  • 1

    . What Design code should the design team first consider in the plan preparation which is critical in applying the Building Permit?

    National Building Code

  • 2

    Which of the following is not a referral code of the National Building Code?

    Civil Code of the Philippines

  • 3

    . To whom the Junior Architect will be responsible if there are errors found on theplans he heads to produce?c. Building Official

    Principal Architect

  • 4

    If the apprentices, wish to have their logbok for their ALE, who will sign as the mentor?

    . Principal Architect

  • 5

    . After how many years can a newly passed Architect sign the ALE aspirants as a mentor?

    d. NONE

  • 6

    In small-scale projects, Clerk-of-work are commonly referred to as the

    . Foreman

  • 7

    . Once an architect is duly registered, membership to the United Architects of the Philippines is:

    Automatic

  • 8

    .Which of the following Architectural organizations is the duly accredited IAPOA?

    . UAP

  • 9

    . What is required of agencies or organizations that secure the services of a foreign professional authorized by law to practice in the Philippines?

    Secure a special permit from PRC and DOLE

  • 10

    . If an architect finds out that a colleague of him/her is rendering works without any service agreement, what should be the next step of the architect?

    Call the attention of the architect about the violation

  • 11

    . Contract documents should be signed in how many copies by both the contractor and the client duly witnessed?

    Quintuplicate

  • 12

    Shop drawings are prepared by the Contractor to be approved by the architect. Who checks the accuracy of the sub-contractor's shop drawings?

    Contractor

  • 13

    Whatis the maximum length ofi mprisonment or people conieded and found gulty of vio;ating any provisions of RA 92866

    . 6 years

  • 14

    Who implements the final judgment for violation of the provisions of RA9266?d. 5 years

    . PRC BOA

  • 15

    . The final judgment rendered by the Board of Architecture can be appealed thru

    . Court of Appeals

  • 16

    . Architect Nuestro was commissioned to design a Residential Project under Detailed Architectural Design Service (DADS),how much is the professional fee of the architect if the project cost is Ten Million pesos?

    ,600,000

  • 17

    Who will apply for a building permit on this project?

    Client

  • 18

    How much professional fee is the architect entitled?

    . Design fee of 10% plus 7% of DB and reimbursable expenses

  • 19

    . Under the Design-Build on guaranteed maximum cost, if the guaranteed maximum cost is exceeded by 10%, the extra cost exceeding the 10% shall be shouldered by whom?

    . Architect

  • 20

    . The Architect's Guidelines on Methods of Compensation and Schedule of Fees is in compliance with:

    PRBOA Resolution No. 3 s.2010

  • 21

    What is the Recommended Professional Fee for projects belonging to Moderate complexity

    . 6 percent

  • 22

    Fee adjustment factors should be based on the following except

    None of the Choices

  • 23

    The first Standard of Professional Practice was promulgated on

    1979

  • 24

    Who among the following should be the "LEAD" in the conduct of a Bid Conference?

    .Architect of Record

  • 25

    All receipts under Design-Build Project shall be under the name of whom?

    Client

  • 26

    For monetary claims and disputes of less than Two Hundred Thousand Pesos, the process of collection should be through:

    . Small Claims Court

  • 27

    What section under RA 9266 Reciprocity falls?v

    27

  • 28

    What do you call the plans that incorporate the changes made during the construction?

    As-built plans

  • 29

    Which of the following should have an as-built plan?

    All of the above

  • 30

    What is a completely valid proposal to do the work called for by the requirement of the project?

    Contract

  • 31

    c. Whose technical control shall a full-time construction inspector be when engaged by the client

    Owner

  • 32

    Office supplies and consumables at the site office shall be at the expense of the

    Contractor

  • 33

    Who is vested with the administration and enforcement of the NBCP?

    Office of the Building Official

  • 34

    Exempted from payment of building permit fees are traditional Indigenous family dwellings and

    public buildings

  • 35

    . Buildings or structures that are exempted from securing a bullding permit?

    Indigenous family dwellings

  • 36

    An issued building permit shall expire if the building or works authorized is not commenced within a period of years from the date of such permits.

    1

  • 37

    . If in any case, a project under arbitration, how many days should both parties comply with the arbitration order

    30 days or 1 month

  • 38

    What should an architect first do when he/she comes across a prospective client?

    Submits professional brief and fee proposal

  • 39

    Which of the processes comes first?

    sign and service agreeement

  • 40

    What stage of the process does the professional fee of the architect is approved by the Owner

    Before the submission of the schematic design

  • 41

    .What is the PRBOA resolution amending earlier resolutions regarding Code of Ethical Conduct for Registered and Licensed Architects?

    . No.5 series of 2018

  • 42

    The Architect's Credo clearly states that it is the architect's duty to protect our common environment and to preserve the for the sake of the present and future generations.

    Architectural heritage

  • 43

    For the Architect's ethical relationship, what sector group or people that has not been mentioned?

    gorvernment

  • 44

    . Knowledge in office operations, office management, accounting, finance, and taxation is best described in:

    . Architectural Management

  • 45

    Who prepares the Bill of Materials (BOM)?

    Architect

  • 46

    What is the suitable estimate technique during the Project definition and Schematic Design Phase of the Project?

    .Area Method

  • 47

    In the construction estimate, what is the usual percentage of contingency added by the contractor to the cost?

    .5%

  • 48

    What is the general basis of the Architects minimum basic fee?

    .Project Construction Cost

  • 49

    Who shall accredit the Continuing Professional Development providers?

    PRBOA

  • 50

    Under the CPD Law, Architects who wish to renew their licenses must acquire how many CPD units every renewal cycle

    15 units

  • 51

    Who is responsible for preparing the detailed drawings for construction?

    architect

  • 52

    What document outlines the responsibilities of the architect and the client?

    Contract Agreement

  • 53

    Which of the following must be approved by the local govemment before construction can commence?

    .Building Permit

  • 54

    What is the term for the architect's preliminary design concept?

    . Schematic Design

  • 55

    Which phase involves the architect visiting the construction site to ensure compliance with the design?

    Construction Administration

  • 56

    Who typically prepares the Bill of Quantities?

    .Quantity Surveyor

  • 57

    What is the purpose of a feasibility study in architecture?

    To determine project viability

  • 58

    . In project management, what does CPM stand for?

    Critical Path Method

  • 59

    Who is responsible for the overall safety on the construction site?

    contractor

  • 60

    . What is the main focus of the design development phase?

    Detailed design and specifications

  • 61

    What document outlines the specifications for materials and workmanship?

    Specifications

  • 62

    . During which phase does the architect assist the client in bidding and negotiation?

    pre-construction

  • 63

    What is the primary purpose of a punch list?

    To identify remaining work

  • 64

    Who is responsible for obtaining the Certificate of Occupancy?

    owner

  • 65

    What is the term for changes made to the construction documents after bidding?

    change order

  • 66

    Which of the following is not part of the contract documents?

    Shop Drawings

  • 67

    Who typically approves the shop drawings?

    .Architect

  • 68

    . What is the primary role of the construction manager?

    . Overseeing construction activities

  • 69

    What is the importance of zoning ordinances in architecture?

    .To manage land use and development

  • 70

    What is an architect's responsibility during the construction phase?

    . To ensure design intent is followed

  • 71

    . What is the purpose of a site analysis?

    to understand the site's condition and constrains

  • 72

    In which phase are design concepts typically tested and refined?

    desisgn development

  • 73

    What is the role of an architect in the post-occupancy evaluation phase?

    ensure the building is functioning as intended

  • 74

    What is the legal basis for the practice of architecture in the Philippines?a. Presidential Decree No. 1096

    Republic Act No. 9266

  • 75

    . What does the "Uniform Building Code" regulate?

    . Structural integrity and safety standards

  • 76

    Who is primarily responsible for project cost control?

    Quantity Surveyor

  • 77

    Which document is essential for obtaining financing for a constructionproject?

    Feasibility Study

  • 78

    What is a "design brief"?

    A document outlining the project requirements and constraints

  • 79

    What is the main objective of value engineering?

    to optimize cost withhout compromising quality

  • 80

    What does the term "punch list" refer to in construction?

    What does the term "punch list" refer to in construction?

  • 81

    Who typically provides the performance bond for a construction project?

    Contractor

  • 82

    What is the purpose of a "change order"?

    To document changes to the scope of work

  • 83

    What is the architect's role in project commissioning?

    .Managing the construction site

  • 84

    . What is a "charrette" in architectural practice?

    A collaborative session to solve design problems

  • 85

    What does "LEED" certification stand for?

    .Leadership in Energy and Environmental Design

  • 86

    . Which document is essential for starting the construction phase?

    .Building Permit

  • 87

    What is the primary focus of the programming phase in architecture?

    Defining project goals and requirements

  • 88

    What is the role of an "owner's representative"?

    To manage the construction process on behalf of the owner

  • 89

    What is a "punch list" also known as?c. Design list

    .Deficiency list

  • 90

    Who is responsible for the reparation of as-built drawings?

    .Contractor

  • 91

    What is the importance of the "General Conditions" in a contract

    To outline the rights and responsibilities of the partles

  • 92

    What is the purpose of a "bid bond"?

    . To guarantee the contractor will enter into a contract if awarded the bid

  • 93

    Who is responsible for the quality of construction work?

    .Contractor

  • 94

    What is the "Certificate of Substantial Completion"?

    . A certificate stating the project is complete enough to be used for its intended purpose

  • 95

    What is the role of a "construction superintendent"?

    Managing day-to-day operations on the construction site

  • 96

    What is a "specification" in construction?

    A document describing materials and workmanship

  • 97

    What is "fast-tracking" in project management?

    Starting construction before the design is complete

  • 98

    Who is resonsible for the issuance of the Certificate of Occupancy?

    Local Government tanga eya owner

  • 99

    What does "shop drawing" refer to?

    Detailed drawings prepared by subcontractors

  • 100

    What is the "scope of work" in a construction project?

    The responsibilities and tasks to be completed

  • btect

    btect

    ユーザ名非公開 · 10問 · 3年前

    btect

    btect

    10問 • 3年前
    ユーザ名非公開

    btect

    btect

    ユーザ名非公開 · 28問 · 3年前

    btect

    btect

    28問 • 3年前
    ユーザ名非公開

    summer btect

    summer btect

    ユーザ名非公開 · 70問 · 2年前

    summer btect

    summer btect

    70問 • 2年前
    ユーザ名非公開

    summer btect II

    summer btect II

    ユーザ名非公開 · 35問 · 2年前

    summer btect II

    summer btect II

    35問 • 2年前
    ユーザ名非公開

    btect division 3

    btect division 3

    ユーザ名非公開 · 7問 · 2年前

    btect division 3

    btect division 3

    7問 • 2年前
    ユーザ名非公開

    midterm

    midterm

    ユーザ名非公開 · 100問 · 2年前

    midterm

    midterm

    100問 • 2年前
    ユーザ名非公開

    quiz

    quiz

    ユーザ名非公開 · 57問 · 2年前

    quiz

    quiz

    57問 • 2年前
    ユーザ名非公開

    quiz

    quiz

    ユーザ名非公開 · 28問 · 2年前

    quiz

    quiz

    28問 • 2年前
    ユーザ名非公開

    quiz

    quiz

    ユーザ名非公開 · 29問 · 2年前

    quiz

    quiz

    29問 • 2年前
    ユーザ名非公開

    metal

    metal

    ユーザ名非公開 · 27問 · 2年前

    metal

    metal

    27問 • 2年前
    ユーザ名非公開

    WATER PROOFING

    WATER PROOFING

    ユーザ名非公開 · 10問 · 2年前

    WATER PROOFING

    WATER PROOFING

    10問 • 2年前
    ユーザ名非公開

    GLASS

    GLASS

    ユーザ名非公開 · 21問 · 2年前

    GLASS

    GLASS

    21問 • 2年前
    ユーザ名非公開

    plan midterm

    plan midterm

    ユーザ名非公開 · 33問 · 2年前

    plan midterm

    plan midterm

    33問 • 2年前
    ユーザ名非公開

    final plan

    final plan

    ユーザ名非公開 · 7問 · 2年前

    final plan

    final plan

    7問 • 2年前
    ユーザ名非公開

    history

    history

    ユーザ名非公開 · 99問 · 1年前

    history

    history

    99問 • 1年前
    ユーザ名非公開

    building utilities

    building utilities

    ユーザ名非公開 · 100問 · 1年前

    building utilities

    building utilities

    100問 • 1年前
    ユーザ名非公開

    structural

    structural

    ユーザ名非公開 · 86問 · 1年前

    structural

    structural

    86問 • 1年前
    ユーザ名非公開

    HOUSING AND URBAN PLANNING

    HOUSING AND URBAN PLANNING

    ユーザ名非公開 · 98問 · 1年前

    HOUSING AND URBAN PLANNING

    HOUSING AND URBAN PLANNING

    98問 • 1年前
    ユーザ名非公開

    toa

    toa

    ユーザ名非公開 · 99問 · 1年前

    toa

    toa

    99問 • 1年前
    ユーザ名非公開

    btect

    btect

    ユーザ名非公開 · 98問 · 1年前

    btect

    btect

    98問 • 1年前
    ユーザ名非公開

    問題一覧

  • 1

    . What Design code should the design team first consider in the plan preparation which is critical in applying the Building Permit?

    National Building Code

  • 2

    Which of the following is not a referral code of the National Building Code?

    Civil Code of the Philippines

  • 3

    . To whom the Junior Architect will be responsible if there are errors found on theplans he heads to produce?c. Building Official

    Principal Architect

  • 4

    If the apprentices, wish to have their logbok for their ALE, who will sign as the mentor?

    . Principal Architect

  • 5

    . After how many years can a newly passed Architect sign the ALE aspirants as a mentor?

    d. NONE

  • 6

    In small-scale projects, Clerk-of-work are commonly referred to as the

    . Foreman

  • 7

    . Once an architect is duly registered, membership to the United Architects of the Philippines is:

    Automatic

  • 8

    .Which of the following Architectural organizations is the duly accredited IAPOA?

    . UAP

  • 9

    . What is required of agencies or organizations that secure the services of a foreign professional authorized by law to practice in the Philippines?

    Secure a special permit from PRC and DOLE

  • 10

    . If an architect finds out that a colleague of him/her is rendering works without any service agreement, what should be the next step of the architect?

    Call the attention of the architect about the violation

  • 11

    . Contract documents should be signed in how many copies by both the contractor and the client duly witnessed?

    Quintuplicate

  • 12

    Shop drawings are prepared by the Contractor to be approved by the architect. Who checks the accuracy of the sub-contractor's shop drawings?

    Contractor

  • 13

    Whatis the maximum length ofi mprisonment or people conieded and found gulty of vio;ating any provisions of RA 92866

    . 6 years

  • 14

    Who implements the final judgment for violation of the provisions of RA9266?d. 5 years

    . PRC BOA

  • 15

    . The final judgment rendered by the Board of Architecture can be appealed thru

    . Court of Appeals

  • 16

    . Architect Nuestro was commissioned to design a Residential Project under Detailed Architectural Design Service (DADS),how much is the professional fee of the architect if the project cost is Ten Million pesos?

    ,600,000

  • 17

    Who will apply for a building permit on this project?

    Client

  • 18

    How much professional fee is the architect entitled?

    . Design fee of 10% plus 7% of DB and reimbursable expenses

  • 19

    . Under the Design-Build on guaranteed maximum cost, if the guaranteed maximum cost is exceeded by 10%, the extra cost exceeding the 10% shall be shouldered by whom?

    . Architect

  • 20

    . The Architect's Guidelines on Methods of Compensation and Schedule of Fees is in compliance with:

    PRBOA Resolution No. 3 s.2010

  • 21

    What is the Recommended Professional Fee for projects belonging to Moderate complexity

    . 6 percent

  • 22

    Fee adjustment factors should be based on the following except

    None of the Choices

  • 23

    The first Standard of Professional Practice was promulgated on

    1979

  • 24

    Who among the following should be the "LEAD" in the conduct of a Bid Conference?

    .Architect of Record

  • 25

    All receipts under Design-Build Project shall be under the name of whom?

    Client

  • 26

    For monetary claims and disputes of less than Two Hundred Thousand Pesos, the process of collection should be through:

    . Small Claims Court

  • 27

    What section under RA 9266 Reciprocity falls?v

    27

  • 28

    What do you call the plans that incorporate the changes made during the construction?

    As-built plans

  • 29

    Which of the following should have an as-built plan?

    All of the above

  • 30

    What is a completely valid proposal to do the work called for by the requirement of the project?

    Contract

  • 31

    c. Whose technical control shall a full-time construction inspector be when engaged by the client

    Owner

  • 32

    Office supplies and consumables at the site office shall be at the expense of the

    Contractor

  • 33

    Who is vested with the administration and enforcement of the NBCP?

    Office of the Building Official

  • 34

    Exempted from payment of building permit fees are traditional Indigenous family dwellings and

    public buildings

  • 35

    . Buildings or structures that are exempted from securing a bullding permit?

    Indigenous family dwellings

  • 36

    An issued building permit shall expire if the building or works authorized is not commenced within a period of years from the date of such permits.

    1

  • 37

    . If in any case, a project under arbitration, how many days should both parties comply with the arbitration order

    30 days or 1 month

  • 38

    What should an architect first do when he/she comes across a prospective client?

    Submits professional brief and fee proposal

  • 39

    Which of the processes comes first?

    sign and service agreeement

  • 40

    What stage of the process does the professional fee of the architect is approved by the Owner

    Before the submission of the schematic design

  • 41

    .What is the PRBOA resolution amending earlier resolutions regarding Code of Ethical Conduct for Registered and Licensed Architects?

    . No.5 series of 2018

  • 42

    The Architect's Credo clearly states that it is the architect's duty to protect our common environment and to preserve the for the sake of the present and future generations.

    Architectural heritage

  • 43

    For the Architect's ethical relationship, what sector group or people that has not been mentioned?

    gorvernment

  • 44

    . Knowledge in office operations, office management, accounting, finance, and taxation is best described in:

    . Architectural Management

  • 45

    Who prepares the Bill of Materials (BOM)?

    Architect

  • 46

    What is the suitable estimate technique during the Project definition and Schematic Design Phase of the Project?

    .Area Method

  • 47

    In the construction estimate, what is the usual percentage of contingency added by the contractor to the cost?

    .5%

  • 48

    What is the general basis of the Architects minimum basic fee?

    .Project Construction Cost

  • 49

    Who shall accredit the Continuing Professional Development providers?

    PRBOA

  • 50

    Under the CPD Law, Architects who wish to renew their licenses must acquire how many CPD units every renewal cycle

    15 units

  • 51

    Who is responsible for preparing the detailed drawings for construction?

    architect

  • 52

    What document outlines the responsibilities of the architect and the client?

    Contract Agreement

  • 53

    Which of the following must be approved by the local govemment before construction can commence?

    .Building Permit

  • 54

    What is the term for the architect's preliminary design concept?

    . Schematic Design

  • 55

    Which phase involves the architect visiting the construction site to ensure compliance with the design?

    Construction Administration

  • 56

    Who typically prepares the Bill of Quantities?

    .Quantity Surveyor

  • 57

    What is the purpose of a feasibility study in architecture?

    To determine project viability

  • 58

    . In project management, what does CPM stand for?

    Critical Path Method

  • 59

    Who is responsible for the overall safety on the construction site?

    contractor

  • 60

    . What is the main focus of the design development phase?

    Detailed design and specifications

  • 61

    What document outlines the specifications for materials and workmanship?

    Specifications

  • 62

    . During which phase does the architect assist the client in bidding and negotiation?

    pre-construction

  • 63

    What is the primary purpose of a punch list?

    To identify remaining work

  • 64

    Who is responsible for obtaining the Certificate of Occupancy?

    owner

  • 65

    What is the term for changes made to the construction documents after bidding?

    change order

  • 66

    Which of the following is not part of the contract documents?

    Shop Drawings

  • 67

    Who typically approves the shop drawings?

    .Architect

  • 68

    . What is the primary role of the construction manager?

    . Overseeing construction activities

  • 69

    What is the importance of zoning ordinances in architecture?

    .To manage land use and development

  • 70

    What is an architect's responsibility during the construction phase?

    . To ensure design intent is followed

  • 71

    . What is the purpose of a site analysis?

    to understand the site's condition and constrains

  • 72

    In which phase are design concepts typically tested and refined?

    desisgn development

  • 73

    What is the role of an architect in the post-occupancy evaluation phase?

    ensure the building is functioning as intended

  • 74

    What is the legal basis for the practice of architecture in the Philippines?a. Presidential Decree No. 1096

    Republic Act No. 9266

  • 75

    . What does the "Uniform Building Code" regulate?

    . Structural integrity and safety standards

  • 76

    Who is primarily responsible for project cost control?

    Quantity Surveyor

  • 77

    Which document is essential for obtaining financing for a constructionproject?

    Feasibility Study

  • 78

    What is a "design brief"?

    A document outlining the project requirements and constraints

  • 79

    What is the main objective of value engineering?

    to optimize cost withhout compromising quality

  • 80

    What does the term "punch list" refer to in construction?

    What does the term "punch list" refer to in construction?

  • 81

    Who typically provides the performance bond for a construction project?

    Contractor

  • 82

    What is the purpose of a "change order"?

    To document changes to the scope of work

  • 83

    What is the architect's role in project commissioning?

    .Managing the construction site

  • 84

    . What is a "charrette" in architectural practice?

    A collaborative session to solve design problems

  • 85

    What does "LEED" certification stand for?

    .Leadership in Energy and Environmental Design

  • 86

    . Which document is essential for starting the construction phase?

    .Building Permit

  • 87

    What is the primary focus of the programming phase in architecture?

    Defining project goals and requirements

  • 88

    What is the role of an "owner's representative"?

    To manage the construction process on behalf of the owner

  • 89

    What is a "punch list" also known as?c. Design list

    .Deficiency list

  • 90

    Who is responsible for the reparation of as-built drawings?

    .Contractor

  • 91

    What is the importance of the "General Conditions" in a contract

    To outline the rights and responsibilities of the partles

  • 92

    What is the purpose of a "bid bond"?

    . To guarantee the contractor will enter into a contract if awarded the bid

  • 93

    Who is responsible for the quality of construction work?

    .Contractor

  • 94

    What is the "Certificate of Substantial Completion"?

    . A certificate stating the project is complete enough to be used for its intended purpose

  • 95

    What is the role of a "construction superintendent"?

    Managing day-to-day operations on the construction site

  • 96

    What is a "specification" in construction?

    A document describing materials and workmanship

  • 97

    What is "fast-tracking" in project management?

    Starting construction before the design is complete

  • 98

    Who is resonsible for the issuance of the Certificate of Occupancy?

    Local Government tanga eya owner

  • 99

    What does "shop drawing" refer to?

    Detailed drawings prepared by subcontractors

  • 100

    What is the "scope of work" in a construction project?

    The responsibilities and tasks to be completed