4 DE promotional Exam
問題一覧
1
X= 7 and Y = 28
2
Chief of Construction, Chief of Planning and Design
3
For the utilization of the savings of the project
4
Department Order No. 171, series of 2022
5
Head of Implementng Offce
6
Show Cause
7
7 calendar days
8
Notice of Decision to Terminate Contract
9
Department Order No, 60, serles of 2017
10
Legal Parameters and Technical Parameters
11
The total retention money shall be due for release upon final acceptarnce ot the works.
12
For road projects with 10 kilometers or more, additional bill board shall also be installed at every 5-kilometer interval.
13
In case the total sum of liquidated damages reaches 10% of the total contract price, the Procuring Entity has the option to allow the contractor to continue the works with prejudice to the continued imposition of liquidated damages until the works have been completed.
14
The recommended duration for the preparation and submission of As-Staked Plan incudes, conduct of "As-Staked" survey and geotechnical investigation.
15
30% of the total contract price
16
Until acceptance of the project
17
Certificate of Qualty Control Assurance (CQCA)
18
Regional Office
19
Waiver
20
Quality Control Program
21
Contract Documents
22
Acceptance
23
One (1)
24
Minimum Testing Requirements
25
Department Order No. 12, series of 2013
26
Quality Control Work
27
Blend the material with either finer or Coarser material
28
California Bearing Ratio (CBR) Test
29
Moisture Density Relation
30
Open-Graded Asphalt Mixes
31
85% of specified strength, and if no single core is less than 75% of specified strength
32
payment will be made at an adjusted price due to strength defciency of specimens
33
1000 linear meters of pavement when a single traffic lane is poured or 500 linear meters when two lanes are poured concurrently.
34
100 L. M. per lane
35
less than or equal to 25 mm (1 in.)
36
less than or equal to 0.1 mm (0.005 in.)
37
Fifty percent (50%)
38
Natonal primary road
39
ExecUtive Order No. 91
40
Construction Safety and Health Program
41
Water Utility
42
I and III only
43
Expropriation
44
Seek from the court immedlate Issuance of the WOP
45
Seventy percent (70%)
46
Supplemental Bid Bulletin
47
180 calendar days
48
Fifteen percent (15%)
49
Post-Qualification
50
Quality-Cost Based Evaluation
51
Limited Source Bidding
52
Twenty-five percent (25%)
53
30 calendar days
54
Department Order No, 42, series of 2020
55
Head of Implementing Office
56
Continuance of Work Suspension Order
57
Head of Implementing Office
58
Prior or before expiry date and within thirty (30) calendar days after such work has been commenced or after the circumstances leading to such claim have arisen
59
Department Order No. 90, series of 2020
60
As-staked survey/ site layout suvey is an activity necessary to verify the actual field condition and to identify modifications and other deviations in the project.
61
As-built plans have a certification in the cover sheet stating that all material testing requirements were undertaken and that all materials used complied with the required specification, signed by the DPWH Project Engineer.
62
Thirty (30) days
63
Certification that necessary scheduled equipment for the first two months were mobilized after issuance of Notice to Proceed (NTP) with geotagged pictures
64
The contrator shall be qiven a warning and required to submit a detailed "catch-up'" program on a fortnightly basis
65
None of the above
66
None of the above
67
Maximum of eighteen (18) Projects implemented simultaneously, each proiect costing 250 million Pesos and below
68
Three Star
69
3.0 m/km
70
Quality Assurance
71
Bureau of Research and Standards
72
Project Documents
73
Head of Implementing Office
74
Department Order No. 100, series of 2018
75
60- 81 sg. m.
76
At least one (2) Material Engineers
77
More than one (1) hour
78
280 mm
79
Construction Joint
80
No payment or remove and replace
81
Not be used
82
Three-edged bearing method
83
Hydrated Lime
84
Environmental Impact Statement (EIS)
85
Alignment option 2
86
Category A- Environmentally Critical Projects (ECP)
PE/PI/ME Exam
PE/PI/ME Exam
denis cagomoc · 106問 · 2年前PE/PI/ME Exam
PE/PI/ME Exam
106問 • 2年前Latest Promotional Exam
Latest Promotional Exam
denis cagomoc · 109問 · 2年前Latest Promotional Exam
Latest Promotional Exam
109問 • 2年前2 Latest Promotional Exam
2 Latest Promotional Exam
denis cagomoc · 100問 · 2年前2 Latest Promotional Exam
2 Latest Promotional Exam
100問 • 2年前3 Promotional Exam
3 Promotional Exam
denis cagomoc · 100問 · 2年前3 Promotional Exam
3 Promotional Exam
100問 • 2年前Department Orders
Department Orders
denis cagomoc · 34問 · 2年前Department Orders
Department Orders
34問 • 2年前PE / PI / ME Exam 2
PE / PI / ME Exam 2
denis cagomoc · 101問 · 2年前PE / PI / ME Exam 2
PE / PI / ME Exam 2
101問 • 2年前Marichu
Marichu
denis cagomoc · 126問 · 2年前Marichu
Marichu
126問 • 2年前PE / PI / ME EXAM 3
PE / PI / ME EXAM 3
denis cagomoc · 221問 · 2年前PE / PI / ME EXAM 3
PE / PI / ME EXAM 3
221問 • 2年前Eduarte
Eduarte
denis cagomoc · 53問 · 2年前Eduarte
Eduarte
53問 • 2年前PE/ME Exam 4
PE/ME Exam 4
denis cagomoc · 69問 · 2年前PE/ME Exam 4
PE/ME Exam 4
69問 • 2年前DO 189 s 2022
DO 189 s 2022
denis cagomoc · 35問 · 2年前DO 189 s 2022
DO 189 s 2022
35問 • 2年前PE/ME 5
PE/ME 5
denis cagomoc · 60問 · 2年前PE/ME 5
PE/ME 5
60問 • 2年前New
New
denis cagomoc · 23問 · 1年前New
New
23問 • 1年前Gilbert
Gilbert
denis cagomoc · 20問 · 1年前Gilbert
Gilbert
20問 • 1年前Arra 2
Arra 2
denis cagomoc · 50問 · 1年前Arra 2
Arra 2
50問 • 1年前Arra 3
Arra 3
denis cagomoc · 50問 · 1年前Arra 3
Arra 3
50問 • 1年前Arra 4
Arra 4
denis cagomoc · 67問 · 1年前Arra 4
Arra 4
67問 • 1年前問題一覧
1
X= 7 and Y = 28
2
Chief of Construction, Chief of Planning and Design
3
For the utilization of the savings of the project
4
Department Order No. 171, series of 2022
5
Head of Implementng Offce
6
Show Cause
7
7 calendar days
8
Notice of Decision to Terminate Contract
9
Department Order No, 60, serles of 2017
10
Legal Parameters and Technical Parameters
11
The total retention money shall be due for release upon final acceptarnce ot the works.
12
For road projects with 10 kilometers or more, additional bill board shall also be installed at every 5-kilometer interval.
13
In case the total sum of liquidated damages reaches 10% of the total contract price, the Procuring Entity has the option to allow the contractor to continue the works with prejudice to the continued imposition of liquidated damages until the works have been completed.
14
The recommended duration for the preparation and submission of As-Staked Plan incudes, conduct of "As-Staked" survey and geotechnical investigation.
15
30% of the total contract price
16
Until acceptance of the project
17
Certificate of Qualty Control Assurance (CQCA)
18
Regional Office
19
Waiver
20
Quality Control Program
21
Contract Documents
22
Acceptance
23
One (1)
24
Minimum Testing Requirements
25
Department Order No. 12, series of 2013
26
Quality Control Work
27
Blend the material with either finer or Coarser material
28
California Bearing Ratio (CBR) Test
29
Moisture Density Relation
30
Open-Graded Asphalt Mixes
31
85% of specified strength, and if no single core is less than 75% of specified strength
32
payment will be made at an adjusted price due to strength defciency of specimens
33
1000 linear meters of pavement when a single traffic lane is poured or 500 linear meters when two lanes are poured concurrently.
34
100 L. M. per lane
35
less than or equal to 25 mm (1 in.)
36
less than or equal to 0.1 mm (0.005 in.)
37
Fifty percent (50%)
38
Natonal primary road
39
ExecUtive Order No. 91
40
Construction Safety and Health Program
41
Water Utility
42
I and III only
43
Expropriation
44
Seek from the court immedlate Issuance of the WOP
45
Seventy percent (70%)
46
Supplemental Bid Bulletin
47
180 calendar days
48
Fifteen percent (15%)
49
Post-Qualification
50
Quality-Cost Based Evaluation
51
Limited Source Bidding
52
Twenty-five percent (25%)
53
30 calendar days
54
Department Order No, 42, series of 2020
55
Head of Implementing Office
56
Continuance of Work Suspension Order
57
Head of Implementing Office
58
Prior or before expiry date and within thirty (30) calendar days after such work has been commenced or after the circumstances leading to such claim have arisen
59
Department Order No. 90, series of 2020
60
As-staked survey/ site layout suvey is an activity necessary to verify the actual field condition and to identify modifications and other deviations in the project.
61
As-built plans have a certification in the cover sheet stating that all material testing requirements were undertaken and that all materials used complied with the required specification, signed by the DPWH Project Engineer.
62
Thirty (30) days
63
Certification that necessary scheduled equipment for the first two months were mobilized after issuance of Notice to Proceed (NTP) with geotagged pictures
64
The contrator shall be qiven a warning and required to submit a detailed "catch-up'" program on a fortnightly basis
65
None of the above
66
None of the above
67
Maximum of eighteen (18) Projects implemented simultaneously, each proiect costing 250 million Pesos and below
68
Three Star
69
3.0 m/km
70
Quality Assurance
71
Bureau of Research and Standards
72
Project Documents
73
Head of Implementing Office
74
Department Order No. 100, series of 2018
75
60- 81 sg. m.
76
At least one (2) Material Engineers
77
More than one (1) hour
78
280 mm
79
Construction Joint
80
No payment or remove and replace
81
Not be used
82
Three-edged bearing method
83
Hydrated Lime
84
Environmental Impact Statement (EIS)
85
Alignment option 2
86
Category A- Environmentally Critical Projects (ECP)