CAD M10 - Other [321-335]

CAD M10 - Other [321-335]
15問 • 2年前
  • Smile Ken Leung (SmileKL)
  • 通報

    問題一覧

  • 1

    Vital point inspections are carried out:

    On any point on an aircraft at which misassembly could lead to catastrophe

  • 2

    After the installation of a hydraulic / electric flight control actuator a duplicate inspection would be required:

    Only for the attachment to the flight control surface

  • 3

    When carrying out duplicate inspection of install engine control cable through pulley:

    Duplicate inspection should be performed before the panel closes

  • 4

    The number of spare fuses required to be carried on the aircraft as stated in the AN(HK)O is:

    10% of the number of each rating or three of each ratin, whichever is greater

  • 5

    Where can the expiry date of life jacket be found?

    Maintenance Schedule

  • 6

    Maintenance Record shall be retained for the HKAR-145 approved maintenance organization:

    For 2 years from the date the aircraft to which the work is related was released from the HKAR-145 maintenance organization

  • 7

    An amendment to an Approved Maintenance Schedule:

    Shall not be made without the written consent of the Civil Aviation Department

  • 8

    Inspection stamps must not be transferred from one inspector to another unless they have been quarantined for at least:

    6 months

  • 9

    Unapproved repair on the aircraft:

    Cannot be certified until the approved repair is made

  • 10

    When an unapproved repair has been carried out to an aircraft:

    The Certifiacte of Airworthiness will be invalid until an authorized repair is carried out

  • 11

    At the completion of general visual inspection during a schedule hangar “C” check maintenance visit:

    A certificate of release to service must be issued for the individual inspection

  • 12

    Perform “C” check inspection:

    Certificate should be all in one form

  • 13

    Yellow AD are:

    Administrative and technical items

  • 14

    Condition monitoring maintanenace process is:

    A non-preventative action

  • 15

    Inspection / test carried out in a specific period is:

    On-condition maintenance process

  • CAD M10 - Aircraft maintenance license_General [5-12]

    CAD M10 - Aircraft maintenance license_General [5-12]

    Smile Ken Leung (SmileKL) · 8問 · 2年前

    CAD M10 - Aircraft maintenance license_General [5-12]

    CAD M10 - Aircraft maintenance license_General [5-12]

    8問 • 2年前
    Smile Ken Leung (SmileKL)

    CAD M10 - AML & Type approval responsibility [16-26]

    CAD M10 - AML & Type approval responsibility [16-26]

    Smile Ken Leung (SmileKL) · 10問 · 2年前

    CAD M10 - AML & Type approval responsibility [16-26]

    CAD M10 - AML & Type approval responsibility [16-26]

    10問 • 2年前
    Smile Ken Leung (SmileKL)

    CAD M10 - AML & Type approval responsibility [27-37]

    CAD M10 - AML & Type approval responsibility [27-37]

    Smile Ken Leung (SmileKL) · 11問 · 2年前

    CAD M10 - AML & Type approval responsibility [27-37]

    CAD M10 - AML & Type approval responsibility [27-37]

    11問 • 2年前
    Smile Ken Leung (SmileKL)

    CAD M10 - Renewal of AML [38-43]

    CAD M10 - Renewal of AML [38-43]

    Smile Ken Leung (SmileKL) · 6問 · 2年前

    CAD M10 - Renewal of AML [38-43]

    CAD M10 - Renewal of AML [38-43]

    6問 • 2年前
    Smile Ken Leung (SmileKL)

    CAD M10 - HKAR-145 [44-58]

    CAD M10 - HKAR-145 [44-58]

    Smile Ken Leung (SmileKL) · 15問 · 2年前

    CAD M10 - HKAR-145 [44-58]

    CAD M10 - HKAR-145 [44-58]

    15問 • 2年前
    Smile Ken Leung (SmileKL)

    CAD M10 - HKAR147 + Aircraft operator + Airworthiness notices general + Aircraft Prototype/Series/Variant [59-73]

    CAD M10 - HKAR147 + Aircraft operator + Airworthiness notices general + Aircraft Prototype/Series/Variant [59-73]

    Smile Ken Leung (SmileKL) · 15問 · 2年前

    CAD M10 - HKAR147 + Aircraft operator + Airworthiness notices general + Aircraft Prototype/Series/Variant [59-73]

    CAD M10 - HKAR147 + Aircraft operator + Airworthiness notices general + Aircraft Prototype/Series/Variant [59-73]

    15問 • 2年前
    Smile Ken Leung (SmileKL)

    CAD M10 - Aircraft registration/certificate of registration + Nationality and registration marks [74-89]

    CAD M10 - Aircraft registration/certificate of registration + Nationality and registration marks [74-89]

    Smile Ken Leung (SmileKL) · 16問 · 2年前

    CAD M10 - Aircraft registration/certificate of registration + Nationality and registration marks [74-89]

    CAD M10 - Aircraft registration/certificate of registration + Nationality and registration marks [74-89]

    16問 • 2年前
    Smile Ken Leung (SmileKL)

    CAD M10 - Certificate of airworthiness (C of A) [90-110]

    CAD M10 - Certificate of airworthiness (C of A) [90-110]

    Smile Ken Leung (SmileKL) · 20問 · 2年前

    CAD M10 - Certificate of airworthiness (C of A) [90-110]

    CAD M10 - Certificate of airworthiness (C of A) [90-110]

    20問 • 2年前
    Smile Ken Leung (SmileKL)

    CAD M10 - Certificate of release to service (CRS) [111-127]

    CAD M10 - Certificate of release to service (CRS) [111-127]

    Smile Ken Leung (SmileKL) · 17問 · 2年前

    CAD M10 - Certificate of release to service (CRS) [111-127]

    CAD M10 - Certificate of release to service (CRS) [111-127]

    17問 • 2年前
    Smile Ken Leung (SmileKL)

    CAD M10 - Certificate of Maintenance review (CMR) [128-146]

    CAD M10 - Certificate of Maintenance review (CMR) [128-146]

    Smile Ken Leung (SmileKL) · 19問 · 2年前

    CAD M10 - Certificate of Maintenance review (CMR) [128-146]

    CAD M10 - Certificate of Maintenance review (CMR) [128-146]

    19問 • 2年前
    Smile Ken Leung (SmileKL)

    CAD M10 - Aircraft Equipment + Emergency Exits + Weapons + Radio and Radio Navigation Equipment [147-166]

    CAD M10 - Aircraft Equipment + Emergency Exits + Weapons + Radio and Radio Navigation Equipment [147-166]

    Smile Ken Leung (SmileKL) · 20問 · 2年前

    CAD M10 - Aircraft Equipment + Emergency Exits + Weapons + Radio and Radio Navigation Equipment [147-166]

    CAD M10 - Aircraft Equipment + Emergency Exits + Weapons + Radio and Radio Navigation Equipment [147-166]

    20問 • 2年前
    Smile Ken Leung (SmileKL)

    CAD M10 - Flight Manual + Technical Log [167-182]

    CAD M10 - Flight Manual + Technical Log [167-182]

    Smile Ken Leung (SmileKL) · 16問 · 2年前

    CAD M10 - Flight Manual + Technical Log [167-182]

    CAD M10 - Flight Manual + Technical Log [167-182]

    16問 • 2年前
    Smile Ken Leung (SmileKL)

    CAD M10 - Technical Log [183-199]

    CAD M10 - Technical Log [183-199]

    Smile Ken Leung (SmileKL) · 17問 · 2年前

    CAD M10 - Technical Log [183-199]

    CAD M10 - Technical Log [183-199]

    17問 • 2年前
    Smile Ken Leung (SmileKL)

    CAD M10 - Log book [200-214]

    CAD M10 - Log book [200-214]

    Smile Ken Leung (SmileKL) · 15問 · 2年前

    CAD M10 - Log book [200-214]

    CAD M10 - Log book [200-214]

    15問 • 2年前
    Smile Ken Leung (SmileKL)

    CAD M10 - Weight Schedule + Load Sheet +Required Documents To Be Carred [215-232]

    CAD M10 - Weight Schedule + Load Sheet +Required Documents To Be Carred [215-232]

    Smile Ken Leung (SmileKL) · 19問 · 2年前

    CAD M10 - Weight Schedule + Load Sheet +Required Documents To Be Carred [215-232]

    CAD M10 - Weight Schedule + Load Sheet +Required Documents To Be Carred [215-232]

    19問 • 2年前
    Smile Ken Leung (SmileKL)

    CAD M10 - Aircraft Parts + Certification Of Aircraft Components [233-257]

    CAD M10 - Aircraft Parts + Certification Of Aircraft Components [233-257]

    Smile Ken Leung (SmileKL) · 25問 · 2年前

    CAD M10 - Aircraft Parts + Certification Of Aircraft Components [233-257]

    CAD M10 - Aircraft Parts + Certification Of Aircraft Components [233-257]

    25問 • 2年前
    Smile Ken Leung (SmileKL)

    CAD M10 - Foreign Policy [258-274]

    CAD M10 - Foreign Policy [258-274]

    Smile Ken Leung (SmileKL) · 17問 · 2年前

    CAD M10 - Foreign Policy [258-274]

    CAD M10 - Foreign Policy [258-274]

    17問 • 2年前
    Smile Ken Leung (SmileKL)

    CAD M10 - Foreign Policy [275-289]

    CAD M10 - Foreign Policy [275-289]

    Smile Ken Leung (SmileKL) · 15問 · 2年前

    CAD M10 - Foreign Policy [275-289]

    CAD M10 - Foreign Policy [275-289]

    15問 • 2年前
    Smile Ken Leung (SmileKL)

    CAD M10 - MOR/Reporting [290-305]

    CAD M10 - MOR/Reporting [290-305]

    Smile Ken Leung (SmileKL) · 16問 · 2年前

    CAD M10 - MOR/Reporting [290-305]

    CAD M10 - MOR/Reporting [290-305]

    16問 • 2年前
    Smile Ken Leung (SmileKL)

    CAD M10 - Other [306-320]

    CAD M10 - Other [306-320]

    Smile Ken Leung (SmileKL) · 15問 · 2年前

    CAD M10 - Other [306-320]

    CAD M10 - Other [306-320]

    15問 • 2年前
    Smile Ken Leung (SmileKL)

    Other pass paper

    Other pass paper

    Smile Ken Leung (SmileKL) · 40問 · 2年前

    Other pass paper

    Other pass paper

    40問 • 2年前
    Smile Ken Leung (SmileKL)

    Other pass paper

    Other pass paper

    Smile Ken Leung (SmileKL) · 25問 · 2年前

    Other pass paper

    Other pass paper

    25問 • 2年前
    Smile Ken Leung (SmileKL)

    問題一覧

  • 1

    Vital point inspections are carried out:

    On any point on an aircraft at which misassembly could lead to catastrophe

  • 2

    After the installation of a hydraulic / electric flight control actuator a duplicate inspection would be required:

    Only for the attachment to the flight control surface

  • 3

    When carrying out duplicate inspection of install engine control cable through pulley:

    Duplicate inspection should be performed before the panel closes

  • 4

    The number of spare fuses required to be carried on the aircraft as stated in the AN(HK)O is:

    10% of the number of each rating or three of each ratin, whichever is greater

  • 5

    Where can the expiry date of life jacket be found?

    Maintenance Schedule

  • 6

    Maintenance Record shall be retained for the HKAR-145 approved maintenance organization:

    For 2 years from the date the aircraft to which the work is related was released from the HKAR-145 maintenance organization

  • 7

    An amendment to an Approved Maintenance Schedule:

    Shall not be made without the written consent of the Civil Aviation Department

  • 8

    Inspection stamps must not be transferred from one inspector to another unless they have been quarantined for at least:

    6 months

  • 9

    Unapproved repair on the aircraft:

    Cannot be certified until the approved repair is made

  • 10

    When an unapproved repair has been carried out to an aircraft:

    The Certifiacte of Airworthiness will be invalid until an authorized repair is carried out

  • 11

    At the completion of general visual inspection during a schedule hangar “C” check maintenance visit:

    A certificate of release to service must be issued for the individual inspection

  • 12

    Perform “C” check inspection:

    Certificate should be all in one form

  • 13

    Yellow AD are:

    Administrative and technical items

  • 14

    Condition monitoring maintanenace process is:

    A non-preventative action

  • 15

    Inspection / test carried out in a specific period is:

    On-condition maintenance process