ログイン

M7c5
11問 • 2ヶ月前
  • ユーザ名非公開
  • 通報

    問題一覧

  • 1

    In first angle projection each view shows what would be seen

    by looking on the far side of an adjacent view (opposite upper).

  • 2

    When a large area is shown sectioned the hatching may be limited to

    that part of the area which touches adjacent hatched parts or the outline of the large part

  • 3

    The symbol (M) in detail (f) of Figure 5.13, indicates

    that the tolerance applies only to the maximum material condition of the dimension or datum feature and may be greater at the actual finished size.

  • 4

    Since 1 June 1956, the Air Transport Association of America (ATA), has used a specification, to:

    establish a standard for the presentation of technical data provided by aircraft, engine or component manufacturers.

  • 5

    A limit system is on a shaft basis when the shaft is the constant member and the different fits are obtained by varying the size of the hole

    shaft basis

  • 6

    A limit system is on a hole basis when the hole is the constant member and different fits are obtained by varying the size of the shaft

    Hole basis

  • 7

    A schematic diagram show

    the functional location of components within a system.

  • 8

    If a design amendment is made on a drawing

    a new issue number and date must be allocated to the drawing.

  • 9

    Drawing numbers are

    unique to each drawing.

  • 10

    Hatching lines are usually drawn at :

    60°

  • 11

    An Oblique view is shown face on with the sides and plan projected at an angle of :

    45º - 60º.

  • MPLE

    MPLE

    ユーザ名非公開 · 41問 · 13日前

    MPLE

    MPLE

    41問 • 13日前
    ユーザ名非公開

    Weekly Test 3

    Weekly Test 3

    ユーザ名非公開 · 50問 · 13日前

    Weekly Test 3

    Weekly Test 3

    50問 • 13日前
    ユーザ名非公開

    Weekly Test 2

    Weekly Test 2

    ユーザ名非公開 · 50問 · 13日前

    Weekly Test 2

    Weekly Test 2

    50問 • 13日前
    ユーザ名非公開

    Weekly Test 1

    Weekly Test 1

    ユーザ名非公開 · 50問 · 13日前

    Weekly Test 1

    Weekly Test 1

    50問 • 13日前
    ユーザ名非公開

    Refresher SPDI 1

    Refresher SPDI 1

    ユーザ名非公開 · 9問 · 13日前

    Refresher SPDI 1

    Refresher SPDI 1

    9問 • 13日前
    ユーザ名非公開

    Refresher SPDI 1

    Refresher SPDI 1

    ユーザ名非公開 · 100問 · 13日前

    Refresher SPDI 1

    Refresher SPDI 1

    100問 • 13日前
    ユーザ名非公開

    Definition of Terms 3

    Definition of Terms 3

    ユーザ名非公開 · 90問 · 13日前

    Definition of Terms 3

    Definition of Terms 3

    90問 • 13日前
    ユーザ名非公開

    Definition of Terms 2

    Definition of Terms 2

    ユーザ名非公開 · 90問 · 13日前

    Definition of Terms 2

    Definition of Terms 2

    90問 • 13日前
    ユーザ名非公開

    Definition of Terms 1

    Definition of Terms 1

    ユーザ名非公開 · 90問 · 13日前

    Definition of Terms 1

    Definition of Terms 1

    90問 • 13日前
    ユーザ名非公開

    WT 6

    WT 6

    ユーザ名非公開 · 50問 · 13日前

    WT 6

    WT 6

    50問 • 13日前
    ユーザ名非公開

    WT 3

    WT 3

    ユーザ名非公開 · 50問 · 13日前

    WT 3

    WT 3

    50問 • 13日前
    ユーザ名非公開

    WT 2

    WT 2

    ユーザ名非公開 · 48問 · 13日前

    WT 2

    WT 2

    48問 • 13日前
    ユーザ名非公開

    WT 1

    WT 1

    ユーザ名非公開 · 50問 · 13日前

    WT 1

    WT 1

    50問 • 13日前
    ユーザ名非公開

    SPI version D pt 2

    SPI version D pt 2

    ユーザ名非公開 · 61問 · 13日前

    SPI version D pt 2

    SPI version D pt 2

    61問 • 13日前
    ユーザ名非公開

    Item 311 Portland Cement Concrete Pavement (PART 1)

    Item 311 Portland Cement Concrete Pavement (PART 1)

    ユーザ名非公開 · 78問 · 13日前

    Item 311 Portland Cement Concrete Pavement (PART 1)

    Item 311 Portland Cement Concrete Pavement (PART 1)

    78問 • 13日前
    ユーザ名非公開

    Item 311 Portland Cement Concrete Pavement (PART 2)

    Item 311 Portland Cement Concrete Pavement (PART 2)

    ユーザ名非公開 · 61問 · 13日前

    Item 311 Portland Cement Concrete Pavement (PART 2)

    Item 311 Portland Cement Concrete Pavement (PART 2)

    61問 • 13日前
    ユーザ名非公開

    Item 406 Prestressed Concrete Structures

    Item 406 Prestressed Concrete Structures

    ユーザ名非公開 · 36問 · 13日前

    Item 406 Prestressed Concrete Structures

    Item 406 Prestressed Concrete Structures

    36問 • 13日前
    ユーザ名非公開

    RNPCP Appendix A and B

    RNPCP Appendix A and B

    ユーザ名非公開 · 79問 · 13日前

    RNPCP Appendix A and B

    RNPCP Appendix A and B

    79問 • 13日前
    ユーザ名非公開

    RNPCP Chapter 6 to 9

    RNPCP Chapter 6 to 9

    ユーザ名非公開 · 94問 · 13日前

    RNPCP Chapter 6 to 9

    RNPCP Chapter 6 to 9

    94問 • 13日前
    ユーザ名非公開

    Item 303 Bituminous Seal Coat

    Item 303 Bituminous Seal Coat

    ユーザ名非公開 · 20問 · 13日前

    Item 303 Bituminous Seal Coat

    Item 303 Bituminous Seal Coat

    20問 • 13日前
    ユーザ名非公開

    問題一覧

  • 1

    In first angle projection each view shows what would be seen

    by looking on the far side of an adjacent view (opposite upper).

  • 2

    When a large area is shown sectioned the hatching may be limited to

    that part of the area which touches adjacent hatched parts or the outline of the large part

  • 3

    The symbol (M) in detail (f) of Figure 5.13, indicates

    that the tolerance applies only to the maximum material condition of the dimension or datum feature and may be greater at the actual finished size.

  • 4

    Since 1 June 1956, the Air Transport Association of America (ATA), has used a specification, to:

    establish a standard for the presentation of technical data provided by aircraft, engine or component manufacturers.

  • 5

    A limit system is on a shaft basis when the shaft is the constant member and the different fits are obtained by varying the size of the hole

    shaft basis

  • 6

    A limit system is on a hole basis when the hole is the constant member and different fits are obtained by varying the size of the shaft

    Hole basis

  • 7

    A schematic diagram show

    the functional location of components within a system.

  • 8

    If a design amendment is made on a drawing

    a new issue number and date must be allocated to the drawing.

  • 9

    Drawing numbers are

    unique to each drawing.

  • 10

    Hatching lines are usually drawn at :

    60°

  • 11

    An Oblique view is shown face on with the sides and plan projected at an angle of :

    45º - 60º.