  • 1

    what is the minimum design thickness for asphalt overlay projects?

    50mm

  • 2

    what is the minimum STE individual years of experience for Class A category AA contractor?

    10yrs

  • 3

    what is the maximum allowable single project cost for Small B category C contractor?

    15 million

  • 4

    what is the maximum allowable contract cost for medium A category B contractors?

    150 million

  • 5

    what is the minimum width of turnouts, loading and unloading bay, to accommodate all types of vehicle?

    3.60m

  • 6

    what is the standard color for all DPWH steel bridges? international ___

    orange

  • 7

    national route numbering (NRS) should remain over the medium term and reviews shall be undertaken on a periodic ____ cycle

    6 yrs

  • 8

    what is the minimum width of zebra (longitudinal bars) for pedestrian crossing markings?

    4.0m

  • 9

    pedestrian crossing markings at road intersections without channelized islands shall be placed outside the intersection area at least ___ set back from the edge of road.

    2.0m

  • 10

    who is the approving official if the work suspension order (WSO) is beyond 120 CD?

    undersecretary

  • 11

    what is the standard dimension for project billboard?

    1.22m x 2.44m

  • 12

    for road projects with length of 10km or more, additional billboard shall also be installed at every ____ interval

    5.0km

  • 13

    no other billboards shall be allowed to be installed ____ before and after all DPWH projects and in-between the project limits or within the road right-of-way.

    100m

  • 14

    it is acceptable for "as-built plans" as a reason for final variation order if the cumulative increase in value of work does not exceed ___ of the adjusted original contract price.

    5%

  • 15

    what is the maximum amount for regional directors to procure, implement, and approved plans, POW, and ABC?

    400million

  • 16

    what is the maximum amount for DE to procure, implement, and approved plans, POW, and ABC?

    150million

  • 17

    what is the maximum amount for "ALL" DE to approved POW, ABC and plans like as-built and as-staked?

    50million

  • 18

    what is the minimum pavement thickness for farm to market roads?

    200mm

  • 19

    what is the minimum radius of horizontal curve for farm to market roads

    30m

  • 20

    what is the minimum radius of horizontal curve for tourism roads?

    50m

  • 21

    the RROW boundary marker poats shall be installed along the RROW limit line on each side of the road at ____ km interval

    1km

  • 22

    on highly urbanized area, RROW marker shall be concrete block embedded on the surface along the edge of concrete sidewalk on each side of the road at ___ interval.

    200m

  • 23

    all permanent bridges along national roads shall be provided with the informative signs to be posted on conspicuous place within ___ before the abutment at both approaches.

    5m

  • 24

    what is the negative slippage for ICU stage

    10%

  • 25

    what is the negative slippage for Terminal stage

    15%

  • 26

    what is the maximum distance outside the shoulder for kilometer post from the edge of the road pavement?

    2.5m

  • 27

    if the shoulder is lwss than 2.0m, what is the setback distance of the kilometer post from the edge of the shoulder?

    0.5m

  • 28

    what is the spacing of dowel bars for 280mm thick PCCP

    300mm

  • 29

    what is the spacing of dowel bars for 300mm thick PCCP

    274mm

  • 30

    vertical clearance for bridges over navigable waterways is the sum of highest water level (hwl) and height of vessel (hv) and the K factor. what is the constant value of the k factor?

    1.0m

  • 31

    contractor shall shoulder all the expenses for the alteration and/or reconstruction of the structure and a fine of ____% of the original total contract price, if they violated the minimum vertical clearance for Bridges over navigable waterways.

    2.0

  • 32

    what is the setback distance from the RROW limit for welcome arches and overhead boundary markers?

    2.0m

  • 33

    what is the minimum vertical clearance of the welcome arch/overhead boundary marker from the roadway surface?

    5.33m

  • 34

    what is the minimum vertical clearance of the overhead utilities and power lines from the roadway surface to the calculated lowest point of cable sag?

    5.50m

  • 35

    what is the minimum vertical clearance of the overhead utilities and power lines from the sidewalka surface to the calculated lowest point of cable sag?

    4.88m

  • 36

    what is the minimum sidewalk width as per accessibility law BP 344 along national highways?

    1.20m

  • 37

    what is the minimum ans maximum height of signages on walls and doors as per accessibility law BP344

    1.40m-1.60m

  • 38

    during re-blocking construction of PCCP, the breaking and restoration of pavement in 2-lane carriageway shall be limited to 1-lane and not more than ____ in length at any time in non-urban areas.

    100m

  • 39

    during re-blocking construction of PCCP, the breaking and restoration of pavement in 2-lane carriageway shall be limited to 1-lane and not more than ____ in length at any time in urban areas.

    50m

  • 40

    the cut-off date of physical accomplishments to be reflected in progress billings shall be reckoned on the ____ day of each month instead of the 25th day of the month.

    10th

  • 41

    monthly accomplishment for any DPWH project shall constitute the works completed and accepted from the ___ day of the preceding month up to the ___ day of the current month.

    11th and 10th

  • 42

    what is the minimum PCCP width on national roads

    6.7m

  • 43

    what is the minimum PCCP width of tourism roads?

    6.1m

  • 44

    what is the minimum PCCP slab thickness on national roads?

    280mm

  • 45

    for span lengths of 21-30m, what bridge type shall be use as per DO 30 series of 2011?

    PSCG

  • 46

    for span lengths of 6-12m, what bridge type shall be use as per DO 30 series of 2011?

    flat slab

  • 47

    which of the following contractor category is not required for ISO 9000 certification?

    none of the above

  • 48

    what is the minimum individual years of construction experience for Sustaining Technical Employee (STE)?

    3 yrs

  • 49

    what is the minimum individual years of construction experience for Sustaining Technical Employee (STE) for all Classes and Categories of a contractor?

    10 yrs

  • 50

    what is the minimum financial capacity, net worth / equity of a class A category A contractor in pesos?

    30 million

  • 51

    what is the minimum financial capacity, net worth/ equity of a class A category AAAA contractor in pesos?

    1 billion

  • 52

    what do you call the project scheduling technique used for DPWH projects?

    PDM

  • 53

    if the actual soil bearing capacity of the natural ground is less than 96 kPa at depth of 1.5m, what is the maximum depth of the isolated footing?

    2.0m

  • 54

    what is design speed for Flat terrain of tourism roads?

    60 kph

  • 55

    what is design speed for mountainous terrain of farm to market roads?

    30 kph

  • 56

    what is design speed for flat terrain of farm to market roads?

    30 kph

  • 57

    what is the roadway cross slope for PCCP?

    1.50%

  • 58

    what is the roadway cross slope for gravel surfacing of sidewalk?

    3.0%

  • 59

    it is the physical island at the center of a divides roadway separating traffic flows.

    median island

  • 60

    it is designed to control and direct traffic movent, usually turning.

    channelizing island

  • 61

    as a minimum requirement for bridge projects, ___ bored pile(s) shall be tested representing each pile size.

    1

  • 62

    for buildings, at least ____ of the total number of bored piles shall be tested.

    5%

  • 63

    as per BP 344, handrails attached to walls should have a clearance no less than 50mm from the wall and handrails on ledges should have a clearance not less than ____.

    40mm

  • 64

    what is the minimum raised height required for signages/symbols labeling public rooms and places?

    1 mm

  • 65

    to guide the blind, sidewalks should as much as possible follow straight forward routes with

    right

  • 66

    what is the minimum width of the refuge island and its total length?

    1.5m, 30m

  • 67

    the refuge island shall be provided in roadways having clear carriageway width of at least ___ lanes.

    4

  • 68

    what is the flood flow velocity criteria in designing slope protection works?

    3m/sec

  • 69

    what is the minimum desirable length of turnouts, unloading and loading bays, on national roads?

    60m

  • 70

    what is the maximum length of turnouts, unloading and loading bays, on national roads?

    185m

  • 71

    if the actual soil bearing capacity of school building did not meet the required 96 kpa soil bearing capacity, the implementing office may opt to perform / use the following except one:

    H-piles

  • 72

    what is the width of the stop line in urban roads?

    450mm

  • 73

    what is the width of the stop line in rural roads?

    600mm

  • 74

    when using reclaimed asphalt pavement (RAP) as partial replacement to coarse aggregate in hot-mix asphalt (HMA), what is the maximum % for item 310 grading D and grading B?

    25%, 40%

  • 75

    if the actual condition of the soil in school building is susceptible to liquefaction, ground improvement technique may be performed except one;

    none of the above

  • 76

    the minimum bridge carriageway width for tourism roads

    6.70m

  • 77

    the minimum bridge carriageway width for 5.0m width-farm to market roads

    5.60m

  • 78

    the minimum bridge carriageway width for 6.1m width-farm to market roads

    6.70m

  • 79

    what is the flood frequency used in hydraulic analysis for bridge design?

    50 yrs

  • 80

    for pre-cast concrete curb and gutter, minimum curb inlet interval (D) is ___ in flooded areas and ___ in other areas.

    10m, 20m

  • 81

    for multi-span bridges, pile bearing capacity test shall be conducted ___ at each abutment and 1 at every other pier

    1

  • 82

    pile integrity test shall be conducted on at least ___ of the total number of bored piles at each abutment and pier of bridges or at the entire foundation area of buildings.

    50%

  • 83

    cross hole sonic logging test (CSL) is recommended for bored piles with embedded length of more than ___.

    30m

  • 84

    what is the minimum width of a curb cut-out?

    0.90m

  • 85

    when the AADT is greater than ___ vehicles, paving of shoulder is necessary

    1,250

  • 86

    minimum distance between two consecutive pedestrian refuge islands along the highway shall not be less than ___ meters

    500m

  • 87

    what is the navigable clearance of a bridge over navigable waterways with the given data: HWL=15m AND HV=10m

    26m

  • 88

    if the length and width of the drainage area is equal to 50m and 100m respectively; what should be the length of the channel?

    136.8m

  • 89

    compute the amount of liquidated damages (LD) given the following data: Remaining scope of work amount is Php1,000,000.00 and the contractor completed the remaining scope of work in 15 CD time.

    Php 15,000.00

  • 90

    defects liability period

    1 yr

  • 91

    as per RA 11058, the general contractor must provide one (1) construction safety and health officer for every ___ units of heavy equipment assigned to the project site to oversee the effective compliance with the COSH program

    10 units

  • 92

    what is the maximum gradient for curb cut-outs?

    1:12

  • 93

    as per BP 344 requirements, what is the walking speed design on the crossings?

    0.90m/sec

  • 94

    what is the length of tangent between reverse curves for both tourism and farm to market roads?

    30m

  • 95

    for roadway obstructions, such as bridge piers, what is the width of the black and white stripes on the object markings?

    300m

  • 96

    for roadway obstructions markings, what is the minimum width of the black and white strips on the object markings?

    100mm

  • 97

    what is the maximum gradient for sidewalk as per BP 344?

    1:20

  • 98

    for raised median island, planting of trees should not be permitted on high speed multilane divided highway and the surface level of soil fill shall be lower than the top of island-50mm for island height less than or equal to ___ and 10mm for island height greater than ___

    0.45m

  • 99

    the pavement thickness of turnout, unloading and loading bays, shall in no case be less than ___ for asphalt and 230mm for concrete with supporting base layers

    100mm

  • 100

    during road re-blocking works, holes of ___ diameter and spaced at 300mm shall be drilled at 1/2 of the existing concrete pavement thickness to permit the load transfer transverse construction joints.

    26mm

  • module 2

    module 2

    Wilson Angelo Oraza · 259問 · 2年前

    module 2

    module 2

    259問 • 2年前
    Wilson Angelo Oraza

    module 3

    module 3

    Wilson Angelo Oraza · 107問 · 2年前

    module 3

    module 3

    107問 • 2年前
    Wilson Angelo Oraza

    module 4

    module 4

    Wilson Angelo Oraza · 59問 · 2年前

    module 4

    module 4

    59問 • 2年前
    Wilson Angelo Oraza

    item #

    item #

    Wilson Angelo Oraza · 25問 · 2年前

    item #

    item #

    25問 • 2年前
    Wilson Angelo Oraza

    compre set 1

    compre set 1

    Wilson Angelo Oraza · 100問 · 2年前

    compre set 1

    compre set 1

    100問 • 2年前
    Wilson Angelo Oraza

    compre set 4

    compre set 4

    Wilson Angelo Oraza · 50問 · 2年前

    compre set 4

    compre set 4

    50問 • 2年前
    Wilson Angelo Oraza

    問題一覧

  • 1

    what is the minimum design thickness for asphalt overlay projects?

    50mm

  • 2

    what is the minimum STE individual years of experience for Class A category AA contractor?

    10yrs

  • 3

    what is the maximum allowable single project cost for Small B category C contractor?

    15 million

  • 4

    what is the maximum allowable contract cost for medium A category B contractors?

    150 million

  • 5

    what is the minimum width of turnouts, loading and unloading bay, to accommodate all types of vehicle?

    3.60m

  • 6

    what is the standard color for all DPWH steel bridges? international ___

    orange

  • 7

    national route numbering (NRS) should remain over the medium term and reviews shall be undertaken on a periodic ____ cycle

    6 yrs

  • 8

    what is the minimum width of zebra (longitudinal bars) for pedestrian crossing markings?

    4.0m

  • 9

    pedestrian crossing markings at road intersections without channelized islands shall be placed outside the intersection area at least ___ set back from the edge of road.

    2.0m

  • 10

    who is the approving official if the work suspension order (WSO) is beyond 120 CD?

    undersecretary

  • 11

    what is the standard dimension for project billboard?

    1.22m x 2.44m

  • 12

    for road projects with length of 10km or more, additional billboard shall also be installed at every ____ interval

    5.0km

  • 13

    no other billboards shall be allowed to be installed ____ before and after all DPWH projects and in-between the project limits or within the road right-of-way.

    100m

  • 14

    it is acceptable for "as-built plans" as a reason for final variation order if the cumulative increase in value of work does not exceed ___ of the adjusted original contract price.

    5%

  • 15

    what is the maximum amount for regional directors to procure, implement, and approved plans, POW, and ABC?

    400million

  • 16

    what is the maximum amount for DE to procure, implement, and approved plans, POW, and ABC?

    150million

  • 17

    what is the maximum amount for "ALL" DE to approved POW, ABC and plans like as-built and as-staked?

    50million

  • 18

    what is the minimum pavement thickness for farm to market roads?

    200mm

  • 19

    what is the minimum radius of horizontal curve for farm to market roads

    30m

  • 20

    what is the minimum radius of horizontal curve for tourism roads?

    50m

  • 21

    the RROW boundary marker poats shall be installed along the RROW limit line on each side of the road at ____ km interval

    1km

  • 22

    on highly urbanized area, RROW marker shall be concrete block embedded on the surface along the edge of concrete sidewalk on each side of the road at ___ interval.

    200m

  • 23

    all permanent bridges along national roads shall be provided with the informative signs to be posted on conspicuous place within ___ before the abutment at both approaches.

    5m

  • 24

    what is the negative slippage for ICU stage

    10%

  • 25

    what is the negative slippage for Terminal stage

    15%

  • 26

    what is the maximum distance outside the shoulder for kilometer post from the edge of the road pavement?

    2.5m

  • 27

    if the shoulder is lwss than 2.0m, what is the setback distance of the kilometer post from the edge of the shoulder?

    0.5m

  • 28

    what is the spacing of dowel bars for 280mm thick PCCP

    300mm

  • 29

    what is the spacing of dowel bars for 300mm thick PCCP

    274mm

  • 30

    vertical clearance for bridges over navigable waterways is the sum of highest water level (hwl) and height of vessel (hv) and the K factor. what is the constant value of the k factor?

    1.0m

  • 31

    contractor shall shoulder all the expenses for the alteration and/or reconstruction of the structure and a fine of ____% of the original total contract price, if they violated the minimum vertical clearance for Bridges over navigable waterways.

    2.0

  • 32

    what is the setback distance from the RROW limit for welcome arches and overhead boundary markers?

    2.0m

  • 33

    what is the minimum vertical clearance of the welcome arch/overhead boundary marker from the roadway surface?

    5.33m

  • 34

    what is the minimum vertical clearance of the overhead utilities and power lines from the roadway surface to the calculated lowest point of cable sag?

    5.50m

  • 35

    what is the minimum vertical clearance of the overhead utilities and power lines from the sidewalka surface to the calculated lowest point of cable sag?

    4.88m

  • 36

    what is the minimum sidewalk width as per accessibility law BP 344 along national highways?

    1.20m

  • 37

    what is the minimum ans maximum height of signages on walls and doors as per accessibility law BP344

    1.40m-1.60m

  • 38

    during re-blocking construction of PCCP, the breaking and restoration of pavement in 2-lane carriageway shall be limited to 1-lane and not more than ____ in length at any time in non-urban areas.

    100m

  • 39

    during re-blocking construction of PCCP, the breaking and restoration of pavement in 2-lane carriageway shall be limited to 1-lane and not more than ____ in length at any time in urban areas.

    50m

  • 40

    the cut-off date of physical accomplishments to be reflected in progress billings shall be reckoned on the ____ day of each month instead of the 25th day of the month.

    10th

  • 41

    monthly accomplishment for any DPWH project shall constitute the works completed and accepted from the ___ day of the preceding month up to the ___ day of the current month.

    11th and 10th

  • 42

    what is the minimum PCCP width on national roads

    6.7m

  • 43

    what is the minimum PCCP width of tourism roads?

    6.1m

  • 44

    what is the minimum PCCP slab thickness on national roads?

    280mm

  • 45

    for span lengths of 21-30m, what bridge type shall be use as per DO 30 series of 2011?

    PSCG

  • 46

    for span lengths of 6-12m, what bridge type shall be use as per DO 30 series of 2011?

    flat slab

  • 47

    which of the following contractor category is not required for ISO 9000 certification?

    none of the above

  • 48

    what is the minimum individual years of construction experience for Sustaining Technical Employee (STE)?

    3 yrs

  • 49

    what is the minimum individual years of construction experience for Sustaining Technical Employee (STE) for all Classes and Categories of a contractor?

    10 yrs

  • 50

    what is the minimum financial capacity, net worth / equity of a class A category A contractor in pesos?

    30 million

  • 51

    what is the minimum financial capacity, net worth/ equity of a class A category AAAA contractor in pesos?

    1 billion

  • 52

    what do you call the project scheduling technique used for DPWH projects?

    PDM

  • 53

    if the actual soil bearing capacity of the natural ground is less than 96 kPa at depth of 1.5m, what is the maximum depth of the isolated footing?

    2.0m

  • 54

    what is design speed for Flat terrain of tourism roads?

    60 kph

  • 55

    what is design speed for mountainous terrain of farm to market roads?

    30 kph

  • 56

    what is design speed for flat terrain of farm to market roads?

    30 kph

  • 57

    what is the roadway cross slope for PCCP?

    1.50%

  • 58

    what is the roadway cross slope for gravel surfacing of sidewalk?

    3.0%

  • 59

    it is the physical island at the center of a divides roadway separating traffic flows.

    median island

  • 60

    it is designed to control and direct traffic movent, usually turning.

    channelizing island

  • 61

    as a minimum requirement for bridge projects, ___ bored pile(s) shall be tested representing each pile size.

    1

  • 62

    for buildings, at least ____ of the total number of bored piles shall be tested.

    5%

  • 63

    as per BP 344, handrails attached to walls should have a clearance no less than 50mm from the wall and handrails on ledges should have a clearance not less than ____.

    40mm

  • 64

    what is the minimum raised height required for signages/symbols labeling public rooms and places?

    1 mm

  • 65

    to guide the blind, sidewalks should as much as possible follow straight forward routes with

    right

  • 66

    what is the minimum width of the refuge island and its total length?

    1.5m, 30m

  • 67

    the refuge island shall be provided in roadways having clear carriageway width of at least ___ lanes.

    4

  • 68

    what is the flood flow velocity criteria in designing slope protection works?

    3m/sec

  • 69

    what is the minimum desirable length of turnouts, unloading and loading bays, on national roads?

    60m

  • 70

    what is the maximum length of turnouts, unloading and loading bays, on national roads?

    185m

  • 71

    if the actual soil bearing capacity of school building did not meet the required 96 kpa soil bearing capacity, the implementing office may opt to perform / use the following except one:

    H-piles

  • 72

    what is the width of the stop line in urban roads?

    450mm

  • 73

    what is the width of the stop line in rural roads?

    600mm

  • 74

    when using reclaimed asphalt pavement (RAP) as partial replacement to coarse aggregate in hot-mix asphalt (HMA), what is the maximum % for item 310 grading D and grading B?

    25%, 40%

  • 75

    if the actual condition of the soil in school building is susceptible to liquefaction, ground improvement technique may be performed except one;

    none of the above

  • 76

    the minimum bridge carriageway width for tourism roads

    6.70m

  • 77

    the minimum bridge carriageway width for 5.0m width-farm to market roads

    5.60m

  • 78

    the minimum bridge carriageway width for 6.1m width-farm to market roads

    6.70m

  • 79

    what is the flood frequency used in hydraulic analysis for bridge design?

    50 yrs

  • 80

    for pre-cast concrete curb and gutter, minimum curb inlet interval (D) is ___ in flooded areas and ___ in other areas.

    10m, 20m

  • 81

    for multi-span bridges, pile bearing capacity test shall be conducted ___ at each abutment and 1 at every other pier

    1

  • 82

    pile integrity test shall be conducted on at least ___ of the total number of bored piles at each abutment and pier of bridges or at the entire foundation area of buildings.

    50%

  • 83

    cross hole sonic logging test (CSL) is recommended for bored piles with embedded length of more than ___.

    30m

  • 84

    what is the minimum width of a curb cut-out?

    0.90m

  • 85

    when the AADT is greater than ___ vehicles, paving of shoulder is necessary

    1,250

  • 86

    minimum distance between two consecutive pedestrian refuge islands along the highway shall not be less than ___ meters

    500m

  • 87

    what is the navigable clearance of a bridge over navigable waterways with the given data: HWL=15m AND HV=10m

    26m

  • 88

    if the length and width of the drainage area is equal to 50m and 100m respectively; what should be the length of the channel?

    136.8m

  • 89

    compute the amount of liquidated damages (LD) given the following data: Remaining scope of work amount is Php1,000,000.00 and the contractor completed the remaining scope of work in 15 CD time.

    Php 15,000.00

  • 90

    defects liability period

    1 yr

  • 91

    as per RA 11058, the general contractor must provide one (1) construction safety and health officer for every ___ units of heavy equipment assigned to the project site to oversee the effective compliance with the COSH program

    10 units

  • 92

    what is the maximum gradient for curb cut-outs?

    1:12

  • 93

    as per BP 344 requirements, what is the walking speed design on the crossings?

    0.90m/sec

  • 94

    what is the length of tangent between reverse curves for both tourism and farm to market roads?

    30m

  • 95

    for roadway obstructions, such as bridge piers, what is the width of the black and white stripes on the object markings?

    300m

  • 96

    for roadway obstructions markings, what is the minimum width of the black and white strips on the object markings?

    100mm

  • 97

    what is the maximum gradient for sidewalk as per BP 344?

    1:20

  • 98

    for raised median island, planting of trees should not be permitted on high speed multilane divided highway and the surface level of soil fill shall be lower than the top of island-50mm for island height less than or equal to ___ and 10mm for island height greater than ___

    0.45m

  • 99

    the pavement thickness of turnout, unloading and loading bays, shall in no case be less than ___ for asphalt and 230mm for concrete with supporting base layers

    100mm

  • 100

    during road re-blocking works, holes of ___ diameter and spaced at 300mm shall be drilled at 1/2 of the existing concrete pavement thickness to permit the load transfer transverse construction joints.

    26mm