1
After item/parts are drawn from store, what should be checked?
Part number, GRN, serial number, and approval stamp
2
Where is the standard part listed in? / Standard parts such as fasteners can only be used when the supplier is listed in:
HKAR-145 company exposition
3
Avionic LRU can be used when:
Both are not correct
4
The supply of standard parts such as bolts can be considered fit to install on aircraft if:
It is together with an ARC
5
The life limitation for engine components is specified in:
Mainetnance schedule
6
A component is attached with EASA Form 1. How to certify that it can be used on an aircraft?
An approved person to certify that it is safe and that the condition is ‘good’
7
Used component to be installed in Hong Kong registered aircraft must have release certificate issued by:
HKAR-145 organizsation with B, C class rating
8
After a test of aircraft related engine or parts, which of the following will be issued?
C of RS
9
A component had need carried out on a test. It should be certified on:
CAD Form 1
10
A component is installed on an aircraft. It’s ARC should:
Be kept as long as the log book
11
Requirements for the airworthiness certification of parts and products are found in:
EASA Part 21
12
EASA Part 21 is acceptable to the HKCAD for the:
Maintenance of aircraft components
13
Which of the following describe the certification of aircraft parts?
JAR 21
14
Where can you find information and procedures for certifying materials and components?
JAR-21
15
The Authorized Release Certificate (JAR From 1) is:
An international certificate for release aircraft part to service
16
When recording ARC in log book, what detail should be recorded?
P/N and S/N of component, reference number of approval organisation, number of staff
17
For an ARC (Authorized Release Certificate) of component after installation, what should be filled in the log book with information from ARC?
ARC issue number
18
Components or materials supplies by an approved source will be accompanied with:
Approved certificate (ARC)
19
An Authorized Release Certificate is issued for a component to certify that:
It conforms to the required specifications
20
Aeronautical parts supplied by an approved manufacturing company must be accompanied by:
Approved certificate and associated documents
21
Standard part such as fasteners that have been received from a supplier may only be used if:
They have an authorized relrease certificate (ARC)
22
There is a component change of the aircraft, when should the ARC of the component be retained?
Only when that component is critical
23
Aircraft component removed, repaired, or overhauled, and installed back to aircraft, it involves:
An issue of C of RS for the removal and installation and an issue of C of RS for the repair or overhaul
24
A LAME can sign a C of RS after the replacement of a component taken from another aircraft, unless:
He is satisfied that the component is servicealbe
25
After the replacement of a component in the aircraft, and where an overlap of responsibility of the ground engineers occurred, who issues the C of RS?
By all persons concerned