1
true
2
for every 75 cu.m
3
1 - set consisting of 3 concrete cylinder samples for ot more than 25 pupes cast in the field and 1 - inspection report for each size for not more than 25 pipes cast in the field.
4
1 - sample for every 100 cans or fraction thereof
5
1 - Quality test
6
100%
7
14 days after pouring
8
Class C1
9
at optimum moisture content
10
80
11
unsuitable soil
12
consistency
13
very coarse sand
14
false
15
flexural
16
false
17
water and fine aggregates
18
after 3 days
19
strength
20
Bottom
21
40%
22
6
23
C2
24
more then 100%
25
1,603 tons/cu.m
26
0.30 li/sq.m
27
5
28
1:2
29
true
30
4
31
less than 6
32
poor
33
group index
34
false
35
total weight of soil
36
compaction test
37
sieve analysis test
38
Gradular
39
sieve test
40
less than 3
41
plastic limit
42
all of the above
43
test to determine volume change
44
none of the preceding
45
water content
46
40 ton
47
thermoplastic
48
viscosity at 60*C
49
500 sq.m
50
335 sq.m
51
passing the no.8 sieve
52
1.5 mm
53
viscosity
54
3.2 to 4.8 mm
55
0.5 to 1.0 mass %
56
make a trial section
57
compressive strength test
58
50%
59
the DPWH project personnel
60
before start of work items
61
overheating during manufacture
62
cold climate
63
materials test report
64
pneumatic
65
blown asphalt
66
DPWH materials engineer
67
75 pcs
68
75 sets of 3
69
tar
70
kerosene
71
job mix formula
72
density and compaction of complete pavement
73
by the use of 3 meter straight edge
74
penetration
75
DPWH project/material engineer
76
temperature
77
tandem - smooth wheeled roller
78
5 kph
79
degree of compaction
80
When the asphalt has cooled to atmospheric temperature
81
penetrometer
82
viscometer
83
4% air voids
84
flash point test
85
asphalt mixes
86
Tensile and bending
87
three edge bearing method
88
18 units
89
3 samples
90
3 to 5%
91
15 to 30 mins
92
Class A riprap
93
100 mm
94
No. 8 sieve
95
90 mins
96
50 mm
97
3 days
98
42 - 45% pigment ; 53 - 55% vehicle
99
23% pigment and 77% vehicle
MT 4
MT 4
ユーザ名非公開 · 60問 · 11日前MT 4
MT 4
60問 • 11日前MPLE
MPLE
ユーザ名非公開 · 41問 · 13日前MPLE
MPLE
41問 • 13日前Weekly Test 3
Weekly Test 3
ユーザ名非公開 · 50問 · 13日前Weekly Test 3
Weekly Test 3
50問 • 13日前Weekly Test 2
Weekly Test 2
ユーザ名非公開 · 50問 · 13日前Weekly Test 2
Weekly Test 2
50問 • 13日前Refresher SPDI 1
Refresher SPDI 1
ユーザ名非公開 · 9問 · 13日前Refresher SPDI 1
Refresher SPDI 1
9問 • 13日前Refresher SPDI 1
Refresher SPDI 1
ユーザ名非公開 · 100問 · 13日前Refresher SPDI 1
Refresher SPDI 1
100問 • 13日前Definition of Terms 3
Definition of Terms 3
ユーザ名非公開 · 90問 · 13日前Definition of Terms 3
Definition of Terms 3
90問 • 13日前Definition of Terms 1
Definition of Terms 1
ユーザ名非公開 · 90問 · 13日前Definition of Terms 1
Definition of Terms 1
90問 • 13日前WT 6
WT 6
ユーザ名非公開 · 50問 · 13日前WT 6
WT 6
50問 • 13日前WT 3
WT 3
ユーザ名非公開 · 50問 · 13日前WT 3
WT 3
50問 • 13日前RNPCP Chapter 6 to 9
RNPCP Chapter 6 to 9
ユーザ名非公開 · 94問 · 13日前RNPCP Chapter 6 to 9
RNPCP Chapter 6 to 9
94問 • 13日前Item 303 Bituminous Seal Coat
Item 303 Bituminous Seal Coat
ユーザ名非公開 · 20問 · 13日前Item 303 Bituminous Seal Coat
Item 303 Bituminous Seal Coat
20問 • 13日前Item 301 Bituminous Prime Coat
Item 301 Bituminous Prime Coat
ユーザ名非公開 · 10問 · 13日前Item 301 Bituminous Prime Coat
Item 301 Bituminous Prime Coat
10問 • 13日前Item 300 Aggregate Surface Course
Item 300 Aggregate Surface Course
ユーザ名非公開 · 11問 · 13日前Item 300 Aggregate Surface Course
Item 300 Aggregate Surface Course
11問 • 13日前Item 206 Chemically Stabilized Road Mix Subbase/Base Course
Item 206 Chemically Stabilized Road Mix Subbase/Base Course
ユーザ名非公開 · 11問 · 13日前Item 206 Chemically Stabilized Road Mix Subbase/Base Course
Item 206 Chemically Stabilized Road Mix Subbase/Base Course
11問 • 13日前Item 205 Asphalt Stabilized Road Mix Base Course
Item 205 Asphalt Stabilized Road Mix Base Course
ユーザ名非公開 · 7問 · 13日前Item 205 Asphalt Stabilized Road Mix Base Course
Item 205 Asphalt Stabilized Road Mix Base Course
7問 • 13日前Item 207 Portland Cement Stabilized Treated Plant Mix Base Course
Item 207 Portland Cement Stabilized Treated Plant Mix Base Course
ユーザ名非公開 · 13問 · 13日前Item 207 Portland Cement Stabilized Treated Plant Mix Base Course
Item 207 Portland Cement Stabilized Treated Plant Mix Base Course
13問 • 13日前Item 204 Portland Cement Stabilized Road Mix Base Course
Item 204 Portland Cement Stabilized Road Mix Base Course
ユーザ名非公開 · 7問 · 13日前Item 204 Portland Cement Stabilized Road Mix Base Course
Item 204 Portland Cement Stabilized Road Mix Base Course
7問 • 13日前Item 203 Lime Stabilized Road Mix Base Course
Item 203 Lime Stabilized Road Mix Base Course
ユーザ名非公開 · 27問 · 13日前Item 203 Lime Stabilized Road Mix Base Course
Item 203 Lime Stabilized Road Mix Base Course
27問 • 13日前Item 202 Crushed Aggregate Base Course
Item 202 Crushed Aggregate Base Course
ユーザ名非公開 · 18問 · 13日前Item 202 Crushed Aggregate Base Course
Item 202 Crushed Aggregate Base Course
18問 • 13日前問題一覧
1
true
2
for every 75 cu.m
3
1 - set consisting of 3 concrete cylinder samples for ot more than 25 pupes cast in the field and 1 - inspection report for each size for not more than 25 pipes cast in the field.
4
1 - sample for every 100 cans or fraction thereof
5
1 - Quality test
6
100%
7
14 days after pouring
8
Class C1
9
at optimum moisture content
10
80
11
unsuitable soil
12
consistency
13
very coarse sand
14
false
15
flexural
16
false
17
water and fine aggregates
18
after 3 days
19
strength
20
Bottom
21
40%
22
6
23
C2
24
more then 100%
25
1,603 tons/cu.m
26
0.30 li/sq.m
27
5
28
1:2
29
true
30
4
31
less than 6
32
poor
33
group index
34
false
35
total weight of soil
36
compaction test
37
sieve analysis test
38
Gradular
39
sieve test
40
less than 3
41
plastic limit
42
all of the above
43
test to determine volume change
44
none of the preceding
45
water content
46
40 ton
47
thermoplastic
48
viscosity at 60*C
49
500 sq.m
50
335 sq.m
51
passing the no.8 sieve
52
1.5 mm
53
viscosity
54
3.2 to 4.8 mm
55
0.5 to 1.0 mass %
56
make a trial section
57
compressive strength test
58
50%
59
the DPWH project personnel
60
before start of work items
61
overheating during manufacture
62
cold climate
63
materials test report
64
pneumatic
65
blown asphalt
66
DPWH materials engineer
67
75 pcs
68
75 sets of 3
69
tar
70
kerosene
71
job mix formula
72
density and compaction of complete pavement
73
by the use of 3 meter straight edge
74
penetration
75
DPWH project/material engineer
76
temperature
77
tandem - smooth wheeled roller
78
5 kph
79
degree of compaction
80
When the asphalt has cooled to atmospheric temperature
81
penetrometer
82
viscometer
83
4% air voids
84
flash point test
85
asphalt mixes
86
Tensile and bending
87
three edge bearing method
88
18 units
89
3 samples
90
3 to 5%
91
15 to 30 mins
92
Class A riprap
93
100 mm
94
No. 8 sieve
95
90 mins
96
50 mm
97
3 days
98
42 - 45% pigment ; 53 - 55% vehicle
99
23% pigment and 77% vehicle