ログイン

PCAR 2nd
21問 • 1年前
  • Dale Cabanlong
  • 通報

    問題一覧

  • 1

    Conversions of any sort for the purpose of using fuel rating or grade other than listed in the engine specifications (Part IS 5.1.1.2 )

    powerplant major modification

  • 2

    Any maintenance operation requiring of the cold and hot sections

    powerplant major repair

  • 3

    In accordance with table of sanction under PCAR’S part 1, the penalty for “Improperly releasing an aircraft to service” is

    30 to 60 days suspension

  • 4

    In accordance with table of sanction under PCAR’S part 1, the penalty for “failure to complete and sign maintenance release ” is

    15 to 30 days suspension

  • 5

    Who is responsible for maintaining an aircraft’s airworthy condition including compliance with airworthiness directives ? (PCAR

    registered owner or operator

  • 6

    What is the regulatory definition of preventive maintenance

    Simple or minor preservation operations and the replacement of small standard parts, not involving complex assembly operations.

  • 7

    Fabrication performed in the wing main ribs and compression members is a (IS: 5.1.1.2)

    airframe major repair

  • 8

    A special flight permit may be issued for an aircraft that may not currently meet applicable airworthiness requirements, but is capable of safe flight when: Flying the aircraft to a base where repairs, alterations, or maintenance are to be performed, or to a point of storage. . Delivering or exporting the aircraft. Production flight testing new production aircraft. Evacuating aircraft from areas of impending danger. Conducting customer demonstration flights in new production aircraft that have completed production flight tests. Which statements are correct? A special flight permit may be issued for an aircraft that may not currently meet applicable airworthiness requirements, but is capable of safe flight when: Flying the aircraft to a base where repairs, alterations, or maintenance are to be performed, or to a point of storage. . Delivering or exporting the aircraft. Production flight testing new production aircraft. Evacuating aircraft from areas of impending danger. Conducting customer demonstration flights in new production aircraft that have completed production flight tests. Which statements are correct?

    all of the statements are correct

  • 9

    Calibration and repair of instruments is an example of (Part IS:

    appliance major repair

  • 10

    The AMO shall relieve the person performing maintenance functions from all duties for how many consecutive hours during any 7 consecutive day period?

    24 hours

  • 11

    Who is responsible for maintaining the aircraft from unairworthy condition

    licnesed aircraft maintenance technician/mechanic

  • 12

    Standard certificate of airworthiness directives, special certificate of airworthiness directives, and certificate of airworthiness issued for restricted or limited category aircraft, as long as the maintenance, preventive maintenance and alterations are performed, are effective for how many year/s?

    1 year

  • 13

    A certification confirming that the maintenance work to which it relates has been complied with in accordance with the applicable standards of airworthiness using approved date

    maintenance release

  • 14

    A certificate or rating issued to an approved maintenance organization is valid for how many year/s from the date of issuance subject to compliance with the AMO procedure manual?

    5 years

  • 15

    Who is authorized to repair an aircraft instrument

    certified repair station

  • 16

    Following unscheduled duty periods, the person performing maintenance functions for an aircraft shall have mandatory rest period of

    10 hours

  • 17

    A holder of an AMT license desiring to renew must accomplish and submit the requirements within how many days prior to the expiry of his/her license?

    30 days

  • 18

    An Aviation Maintenance Technician or Specialist who seeks reinstatement of his/her license that has already expired for 24 months from expiration date shall

    Pass the Civil Aviation Regulations test and must undergo the appropriate recurrent training from an Approved Maintenance Organization, or any school or facility accredited by the Authority for such purpose

  • 19

    The Contracting State which approved the original type certificate and any subsequent supplemental type certificates for an aircraft, or which approved the design of an aeronautical product or appliance

    state of design

  • 20

    Each person performing a major repair or major modification shall forward a copy of that from to the authority in accordance with authority instructions within 48 hours after aeronautical product is approved for return to service (part IS 5.7.1.1)

    48 hours

  • 21

    No person may schedule a personnel to perform a maintenance task on an aircraft for more than how many consecutive hours of duty

    12 hours

  • MPLE

    MPLE

    ユーザ名非公開 · 41問 · 13日前

    MPLE

    MPLE

    41問 • 13日前
    ユーザ名非公開

    Weekly Test 3

    Weekly Test 3

    ユーザ名非公開 · 50問 · 13日前

    Weekly Test 3

    Weekly Test 3

    50問 • 13日前
    ユーザ名非公開

    Weekly Test 1

    Weekly Test 1

    ユーザ名非公開 · 50問 · 13日前

    Weekly Test 1

    Weekly Test 1

    50問 • 13日前
    ユーザ名非公開

    Refresher SPDI 1

    Refresher SPDI 1

    ユーザ名非公開 · 9問 · 13日前

    Refresher SPDI 1

    Refresher SPDI 1

    9問 • 13日前
    ユーザ名非公開

    Refresher SPDI 1

    Refresher SPDI 1

    ユーザ名非公開 · 100問 · 13日前

    Refresher SPDI 1

    Refresher SPDI 1

    100問 • 13日前
    ユーザ名非公開

    Definition of Terms 2

    Definition of Terms 2

    ユーザ名非公開 · 90問 · 13日前

    Definition of Terms 2

    Definition of Terms 2

    90問 • 13日前
    ユーザ名非公開

    WT 1

    WT 1

    ユーザ名非公開 · 50問 · 13日前

    WT 1

    WT 1

    50問 • 13日前
    ユーザ名非公開

    Standpipe Requirements

    Standpipe Requirements

    ユーザ名非公開 · 29問 · 13日前

    Standpipe Requirements

    Standpipe Requirements

    29問 • 13日前
    ユーザ名非公開

    Principles and Code of Ethics

    Principles and Code of Ethics

    ユーザ名非公開 · 29問 · 13日前

    Principles and Code of Ethics

    Principles and Code of Ethics

    29問 • 13日前
    ユーザ名非公開

    RNPCP Appendix A and B

    RNPCP Appendix A and B

    ユーザ名非公開 · 79問 · 13日前

    RNPCP Appendix A and B

    RNPCP Appendix A and B

    79問 • 13日前
    ユーザ名非公開

    RNPCP Chapter 10 to 13

    RNPCP Chapter 10 to 13

    ユーザ名非公開 · 93問 · 13日前

    RNPCP Chapter 10 to 13

    RNPCP Chapter 10 to 13

    93問 • 13日前
    ユーザ名非公開

    RNPCP Chapter 6 to 9

    RNPCP Chapter 6 to 9

    ユーザ名非公開 · 94問 · 13日前

    RNPCP Chapter 6 to 9

    RNPCP Chapter 6 to 9

    94問 • 13日前
    ユーザ名非公開

    Practical Problems and Experiences REFRESHER 2

    Practical Problems and Experiences REFRESHER 2

    ユーザ名非公開 · 70問 · 13日前

    Practical Problems and Experiences REFRESHER 2

    Practical Problems and Experiences REFRESHER 2

    70問 • 13日前
    ユーザ名非公開

    Practical Problems and Experiences REFRESHER 1

    Practical Problems and Experiences REFRESHER 1

    ユーザ名非公開 · 100問 · 13日前

    Practical Problems and Experiences REFRESHER 1

    Practical Problems and Experiences REFRESHER 1

    100問 • 13日前
    ユーザ名非公開

    Plumbing Code WSFU

    Plumbing Code WSFU

    ユーザ名非公開 · 58問 · 13日前

    Plumbing Code WSFU

    Plumbing Code WSFU

    58問 • 13日前
    ユーザ名非公開

    Plumbing Arithmetic Terms 4

    Plumbing Arithmetic Terms 4

    ユーザ名非公開 · 27問 · 13日前

    Plumbing Arithmetic Terms 4

    Plumbing Arithmetic Terms 4

    27問 • 13日前
    ユーザ名非公開

    Plumbing Arithmetic Terms 3

    Plumbing Arithmetic Terms 3

    ユーザ名非公開 · 49問 · 13日前

    Plumbing Arithmetic Terms 3

    Plumbing Arithmetic Terms 3

    49問 • 13日前
    ユーザ名非公開

    Plumbing Arithmetic Terms 2

    Plumbing Arithmetic Terms 2

    ユーザ名非公開 · 47問 · 13日前

    Plumbing Arithmetic Terms 2

    Plumbing Arithmetic Terms 2

    47問 • 13日前
    ユーザ名非公開

    Plumbing Arithmetic Terms 1

    Plumbing Arithmetic Terms 1

    ユーザ名非公開 · 49問 · 13日前

    Plumbing Arithmetic Terms 1

    Plumbing Arithmetic Terms 1

    49問 • 13日前
    ユーザ名非公開

    Plumbing Tools 1

    Plumbing Tools 1

    ユーザ名非公開 · 87問 · 13日前

    Plumbing Tools 1

    Plumbing Tools 1

    87問 • 13日前
    ユーザ名非公開

    問題一覧

  • 1

    Conversions of any sort for the purpose of using fuel rating or grade other than listed in the engine specifications (Part IS 5.1.1.2 )

    powerplant major modification

  • 2

    Any maintenance operation requiring of the cold and hot sections

    powerplant major repair

  • 3

    In accordance with table of sanction under PCAR’S part 1, the penalty for “Improperly releasing an aircraft to service” is

    30 to 60 days suspension

  • 4

    In accordance with table of sanction under PCAR’S part 1, the penalty for “failure to complete and sign maintenance release ” is

    15 to 30 days suspension

  • 5

    Who is responsible for maintaining an aircraft’s airworthy condition including compliance with airworthiness directives ? (PCAR

    registered owner or operator

  • 6

    What is the regulatory definition of preventive maintenance

    Simple or minor preservation operations and the replacement of small standard parts, not involving complex assembly operations.

  • 7

    Fabrication performed in the wing main ribs and compression members is a (IS: 5.1.1.2)

    airframe major repair

  • 8

    A special flight permit may be issued for an aircraft that may not currently meet applicable airworthiness requirements, but is capable of safe flight when: Flying the aircraft to a base where repairs, alterations, or maintenance are to be performed, or to a point of storage. . Delivering or exporting the aircraft. Production flight testing new production aircraft. Evacuating aircraft from areas of impending danger. Conducting customer demonstration flights in new production aircraft that have completed production flight tests. Which statements are correct? A special flight permit may be issued for an aircraft that may not currently meet applicable airworthiness requirements, but is capable of safe flight when: Flying the aircraft to a base where repairs, alterations, or maintenance are to be performed, or to a point of storage. . Delivering or exporting the aircraft. Production flight testing new production aircraft. Evacuating aircraft from areas of impending danger. Conducting customer demonstration flights in new production aircraft that have completed production flight tests. Which statements are correct?

    all of the statements are correct

  • 9

    Calibration and repair of instruments is an example of (Part IS:

    appliance major repair

  • 10

    The AMO shall relieve the person performing maintenance functions from all duties for how many consecutive hours during any 7 consecutive day period?

    24 hours

  • 11

    Who is responsible for maintaining the aircraft from unairworthy condition

    licnesed aircraft maintenance technician/mechanic

  • 12

    Standard certificate of airworthiness directives, special certificate of airworthiness directives, and certificate of airworthiness issued for restricted or limited category aircraft, as long as the maintenance, preventive maintenance and alterations are performed, are effective for how many year/s?

    1 year

  • 13

    A certification confirming that the maintenance work to which it relates has been complied with in accordance with the applicable standards of airworthiness using approved date

    maintenance release

  • 14

    A certificate or rating issued to an approved maintenance organization is valid for how many year/s from the date of issuance subject to compliance with the AMO procedure manual?

    5 years

  • 15

    Who is authorized to repair an aircraft instrument

    certified repair station

  • 16

    Following unscheduled duty periods, the person performing maintenance functions for an aircraft shall have mandatory rest period of

    10 hours

  • 17

    A holder of an AMT license desiring to renew must accomplish and submit the requirements within how many days prior to the expiry of his/her license?

    30 days

  • 18

    An Aviation Maintenance Technician or Specialist who seeks reinstatement of his/her license that has already expired for 24 months from expiration date shall

    Pass the Civil Aviation Regulations test and must undergo the appropriate recurrent training from an Approved Maintenance Organization, or any school or facility accredited by the Authority for such purpose

  • 19

    The Contracting State which approved the original type certificate and any subsequent supplemental type certificates for an aircraft, or which approved the design of an aeronautical product or appliance

    state of design

  • 20

    Each person performing a major repair or major modification shall forward a copy of that from to the authority in accordance with authority instructions within 48 hours after aeronautical product is approved for return to service (part IS 5.7.1.1)

    48 hours

  • 21

    No person may schedule a personnel to perform a maintenance task on an aircraft for more than how many consecutive hours of duty

    12 hours