detailed program of activities with weekly physical targets, together with the required additional input resources.

    True

  • 61

    Based on the DPWH issuances, the Inspectorate Team for the issuance of Certificate of Completion and Certificate of Acceptance shall be composed of Chief of Technical Sections/Divisions of the Implementing Office.

    False

  • 62

    The negative slippage, in %, termed as the "Terminal Stage" as stated in Department Order 193 Series of 2016.

    15% or more

  • 63

    The use of Specific knowledge, skils, tools, and techniques to deliver something of value to people.

    Project Management

  • 64

    A Feasibility Study requirement that contains in-depth analysis of long-term sustained effects of the project or intervention to the different aspects of lives in the populace and the impact on people's livelihood.

    Development Impact Study

  • 65

    The negative slippage, in %, termed as the "Early Warning" as stated in Departrment Order 193 Series of 2016.

    5%

  • 66

    The DPWH-QMS manual is under what DO?

    DO 43 s 2019

  • 67

    Risk and Opportunities is underwhat section of the DPWH-QMS Manual?

    Planning

  • 68

    In the preparation and submission of As-Built Plan, what is the required submission date as per Department Order38 series of 2016?

    Within 30 calendar days upon reaching 95% completion of the projects

  • 69

    What is the Project Cost Threshold that requires submission to NEDA for review/evaluation and approval?

    2.5 Billion and above

  • 70

    As per RA 9184, what is the required effective period of warranty security to be posted by the contractor before the issuance of Certificate of Acceptance?

    1 year from the date of issuance of the Certificate of Acceptance

  • 71

    If the Project incurred a negative slippage of 5% and beyond and at contractors fault, which of the following actions appropriate to be applied?

    Calibrated Action

  • 72

    What is the Project Cost threshold that requires the conduct of Pre-Feasibility Study?

    More than 30OM up to 1 billion

  • 73

    The DBM Budget Cycle is made up of 4 main parts; Preparation, Legislation,_________________and Accountability.

    Execution

  • 74

    Processes are the tasks and methodologies that occur within the projects life cycie phases which iincdude the following:

    All of the above

  • 75

    The Process of undertaking activities to minimize further effects of risks and actions to correct/address noted deviations from the targets/plans per monitoring

    Control

  • 76

    Finalizes all project activities completed across all phases of the project to formally conclude the project

    Close-out

  • 77

    What is the Project Cost Threshold that requires the conduct of feasibility study to ensure that projects to be funded are feasible?

    Above 1 Billion

  • 78

    Based on Department Order 99 series 0f 2018 – Guidelines and Procedures in the Issuance of Certificate of Completion and Acceptance, what is the reckoning date of the effectivity of the one (1) year defects liability period?

    From the Issuance of Certifcate of Completion

  • 79

    If the contractor fails to submit As-Staked Plans within the period prescribed in Department Order 15 series of 2016, what is the allowable one-time extension for submission that can be granted?

    15 calendar days

  • 80

    District Engineers can surely be successful in their job in DPWH If they understand the DPWH Strategy Map. All DEs must:

    All of the above

  • 81

    Project Management can be defined as:

    e. (a), (b) and (c)

  • 82

    iDistrict Engineers or Assistant Engineers are in practice Project Managers.

    All of the above are valid.

  • 83

    We incorporate Project Management in the D.E. Candidates Course because:

    e. (a) and (d)

  • 84

    Which is not a Project Communication Management Process?

    Prepare work Program

  • 85

    Who is the primary Authorized Spokesperson for DPWH District Engineering Offices?

    District Engineer

  • 86

    The most current and updated service standards in the form of information billboards which shall be posted at the main entrance of DPWH offices.

    Citizens' Charter

  • 87

    This'll refers to the deliberat and strategic use of information to persuade an audience towards some attitude and ledispositions to action.

    Advocacy

  • 88

    Resignation or retirement does not bar the fling of a formal charge against an offical or employee for acts or omissions while in office.

    True

  • 89

    The level of communication that uses technological devices such as press, radio, TV and films to impart or exchange information on a large scale to a wide range of peope is cálled:

    mass communication.

  • 90

    The following statements about communication are true except:

    Communication always takes place in words.

  • 91

    Which of the following are common forms of mass media?

    Television, Radio, Newspaper, Internet

  • 92

    It is the outcome of a communication or the response of the receiver to the message of the source.

    Feedback

  • 93

    During the pendency of a petition to recall the approval/validation of an appointment, the appointee shall remain and continue to discharge the functions of the position.

    False

  • 94

    When can an employee/official request for correction of personal information?

    Both b and C

  • 95

    Who cân file a protest?

    a qualified next-in-rank official or employee

  • 96

    An appointee whose appointment was disapproved or invalidated because of a violation of the Omnibus Rules on Elections can have his/her services rendered thereunder accredited.

    False

  • 97

    A valid complaint must be:

    Must be written and under oath

  • 98

    The right to counsel may be waived in the Formal Investigation of a Disciplinary Case.

    Yes

  • 99

    The right to appeal is a natural right or a part of due process?

    No

  • 100

    This refers to the part or the entirety of a property, site or location, with defined physical boundaries, used or required by a government infrastructure project.

    Right-of-Way