As per existing Department Order regarding MPP walk-the-line inspection, how many times per year shall inspector/validation be done by the Bureau of Maintenance other than NCR.
2 times
2
The following are the types of monitoring of the condition of the flood control structures, except?
Monitoring during Disaster
3
This refers to the level of status/condition of the flood control structure, wherein the damage is serious, and huge flood damages to human lives and properties have occurred or are expected to occur in the next flood event.
Urgency A
4
Responsible for preparing and keeping the inventory of Flood Control and Drainage Structures under each DEOs.
Maintenance Section
5
The DEOs prepares and submits inventory of Flood Control and Drainage Structures to the Bureau of Maintenance every year, by the end of what month?
June
6
It is a mode or system of Budget Allocation, designed to address the road maintenance requirements.
Equivalent Maintenance Kilometrage
7
What is code 01?
Pathole
8
Material that is being put on a square cut hole on the pavement before the application of Asphalt Mix?
Tack Coat
9
How many response time is allotted for the repair of Code 05 (Pumping and Depression)?
30 days
10
Major Scaling is the deterioration of the upper concrete slab surface of more than______mm affecting the whole slab.
10mm
11
As per Do41, s2016, what is the weighted grade/percentage for code 09 Clogged Drains?
5%
12
Which bureau maintains the pool of Project Engineers and Project Inspectors included in PCMA?
Bureau of Quality and Safety
13
Which work control category has the second highest priority in PHMMS?
Limited
14
What does 'P' stand for in AMWP?
Program
15
It is a distinct part of the roadway system that requires one or more activities to be performed on it.
Maintenance Feature
16
Which of the following has the highest EMK Factor?
Temporary Bridges (Bailey and Timber)
17
What type of maintenance corresponds to Work Category No. 12?
Bridge and Structure Máintenance
18
It is a numerical input to either a work program or performance budget.
Planning Value
19
The D.0. 125, Series of 2015 sets the limitation of the total payment for progress billing of all locally funded projects to 95% and 90% of their respective total contract cost. The remaining balance/uńcollected of the progress billing, except the retention money will be paid to the contractor upon issuance of the Certificate of Acceptance for the project by the Head of the Implementing Office.
False
20
Payment for first progress billing can be granted to the contractor even if partial as-staked plan is submitted.
True with certain conditions
21
After the Head of Implementing Office approves the Contract Termination, the _______________ shall be forwarded to the contractor.
Notice of Decision toTerminate Contract
22
If through no faut of the contractor, Road right of way problem is a ground for termination by contractor:
True
23
The Notice to Termirate Contract shall always be accompanied by the Verified Report of the Inspectorate Team or the Implementing Unit.
True
24
Upon reaching 15% negative slippage, the Project Engineer shall immediately issue the Noticé to Terminate Contract even without the Verified Report.
False
25
After the effectivity of contract termination for default, the Head of the Agency shall issue the Blacklisting Order of the contractor within_______calendar days.
7
26
Which of the following statement is correct?
The retention money shall be due for release upon substitution with irrevocable standby letters of credit from a commercial bank, bank guarantees or surety bonds callable on demand, of amounts equivalent to the retention money substituted
27
Choose the correct statement among the choices below.
The advance payment shall be made only upon the submission to and acceptance by the procuring entity of the performance security.
28
Official receipt and approved voucher of the previous payment, if not yet submitted to the accounting Division or copy of duly received OR by the Accounting Division is required in thé Release of Retention.
True
29
Considering the discussion from presentation for the computation of the Construction Durations as stipulated in Department Orders No. 141, Series of 2014, and No. 44, Series of 2012, and No. 71, Series of 2013, how many year(s) should the Pre-determined Unworkable Day for Rainy Days be based on?
Three (3) years historical rainfall records
30
Based on the table below, compute for the total Project Duration of the project amounting to Php 14,700,000.00, for Paved (Concrete) to Paved (Concrete)
137 working days
31
It is the budget for the contract duly approved by the Head of the Procuring Entity, as provided for in the General Appropriations Act (GAA), continuing, and automatic appropriations, in the case of national government agencies (NGAs).
Approved Budget for the Contract
32
For mobilization/demobilization exceeding allotted % as per DO 197, series of 2016, approval shalł be secured from the concerned____________.
Undersecretary for Operations
33
It is a type of Control Curve where the slope starts out Steep and hen fatens out towards the end.
Front-Loaded
34
It is the stage where the contraçtor shall be issued a final warning and required to come-up with a more detailed program of activities with weekty physical targets, together with the required additional input resources.
ICU Stage
35
It is the first step in furnishing the Catch-Up schedule.
Update the construction schedules
36
__________________is the rough calculation of the value, number, quantity, or extent of something.
Estimation
37
_______________is an approximation of the project cost at completion.
Cost estimate
38
AS per D.O. No. 197, Series of 2016, the percentages to be utilized for the OCM and Profit Mark-up should be based on_____________?
Estimated Total Direct Cost
39
What is the percent weight distributiòn in a Normal S-Curve?
25-50-25
40
Who will prepare the complete set of the Construction Schedules prior to the signing of the Contract?
Contractor
41
It is the Department Order instructing the adoption of the PDM as the project scheduling technique to be utilized in DPWH infrastructure projects.
D.O. no. 133, series of 2015
42
It is the amount of time whereby a successor activity can be advanced with respect to the predecessor activity.
Lead
43
This is a tool to assist employees in career and personal development.It helps employees reach short or long-term career goals, as well as improve current job performance.
Individual Development Plan
44
This involves consistently observing the achievement of outouts for the purpose of measuring performance, keeping track of and documenting outputs and behaviour and checking progress of committed plans and actions.
Performance Monitoring and Coaching
45
An approved IPCR can be modified.
False
46
Which of the following is not true.
The minimum appraisal period is at least sixty (60) calendar days or two (2) months
47
For the Desigň Measure, if VS is at least 90.00%, how many Implementing Offices achieved the target?
7
48
For the Quality Méasure, what percent of the Implementing Offices met the target?
100
49
If VS is at least 85.00% in the Maintenance Measure, which offices met all three (3) targets?
Las Malabon South
50
This is done at the start of the performance period where supervisors and subordinates agree on Outputs and targets to be accomplished and success indicators.
Performance Planning and Commitment
51
The Certificate of Acceptance shall be issued by the Head of the Implementing Office after the one-year defects liability period, after all defects/deficiencies, f any. shall have been repaired by the Contractor to the Satsfaction of the same Inspectorate Team as mentioned above and upon extension of the Performance Securiy up to one year by the Contractor.
False
52
Which project ID has the highest accomplishment?
1210
53
What implementing office has the highest accomplishyênt rate?
2504
54
What is the length that needs to be completed to at least achieve a 90% overall accomplishment?
10.21
55
Upon issuance by the DPWH of the NTP the IO chall provide the contractor withn an editable file of the approved original plan of the proiect in order to facilitate the as staked plan.
True
56
If the contractor fails to submit the as-staked plan on time for processing, the Contractor shall submit to the IO a request for one (1) time extension of at least fifteen (15) days depending on the project cost.
False
57
Submission of "As-Staked" plan is not required if there are no changes in the original plan. The Project Engineer/Manager shall issue a certification to this effect to be approved by the Head of Implementing Office within the prescribed time duration after the issuance of NTP.
False
58
The contractor shall take the reasonable precautions to maintain the health and safety of his personnel based on the Construction Safety and Health Program (CSHP) duly concurred bythe DPWH.
False
59
Upon issuanceof Notice of Proceed, the approve CSHP is among the list of required documents to be submitted for the perfection of the contract.
False
60
When the contractor incurred a negative 10% slippage, the contractor shall be issued a final warning and required to come-up with a more detailed program of activities with weekly physical targets, together with the required additional input resources.
True
61
Based on the DPWH issuances, the Inspectorate Team for the issuance of Certificate of Completion and Certificate of Acceptance shall be composed of Chief of Technical Sections/Divisions of the Implementing Office.
False
62
The negative slippage, in %, termed as the "Terminal Stage" as stated in Department Order 193 Series of 2016.
15% or more
63
The use of Specific knowledge, skils, tools, and techniques to deliver something of value to people.
Project Management
64
A Feasibility Study requirement that contains in-depth analysis of long-term sustained effects of the project or intervention to the different aspects of lives in the populace and the impact on people's livelihood.
Development Impact Study
65
The negative slippage, in %, termed as the "Early Warning" as stated in Departrment Order 193 Series of 2016.
5%
66
The DPWH-QMS manual is under what DO?
DO 43 s 2019
67
Risk and Opportunities is underwhat section of the DPWH-QMS Manual?
Planning
68
In the preparation and submission of As-Built Plan, what is the required submission date as per Department Order38 series of 2016?
Within 30 calendar days upon reaching 95% completion of the projects
69
What is the Project Cost Threshold that requires submission to NEDA for review/evaluation and approval?
2.5 Billion and above
70
As per RA 9184, what is the required effective period of warranty security to be posted by the contractor before the issuance of Certificate of Acceptance?
1 year from the date of issuance of the Certificate of Acceptance
71
If the Project incurred a negative slippage of 5% and beyond and at contractors fault, which of the following actions appropriate to be applied?
Calibrated Action
72
What is the Project Cost threshold that requires the conduct of Pre-Feasibility Study?
More than 30OM up to 1 billion
73
The DBM Budget Cycle is made up of 4 main parts; Preparation, Legislation,_________________and Accountability.
Execution
74
Processes are the tasks and methodologies that occur within the projects life cycie phases which iincdude the following:
All of the above
75
The Process of undertaking activities to minimize further effects of risks and actions to correct/address noted deviations from the targets/plans per monitoring
Control
76
Finalizes all project activities completed across all phases of the project to formally conclude the project
Close-out
77
What is the Project Cost Threshold that requires the conduct of feasibility study to ensure that projects to be funded are feasible?
Above 1 Billion
78
Based on Department Order 99 series 0f 2018 – Guidelines and Procedures in the Issuance of Certificate of Completion and Acceptance, what is the reckoning date of the effectivity of the one (1) year defects liability period?
From the Issuance of Certifcate of Completion
79
If the contractor fails to submit As-Staked Plans within the period prescribed in Department Order 15 series of 2016, what is the allowable one-time extension for submission that can be granted?
15 calendar days
80
District Engineers can surely be successful in their job in DPWH If they understand the DPWH Strategy Map. All DEs must:
All of the above
81
Project Management can be defined as:
e. (a), (b) and (c)
82
iDistrict Engineers or Assistant Engineers are in practice Project Managers.
All of the above are valid.
83
We incorporate Project Management in the D.E. Candidates Course because:
e. (a) and (d)
84
Which is not a Project Communication Management Process?
Prepare work Program
85
Who is the primary Authorized Spokesperson for DPWH District Engineering Offices?
District Engineer
86
The most current and updated service standards in the form of information billboards which shall be posted at the main entrance of DPWH offices.
Citizens' Charter
87
This'll refers to the deliberat and strategic use of information to persuade an audience towards some attitude and ledispositions to action.
Advocacy
88
Resignation or retirement does not bar the fling of a formal charge against an offical or employee for acts or omissions while in office.
True
89
The level of communication that uses technological devices such as press, radio, TV and films to impart or exchange information on a large scale to a wide range of peope is cálled:
mass communication.
90
The following statements about communication are true except:
Communication always takes place in words.
91
Which of the following are common forms of mass media?
Television, Radio, Newspaper, Internet
92
It is the outcome of a communication or the response of the receiver to the message of the source.
Feedback
93
During the pendency of a petition to recall the approval/validation of an appointment, the appointee shall remain and continue to discharge the functions of the position.
False
94
When can an employee/official request for correction of personal information?
Both b and C
95
Who cân file a protest?
a qualified next-in-rank official or employee
96
An appointee whose appointment was disapproved or invalidated because of a violation of the Omnibus Rules on Elections can have his/her services rendered thereunder accredited.
False
97
A valid complaint must be:
Must be written and under oath
98
The right to counsel may be waived in the Formal Investigation of a Disciplinary Case.
Yes
99
The right to appeal is a natural right or a part of due process?
No
100
This refers to the part or the entirety of a property, site or location, with defined physical boundaries, used or required by a government infrastructure project.
Right-of-Way