ログイン

Professional Practice and Ethics

Professional Practice and Ethics
29問 • 2年前
  • Martha
  • 通報

    問題一覧

  • 1

    Landscape Architectural Programming is one of the architect's services that falls under:

    a) Specialized Allied Services

  • 2

    One of the methods of compensating the services of the landscape architect, which is applicable only to non-creative work such as accounting, supervision and data gathering

    c) Per diem plus reimbursible expenses

  • 3

    RA 9053 known as the "Philippine Landscape Architecture Act of 20" was approved on

    d) Mar 30, 2001

  • 4

    The qualifications of members of the Board of Examiners for Landscape Architecture include all but one of the folowing:

    d) conferred felow by the PALA

  • 5

    Percentage of the total basic professional fee for regular services that is paid by the owner to the landscape architect after completion of the project.

    d) 50%

  • 6

    The profession with the folowing scope of work: development of acommunity, town, city or region, development of a site for particular needs, land use and zoning, pre-investment/ feasibility studies.

    d) environmental planner

  • 7

    Part-time construction supervision is falls under the folowing services of the landscape architect:

    c) specialized allied service

  • 8

    Which of the following statements is not true.

    b) The construction manager can make decisions on the project's design matters.

  • 9

    Amode of supply under the GATS where the professional and client do not meet each other. Means of trade is communication through the information technology

    a) cross border

  • 10

    Based on the standard owner-architect agreement, one of the folowing items should be paid by the architect and not by the owner. Which is this item?

    b) tax that the govemment may impose on the Architect as a consequence of the services performed for the project.

  • 11

    The project manager acts as overall coordinator and ls compensated on a percentage basis of—————- of estimated project cost

    10-15%

  • 12

    ___________ means ot build in, mount ni positions, connect or apply any object specified ready for the intended use.

    b) build

  • 13

    ________ refers ot the additional information on contract documents issuedot bidders before date of bidding.

    d) instructions ot bidders.

  • 14

    The approved form of security furnished by the Contractor and his Surety as a guarantee ot the quality of materials and equipment instaled and the workmanship performed by the Contractor.

    b) Payment Bond

  • 15

    Printed documents stipulating the procedural and administrative aspects of the contract.

    a) specifications

  • 16

    Which of these statements is true?

    a) The project owner shal provide al temporary facilities and enclosures before construction starts

  • 17

    nI the three-part section format for writing specifications, al but one of these fal under Part I: Execution

    c) patching

  • 18

    Calls by an agency of government, institution or corporation to shortlist a pool of consultants and contractors; the invitations specify which documents are to be submitted for review (ex company profile, financial statements) in the prescribed format

    Invitation for pre-qualifications

  • 19

    A person who allows his name and signature to be used in abetting (a crime) the illegal practice of profession

    Dummy

  • 20

    A proposal or bid to undertake a project for a specified amount of time

    Bid tender

  • 21

    Amount of time rerquired to complete each acrivity

    Duration

  • 22

    Which of the following is not a scheduling technique?

    None of the choices

  • 23

    Leeway that can be used without adverse effect on the project

    Float or Slack

  • 24

    These are the importance of time management except:

    operating instructions

  • 25

    Urban Development and Housing Act of 1992

    RA 7279

  • 26

    An act regulating the practice of Landscape Architecture in the Philippines

    RA 9053

  • 27

    Who appoints the members of the Board from a list forwarded by the Commision?

    President of the Philippines

  • 28

    Term of the members of the board

    3 years

  • 29

    Compensation of Board members shll be accordance to

    PRC Modernization Act of 2000

  • Landscape Design and Technology

    Landscape Design and Technology

    Martha · 100問 · 2年前

    Landscape Design and Technology

    Landscape Design and Technology

    100問 • 2年前
    Martha

    HISTORY AND THEORY

    HISTORY AND THEORY

    Martha · 100問 · 2年前

    HISTORY AND THEORY

    HISTORY AND THEORY

    100問 • 2年前
    Martha

    PLANT DESIGN AND INTERIOR PLANTSCAPING

    PLANT DESIGN AND INTERIOR PLANTSCAPING

    Martha · 100問 · 2年前

    PLANT DESIGN AND INTERIOR PLANTSCAPING

    PLANT DESIGN AND INTERIOR PLANTSCAPING

    100問 • 2年前
    Martha

    Ecology

    Ecology

    Martha · 100問 · 2年前

    Ecology

    Ecology

    100問 • 2年前
    Martha

    HISTORY 2

    HISTORY 2

    Martha · 86問 · 2年前

    HISTORY 2

    HISTORY 2

    86問 • 2年前
    Martha

    Ecology 2

    Ecology 2

    Martha · 29問 · 1年前

    Ecology 2

    Ecology 2

    29問 • 1年前
    Martha

    Code of Ethics

    Code of Ethics

    Martha · 26問 · 1年前

    Code of Ethics

    Code of Ethics

    26問 • 1年前
    Martha

    Laws

    Laws

    Martha · 17問 · 1年前

    Laws

    Laws

    17問 • 1年前
    Martha

    Landscape Materials

    Landscape Materials

    Martha · 32問 · 1年前

    Landscape Materials

    Landscape Materials

    32問 • 1年前
    Martha

    National History of LA

    National History of LA

    Martha · 53問 · 1年前

    National History of LA

    National History of LA

    53問 • 1年前
    Martha

    Phil Standards

    Phil Standards

    Martha · 11問 · 1年前

    Phil Standards

    Phil Standards

    11問 • 1年前
    Martha

    Methods of Construction

    Methods of Construction

    Martha · 13問 · 1年前

    Methods of Construction

    Methods of Construction

    13問 • 1年前
    Martha

    STEINER COMPRESSED

    STEINER COMPRESSED

    Martha · 28問 · 1年前

    STEINER COMPRESSED

    STEINER COMPRESSED

    28問 • 1年前
    Martha

    PLANT FAMILIES

    PLANT FAMILIES

    Martha · 80問 · 1年前

    PLANT FAMILIES

    PLANT FAMILIES

    80問 • 1年前
    Martha

    Collated

    Collated

    Martha · 50問 · 1年前

    Collated

    Collated

    50問 • 1年前
    Martha

    International Works

    International Works

    Martha · 27問 · 1年前

    International Works

    International Works

    27問 • 1年前
    Martha

    問題一覧

  • 1

    Landscape Architectural Programming is one of the architect's services that falls under:

    a) Specialized Allied Services

  • 2

    One of the methods of compensating the services of the landscape architect, which is applicable only to non-creative work such as accounting, supervision and data gathering

    c) Per diem plus reimbursible expenses

  • 3

    RA 9053 known as the "Philippine Landscape Architecture Act of 20" was approved on

    d) Mar 30, 2001

  • 4

    The qualifications of members of the Board of Examiners for Landscape Architecture include all but one of the folowing:

    d) conferred felow by the PALA

  • 5

    Percentage of the total basic professional fee for regular services that is paid by the owner to the landscape architect after completion of the project.

    d) 50%

  • 6

    The profession with the folowing scope of work: development of acommunity, town, city or region, development of a site for particular needs, land use and zoning, pre-investment/ feasibility studies.

    d) environmental planner

  • 7

    Part-time construction supervision is falls under the folowing services of the landscape architect:

    c) specialized allied service

  • 8

    Which of the following statements is not true.

    b) The construction manager can make decisions on the project's design matters.

  • 9

    Amode of supply under the GATS where the professional and client do not meet each other. Means of trade is communication through the information technology

    a) cross border

  • 10

    Based on the standard owner-architect agreement, one of the folowing items should be paid by the architect and not by the owner. Which is this item?

    b) tax that the govemment may impose on the Architect as a consequence of the services performed for the project.

  • 11

    The project manager acts as overall coordinator and ls compensated on a percentage basis of—————- of estimated project cost

    10-15%

  • 12

    ___________ means ot build in, mount ni positions, connect or apply any object specified ready for the intended use.

    b) build

  • 13

    ________ refers ot the additional information on contract documents issuedot bidders before date of bidding.

    d) instructions ot bidders.

  • 14

    The approved form of security furnished by the Contractor and his Surety as a guarantee ot the quality of materials and equipment instaled and the workmanship performed by the Contractor.

    b) Payment Bond

  • 15

    Printed documents stipulating the procedural and administrative aspects of the contract.

    a) specifications

  • 16

    Which of these statements is true?

    a) The project owner shal provide al temporary facilities and enclosures before construction starts

  • 17

    nI the three-part section format for writing specifications, al but one of these fal under Part I: Execution

    c) patching

  • 18

    Calls by an agency of government, institution or corporation to shortlist a pool of consultants and contractors; the invitations specify which documents are to be submitted for review (ex company profile, financial statements) in the prescribed format

    Invitation for pre-qualifications

  • 19

    A person who allows his name and signature to be used in abetting (a crime) the illegal practice of profession

    Dummy

  • 20

    A proposal or bid to undertake a project for a specified amount of time

    Bid tender

  • 21

    Amount of time rerquired to complete each acrivity

    Duration

  • 22

    Which of the following is not a scheduling technique?

    None of the choices

  • 23

    Leeway that can be used without adverse effect on the project

    Float or Slack

  • 24

    These are the importance of time management except:

    operating instructions

  • 25

    Urban Development and Housing Act of 1992

    RA 7279

  • 26

    An act regulating the practice of Landscape Architecture in the Philippines

    RA 9053

  • 27

    Who appoints the members of the Board from a list forwarded by the Commision?

    President of the Philippines

  • 28

    Term of the members of the board

    3 years

  • 29

    Compensation of Board members shll be accordance to

    PRC Modernization Act of 2000