記憶度
6問
14問
0問
0問
0問
アカウント登録して、解答結果を保存しよう
問題一覧
1
Pick out the possible out come for a mandatory report:
Both of the others
2
Each entry into engine log book shall be:
As soon as practical after the occurrence raised
3
Which occurrence report shall be carried out?
Effects of safety aircraft person and occupation
4
In the context of HKAR, the standard repair means:
The repair can within specified limits applicable to various structures
5
With respect to the subcontractor of approved primary company, all supplies which fulfillment to the purchase order, they must come from:
Prime contractor
6
The maintenance review book (modification log book) mus keep up to date:
At the time of issue or renewal of C of A
7
Basic weight of aircraft is:
Aircaft with fuel and oil on board
8
Person having AMEL before HKAR-66 compliance date:
Can continue to exercise their privilege as previously allowed
9
Foreign AD is issued by:
UK CAA for aircraft type equipment/component
10
Regarding as qualification category B1 or B2 staff:
Several experience option
11
Category “C” license:
It can be granted to person with no previous B1 or B2 AML
12
In respect that major modification approved by CAD, the application of major modification:
Complete CAD DCA282 detail and submit to CAD
13
In AN(HK)O requirement, the holder of AML is authorized to:
Release to services to respect to maintenance and inspection
14
Airworthiness directive is list as:
One single alph-numberical
15
In order that status recognized by director, the radio apparatus use on aircraft should:
Comply UK CAA and JAA JSTO (Joint Technical Standard Order)
16
The general parts of AOC maintenance schedule:
Record of amendation
17
The procedure a new type certificate of an aircraft with turbine engine:
Shall include design investigation and flight test
18
The incorrect statement about the duplication:
All defect found at first must be certificated before second
19
An act or omission of a license holder contravene to AN(HK)O. however it is proved that the cause of it is unavoidable, how to deal with it?
There is no liable punishment to him
20
For an aircraft is carried out a revenus flight to Hong Kong:
Under the validity certification of airworthiness
21
Correct statement about approval of HKAR-145 organization:
Outside training organization can training staff
22
Detaill requirement for “Continued airworthiness - certificate of operator” contains in:
HKAR-1
23
The source of maintenance schedule data is from
Maintenance manual
24
The group of release to service in B1 category, an aircraft is invalidly whenever:
One maintenance task in B1 category is signature omission
25
During the process of renew C of A, necessary condition are:
A schedule of flight test report
26
A minimum period of which when C of RS is destroyed:
24 months
27
The purpose of RVSM is:
To reduce the vertical separation to 1000 feet at altitude from 29000 to 41000 feet
28
The structure and times of license module susceptive exams can be found in the publication:
HKAR-2
29
A minimum period of telecommunication log book must be preserved by the operation of the aircraft after the date of the last entry therein:
6 months
30
JAR-145 is about:
Approved maintenance organization
31
HKAR-1 maintenance part of AMM include:
Description and operation
32
An aircraft which there is UK CAA approved MMEL will:
Provided a basic for the operator to made MEL
33
The purpose of the preamble of the MMEL:
To explain the scope, validity of it
34
In HKAR-1, the requirement of MRB is put under section:
The procedure of the approved documents and manuals for aircraft operation and maintenance
35
The airworthiness notice printed in pink colour:
Cover the airworthiness matters
36
Which is correct a bout ETOPS of the requirement for JCAO ANNEX 6:
Relax to 120 minutes
37
The second copy of load sheet:
Should not be carried on the aircraft
38
JAR-145 and FAR-145 is:
Approved maintenance organization
39
Modification to engine carried on the aircraft a directly record or cross reference:
In the engine log book
40
The domestic passenger aircraft need not carry what on board?
The C of R