ログイン

irrigation 4

irrigation 4
28問 • 2年前
  • ezekiel emano
  • 通報

    問題一覧

  • 1

    consists mainly of operation losses, evaporation, and seepageinto the soil from the sloping surfacesand bed of the canal. Themost important of these is seepage.

    Water conveyance losses

  • 2

    sometimes, this is considered negligible and are not included in the estimation process.

    evaporation losses

  • 3

    this is the most significant loss that should beconsidered for efficiency improvement.

    seepage losses

  • 4

    prevalent in old and new irrigation systems.

    Open irrigation channels

  • 5

    cross sectional area of a conveyance channel measured perpendicular to the direction of flow.

    Area

  • 6

    elevation drop per unit length of the channel bottom

    Channel bed slope

  • 7

    water in the channel cross section

    Depth

  • 8

    grade line of the water surface profile plus the velocity head in open channels.

    Energy grade line

  • 9

    vertical line from the top of the channel to the water surface at the design condition.

    Free board

  • 10

    ratio of flow area to the wetted top width.

    Hydraulic depth

  • 11

    cross sectional area of flow divided by the wetted perimeter

    hydraulic radius

  • 12

    canals with impermeable material for channel stabilization and/or reduced seepage.

    Lined channel

  • 13

    constant flow depth along a longitudinal section of a channel under a uniform flow condition.

    Normal depth

  • 14

    water flow that is conveyed in such a manner that top surface is exposed to the atmosphere

    Open channel flow

  • 15

    slope of the free water surface

    Slope of the hydraulic grade line

  • 16

    ratio of the horizontal to vertical dimension of the channel wall

    Side slope

  • 17

    width of the channel cross-section at the free surface

    Top width

  • 18

    occurs when flow has a constant water area, depth, discharge, and average velocity through a reach of channel

    Uniform flow

  • 19

    - canals that are cut through soil

    Unlined channels

  • 20

    portion of the perimeter of the canal that is in contact with the flowing water

    Wetted perimeter

  • 21

    design of an open channel:

    1. Design Discharge or Flow Capacity 2. How Velocity 3. Roughness Coefficient 4. Canal Cross Section 5. Bottom Slope 6. Freeboard

  • 22

    retard irrigation water flow

    Roughness Coefficient

  • 23

    This is due to its stability, and ease of construction.

    Canal Cross section

  • 24

    very common in the construction of concrete-lined canals

    Rectangular channels

  • 25

    Fundamentals of water flow, types, calculation of losses, pipe designs

    Pipes for irrigation water conveyance

  • 26

    Types of piping available

    PVC Pipes Polyethylene pipes (black roll pipe)

  • 27

    these are commonly used due to its availability, easy to work with, and quite inexpensive.

    PVC Pipes

  • 28

    this is commonly used in irrigation due to its availability in various length.

    Polyethylene pipes (black roll pipe)

  • crop science 100

    crop science 100

    ezekiel emano · 68問 · 2年前

    crop science 100

    crop science 100

    68問 • 2年前
    ezekiel emano

    irrigation 1

    irrigation 1

    ezekiel emano · 34問 · 2年前

    irrigation 1

    irrigation 1

    34問 • 2年前
    ezekiel emano

    Crop science transpiration

    Crop science transpiration

    ezekiel emano · 100問 · 2年前

    Crop science transpiration

    Crop science transpiration

    100問 • 2年前
    ezekiel emano

    crop science 💪

    crop science 💪

    ezekiel emano · 16問 · 2年前

    crop science 💪

    crop science 💪

    16問 • 2年前
    ezekiel emano

    soil tech 1

    soil tech 1

    ezekiel emano · 11問 · 2年前

    soil tech 1

    soil tech 1

    11問 • 2年前
    ezekiel emano

    soil tech 2

    soil tech 2

    ezekiel emano · 9問 · 2年前

    soil tech 2

    soil tech 2

    9問 • 2年前
    ezekiel emano

    soil tech 3

    soil tech 3

    ezekiel emano · 17問 · 2年前

    soil tech 3

    soil tech 3

    17問 • 2年前
    ezekiel emano

    soil tech 4

    soil tech 4

    ezekiel emano · 35問 · 2年前

    soil tech 4

    soil tech 4

    35問 • 2年前
    ezekiel emano

    Irrigation 2

    Irrigation 2

    ezekiel emano · 23問 · 2年前

    Irrigation 2

    Irrigation 2

    23問 • 2年前
    ezekiel emano

    irrigation of 3

    irrigation of 3

    ezekiel emano · 26問 · 2年前

    irrigation of 3

    irrigation of 3

    26問 • 2年前
    ezekiel emano

    ARNIS

    ARNIS

    ezekiel emano · 22問 · 2年前

    ARNIS

    ARNIS

    22問 • 2年前
    ezekiel emano

    irigasyonis

    irigasyonis

    ezekiel emano · 27問 · 2年前

    irigasyonis

    irigasyonis

    27問 • 2年前
    ezekiel emano

    CS reviewer

    CS reviewer

    ezekiel emano · 11問 · 2年前

    CS reviewer

    CS reviewer

    11問 • 2年前
    ezekiel emano

    CS GMO

    CS GMO

    ezekiel emano · 9問 · 2年前

    CS GMO

    CS GMO

    9問 • 2年前
    ezekiel emano

    CS 8

    CS 8

    ezekiel emano · 9問 · 2年前

    CS 8

    CS 8

    9問 • 2年前
    ezekiel emano

    CS 7

    CS 7

    ezekiel emano · 14問 · 2年前

    CS 7

    CS 7

    14問 • 2年前
    ezekiel emano

    CS 10

    CS 10

    ezekiel emano · 5問 · 2年前

    CS 10

    CS 10

    5問 • 2年前
    ezekiel emano

    SOIL TECH 1

    SOIL TECH 1

    ezekiel emano · 52問 · 2年前

    SOIL TECH 1

    SOIL TECH 1

    52問 • 2年前
    ezekiel emano

    SOIL TECH 2

    SOIL TECH 2

    ezekiel emano · 40問 · 2年前

    SOIL TECH 2

    SOIL TECH 2

    40問 • 2年前
    ezekiel emano

    Cropscience

    Cropscience

    ezekiel emano · 44問 · 2年前

    Cropscience

    Cropscience

    44問 • 2年前
    ezekiel emano

    CS 6

    CS 6

    ezekiel emano · 16問 · 2年前

    CS 6

    CS 6

    16問 • 2年前
    ezekiel emano

    AT 100

    AT 100

    ezekiel emano · 34問 · 2年前

    AT 100

    AT 100

    34問 • 2年前
    ezekiel emano

    AT 100

    AT 100

    ezekiel emano · 36問 · 2年前

    AT 100

    AT 100

    36問 • 2年前
    ezekiel emano

    AT 100 SCIENTIFIC NAME

    AT 100 SCIENTIFIC NAME

    ezekiel emano · 14問 · 2年前

    AT 100 SCIENTIFIC NAME

    AT 100 SCIENTIFIC NAME

    14問 • 2年前
    ezekiel emano

    POULTRY PRODUCTION

    POULTRY PRODUCTION

    ezekiel emano · 15問 · 2年前

    POULTRY PRODUCTION

    POULTRY PRODUCTION

    15問 • 2年前
    ezekiel emano

    chicken

    chicken

    ezekiel emano · 21問 · 2年前

    chicken

    chicken

    21問 • 2年前
    ezekiel emano

    問題一覧

  • 1

    consists mainly of operation losses, evaporation, and seepageinto the soil from the sloping surfacesand bed of the canal. Themost important of these is seepage.

    Water conveyance losses

  • 2

    sometimes, this is considered negligible and are not included in the estimation process.

    evaporation losses

  • 3

    this is the most significant loss that should beconsidered for efficiency improvement.

    seepage losses

  • 4

    prevalent in old and new irrigation systems.

    Open irrigation channels

  • 5

    cross sectional area of a conveyance channel measured perpendicular to the direction of flow.

    Area

  • 6

    elevation drop per unit length of the channel bottom

    Channel bed slope

  • 7

    water in the channel cross section

    Depth

  • 8

    grade line of the water surface profile plus the velocity head in open channels.

    Energy grade line

  • 9

    vertical line from the top of the channel to the water surface at the design condition.

    Free board

  • 10

    ratio of flow area to the wetted top width.

    Hydraulic depth

  • 11

    cross sectional area of flow divided by the wetted perimeter

    hydraulic radius

  • 12

    canals with impermeable material for channel stabilization and/or reduced seepage.

    Lined channel

  • 13

    constant flow depth along a longitudinal section of a channel under a uniform flow condition.

    Normal depth

  • 14

    water flow that is conveyed in such a manner that top surface is exposed to the atmosphere

    Open channel flow

  • 15

    slope of the free water surface

    Slope of the hydraulic grade line

  • 16

    ratio of the horizontal to vertical dimension of the channel wall

    Side slope

  • 17

    width of the channel cross-section at the free surface

    Top width

  • 18

    occurs when flow has a constant water area, depth, discharge, and average velocity through a reach of channel

    Uniform flow

  • 19

    - canals that are cut through soil

    Unlined channels

  • 20

    portion of the perimeter of the canal that is in contact with the flowing water

    Wetted perimeter

  • 21

    design of an open channel:

    1. Design Discharge or Flow Capacity 2. How Velocity 3. Roughness Coefficient 4. Canal Cross Section 5. Bottom Slope 6. Freeboard

  • 22

    retard irrigation water flow

    Roughness Coefficient

  • 23

    This is due to its stability, and ease of construction.

    Canal Cross section

  • 24

    very common in the construction of concrete-lined canals

    Rectangular channels

  • 25

    Fundamentals of water flow, types, calculation of losses, pipe designs

    Pipes for irrigation water conveyance

  • 26

    Types of piping available

    PVC Pipes Polyethylene pipes (black roll pipe)

  • 27

    these are commonly used due to its availability, easy to work with, and quite inexpensive.

    PVC Pipes

  • 28

    this is commonly used in irrigation due to its availability in various length.

    Polyethylene pipes (black roll pipe)