what is the minimum design thickness for asphalt overlay projects?50mm
what is the minimum STE individual years of experience for Class A category AA contractor?10yrs
what is the maximum allowable single project cost for Small B category C contractor?15 million
what is the maximum allowable contract cost for medium A category B contractors?150 million
what is the minimum width of turnouts, loading and unloading bay, to accommodate all types of vehicle?3.60m
what is the standard color for all DPWH steel bridges? international ___orange
national route numbering (NRS) should remain over the medium term and reviews shall be undertaken on a periodic ____ cycle6 yrs
what is the minimum width of zebra (longitudinal bars) for pedestrian crossing markings?4.0m
pedestrian crossing markings at road intersections without channelized islands shall be placed outside the intersection area at least ___ set back from the edge of road.2.0m
who is the approving official if the work suspension order (WSO) is beyond 120 CD?undersecretary
what is the standard dimension for project billboard?1.22m x 2.44m
for road projects with length of 10km or more, additional billboard shall also be installed at every ____ interval5.0km
no other billboards shall be allowed to be installed ____ before and after all DPWH projects and in-between the project limits or within the road right-of-way.100m
it is acceptable for "as-built plans" as a reason for final variation order if the cumulative increase in value of work does not exceed ___ of the adjusted original contract price.5%
what is the maximum amount for regional directors to procure, implement, and approved plans, POW, and ABC?400million
what is the maximum amount for DE to procure, implement, and approved plans, POW, and ABC?150million
what is the maximum amount for "ALL" DE to approved POW, ABC and plans like as-built and as-staked?50million
what is the minimum pavement thickness for farm to market roads?200mm
what is the minimum radius of horizontal curve for farm to market roads30m
what is the minimum radius of horizontal curve for tourism roads?50m
the RROW boundary marker poats shall be installed along the RROW limit line on each side of the road at ____ km interval1km
on highly urbanized area, RROW marker shall be concrete block embedded on the surface along the edge of concrete sidewalk on each side of the road at ___ interval.200m
all permanent bridges along national roads shall be provided with the informative signs to be posted on conspicuous place within ___ before the abutment at both approaches.5m
what is the negative slippage for ICU stage10%
what is the negative slippage for Terminal stage15%
what is the maximum distance outside the shoulder for kilometer post from the edge of the road pavement?2.5m
if the shoulder is lwss than 2.0m, what is the setback distance of the kilometer post from the edge of the shoulder?0.5m
what is the spacing of dowel bars for 280mm thick PCCP300mm
what is the spacing of dowel bars for 300mm thick PCCP274mm
vertical clearance for bridges over navigable waterways is the sum of highest water level (hwl) and height of vessel (hv) and the K factor. what is the constant value of the k factor?1.0m
contractor shall shoulder all the expenses for the alteration and/or reconstruction of the structure and a fine of ____% of the original total contract price, if they violated the minimum vertical clearance for Bridges over navigable waterways.2.0
what is the setback distance from the RROW limit for welcome arches and overhead boundary markers?2.0m
what is the minimum vertical clearance of the welcome arch/overhead boundary marker from the roadway surface?5.33m
what is the minimum vertical clearance of the overhead utilities and power lines from the roadway surface to the calculated lowest point of cable sag?5.50m
what is the minimum vertical clearance of the overhead utilities and power lines from the sidewalka surface to the calculated lowest point of cable sag?4.88m
what is the minimum sidewalk width as per accessibility law BP 344 along national highways?1.20m
what is the minimum ans maximum height of signages on walls and doors as per accessibility law BP3441.40m-1.60m
during re-blocking construction of PCCP, the breaking and restoration of pavement in 2-lane carriageway shall be limited to 1-lane and not more than ____ in length at any time in non-urban areas.100m
during re-blocking construction of PCCP, the breaking and restoration of pavement in 2-lane carriageway shall be limited to 1-lane and not more than ____ in length at any time in urban areas.50m
the cut-off date of physical accomplishments to be reflected in progress billings shall be reckoned on the ____ day of each month instead of the 25th day of the month.10th
monthly accomplishment for any DPWH project shall constitute the works completed and accepted from the ___ day of the preceding month up to the ___ day of the current month.11th and 10th
what is the minimum PCCP width on national roads6.7m
what is the minimum PCCP width of tourism roads?6.1m
what is the minimum PCCP slab thickness on national roads?280mm
for span lengths of 21-30m, what bridge type shall be use as per DO 30 series of 2011?PSCG
for span lengths of 6-12m, what bridge type shall be use as per DO 30 series of 2011?flat slab
which of the following contractor category is not required for ISO 9000 certification?none of the above
what is the minimum individual years of construction experience for Sustaining Technical Employee (STE)?3 yrs
what is the minimum individual years of construction experience for Sustaining Technical Employee (STE) for all Classes and Categories of a contractor?10 yrs
what is the minimum financial capacity, net worth / equity of a class A category A contractor in pesos?30 million
what is the minimum financial capacity, net worth/ equity of a class A category AAAA contractor in pesos?1 billion
what do you call the project scheduling technique used for DPWH projects?PDM
if the actual soil bearing capacity of the natural ground is less than 96 kPa at depth of 1.5m, what is the maximum depth of the isolated footing?2.0m
what is design speed for Flat terrain of tourism roads?60 kph
what is design speed for mountainous terrain of farm to market roads?30 kph
what is design speed for flat terrain of farm to market roads?30 kph
what is the roadway cross slope for PCCP?1.50%
what is the roadway cross slope for gravel surfacing of sidewalk?3.0%
it is the physical island at the center of a divides roadway separating traffic flows.median island
it is designed to control and direct traffic movent, usually turning.channelizing island
as a minimum requirement for bridge projects, ___ bored pile(s) shall be tested representing each pile size.1
for buildings, at least ____ of the total number of bored piles shall be tested.5%
as per BP 344, handrails attached to walls should have a clearance no less than 50mm from the wall and handrails on ledges should have a clearance not less than ____.40mm
what is the minimum raised height required for signages/symbols labeling public rooms and places?1 mm
to guide the blind, sidewalks should as much as possible follow straight forward routes with right
what is the minimum width of the refuge island and its total length?1.5m, 30m
the refuge island shall be provided in roadways having clear carriageway width of at least ___ lanes.4
what is the flood flow velocity criteria in designing slope protection works?3m/sec
what is the minimum desirable length of turnouts, unloading and loading bays, on national roads?60m
what is the maximum length of turnouts, unloading and loading bays, on national roads?185m
if the actual soil bearing capacity of school building did not meet the required 96 kpa soil bearing capacity, the implementing office may opt to perform / use the following except one:H-piles
what is the width of the stop line in urban roads?450mm
what is the width of the stop line in rural roads?600mm
when using reclaimed asphalt pavement (RAP) as partial replacement to coarse aggregate in hot-mix asphalt (HMA), what is the maximum % for item 310 grading D and grading B?25%, 40%
if the actual condition of the soil in school building is susceptible to liquefaction, ground improvement technique may be performed except one;none of the above
the minimum bridge carriageway width for tourism roads6.70m
the minimum bridge carriageway width for 5.0m width-farm to market roads5.60m
the minimum bridge carriageway width for 6.1m width-farm to market roads6.70m
what is the flood frequency used in hydraulic analysis for bridge design?50 yrs
for pre-cast concrete curb and gutter, minimum curb inlet interval (D) is ___ in flooded areas and ___ in other areas.10m, 20m
for multi-span bridges, pile bearing capacity test shall be conducted ___ at each abutment and 1 at every other pier1
pile integrity test shall be conducted on at least ___ of the total number of bored piles at each abutment and pier of bridges or at the entire foundation area of buildings.50%
cross hole sonic logging test (CSL) is recommended for bored piles with embedded length of more than ___.30m
what is the minimum width of a curb cut-out?0.90m
when the AADT is greater than ___ vehicles, paving of shoulder is necessary1,250
minimum distance between two consecutive pedestrian refuge islands along the highway shall not be less than ___ meters500m
what is the navigable clearance of a bridge over navigable waterways with the given data: HWL=15m AND HV=10m26m
if the length and width of the drainage area is equal to 50m and 100m respectively; what should be the length of the channel?136.8m
compute the amount of liquidated damages (LD) given the following data:
Remaining scope of work amount is Php1,000,000.00 and the contractor completed the remaining scope of work in 15 CD time.Php 15,000.00
defects liability period1 yr
as per RA 11058, the general contractor must provide one (1) construction safety and health officer for every ___ units of heavy equipment assigned to the project site to oversee the effective compliance with the COSH program10 units
what is the maximum gradient for curb cut-outs?1:12
as per BP 344 requirements, what is the walking speed design on the crossings?0.90m/sec
what is the length of tangent between reverse curves for both tourism and farm to market roads?30m
for roadway obstructions, such as bridge piers, what is the width of the black and white stripes on the object markings?300m
for roadway obstructions markings, what is the minimum width of the black and white strips on the object markings?100mm
what is the maximum gradient for sidewalk as per BP 344?1:20
for raised median island, planting of trees should not be permitted on high speed multilane divided highway and the surface level of soil fill shall be lower than the top of island-50mm for island height less than or equal to ___ and 10mm for island height greater than ___0.45m
the pavement thickness of turnout, unloading and loading bays, shall in no case be less than ___ for asphalt and 230mm for concrete with supporting base layers100mm
during road re-blocking works, holes of ___ diameter and spaced at 300mm shall be drilled at 1/2 of the existing concrete pavement thickness to permit the load transfer transverse construction joints.26mm
what is the minimum design thickness for asphalt overlay projects?50mm
what is the minimum STE individual years of experience for Class A category AA contractor?10yrs
what is the maximum allowable single project cost for Small B category C contractor?15 million
what is the maximum allowable contract cost for medium A category B contractors?150 million
what is the minimum width of turnouts, loading and unloading bay, to accommodate all types of vehicle?3.60m
what is the standard color for all DPWH steel bridges? international ___orange
national route numbering (NRS) should remain over the medium term and reviews shall be undertaken on a periodic ____ cycle6 yrs
what is the minimum width of zebra (longitudinal bars) for pedestrian crossing markings?4.0m
pedestrian crossing markings at road intersections without channelized islands shall be placed outside the intersection area at least ___ set back from the edge of road.2.0m
who is the approving official if the work suspension order (WSO) is beyond 120 CD?undersecretary
what is the standard dimension for project billboard?1.22m x 2.44m
for road projects with length of 10km or more, additional billboard shall also be installed at every ____ interval5.0km
no other billboards shall be allowed to be installed ____ before and after all DPWH projects and in-between the project limits or within the road right-of-way.100m
it is acceptable for "as-built plans" as a reason for final variation order if the cumulative increase in value of work does not exceed ___ of the adjusted original contract price.5%
what is the maximum amount for regional directors to procure, implement, and approved plans, POW, and ABC?400million
what is the maximum amount for DE to procure, implement, and approved plans, POW, and ABC?150million
what is the maximum amount for "ALL" DE to approved POW, ABC and plans like as-built and as-staked?50million
what is the minimum pavement thickness for farm to market roads?200mm
what is the minimum radius of horizontal curve for farm to market roads30m
what is the minimum radius of horizontal curve for tourism roads?50m
the RROW boundary marker poats shall be installed along the RROW limit line on each side of the road at ____ km interval1km
on highly urbanized area, RROW marker shall be concrete block embedded on the surface along the edge of concrete sidewalk on each side of the road at ___ interval.200m
all permanent bridges along national roads shall be provided with the informative signs to be posted on conspicuous place within ___ before the abutment at both approaches.5m
what is the negative slippage for ICU stage10%
what is the negative slippage for Terminal stage15%
what is the maximum distance outside the shoulder for kilometer post from the edge of the road pavement?2.5m
if the shoulder is lwss than 2.0m, what is the setback distance of the kilometer post from the edge of the shoulder?0.5m
what is the spacing of dowel bars for 280mm thick PCCP300mm
what is the spacing of dowel bars for 300mm thick PCCP274mm
vertical clearance for bridges over navigable waterways is the sum of highest water level (hwl) and height of vessel (hv) and the K factor. what is the constant value of the k factor?1.0m
contractor shall shoulder all the expenses for the alteration and/or reconstruction of the structure and a fine of ____% of the original total contract price, if they violated the minimum vertical clearance for Bridges over navigable waterways.2.0
what is the setback distance from the RROW limit for welcome arches and overhead boundary markers?2.0m
what is the minimum vertical clearance of the welcome arch/overhead boundary marker from the roadway surface?5.33m
what is the minimum vertical clearance of the overhead utilities and power lines from the roadway surface to the calculated lowest point of cable sag?5.50m
what is the minimum vertical clearance of the overhead utilities and power lines from the sidewalka surface to the calculated lowest point of cable sag?4.88m
what is the minimum sidewalk width as per accessibility law BP 344 along national highways?1.20m
what is the minimum ans maximum height of signages on walls and doors as per accessibility law BP3441.40m-1.60m
during re-blocking construction of PCCP, the breaking and restoration of pavement in 2-lane carriageway shall be limited to 1-lane and not more than ____ in length at any time in non-urban areas.100m
during re-blocking construction of PCCP, the breaking and restoration of pavement in 2-lane carriageway shall be limited to 1-lane and not more than ____ in length at any time in urban areas.50m
the cut-off date of physical accomplishments to be reflected in progress billings shall be reckoned on the ____ day of each month instead of the 25th day of the month.10th
monthly accomplishment for any DPWH project shall constitute the works completed and accepted from the ___ day of the preceding month up to the ___ day of the current month.11th and 10th
what is the minimum PCCP width on national roads6.7m
what is the minimum PCCP width of tourism roads?6.1m
what is the minimum PCCP slab thickness on national roads?280mm
for span lengths of 21-30m, what bridge type shall be use as per DO 30 series of 2011?PSCG
for span lengths of 6-12m, what bridge type shall be use as per DO 30 series of 2011?flat slab
which of the following contractor category is not required for ISO 9000 certification?none of the above
what is the minimum individual years of construction experience for Sustaining Technical Employee (STE)?3 yrs
what is the minimum individual years of construction experience for Sustaining Technical Employee (STE) for all Classes and Categories of a contractor?10 yrs
what is the minimum financial capacity, net worth / equity of a class A category A contractor in pesos?30 million
what is the minimum financial capacity, net worth/ equity of a class A category AAAA contractor in pesos?1 billion
what do you call the project scheduling technique used for DPWH projects?PDM
if the actual soil bearing capacity of the natural ground is less than 96 kPa at depth of 1.5m, what is the maximum depth of the isolated footing?2.0m
what is design speed for Flat terrain of tourism roads?60 kph
what is design speed for mountainous terrain of farm to market roads?30 kph
what is design speed for flat terrain of farm to market roads?30 kph
what is the roadway cross slope for PCCP?1.50%
what is the roadway cross slope for gravel surfacing of sidewalk?3.0%
it is the physical island at the center of a divides roadway separating traffic flows.median island
it is designed to control and direct traffic movent, usually turning.channelizing island
as a minimum requirement for bridge projects, ___ bored pile(s) shall be tested representing each pile size.1
for buildings, at least ____ of the total number of bored piles shall be tested.5%
as per BP 344, handrails attached to walls should have a clearance no less than 50mm from the wall and handrails on ledges should have a clearance not less than ____.40mm
what is the minimum raised height required for signages/symbols labeling public rooms and places?1 mm
to guide the blind, sidewalks should as much as possible follow straight forward routes with right
what is the minimum width of the refuge island and its total length?1.5m, 30m
the refuge island shall be provided in roadways having clear carriageway width of at least ___ lanes.4
what is the flood flow velocity criteria in designing slope protection works?3m/sec
what is the minimum desirable length of turnouts, unloading and loading bays, on national roads?60m
what is the maximum length of turnouts, unloading and loading bays, on national roads?185m
if the actual soil bearing capacity of school building did not meet the required 96 kpa soil bearing capacity, the implementing office may opt to perform / use the following except one:H-piles
what is the width of the stop line in urban roads?450mm
what is the width of the stop line in rural roads?600mm
when using reclaimed asphalt pavement (RAP) as partial replacement to coarse aggregate in hot-mix asphalt (HMA), what is the maximum % for item 310 grading D and grading B?25%, 40%
if the actual condition of the soil in school building is susceptible to liquefaction, ground improvement technique may be performed except one;none of the above
the minimum bridge carriageway width for tourism roads6.70m
the minimum bridge carriageway width for 5.0m width-farm to market roads5.60m
the minimum bridge carriageway width for 6.1m width-farm to market roads6.70m
what is the flood frequency used in hydraulic analysis for bridge design?50 yrs
for pre-cast concrete curb and gutter, minimum curb inlet interval (D) is ___ in flooded areas and ___ in other areas.10m, 20m
for multi-span bridges, pile bearing capacity test shall be conducted ___ at each abutment and 1 at every other pier1
pile integrity test shall be conducted on at least ___ of the total number of bored piles at each abutment and pier of bridges or at the entire foundation area of buildings.50%
cross hole sonic logging test (CSL) is recommended for bored piles with embedded length of more than ___.30m
what is the minimum width of a curb cut-out?0.90m
when the AADT is greater than ___ vehicles, paving of shoulder is necessary1,250
minimum distance between two consecutive pedestrian refuge islands along the highway shall not be less than ___ meters500m
what is the navigable clearance of a bridge over navigable waterways with the given data: HWL=15m AND HV=10m26m
if the length and width of the drainage area is equal to 50m and 100m respectively; what should be the length of the channel?136.8m
compute the amount of liquidated damages (LD) given the following data:
Remaining scope of work amount is Php1,000,000.00 and the contractor completed the remaining scope of work in 15 CD time.Php 15,000.00
defects liability period1 yr
as per RA 11058, the general contractor must provide one (1) construction safety and health officer for every ___ units of heavy equipment assigned to the project site to oversee the effective compliance with the COSH program10 units
what is the maximum gradient for curb cut-outs?1:12
as per BP 344 requirements, what is the walking speed design on the crossings?0.90m/sec
what is the length of tangent between reverse curves for both tourism and farm to market roads?30m
for roadway obstructions, such as bridge piers, what is the width of the black and white stripes on the object markings?300m
for roadway obstructions markings, what is the minimum width of the black and white strips on the object markings?100mm
what is the maximum gradient for sidewalk as per BP 344?1:20
for raised median island, planting of trees should not be permitted on high speed multilane divided highway and the surface level of soil fill shall be lower than the top of island-50mm for island height less than or equal to ___ and 10mm for island height greater than ___0.45m
the pavement thickness of turnout, unloading and loading bays, shall in no case be less than ___ for asphalt and 230mm for concrete with supporting base layers100mm
during road re-blocking works, holes of ___ diameter and spaced at 300mm shall be drilled at 1/2 of the existing concrete pavement thickness to permit the load transfer transverse construction joints.26mm